Proposed Revisions to the Schedules of Civil Penalties for a Violation of a Federal Railroad Safety Law or Federal Railroad Administration Safety Regulation, 70590-70637 [E6-20031]

Download as PDF 70590 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules DEPARTMENT OF TRANSPORTATION Federal Railroad Administration 49 CFR Parts 213, 214, 215, 217, 218, 219, 220, 221, 222, 223, 224, 225, 228, 229, 230, 231, 232, 233, 234, 235, 236, 238, 239, 240, and 241 [Docket No. FRA–2006–25274] RIN 2130–AB81 Proposed Revisions to the Schedules of Civil Penalties for a Violation of a Federal Railroad Safety Law or Federal Railroad Administration Safety Regulation Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Proposed schedules of civil penalties with request for comments. AGENCY: SUMMARY: FRA is issuing for comment proposed statements of agency policy that would amend the 25 schedules of civil penalties (Schedules) issued as appendixes to FRA’s safety regulations to reflect more accurately the safety risks associated with a violation of each section or subsection of the regulations, as well as to make sure that the civil monetary penalty amounts (CMP) are consistent across all the safety regulations. These proposed revisions to the Schedules are being published to inform members and representatives of the regulated community and the general public of the amount of the civil penalty that a respondent would likely be assessed for a given violation and to invite their comments on those proposed amounts. In addition, FRA is proposing to correct any obvious errors or omissions in the Schedules. DATES: Written comments must be received by January 4, 2007. Comments received after that date will be considered to the extent possible without incurring additional delay or expense. Comments: Comments related to this Docket No. FRA 2006– 25274, Notice No. 1, may be submitted by any of the following methods: • Web Site: https://dms.dot.gov. Follow the instructions for submitting comments on the DOT electronic docket site. • Fax: 202–493–2251. • Mail: Docket Management Facility, U.S. Department of Transportation, 400 Seventh Street, SW., Nassif Building, Room PL–401, Washington, DC 20590. • Hand Delivery: Room PL–401 on the plaza level of the Nassif Building, 400 Seventh Street, SW., Washington, ycherry on PROD1PC64 with PROPOSALS2 ADDRESSES: VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 DC between 9 a.m. and 5 p.m. Monday through Friday, except Federal holidays. • Federal eRulemaking Portal: Go to https://www.regulations.gov. Follow the online instructions for submitting comments. Instructions: All submissions must include the agency name and docket number or Regulatory Identification Number (RIN) for this rulemaking. Note that all comments received will be posted without change to https:// dms.dot.gov including any personal information. Docket: For access to the docket to read background documents or comments received go to https:// dms.dot.gov at any time or to PL–401 on the plaza level of the Nassif Building, 400 Seventh Street, SW., Washington, DC between 9 a.m. and 5 p.m., Monday through Friday, except Federal Holidays. FOR FURTHER INFORMATION CONTACT: Edward Pritchard, Director, Office of Safety Assurance and Compliance, FRA, 1120 Vermont Avenue, NW., Washington, DC 20590 (telephone 202– 493–6247), edward.pritchard@dot.gov; or Carolina Mirabal, Trial Attorney, Office of Chief Counsel, FRA, 1120 Vermont Avenue, NW., Mail Stop 10, Washington, DC 20590 (telephone 202– 493–6043), carolina.mirabal@dot.gov. SUPPLEMENTARY INFORMATION: Table of Contents for Supplementary Information I. Background II. FRA’s Approach to Reevaluating the Schedules of Civil Penalties III. Rankings of the Sections or Subsections of Each of the Rail Safety Regulations A. Motive Power and Equipment Regulations (CFR Parts 215, 218 (Partially), 223, 224, 229, 230, 231, 232, 238, and 239 (Partially)) B. Track and Workplace Safety Regulations (CFR Parts 213 and 214) C. Grade Crossing Signal Systems and Signal and Train Control Regulations (CFR Parts 233, 234, 235, and 236) D. Operating Practices Regulations (CFR Parts 214, 217, 218 (Partially), 219, 220, 221, 222, 225, 228, 239 (Partially), 240, and 241) List of Subjects in 49 CFR Parts 213, 214, 215, 217, 218, 219, 220, 221, 222, 223, 224, 225, 228, 229, 230, 231, 232, 233, 234, 235, 236, 238, 239, 240, and 241 I. Background FRA last published comprehensive revisions to the Schedules of its safety regulations on December 29, 1988. 53 FR 52918. The revisions reflected the higher maximum penalty amounts made available by the enactment of the Rail Safety Improvement Act of 1988 (RSIA) (Pub. L. 100–342). 53 FR 52918. With PO 00000 Frm 00002 Fmt 4701 Sfmt 4702 the exception of the penalties relating to the hours of service laws (49 U.S.C. Ch. 211), RSIA raised the maximum CMP for any ordinary violation from $2,500 to $10,000 (the ordinary maximum) and to $20,000 (the aggravated maximum) for a grossly negligent violation or a pattern of repeated violations that has created an imminent hazard of death or injury or caused death or injury. Therefore, FRA published amendments to the Schedules in order to ‘‘give effect to the full range of civil penalties * * * permitted to be assessed for violation of specific regulations.’’ 53 FR 52918. These amendments revised not only the maximum civil penalty amount for any violation, but also the individual lineitem penalties for specific sections or subsections of the regulations. The Rail Safety Enforcement and Review Act (RSERA) of 1992 (Pub. L. 102–365) increased the maximum CMP from $1,000 to $10,000 and in some cases to $20,000, for a violation of the hours of service laws, making these penalty amounts uniform with those of FRA’s other regulatory provisions. RSERA also increased the minimum CMP from $250 to $500 for all of FRA’s regulatory provisions. Since the publication of the Schedules in 1988, FRA has only adjusted its minimum and ordinary or aggravated maximum CMPs to conform to the mandates of the Federal Civil Penalties Inflation Adjustment Act of 1990 (Inflation Act). The Inflation Act required that an agency adjust by regulation each maximum CMP, or range of minimum and maximum CMPs within that agency’s jurisdiction by October 23, 1996, and adjust those penalty amounts once every four years thereafter to reflect inflation. Public Law 101–410, 104 Stat. 890, 28 U.S.C. 2461, note, as amended by Section 31001(s)(1) of the Debt Collection Improvement Act of 1996, Public Law 104–134, 110 Stat. 1321–373, April 26, 1996. In the Inflation Act, Congress found a way to counter the effect that inflation has had on the CMPs by having the agencies charged with enforcement responsibility administratively adjust the CMPs. Currently FRA’s minimum CMP is $550, the ordinary maximum is $11,000, and the aggravated maximum is $27,000 (for when a ‘‘grossly negligent violation or pattern of repeated violations has caused an imminent hazard of death or injury to individuals, or has caused death or injury’’). The Inflation Act requires only that the minimum, maximum and aggravated maximum civil penalty for a violation be adjusted, not that the guideline penalty amounts for a specific type of violation be adjusted; therefore, FRA E:\FR\FM\05DEP2.SGM 05DEP2 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules ycherry on PROD1PC64 with PROPOSALS2 has not adjusted the line-item guideline penalties found in the Schedules in conjunction with its adjustments of the minimum, maximum and aggravated maximum civil penalties. FRA’s practice has been to issue Schedules assigning to each section or subsection of the regulations specific dollar amounts for initial penalty assessments. These Schedules (and all line-item penalty amounts found within them) are statements of agency policy that specify the CMP that FRA will ordinarily assess for the violation of a particular section or subsection of a safety regulation, and are published to inform members of the regulated community of the amount that they are likely to be assessed for a given violation within the range of $550 to $11,000. The Schedules are ‘‘meant to provide guidance as to FRA’s policy in predictable situations, not to bind FRA from using the full range of penalty authority where extraordinary circumstances warrant.’’ 49 CFR part 209, App. A. Thus, regardless of the amounts shown in the Schedules, FRA continues to reserve the right to assess an amount other than that listed in the Schedules based on the circumstances of the alleged violation, as well as the statutory maximum CMP of up to $27,000 per violation in situations ‘‘where a grossly negligent violation or a pattern of repeated violations has caused an imminent hazard of death or injury to individuals, or has caused death or injury.’’ II. FRA’s Approach to Reevaluating the Schedules of Civil Penalties The Federal Railroad Administrator is authorized as the delegate of the Secretary of Transportation to enforce the Federal railroad safety statutes (49 U.S.C. Ch. 201–213) and regulations, including the statutory civil penalty provisions at 49 U.S.C. Ch. 213. 49 CFR 1.49. FRA currently has 25 regulations that contain Schedules.1 FRA is proposing to amend each of the lineitem penalty amounts contained within the Schedules for each of the regulations. In addition, FRA would correct any obvious errors or omissions in the Schedules. For example, FRA would add a line-item penalty for any existing section or subsection that has been inadvertently omitted from an existing Schedule, such as 49 CFR 213.110. FRA would also correct obvious spelling or typographical errors that are caught during the review process. Because the Schedules are 1 FRA is not amending the Schedule found in 49 CFR part 210 because that part is enforcing the Railroad Noise Emission Standards established by the Environmental Protection Agency in 40 CFR part 201. VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 statements of agency policy, FRA has authority to issue these amendments without having to follow the notice and comment procedures under the Administrative Procedure Act, 5 U.S.C. 553(b)(3)(A). Nevertheless, FRA is providing members and representatives of the regulated community and the general public with an opportunity to comment on the proposed line-item penalty amounts before amending the Schedules. In reevaluating the penalty amounts in the Schedules, FRA has developed the following Severity Scale (Severity Scale) for setting the line-item penalty amounts for each of the provisions in the safety regulations: Severity Scale for Setting Line-Item Penalty Amounts in FRA Penalty Schedules FRA’s regulations are intended either to prevent a railroad accident/incident or to mitigate the consequences if one were to occur. For the most severe ratings on the scale, FRA concentrated on the degrees of likelihood that an accident/incident 2 will occur or that graver consequences will occur as a result of failing to comply with the section. The following severity scale is intended to reflect this focus: Level A—Very High Probability— Failure of railroad to comply with this section or subsection of the Code of Federal Regulations (CFR) is extremely likely to result in one or more of the following events, but does not create an imminent hazard of death or injury to individuals or causes an actual death or injury 3: 1. Rail equipment accident/incident; or 2 ‘‘Accidents/incidents’’ is defined at 49 CFR 225.5 and 225.19(c). The term includes highwayrail grade crossing accidents/incidents, rail equipment accidents/incidents, and accidents/ incidents resulting in death, injury, or occupational illness. A highway-rail grade crossing accident/ incident is ‘‘[a]ny impact between railroad on-track equipment and an automobile, bus, truck, motorcycle, bicycle, farm vehicle, or pedestrian at a highway-rail grade crossing.’’ 