Thorn Fire Salvage Recovery Project, Malheur National Forest, Grant County, OR, 71120-71121 [06-9593]

Download as PDF 71120 Notices Federal Register Vol. 71, No. 236 Friday, December 8, 2006 This section of the FEDERAL REGISTER contains documents other than rules or proposed rules that are applicable to the public. Notices of hearings and investigations, committee meetings, agency decisions and rulings, delegations of authority, filing of petitions and applications and agency statements of organization and functions are examples of documents appearing in this section. DEPARTMENT OF AGRICULTURE Forest Service Thorn Fire Salvage Recovery Project, Malheur National Forest, Grant County, OR AGENCY: Forest Service, USDA. SUMMARY: The USDA Forest Service will prepare an environmental impact statement (EIS) to disclose environmental effects on a proposed action to recover the economic value of dead and dying tees damaged in the Shake Table Fire Complex, and remove potential hazard trees from open forest travel routes within the Todd, Duncan, Fields Creek and Dry Creek subwatersheds. Shake Table Fire Complex, located approximately 20 miles southwest of John Day, Oregon, burned approximately 14,527 acres across mixed ownership in August 2006, of that approximately 13,536 acres were on National Forest System Lands administered by the Blue Mountain Ranger District, Malheur National Forest. The proposed action is the Thorn Fire Salvage Recovery Project. Comments concerning the scope of the analysis must be received by January 8, 2007. The draft EIS is expected to be filed with the Environmental Protection Agency (EPA) and be available to the public for review by April 2007. The Final EIS is scheduled to be completed by June 2007. DATES: Send written comments to the Responsible Official, Gary L. ‘‘Stan’’ Benes, Forest Supervisor, Malheur National Forest, 431 Patterson Bridge Road, P.O. Box 909, John Day, Oregon 97845. send electronic comments to: comments-pacificnorthwestmalheur@fs.fed.us. sroberts on PROD1PC70 with NOTICES VerDate Aug<31>2005 19:05 Dec 07, 2006 Jkt 211001 SUPPLEMENTARY INFORMATION: Purpose and Need for Action The purpose and need of the Thorn Fire Salvage Recovery Project includes: (1) Recovery of the economic value of a portion of the dead and dying trees consistent with protection of other resource values; and (2) Improving public safety within the fire area by removing potentional hazard trees for public safety along open forest travel routes. Proposed Action Notice of intent to prepare an environmental impact statement. ACTION: ADDRESSES: Jerry Hensley, Project Manager, Malheur National Forest, 431 Patterson Bridge Road, P.O. Box 909, John Day, Oregon, telephone 541–575–3167, e-mail jhensley@fs.fed.us. FOR FURTHER INFORMATION CONTACT: This action includes salvage of fire killed trees from approximately 4,480 acres and removal of potential hazard trees for public safety along open forest travel routes. Salvage harvest methods would include ground-based and helicopter logging systems. Approximately 80 percent of the harvest area would be salvaged by helicopter. No commercial harvest or road construction is proposed within Appendix C Inventoried Dry Cabin, Cedar Grove and Shake Table Roadless Areas. Road activities associated with salvage and restoration will be limited to reconstruction, opening and reclosing existing roads, and maintenance. No new roads would be built. Following site preparation, approximately 4,480 acres would be planted with conifer seedlings. Forest Plan amendments would be included as needed. Possible Alternatives Alternatives will include the proposed action, no action, and additional alternatives that respond to issues generated during the scoping process. The agency will give notice of the full environmental analysis and decision-making process to interested and affected people may participate and contribute to the final decision. Responsible Official and Nature of Decision To Be Made The Responsible Official is Gary L. ‘‘Stan’’ Benes, Forest Supervisor of the Malheur National Forest, 431 Patterson Bridge Road, P.O. Box 909, John Day, OR 97845. The Responsible Official will PO 00000 Frm 00001 Fmt 4703 Sfmt 4703 decide if the proposed project will be implemented and will document the decision and reasons for the decision in a Record of Decision. That decision will be subject to Forest Service Appeal Regulations. The