49 CFR 225.5, read in light of 49 CFR 225.19(c). Rail equipment accidents/incidents are defined in 49 CFR 225.19(c) to include ‘‘collisions, derailments, fires, explosions, acts of God, and other events involving the operation of on-track equipment (standing or moving) * * * that result in damage to railroad property that is greater than the reporting threshold.’’ Currently the reporting threshold is $7,700. 70 FR 754141, 75417 (Dec. 20, 2005). 3 FRA has statutory authority to assess civil penalties in the range of $550 (minimum) to $11,000 (maximum) for ordinary violations of its regulations. FRA may only assess a penalty at the statutory maximum of $27,000 ‘‘when a grossly negligent violation or a pattern of repeated violations has caused an imminent hazard of death or injury to individuals, or has caused death or injury.’’ A $27,000 statutory maximum penalty is the equivalent of a Level A Plus and is therefore off the scale. PO 00000 Frm 00003 Fmt 4701 Sfmt 4702 70591 2. Other accident/incident (not a rail equipment accident/incident). FRA is proposing to issue a CMP guideline for Level ‘‘A’’ of $8,500 for ordinary violations and $11,000 for willful violations of the regulations. Level B—High Probability—Failure of railroad to comply with this section or subsection of the CFR is more likely than not to result in the occurrence of: 1. Rail equipment accident/incident; or 2. Other accident/incident (not a rail equipment accident/incident). FRA is proposing to issue a CMP guideline for Level ‘‘B’’ of $6,500 for ordinary violations and $9,000 for willful violations of the regulations. For the following levels, FRA is not only addressing the likelihood that noncompliance will or could contribute to an accident or aggravated consequences if an accident occurred, but also the importance of maintaining compliance in order to prevent violations of these CFR sections or subsections from becoming leading accident causes in the future. Level C—Moderate Probability— Failure of railroad to comply with this section or subsection of the CFR substantially increases the likelihood that one of the following will occur: 1. Rail equipment accident/incident; or 2. Other accident/incident (not a rail equipment accident/incident). FRA is proposing to issue a CMP guideline for Level ‘‘C’’ of $5,000 for ordinary violations and $7,500 for willful violations of the regulations. Level D—Minor Probability—Failure of the railroad to comply with this section or subsection of the CFR slightly increases the likelihood that one of the following will occur: 1. Rail equipment accident/incident; or 2. Other accident/incident (not a rail equipment accident/incident). FRA is proposing to issue a CMP guideline for Level ‘‘D’’ of $3,000 for ordinary violations and $4,500 for willful violations of the regulations. Level E—Minimal Probability— Failure to comply with this CFR section or subsection does not increase the likelihood that a rail equipment accident/incident or other accident/ incident will occur, except in special circumstances, such as if the noncompliance is willful or widespread. Nevertheless, noncompliance with any one of these provisions undercuts the effectiveness of the Federal railroad safety program, and could compromise the safety of rail operations. Example: Violation of § 225.13—Late Reports—Submitting a late accident/ E:\FR\FM\05DEP2.SGM 05DEP2 ycherry on PROD1PC64 with PROPOSALS2 70592 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules incident report to FRA does not increase the likelihood that a rail equipment accident/incident or other accident/ incident will occur. Widespread noncompliance with that provision, however, could lead to inaccuracies in Federal accident databases, which in turn could delay FRA’s response to emerging safety problems. FRA is proposing to issue a CMP guideline for Level ‘‘E’’ of $1,500 for ordinary violations and $2,500 for willful violations of the regulations. As the Severity Scale shows, there are five different degrees of probabilities, ranging from A (the most severe) to E (the least severe of the types of violations). In developing the rankings (A through E), FRA concentrated on the degrees of likelihood that an accident/ incident will occur or that graver consequences will occur as a result of the failure to comply with the particular section or subsection of the safety regulations. The Severity Scale was then used by FRA to assign a ranking (from A to E) to each of the provisions of the particular safety regulations that it has responsibility for administering and enforcing. The resulting line-item penalty amounts for each of the sections or subsections of the safety regulations affected reflect FRA’s determination, based on safety data and industry knowledge, of how likely the violation of a particular section or subsection is to result in a rail equipment accident/ incident or other type of accident/ incident. FRA not only increased the penalty amounts in some instances, but also reduced the penalty amounts for some sections or subsections where it determined that a violation of the particular regulation constituted less of a safety risk. A determination by FRA that a CFR section or subsection does not increase the likelihood than a rail equipment accident/incident or other accident will occur, however, does not mean that this section or subsection is inconsequential to the effectiveness of the Federal railroad safety program or to the overall safety of railroad operations. The new Schedules will continue to have two categories of violations: Ordinary and willful. See 49 CFR part 209, App. A for a discussion of ‘‘willful’’ violations. The ordinary penalties apply to railroads or other respondents, except individuals, while the ‘‘willful’’ column applies to willful violations committed by railroads or other respondents, including individuals. Each Schedule lists the CFR section or subsection in the left hand column, with the corresponding penalties listed in the columns next to it. The only exception continues to be 49 CFR part 231; what are listed in the VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 left hand column of the Schedule are the FRA ‘‘defect codes’’ 4 for that part, and not the corresponding CFR sections. The reason for this continues to be the fact that the defect codes are organized by the type of safety appliance, which makes them easier to use, than the section numbers of part 231, which are organized primarily by car type. Nevertheless, if necessary, every defect code can be traced to a specific regulatory provision in part 231 or statutory provision in 49 U.S.C. Chapter 203, or both. The following chart summarizes the proposed guideline amounts for ordinary and willful violations by severity level: Ordinary violations Severity level Level Level Level Level Level A B C D E .............. .............. ............. ............. .............. $8,500 6,500 5,000 3,000 1,500 Willful violations $11,000 9,000 7,500 4,500 2,500 III. Rankings of the Sections or Subsections of Each of the Rail Safety Regulations Although the railroad industry’s overall safety record has improved over the last decade, significant train accidents/incidents continue to occur. As a result, the FRA’s safety program is being guided by careful analysis of accident/incident, inspection, and other safety data. FRA has also directed both its regulatory and compliance efforts toward the areas that involve the highest of safety risks, in order to reduce the number and severity of accidents/ incidents caused by a failure to comply with those safety regulations. Therefore, the goal of the new line-item penalty amounts for each of the Schedules is to reflect the different degrees of probability that a violation of a particular CFR section or subsection will result in a rail equipment accident/ incident or other accident/incident, in order to improve the overall safety of railroad operations. A. Motive Power and Equipment Regulations (MP&E) (49 CFR Parts 215, 218 (Partially), 223, 224, 229, 230, 231, 232, 238, and 239 (Partially)) In reevaluating the line-item penalty amounts for each of the CFR sections or subsections found in Parts 215, 218 (partially), 223, 224, 229, 231, 232, 238, 4 Defect codes were developed by FRA in order to facilitate computerization of inspection data generated by FRA inspectors by providing a digital format for every CFR section. Defect codes are analytical tools only and are subject to change without notice. PO 00000 Frm 00004 Fmt 4701 Sfmt 4702 and 239 (partially) of the CFR, FRA took into consideration, among other factors, the nationwide list of ‘‘Top 10’’ MP&E defects. The defects are listed in the table below, in descending order, according to the number of times that each defect was determined to have caused a rail equipment accident/ incident, excluding highway-rail grade crossing accidents/incidents that are also classified as rail equipment accidents/incidents (hereinafter) ‘‘train accidents,’’ between 2002 and 2005. Journal (roller bearing) overheated— (158) Truck bolster stiff— (78) Side bearing clearance insufficient— (67) Broken rim—(62) Pantograph defect (locomotive)—(59) Coupler/draft system defects (car)—(55) Electrically caused fire (locomotive)— (50) Coupler retainer pin/ cross key—(48) Damaged flange or tread (built up)— (45) Rigging down or dragging—(43) The CFR sections or subsections that relate to the defects associated with greater safety risks have received more severe rankings in the Schedules, and as such now carry higher CMP amounts. For example, a violation of 49 CFR 215.103(d)(3), which is a defective wheel rim with a crack of one inch or more, received an ‘‘A’’ severity ranking (and a proposed guideline penalty amount of $8,500) because of the high safety risk that the defect will cause a broken-rim derailment. In addition, the FRA applied the Severity Scale in order to determine the degrees of likelihood that any type of accident/incident will occur as a result of noncompliance with the regulations. B. Track and Workplace Safety Regulations (49 CFR Parts 213 and 214) In recent years, most of the serious accidents/incidents (train collisions or derailments resulting in a release of hazardous materials or harm to rail passengers, rail employees, or the general public) resulted from human factor or track causes. Over the last five years 34 percent of train accidents were caused by track defects. In an effort to reduce track accidents, FRA is focusing its track inspections on the areas of highest risks and encouraging inspectors to recommend enforcement action on the kinds of violations that are considered leading causes of trackcaused train accidents. Therefore, in evaluating the line-item penalty amounts for all the sections or subsections, FRA took into consideration the leading causes of E:\FR\FM\05DEP2.SGM 05DEP2 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules track-related train accidents when applying the Severity Scale to the Track Safety Standards. For example, 49 CFR 213.53(b)—Gage—received an ‘‘A’’ (and a proposed penalty guideline amount of $8,500) ranking because it is one of the leading causes of track-related train accidents. In ranking the sections or subsections of 49 CFR part 214 (Part 214)—Railroad Workplace Safety, FRA took into consideration not only the probability that an accident/incident could result if a violation occurred, but also the fact that the accident/incident could result in serious injury or death. One example of the rankings for part 214 is the ranking for the second type of violation of section 214.103, which requires bridge workers to use fall protection. This subsection received a ranking of ‘‘A’’ (and a proposed guideline penalty of $8,500) because a violation of the subsection could result in serious injury or death, as evidenced by the several bridge worker fatalities in the past 10 years due to the failure to use fall protection. ycherry on PROD1PC64 with PROPOSALS2 C. Grade Crossing Signal Systems and Signal and Train Control Regulations (CFR Parts 233, 234, 235, and 236) FRA applied the Severity Scale to each of the sections in Parts 233, 234, 235, and 236, in order to determine the appropriate rankings for each of the sections or subsections of the regulations. In the area of signal and train control (S&TC), FRA followed the Severity Scale, which concentrates on the potential for an accident/incident resulting from noncompliance. While there are relatively few train accidents associated with S&TC causes and few highway-rail grade crossing accidents/ incidents associated with S&TC causes that have occurred in recent years, it is imperative that the Schedules still reflect the levels of risks associated with the violation of these CFR sections or subsections, in order to prevent future S&TC-caused accidents. D. Operating Practices Regulations (CFR Parts 217, 218 (Partially), 219, 220, 221, 222, 225, 228, 239 (Partially), 240, and 241) Over the last five years, human-factorrelated causes have accounted for 38 percent of all train accidents. A review of the FRA’s Office of Safety database indicated that the top four human factor causes contributing to train accidents are as follows: (1) Switch improperly lined; (2) shoving movement, absence of employee on, at or ahead of movement; (3) shoving movement, failure to control; and (4) buff/slack action excess, train handling. These top causes are VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 often involved in violations of such regulations as 49 CFR part 220, Railroad Communications. A review of the top four causes for human factors train accidents between 2001 and 2005 showed that these causes accounted for 2,175 reportable train accidents/ incidents (including 12 employee fatalities, 389 employee injuries, and $60,550,000 in rail and equipment damages). Therefore, when applying the Severity Scale to the CFR sections or subsections, FRA considered all of this safety information in order to ensure that each line-item penalty amount reflected the likelihood that noncompliance would result in a train accident/incident, or that graver consequences would occur as a result of failing to comply with the section or subsection of the regulations 5. 49 CFR Part 222 List of Subjects 49 CFR Part 228 49 CFR Part 213 70593 Penalties, Railroad employees, Reporting and recordkeeping requirements. Bridges, Occupational safety and health, Penalties, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 214 Administrative practice and procedure, Penalties, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 223 Glass and glass products, Penalties, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 224 Incorporation by reference, Penalties, Railroad locomotive safety, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 225 Investigations, Penalties, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 229 Penalties, Railroad safety, Reporting and recordkeeping requirements. Bridges, Occupational safety and health, Penalties, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 230 49 CFR Part 215 49 CFR Part 231 Freight, Penalties, Railroad safety, Reporting and recordkeeping requirements. Penalties, Railroad safety, Reporting and recordkeeping requirements. Penalties, Railroad safety. 49 CFR Part 232 49 CFR Part 217 Penalties, Railroad safety, Reporting and recordkeeping requirements. Penalties, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 233 49 CFR Part 218 Occupational safety and health, Penalties, Railroad employees, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 219 Alcohol abuse, Drug abuse, Drug testing, Penalties, Railroad safety, Reporting and recordkeeping requirements, safety, Transportation. 49 CFR Part 220 Penalties, Radio, Railroad safety. Penalties, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 234 Highway safety, Penalties, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 235 Administrative practice and procedure, Penalties, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 236 49 CFR Part 221 Penalties, Railroad safety, Reporting and recordkeeping requirements. Penalties, Railroad safety, reporting and recordkeeping requirements. 49 CFR Part 238 5 FRA has separately proposed that additional Railroad Operating Rules be incorporated in the Federal regulations and made directly enforceable. The notice of proposed rulemaking was issued on October 12, 2006, and included additional amendments to the Schedules of Parts 217 and 218. See 71 FR 60372. PO 00000 Frm 00005 Fmt 4701 Sfmt 4702 Fire prevention, Penalties, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 239 Penalties, Railroad safety, Reporting and recordkeeping. E:\FR\FM\05DEP2.SGM 05DEP2 70594 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 49 CFR Part 240 Administrative practice and procedure, Penalties, Railroad employees, Railroad safety, Reporting and recordkeeping requirements. 49 CFR Part 241 Communications, Penalties, Railroad safety, Reporting and recordkeeping requirements. In consideration of the foregoing, FRA proposes to amend Parts 213, 214, 215, 217, 218, 219, 220, 221, 222, 223, 224, 225, 228, 229, 230, 231, 232, 233, 234, 235, 236, 238, 239, 240, and 241 of Subtitle B, Chapter II of Title 49 of the Code of Federal Regulations as follows: PART 213—[AMENDED] 1. The authority citation for part 213 continues to read as follows: Authority: 49 U.S.C. 20102–20114 and 20142; 28 U.S.C. 2461, note; and 49 CFR 1.49(m). 2. Appendix B to part 213 is revised to read as follows: APPENDIX B TO PART 213.—SCHEDULE OF CIVIL PENALTIES 1 Section 2 Violation Willful violation Subpart A—General track 2 213.4(a) Excepted ........................................................................................................................................ 213.4(b) Excepted track 2 ........................................................................................................................................ 213.4(c) Excepted track 2 ........................................................................................................................................ 213.4(d) Excepted track 2 ........................................................................................................................................ 213.4(e): (1) Excepted track ............................................................................................................................................ (2) Excepted track ............................................................................................................................................ (3) Excepted track ............................................................................................................................................ (4) Excepted track ............................................................................................................................................ 213.4(f) Excepted track ........................................................................................................................................... 213.7 Designation of qualified persons to supervise certain renewals and inspect track ................................... 213.9 Classes of track: Operating speed limits .................................................................................................... 213.11 Restoration or renewal of track under traffic conditions ........................................................................... 213.13 Measuring track not under load ................................................................................................................ $5,000 6,500 6,500 6,500 $7,500 9,000 9,000 9,000 6,500 6,500 6,500 6,500 3,000 5,000 8,500 5,000 6,500 9,000 9,000 9,000 9,000 4,500 7,500 11,000 7,500 9,000 6,500 5,000 9,000 7,500 8,500 6,500 6,500 6,500 6,500 11,000 9,000 9,000 9,000 9,000 5,000 7,500 3,000 6,500 5,000 5,000 5,000 5,000 4,500 9,000 7,500 7,500 7,500 7,500 5,000 6,500 5,000 6,500 5,000 8,500 6,500 5,000 8,500 8,500 5,000 7,500 9,000 7,500 9,000 7,500 11,000 9,000 7,500 11,000 11,000 7,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 9,000 9,000 9,000 9,000 9,000 9,000 9,000 Subpart B—Roadbed 213.33 213.37 Drainage .................................................................................................................................................... Vegetation ................................................................................................................................................. Subpart C—Track Geometry 213.53 213.55 213.57 213.59 213.63 Gage .......................................................................................................................................................... Alignment .................................................................................................................................................. Curves; elevation and speed limitations ................................................................................................... Elevation of curved track; runoff ............................................................................................................... Track surface ............................................................................................................................................ ycherry on PROD1PC64 with PROPOSALS2 Subpart D—Track Structure 213.103 Ballast; general ....................................................................................................................................... 