responsibility for preparing the DEIS and FEIS has been delegated to Brooks Smith, Acting District Ranger, Blue Mountain Ranger District. Scoping Process Public participation will be especially important at several points during the analysis, beginning with the scoping process (40 CFR 1501.7). Initial scoping began with the project listed in the 2006 Fall Edition of the Malheur National Forest’s Schedule of Proposed Actions. A Public meeting has been planned for January 2007 to discuss the project. Other meetings will be scheduled as needed. Also, correspondence with tribes, government agencies, organizations, and individuals who have indicated their interested will be conducted. Preliminary Issues Preliminary issues identified include the potential effect of the proposed action on: Soils, water quality and fish habitat, snags and down wood, disturbance to cultural resources, potential for noxious weed expansion, threatened, endangered and sensitive aquatic, terrestrial and plant species, potential loss of economic value of trees damaged by wildfire, and the safety and use of the area by public and land managers. Comment Public comments about this proposal are requested to identify issues and alternatives to the proposed action and to focus the scope of the analysis. Comments received in response to solicitation, including names and addresses of those who comment, will be considered part of the public record on this proposed action, and will be available for public inspection. Comments submitted anonymously will be accepted and considered; however, those who submit anonymous comments will not have standing to appeal the subsequent decisions under 36 CFR Parts 215 or 217. Additionally, pursuant to 7 CFR 1.27(d), any person may request the agency to withhold a submission from the public record by showing how the Freedom of E:\FR\FM\08DEN1.SGM 08DEN1 Federal Register / Vol. 71, No. 236 / Friday, December 8, 2006 / Notices sroberts on PROD1PC70 with NOTICES Information Act (FOIA) permits such confidentiality. Persons requesting such confidentiality should be aware that under the FOIA, confidentiality may be granted in only very limited circumstances such as to protect trade secrets. The Forest Service will inform the requester of the agency’s decisions regarding the request for confidentiality, and where the request is denied; the agency will return the submission and notify the requester that the comments may be resubmitted with or without name and address within a specified number of days. Early Notice of Importance of Public Participation in Subsequent Environmental Review A draft environmental impact statement will be prepared for comment. The comment period on the draft environmental impact statement will be 45 days from the date the Environmental Protection agency publishes the notice of availability in the Federal Register. The Forest Service believes, at this early stage, it is important to give reviewers notice of several court rulings related to public participation in the environmental review process. First, reviewers of draft environmental impact statements must structure their participation in the environmental review of the proposal so that it is meaningful and alerts an agency to the reviewer’s position and contentions. Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519, 553 (1978). Also, environmental objections that could be raised at the draft environmental impact statement stage but that are not raised until after completion of the final environmental impact statement may be waived or dismissed by the courts. City of Angoon v. Hodel, 803 F.2d 1016, 1022 (9th Cir. 1986) and Wisconsin Heritages, Inc. v. Harris, 490 F. Supp. 1334, 1338 (E.D. Wis. 1980). Because of these court rulings, it is very important that those interested in this proposed action participate by the close of the 45-day comment period so that substantive comments and objections are made available to the Forest Service at a time when it can meaningfully consider them and respond to them in the final environmental impact statement. To assist the Forest Service in identifying and considering issues and concerns on the proposed action, comments on the draft environmental impact statement should be as specific as possible. It is also helpful if comments refer to specific pages or chapters of the draft statement. Comments may also address the adequacy of the