213.109 Crossties (a) Material used .............................................................................................................................................. (b) Distribution of ties ....................................................................................................................................... (c) Sufficient number of nondefective ties ........................................................................................................ (d) Sufficient number of nondefective ties (effective 9/21/2000) ..................................................................... (f) Joint ties ....................................................................................................................................................... (g) Track constructed without crossties ........................................................................................................... 213.110 Gage restraint measurement systems (a) through (b) Notification ............................................................................................................................... (c) Design requirements ................................................................................................................................... (g) through (i) Exception reports ...................................................................................................................... (j) Data integrity ................................................................................................................................................ (k) Training ....................................................................................................................................................... (l) Remedial actions .......................................................................................................................................... (m) PTLF .......................................................................................................................................................... (n) Recordkeeping ............................................................................................................................................ (o) Inspection frequency ................................................................................................................................... 213.113 Defective rails .......................................................................................................................................... 213.115 Rail end mismatch .................................................................................................................................. 213.119 Continuous welded rail (a) CWR plan filed with FRA ............................................................................................................................ (b) CWR fastening requirements ...................................................................................................................... (c) CWR rail temperature requirements ........................................................................................................... (d) CWR alignment monitoring requirements ................................................................................................... (e) Procedures for controlling train speed on CWR track ................................................................................ (f) CWR track inspections ................................................................................................................................ (g) CWR joint bar inspections .......................................................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00006 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70595 APPENDIX B TO PART 213.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 2 Violation (h) CWR training ............................................................................................................................................... (i) CWR recordkeeping requirements ............................................................................................................... 213.121(a) Rail joints ............................................................................................................................................... 213.121(b) Rail joints ............................................................................................................................................... 213.121(c) Rail joints ............................................................................................................................................... 213.121(d) Rail joints ............................................................................................................................................... 213.121(e) Rail joints ............................................................................................................................................... 213.121(f) Rail joints ................................................................................................................................................ 213.121(g) Rail joints ............................................................................................................................................... 213.121(h) Rail joints ............................................................................................................................................... 213.122 Torch cut rail ........................................................................................................................................... 213.123 Tie plates ................................................................................................................................................. 213.127 Rail fastenings ......................................................................................................................................... 213.133 Turnouts and track crossings, generally ................................................................................................. 213.135 Switches: (a) through (g) .................................................................................................................................................. (h) chipped or worn points ............................................................................................................................... 213.137 Frogs ....................................................................................................................................................... 213.139 Spring rail frogs ....................................................................................................................................... 213.141 Self-guarded frogs ................................................................................................................................... 213.143 Frog guard rails and guard faces; gage ................................................................................................. Willful violation 6,500 6,500 6,500 6,500 8,500 6,500 6,500 6,500 6,500 6,500 6,500 5,000 6,500 5,000 9,000 9,000 9,000 9,000 11,000 9,000 9,000 9,000 9,000 9,000 9,000 7,500 9,000 7,500 6,500 6,500 6,500 6,500 5,000 6,500 9.000 9,000 9,000 9,000 7,500 9,000 5,000 7,500 5,000 5,000 6,500 5,000 5,000 7,500 7,500 9,000 7,500 7,500 8,500 8,500 8,500 6,500 5,000 5,000 8,500 8,500 8,500 8,500 8,500 11,000 11,000 11,000 9,000 7,500 7,500 11,000 11,000 11,000 11,000 11,000 5,000 6,500 5,000 8,500 8,500 8,500 8,500 8,500 8,500 8,500 8,500 8,500 8,500 8,500 8,500 6,500 6,500 8,500 8,500 8,500 8,500 6,500 8,500 7,500 9,000 7,500 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 9,000 9,000 11,000 11,000 11,000 11,000 9,000 11,000 Subpart E—Track Appliances and Track-Related Devices 213.205 Derails ..................................................................................................................................................... Subpart F—Inspection 213.233 213.235 213.237 213.239 213.241 Track inspections .................................................................................................................................... Switches, crossings, transition devices .................................................................................................. Inspection of rail ...................................................................................................................................... Special inspections ................................................................................................................................. Inspection records ................................................................................................................................... ycherry on PROD1PC64 with PROPOSALS2 Subpart G—High Speed 213.305 Designation of qualified individuals; general qualifications .................................................................... 213.307 Class of track; operating speed limits ..................................................................................................... 213.309 Restoration or renewal of track under traffic conditions ......................................................................... 213.311 Measuring track not under load .............................................................................................................. 213.319 Drainage .................................................................................................................................................. 213.321 Vegetation ............................................................................................................................................... 213.323 Track gage .............................................................................................................................................. 213.327 Alignment ................................................................................................................................................ 213.329 Curves, elevation and speed limits ......................................................................................................... 213.331 Track surface .......................................................................................................................................... 213.333 Automated vehicle inspection systems ................................................................................................... 213.335 Crossties (a) Material used .............................................................................................................................................. (b) Distribution of ties ....................................................................................................................................... (c) Sufficient number of nondefective ties, non-concrete ................................................................................ (d) Sufficient number of nondefective, concrete ties ....................................................................................... (e) Joint ties ...................................................................................................................................................... (f) Track constructed without crossties ............................................................................................................ (g) Non-defective ties surrounding defective ties ............................................................................................. (h) Tie plates .................................................................................................................................................... (i) Tie plates ...................................................................................................................................................... 213.337 Defective rails .......................................................................................................................................... 213.339 Inspection of rail in service ..................................................................................................................... 213.341 Inspection of new rail .............................................................................................................................. 213.343 Continuous welded rail (a) through (h) ................................................................................................... 213.345 Vehicle qualification testing (a) through (b) ............................................................................................ (c) through (e) ................................................................................................................................................... 213.347 Automotive or railroad crossings at grade .............................................................................................. 213.349 Rail end mismatch .................................................................................................................................. 213.351(a) Rail joints ............................................................................................................................................... 213.351(b) Rail joints ............................................................................................................................................... 213.351(c) Rail joints ............................................................................................................................................... 213.351(d) Rail joints ............................................................................................................................................... 213.351(e) Rail joints ............................................................................................................................................... 213.351(f) Rail joints ................................................................................................................................................ VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00007 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70596 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX B TO PART 213.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 2 Violation 213.351(g) Rail joints ............................................................................................................................................... 213.352 Torch cut rails ......................................................................................................................................... 213.353 Turnouts, crossovers, transition devices ................................................................................................ 213.355 Frog guard rails and guard faces; gage ................................................................................................. 213.357 Derails ..................................................................................................................................................... 213.359 Track stiffness ......................................................................................................................................... 213.361 Right of way ............................................................................................................................................ 213.365 Visual inspections ................................................................................................................................... 213.367 Special inspections ................................................................................................................................. 213.369 Inspections records ................................................................................................................................. 8,500 5,000 8,500 6,500 5,000 8,500 5,000 8,500 8,500 5,000 Willful violation 11,000 7,500 11,000 9,000 7,500 11,000 7,500 11,000 11,000 7,500 1 A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. 2 In addition to assessment of penalties for each instance of noncompliance with the requirements identified by this footnote, track segments designated as excepted track that are or become ineligible for such designation by virtue of noncompliance with any of the requirements to which this footnote applies are subject to all other requirements of part 213 until such noncompliance is remedied. PART 214—[AMENDED] 3. The authority citation for part 214 continues to read as follows: Authority: 49 U.S.C. 20103, 20107; 28 U.S.C. 2461, note; and 49 CFR 1.49. 4. Appendix A to part 214 is revised to read as follows: APPENDIX A TO PART 214.—SCHEDULE OF CIVIL PENALTIES 1 Section Violation Willful violation ycherry on PROD1PC64 with PROPOSALS2 Subpart B—Bridge Worker Safety Standards 214.103 Fall protection: (i) Failure to provide fall protection .................................................................................................................. (ii) Failure to use fall protection ........................................................................................................................ 214.105 Standards and practices: (a) General: (1) Fall protection used for other purposes .............................................................................................. (2) Failure to remove from service ............................................................................................................ (3) Failure to protect from deterioration .................................................................................................... (4) Failure to inspect and remove ............................................................................................................. (5) Failure to train ...................................................................................................................................... (6) Failure to provide for prompt rescue ................................................................................................... (7) Failure to prevent damage .................................................................................................................. (8) Failure to use proper connectors ........................................................................................................ (9) Failure to use proper anchorages ....................................................................................................... (b) Fall arrest system: (1)–(17) Failure to provide conforming equipment ................................................................................... (c) Safety net systems: (1) Failure to install close to workplace .................................................................................................... (2) Failure to provide fall arrest if over 30 feet ......................................................................................... (3) Failure to provide for unobstructed fall ................................................................................................ (4) Failure to test ....................................................................................................................................... (5) Failure to use proper equipment ......................................................................................................... (6) Failure to prevent contact with surface below ..................................................................................... (7) Failure to properly install ..................................................................................................................... (8) Failure to remove defective nets ......................................................................................................... (9) Failure to inspect ................................................................................................................................. (10) Failure to remove objects .................................................................................................................. (11)–(13) Failure to use conforming equipment ....................................................................................... 