draft environmental VerDate Aug<31>2005 19:05 Dec 07, 2006 Jkt 211001 71121 impact statement or the merits of the alternatives formulated and discussed in the statement. Reviewers may wish to refer to the Council on Environmental Quality Regulations for implementing the procedural provisions of the National Environmental Policy Act of 40 CFR 1503.3 in addressing these points. Comments received, including the names and addresses of those who comment, will be considered part of the public record on this proposal and will be available for public inspection. Road, P.O. Box 909, John Day, Oregon 97845. Send electronic comments to: comments-pacificnorthwestmalheur@fs.fed.us. (Authority: 40 CFR 1501.7 and 1508.22; Forest Service Handbook 1909.15, Section 21) Dated: December 4, 2006. Gay L. Benes, Forest Supervisor. [FR Doc. 06–9593 Filed 12–7–06; 8:45 am] The purpose and need of the Chrome Fire Salvage Recovery Project includes: (1) Recovery of the economic value of a portion of the dead and dying trees consistent with protection of other resource values; and (2) Improving public safety within the fire area by removing potential hazard trees for public safety along open forest travel routes. BILLING CODE 3410–11–M Jerry Hensley, Project Manager, Malheur National Forest, 431 Patterson Bridge Road, P.O. Box 909, John Day, Oregon, telephone 541–575–3167, e-mail jhensley@fs.fed.us. FOR FURTHER INFORMATION CONTACT: SUPPLEMENTARY INFORMATION: Purpose and Need for Action DEPARTMENT OF AGRICULTURE Proposed Action Forest Service This action includes salvage of dead and dying trees from approximately 3,472 acres and removal of potential hazard trees for public safety along open forest travel routes. Salvage harvest methods would include ground-based and helicopter logging systems. Approximately 70 percent of the harvest area would be salvaged by helicopter. No commercial harvest or road construction is proposed within Appendix C Inventoried Dry Cabin, Cedar Grove and Shake Table Roadless Areas. Road activities associated with salvage and restoration will be limited to reconstruction, opening and reclosing existing roads, and maintenance. No new roads would be built. Following site preparation, approximately 3,472 acres would be planted with conifer seedlings. Forest Plan amendments, related to old growth replacement, snag levels, visuals, timber harvest within Semi-Primitive Non-Motorized Recreation Areas, etc. would be included as needed. Chrome Fire Salvage Recovery Project, Malheur National Forest, Grant County, OR Forest Service, USDA. Notice of intent to prepare an environmental impact statement. AGENCY: ACTION: SUMMARY: The USDA Forest Service will prepare an environmental impact statement (EIS) to disclose environmental effects on a proposed action to recover the economic value of dead and dying trees damaged in the Shake Table Fire Complex, and remove potential hazard trees from open forest travel routes within the Todd, Duncan, Fields Creek and Dry Creek subwatersheds. The Shake Table Fire Complex, located approximately 20 miles south west of John Day, Oregon, burned approximately 14,527 acres across mixed ownership in August 2006, of that approximately 13,536 acres were on National Forest System Lands administered by the Blue Mountain Ranger District, Malheur National Forest. The proposed action is the Chrome Fire Salvage Recovery Project. DATES: Comments concerning the scope of the analysis must be received by January 8, 2007. The Draft EIS is expected to be filed with the Environmental Protection Agency (EPA) and be available to the public for review by July 2007. The Final EIS is scheduled to be completed by September 2007. ADDRESSES: Send written comments to the Responsible Official, Gary L. ‘‘Stan’’ Benes, Forest Supervisor, Malheur National Forest, 431 Patterson Bridge PO 00000 Frm 00002 Fmt 4703 Sfmt 4703 Possible Alternatives Alternatives will include the proposed action, no action, and additional alternatives that respond to issues generated during the scoping process. The agency will give notice of the full environmental analysis and decision-making process to interested and affected people may participate and contribute to the final decision. Responsible Official and Nature of Decision To Be Made The Responsible Official is Gary L. ‘‘Stan’’ Benes, Forest Supervisor of the Malheur National Forest, 431 Patterson E:\FR\FM\08DEN1.SGM 08DEN1