214.107 Working over water: (a)(i) Failure to provide life vest ....................................................................................................................... (ii) Failure to use life vest ................................................................................................................................. (c) Failure to inspect ......................................................................................................................................... (e)(i) Failure to provide ring buoys ................................................................................................................... (ii) Failure to use ring buoys ............................................................................................................................ (f)(i) Failure to provide skiff .............................................................................................................................. (ii) Failure to use skiff ....................................................................................................................................... 214.109 Scaffolding: (a)–(f) Failure to provide conforming equipment .............................................................................................. 214.113 Head protection: (a)(i) Failure to provide ..................................................................................................................................... (ii) Failure to use .............................................................................................................................................. (b) or (c) Failure to provide conforming equipment ......................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00008 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 $6,500 8,500 $9,000 11,000 5,000 5,000 5,000 6,500 6,500 6,500 5,000 5,000 5,000 7,500 7,500 7,500 9,000 9,000 9,000 7,500 7,500 7,500 5,000 7,500 5,000 6,500 6,500 5,000 5,000 6,500 6,500 6,500 6,500 3,000 5,000 7,500 9,000 9,000 7,500 7,500 9,000 9,000 9,000 9,000 4,500 7,500 6,500 ........................ 5,000 6,500 5,000 5,000 ........................ 9,000 9,000 7,500 9,000 7,500 7,500 7,500 6,500 9,000 6,500 ........................ 5,000 9,000 9,000 7,500 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70597 APPENDIX A TO PART 214.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section Violation 214.115 Foot protection: (a)(i) Failure to require use of .......................................................................................................................... (ii) Failure to use .............................................................................................................................................. 214.117 Eye and face protection: (a)(i) Failure to provide ..................................................................................................................................... (ii) Failure to use .............................................................................................................................................. (b) Failure to use conforming equipment ......................................................................................................... (c) Use of defective equipment ........................................................................................................................ (d) Failure to provide for corrective lenses ...................................................................................................... Willful violation 5,000 ........................ 7,500 7,500 5,000 ........................ 5,000 5,000 5,000 7,500 4,500 7,500 7,500 7,500 8,500 8,500 11,000 11,000 5,000 7,500 5,000 5,000 7,500 7,500 6,500 5,000 9,000 7,500 8,500 11,000 6,500 9,000 ........................ ........................ ........................ ........................ 11,000 11,000 11,000 11,000 8,500 6,500 6,500 5,000 6,500 6,500 6,500 6,500 ........................ 6,500 11,000 9,000 9,000 7,500 9,000 9,000 9,000 9,000 7,500 9,000 8,500 11,000 8,500 6,500 8,500 8,500 11,000 9,000 11,000 11,000 5,000 ........................ ........................ ........................ 8,500 7,500 7,500 9,000 9,000 11,000 8,500 11,000 8,500 11,000 8,500 11,000 8,500 6,500 11,000 9,000 6,500 5,000 ........................ 6,500 6,500 9,000 7,500 7,500 9,000 9,000 ycherry on PROD1PC64 with PROPOSALS2 Subpart C—Roadway Worker Protection Rule 214.303 Railroad on-track safety programs, generally: (a) Failure of a railroad to implement an On-track Safety Program ................................................................ (b) On-track Safety Program of a railroad includes no internal monitoring procedure ................................... 214.305 Compliance Dates: Failure of a railroad to comply by the specified dates ..................................................................................... 214.307 Review and approval of individual on-track safety programs by FRA: (a)(i) Failure to notify FRA of adoption of On-track Safety Program ............................................................... (ii) Failure to designate primary person to contact for program review ........................................................... 214.309 On-track safety program documents: (1) On-track Safety Manual not provided to prescribed employees ................................................................ (2) On-track Safety Program documents issued in fragments ........................................................................ 214.311 Responsibility of employers: (b) Roadway worker required by employer to foul a track during an unresolved challenge ........................... (c) Roadway workers not provided with written procedure to resolve challenges of on-track safety procedures ............................................................................................................................................................. 214.313 Responsibility of individual roadway workers: (a) Failure to follow railroad’s on-track safety rules ......................................................................................... (b) Roadway worker fouling a track when not necessary in the performance of duty .................................... (c) Roadway worker fouling a track without ascertaining that provision is made for on-track safety ............. (d) Roadway worker failing to notify employer of determination of improper on-track safety provisions ....... 214.315 Supervision and communication: (a) Failure of employer to provide job briefing ................................................................................................. (b) Incomplete job briefing ................................................................................................................................ (c)(i) Failure to designate roadway worker in charge of roadway work group ................................................ (ii) Designation of more than one roadway worker in charge of one roadway work group ............................ (iii) Designation of non-qualified roadway worker in charge of roadway work group ...................................... (d)(i) Failure to notify roadway workers of on-track safety procedures in effect ............................................. (ii) Incorrect information provided to roadway workers regarding on-track safety procedures in effect ......... (iii) Failure to notify roadway workers of change in on-track safety procedures ............................................. (e)(i) Failure of lone worker to communicate with designated employee for daily job briefing ....................... (ii) Failure of employer to provide means for lone worker to receive daily job briefing .................................. 214.317 On-track safety procedures, generally: On-track safety rules conflict with this part ...................................................................................................... 214.319 Working limits, generally: (a) Non-qualified roadway worker in charge of working limits ......................................................................... (b) More than one roadway worker in charge of working limits on the same track segment ......................... (c)(1) Working limits released without notifying all affected roadway workers ................................................ (2) Working limits released before all affected roadway workers are otherwise protected ............................. 214.321 Exclusive track occupancy: (a) Improper transmission of authority for exclusive track occupancy ............................................................ (b)(1) Failure to repeat authority for exclusive track occupancy to issuing employee .................................... (2) Failure to retain possession of written authority for exclusive track occupancy ........................................ (3) Failure to record authority for exclusive track occupancy when issued .................................................... (c) Limits of exclusive track occupancy not identified by proper physical features ......................................... (d)(1) Movement authorized into limits of exclusive track occupancy without authority of roadway worker in charge ........................................................................................................................................................... (2) Movement authorized within limits of exclusive track occupancy without authority of roadway worker in charge ........................................................................................................................................................... (3) Movement within limits of exclusive track occupancy exceeding restricted speed without authority of roadway worker in charge ............................................................................................................................ 214.323 Foul time: (a) Foul time authority overlapping movement authority of train or equipment ............................................... (b) Failure to repeat foul time authority to issuing employee .......................................................................... 214.325 Train coordination: (a) Train coordination limits established where more than one train is authorized to operate ....................... (b)(1) Train coordination established with train not visible to roadway worker at the time ............................. (2) Train coordination established with moving train ....................................................................................... (3) Coordinated train moving without authority of roadway worker in charge ................................................. (4) Coordinated train releasing movement authority while working limits are in effect ................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00009 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70598 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX A TO PART 214.