Agencies

[Federal Register Volume 71, Number 236 (Friday, December 8, 2006)]
[Notices]
[Pages 71120-71121]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-9593]


========================================================================
Notices
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains documents other than rules 
or proposed rules that are applicable to the public. Notices of hearings 
and investigations, committee meetings, agency decisions and rulings, 
delegations of authority, filing of petitions and applications and agency 
statements of organization and functions are examples of documents 
appearing in this section.

========================================================================


Federal Register / Vol. 71, No. 236 / Friday, December 8, 2006 / 
Notices

[[Page 71120]]



DEPARTMENT OF AGRICULTURE

Forest Service


Thorn Fire Salvage Recovery Project, Malheur National Forest, 
Grant County, OR

AGENCY: Forest Service, USDA.

ACTION: Notice of intent to prepare an environmental impact statement.

-----------------------------------------------------------------------

SUMMARY: The USDA Forest Service will prepare an environmental impact 
statement (EIS) to disclose environmental effects on a proposed action 
to recover the economic value of dead and dying tees damaged in the 
Shake Table Fire Complex, and remove potential hazard trees from open 
forest travel routes within the Todd, Duncan, Fields Creek and Dry 
Creek subwatersheds. Shake Table Fire Complex, located approximately 20 
miles southwest of John Day, Oregon, burned approximately 14,527 acres 
across mixed ownership in August 2006, of that approximately 13,536 
acres were on National Forest System Lands administered by the Blue 
Mountain Ranger District, Malheur National Forest. The proposed action 
is the Thorn Fire Salvage Recovery Project.

DATES: Comments concerning the scope of the analysis must be received 
by January 8, 2007. The draft EIS is expected to be filed with the 
Environmental Protection Agency (EPA) and be available to the public 
for review by April 2007. The Final EIS is scheduled to be completed by 
June 2007.

ADDRESSES: Send written comments to the Responsible Official, Gary L. 
``Stan'' Benes, Forest Supervisor, Malheur National Forest, 431 
Patterson Bridge Road, P.O. Box 909, John Day, Oregon 97845. send 
electronic comments to: comments-pacificnorthwest-malheur@fs.fed.us.

FOR FURTHER INFORMATION CONTACT: Jerry Hensley, Project Manager, 
Malheur National Forest, 431 Patterson Bridge Road, P.O. Box 909, John 
Day, Oregon, telephone 541-575-3167, e-mail jhensley@fs.fed.us.

SUPPLEMENTARY INFORMATION:

Purpose and Need for Action

    The purpose and need of the Thorn Fire Salvage Recovery Project 
includes: (1) Recovery of the economic value of a portion of the dead 
and dying trees consistent with protection of other resource values; 
and (2) Improving public safety within the fire area by removing 
potentional hazard trees for public safety along open forest travel 
routes.

Proposed Action

    This action includes salvage of fire killed trees from 
approximately 4,480 acres and removal of potential hazard trees for 
public safety along open forest travel routes. Salvage harvest methods 
would include ground-based and helicopter logging systems. 
Approximately 80 percent of the harvest area would be salvaged by 
helicopter. No commercial harvest or road construction is proposed 
within Appendix C Inventoried Dry Cabin, Cedar Grove and Shake Table 
Roadless Areas. Road activities associated with salvage and restoration 
will be limited to reconstruction, opening and re-closing existing 
roads, and maintenance. No new roads would be built. Following site 
preparation, approximately 4,480 acres would be planted with conifer 
seedlings. Forest Plan amendments would be included as needed.

Possible Alternatives

    Alternatives will include the proposed action, no action, and 
additional alternatives that respond to issues generated during the 
scoping process. The agency will give notice of the full environmental 
analysis and decision-making process to interested and affected people 
may participate and contribute to the final decision.

Responsible Official and Nature of Decision To Be Made

    The Responsible Official is Gary L. ``Stan'' Benes, Forest 
Supervisor of the Malheur National Forest, 431 Patterson Bridge Road, 
P.O. Box 909, John Day, OR 97845. The Responsible Official will decide 
if the proposed project will be implemented and will document the 
decision and reasons for the decision in a Record of Decision. That 
decision will be subject to Forest Service Appeal Regulations. The 
responsibility for preparing the DEIS and FEIS has been delegated to 
Brooks Smith, Acting District Ranger, Blue Mountain Ranger District.

Scoping Process

    Public participation will be especially important at several points 
during the analysis, beginning with the scoping process (40 CFR 
1501.7). Initial scoping began with the project listed in the 2006 Fall 
Edition of the Malheur National Forest's Schedule of Proposed Actions. 
A Public meeting has been planned for January 2007 to discuss the 
project. Other meetings will be scheduled as needed. Also, 
correspondence with tribes, government agencies, organizations, and 
individuals who have indicated their interested will be conducted.

Preliminary Issues

    Preliminary issues identified include the potential effect of the 
proposed action on: Soils, water quality and fish habitat, snags and 
down wood, disturbance to cultural resources, potential for noxious 
weed expansion, threatened, endangered and sensitive aquatic, 
terrestrial and plant species, potential loss of economic value of 
trees damaged by wildfire, and the safety and use of the area by public 
and land managers.

Comment

    Public comments about this proposal are requested to identify 
issues and alternatives to the proposed action and to focus the scope 
of the analysis. Comments received in response to solicitation, 
including names and addresses of those who comment, will be considered 
part of the public record on this proposed action, and will be 
available for public inspection. Comments submitted anonymously will be 
accepted and considered; however, those who submit anonymous comments 
will not have standing to appeal the subsequent decisions under 36 CFR 
Parts 215 or 217. Additionally, pursuant to 7 CFR 1.27(d), any person 
may request the agency to withhold a submission from the public record 
by showing how the Freedom of

[[Page 71121]]

Information Act (FOIA) permits such confidentiality. Persons requesting 
such confidentiality should be aware that under the FOIA, 
confidentiality may be granted in only very limited circumstances such 
as to protect trade secrets. The Forest Service will inform the 
requester of the agency's decisions regarding the request for 
confidentiality, and where the request is denied; the agency will 
return the submission and notify the requester that the comments may be 
resubmitted with or without name and address within a specified number 
of days.

Early Notice of Importance of Public Participation in Subsequent 
Environmental Review

    A draft environmental impact statement will be prepared for 
comment. The comment period on the draft environmental impact statement 
will be 45 days from the date the Environmental Protection agency 
publishes the notice of availability in the Federal Register. The 
Forest Service believes, at this early stage, it is important to give 
reviewers notice of several court rulings related to public 
participation in the environmental review process. First, reviewers of 
draft environmental impact statements must structure their 
participation in the environmental review of the proposal so that it is 
meaningful and alerts an agency to the reviewer's position and 
contentions. Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519, 
553 (1978). Also, environmental objections that could be raised at the 
draft environmental impact statement stage but that are not raised 
until after completion of the final environmental impact statement may 
be waived or dismissed by the courts. City of Angoon v. Hodel, 803 F.2d 
1016, 1022 (9th Cir. 1986) and Wisconsin Heritages, Inc. v. Harris, 490 
F. Supp. 1334, 1338 (E.D. Wis. 1980). Because of these court rulings, 
it is very important that those interested in this proposed action 
participate by the close of the 45-day comment period so that 
substantive comments and objections are made available to the Forest 
Service at a time when it can meaningfully consider them and respond to 
them in the final environmental impact statement.
    To assist the Forest Service in identifying and considering issues 
and concerns on the proposed action, comments on the draft 
environmental impact statement should be as specific as possible. It is 
also helpful if comments refer to specific pages or chapters of the 
draft statement. Comments may also address the adequacy of the draft 
environmental impact statement or the merits of the alternatives 
formulated and discussed in the statement. Reviewers may wish to refer 
to the Council on Environmental Quality Regulations for implementing 
the procedural provisions of the National Environmental Policy Act of 
40 CFR 1503.3 in addressing these points.
    Comments received, including the names and addresses of those who 
comment, will be considered part of the public record on this proposal 
and will be available for public inspection.


(Authority: 40 CFR 1501.7 and 1508.22; Forest Service Handbook 
1909.15, Section 21)

    Dated: December 4, 2006.
Gay L. Benes,
Forest Supervisor.
[FR Doc. 06-9593 Filed 12-7-06; 8:45 am]
BILLING CODE 3410-11-M
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.