—SCHEDULE OF CIVIL PENALTIES 1—Continued ycherry on PROD1PC64 with PROPOSALS2 Section Violation 214.327 Inaccessible track: (a) Improper control of entry to inaccessible track .......................................................................................... (5) Remotely controlled switch not properly secured by control operator ....................................................... (b) Train or equipment moving within inaccessible track limits without permission of roadway worker in charge ........................................................................................................................................................... (c) Unauthorized train or equipment located within inaccessible track limits .................................................. 214.329 Train approach warning provided by watchmen/lookouts: (a) Failure to give timely warning of approaching train ................................................................................... (b)(1) Failure of watchman/lookout to give full attention to detecting approach of train ................................. (2) Assignment of other duties to watchman/lookout ....................................................................................... (c) Failure to provide proper warning signal devices ....................................................................................... (d) Failure to maintain position to receive train approach warning signal ....................................................... (e) Failure to communicate proper warning signal .......................................................................................... (f)(1) Assignment of non-qualified person as watchman/lookout ..................................................................... (2) Non-qualified person accepting assignment as watchman/lookout ........................................................... (g) Failure to properly equip a watchman/lookout ........................................................................................... 214.331 Definite train location: (a) Definite train location established where prohibited ................................................................................... (b) Failure to phase out definite train location by required date ...................................................................... (d)(1) Train location information issued by unauthorized person .................................................................... (2) Failure to include all trains operated on train location list .......................................................................... (5) Failure to clear track 10 minutes before earliest departure time of train at last station prior to work location, or failure to remain clear until such train passed ............................................................................. (6) Train passing station before time shown in train location list .................................................................... (7) Non-qualified person using definite train location to establish on-track safety .......................................... 214.333 Informational line-ups of trains: (a) Informational line-ups of trains used for on-track safety where prohibited ................................................ (b) Informational line-up procedures inadequate to protect roadway workers ................................................ (c) Failure to discontinue informational line-ups by required date ................................................................... 214.335 On-track safety procedures for roadway work groups: (a) Failure to provide on-track safety for a member of a roadway work group ............................................... (b) Member of roadway work group fouling a track without authority of employee in charge ........................ (c) Failure to provide train approach warning or working limits on adjacent track where required ................ 214.337 On-track safety procedures for lone workers: (b) Failure by employer to permit individual discretion in use of individual train detection ............................. (c)(1) Individual train detection used by non-qualified employee .................................................................... (2) Use of individual train detection while engaged in heavy or distracting work ........................................... (3) Use of individual train detection in controlled point or manual interlocking ............................................... (4) Use of individual train detection with insufficient visibility .......................................................................... (5) Use of individual train detection with interfering noise ............................................................................... (6) Use of individual train detection while a train is passing ........................................................................... (d) Failure to maintain access to place of safety clear of live tracks .............................................................. (e) Lone worker unable to maintain vigilant lookout ........................................................................................ (f)(1) Failure to prepare written statement of on-track safety .......................................................................... (2) Incomplete written statement of on-track safety ......................................................................................... (3) Failure to produce written statement of on-track safety to FRA ................................................................ 214.339 Audible warning from trains: (a) Failure to require audible warning from trains ............................................................................................ (b) Failure of train to give audible warning where required ............................................................................. 214.341 Roadway maintenance machines: (a) Failure of on-track safety program to include provisions for safety near roadway maintenance machines ............................................................................................................................................................ (b) Failure to provide operating instructions .................................................................................................... (1) Assignment of non-qualified employee to operate machine ...................................................................... (2) Operator unfamiliar with safety instructions for machine ........................................................................... (3) Roadway worker working with unfamiliar machine .................................................................................... (c) Roadway maintenance machine not clear of passing trains or operation of machine component closer than four feet to adjacent track without procedural instructions .................................................................. 214.343 Training and qualification, general: (a)(1) Failure of railroad program to include training provisions ...................................................................... (2) Failure to provide initial training .................................................................................................................. (b) Failure to provide annual training ............................................................................................................... (c) Assignment of non-qualified railroad employees to provide on-track safety .............................................. (d)(1) Failure to maintain records of qualifications .......................................................................................... (2) Incomplete records of qualifications ........................................................................................................... (3) Failure to provide records of qualifications to FRA .................................................................................... 214.345 Training for all roadway workers ............................................................................................................. 214.347 Training and qualification for lone workers. 214.349 Training and qualification of watchmen/lookouts. 214.351 Training and qualification of flagmen. 214.353 Training and qualification of roadway workers who provide on-track safety for roadway work groups. VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00010 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Willful violation 6,500 6,500 9,000 9,000 6,500 6,500 9,000 9,000 ........................ ........................ 6,500 5,000 6,500 6,500 6,500 5,000 5,000 11,000 9,000 9,000 7,500 9,000 9,000 9,000 7,500 7,500 6,500 5,000 6,500 8,500 9,000 7,500 9,000 11,000 ........................ 8,500 6,500 9,000 11,000 9,000 8,500 8,500 5,000 11,000 11,000 7,500 8,500 6,500 8,500 11,000 9,000 11,000 8,500 6,500 5,000 5,000 8,500 ........................ ........................ ........................ ........................ ........................ ........................ ........................ 11,000 9,000 7,500 7,500 11,000 7,500 9,000 11,000 9,000 4,500 4,500 4,500 5,000 5,000 7,500 7,500 8,500 5,000 6,500 6,500 6,500 11,000 7,500 9,000 9,000 9,000 8,500 11,000 6,500 6,500 6,500 6,500 5,000 5,000 5,000 6,500 9,000 9,000 9,000 9,000 7,500 7,500 7,500 9,000 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70599 APPENDIX A TO PART 214.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 214.355 Violation Willful violation Training and qualification in on-track safety for operators of roadway maintenance machines. ycherry on PROD1PC64 with PROPOSALS2 Subpart D—On-Track Roadway Maintenance Machines and Hi-Rail Vehicles 214.503 Good-faith challenges; procedures for notification and resolution: (a) Failure of employee to notify employer that the machine or vehicle does not comply with this subpart or has a condition inhibiting safe operation .................................................................................................. (b) Roadway worker required to operate machine or vehicle when good-faith challenge not resolved ......... (c) Failure of employer to have or follow written procedures to resolve good-faith challenges ...................... 214.505 Required environmental control and protection systems for new on-track roadway maintenance machines with enclosed cabs: (a) Failure to equip new machines with required systems .............................................................................. (b) Failure of new or existing machines to protect employees from exposure to air contaminants ............... (c) Failure of employer to maintain required list of machines or make list available ...................................... (d) Removal of ‘‘designated machine’’ from list before retired or sold ............................................................ (e) Personal respiratory protective equipment not provided when ventilation system fails ............................ (f) Personal respiratory protective equipment fails to meet required standards .............................................. (g) Other new machines with enclosed cabs not equipped with operable heating and ventilation systems .. (h) Non-enclosed station not equipped with covering, where feasible ............................................................ 214.507 Required safety equipment for new on-track roadway maintenance machines: (a)(1)–(5) Failure to equip new machine or provide protection as specified in these paragraphs ................. (a)(6)–(7) Failure to equip new machine with first-aid kit or operative and charged fire extinguisher ............ (b) Position for operator to stand not properly equipped to provide safe and secure position ....................... (c) New machine not equipped with accurate speed indicator, as required ................................................... (d) As-built light weight not conspicuously displayed on new machine ........................................................... 214.509 Required visual illumination and reflective devices for new on-track roadway maintenance machines 214.511 Required audible warning devices for new on-track roadway maintenance machines ......................... 214.513 Retrofitting of existing on-track roadway maintenance machines; general: (a) Failure to provide safe and secure position and protection from moving parts inside cab for each roadway worker transported on machine ............................................................................................................ (b) Horn or other audible warning device is missing, inoperable, or has non-compliant triggering mechanism ............................................................................................................................................................... (c) Illumination device or portable light missing, inoperable, improperly secured, or incapable of illuminating track as required ............................................................................................................................ 214.515 Overhead covers for existing on-track roadway maintenance machines: (a) Failure to repair, reinstall, or maintain overhead cover as required .......................................................... (b) Failure to provide written response to operator’s request within 60 days ................................................. 214.517 Retrofitting of existing on-track roadway maintenance machines manufactured on or after January 1, 1991: (a) Failure to equip machine with change-of-direction alarm or rearward viewing device .............................. (b) Failure to equip machine with operative heater ......................................................................................... (c) Failure to display light weight of machine as required ............................................................................... (d) Failure to equip machine with reflective material, reflective device, or operable brake lights .................. (e) Failure to install or replace safety glass as required ................................................................................. (f) Failure to equip machine with turntable restraint device or warning light as required ............................... 214.518 Safe and secure position for riders ......................................................................................................... 214.519 Floors, decks, stairs, and ladders for on-track roadway maintenance machines .................................. 214.521 Flagging equipment for on-track roadway maintenance machines and hi-rail vehicles ........................ 214.523 Hi-rail vehicles: (a) Failure to inspect hi-rail gear annually ....................................................................................................... (b) Failure to maintain inspection record or make record available to FRA .................................................... (c) Failure to equip new hi-rail vehicle with alarm and light or beacon as required ....................................... (d)(2) Failure of operator to tag, date or report non-complying condition ....................................................... (d)(3) Failure to repair or replace non-complying alarms, lights or beacons as required ............................... 214.525 Towing with on-track roadway maintenance machines or hi-rail vehicles ............................................. 214.527 On-track roadway maintenance machines; inspection for compliance and schedule for repairs: (a) Failure of operator to check on-track roadway maintenance machine for compliance ............................. (b) Failure of operator to tag, date, or report noncomplying condition ............................................................ (c)(1)–(4) Failure to meet requirements for operating on-track roadway maintenance machine with noncomplying headlights, work lights, horn, fire extinguisher, alarm, warning light, or beacon ........................ (c)(5) Failure to repair or replace defective or missing operator’s seat within required time period .............. 214.529 In-service failure of primary braking system ........................................................................................... 214.531 Schedule of repairs; general ................................................................................................................... 214.533 Schedule of repairs subject to availability of parts: (a)–(c) Failure to order necessary part(s), make repair(s), or remove on-track roadway maintenance machine or hi-rail vehicle from service as required .......................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00011 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 ........................ 8,500 8,500 9,000 11,000 11,000 8,500 8,500 5,000 5,000 8,500 8,500 8,500 8,500 11,000 11,000 7,500 7,500 11,000 11,000 11,000 11,000 8,500 6,500 8,500 6,500 6,500 6,500 8,500 11,000 9,000 11,000 9,000 9,000 9,000 11,000 8,500 11,000 6,500 9,000 6,500 9,000 8,500 5,000 11,000 7,500 8,500 8,500 6,500 8,500 8,500 8,500 8,500 8,500 6,500 11,000 11,000 9,000 11,000 11,000 11,000 11,000 11,000 9,000 8,500 5,000 6,500 5,000 6,500 8,500 11,000 7,500 9,000 7,500 9,000 11,000 5,000 5,000 7,500 7,500 6,500 8,500 8,500 6,500 9,000 11,000 11,000 9,000 6,500 9,000 70600 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX A TO PART 214.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section Violation (d) Failure to maintain record or make record available to FRA ..................................................................... 5,000 Willful violation 7,500 1A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. The penalty schedule uses section numbers from 49 CFR part 214. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. PART 215—[AMENDED] 5. The authority citation for part 215 continues to read as follows: Authority: 49 U.S.C. 20103, 20107; 28 U.S.C. 2461. 6. Appendix B to part 215 is revised to read as follows: APPENDIX B TO PART 215.—SCHEDULE OF CIVIL PENALTIES 1 Section Violation Willful violation Subpart A—General 215.9 Movement for repair: (a), (c) ............................................................................................................................................................... (b) ..................................................................................................................................................................... 215.11 Designation of qualified persons ............................................................................................................... 215.13 Pre-departure inspection ........................................................................................................................... (1) $3,000 5,000 5,000 ( 1) $4,500 7,500 7,500 5,000 6,500 7,500 9,000 5,000 6,500 7,500 9,000 5,000 6,500 7,500 9,000 5,000 6,500 8,500 7,500 9,000 11,000 3,000 5,000 4,500 7,500 3,000 5,000 3,000 5,000 8,500 4,500 7,500 4,500 7,500 11,000 5,000 6,500 6,500 7,500 9.000 9,000 5,000 6,500 8,500 3,000 5,000 8,500 7,500 9,000 11,000 4,500 7,500 11,000 5,000 7,500 3,000 6,500 3,000 4,500 9,000 4,500 5,000 7,500 ycherry on PROD1PC64 with PROPOSALS2 Subpart B—Freight Car Components 215.103 Defective wheel: (a) Flange thickness of: (1) 7⁄8″ or less but more than 13⁄16″ ........................................................................................................... (2) 13⁄16″ or less ......................................................................................................................................... (b) Flange height of: (1) 11⁄2″ or greater but less than 15⁄8″ ...................................................................................................... (2) 15⁄8″ or more ........................................................................................................................................ (c) Rim thickness of: (1) 11⁄16″ or less but more than 5⁄8″ ........................................................................................................... (2) 5⁄8″ or less ............................................................................................................................................ (d) Wheel rim, flange plate hub width: (1) Crack of less than 1″ ........................................................................................................................... (2) Crack of 1″ or more ............................................................................................................................. (3) Break .................................................................................................................................................... (e) Chip or gouge in flange of: (1) 11⁄2″ or more but less than 15⁄8″ in length; and 1⁄2″ or more but less than 5⁄8″ in width .................... (2) 15⁄8 ″ or more in length; or 5⁄8″ or more in width ................................................................................. (f) Slid flat or shelled spot(s): (1)(i) One spot more than 21⁄2″, but less than 3″, in length ..................................................................... (ii) One spot 3″ or more in length ............................................................................................................. (2)(i) Two adjoining spots each of which is more than 2″ but less than 21⁄2″ in length ........................... (ii) Two adjoining spots both of which are at least 2″ in length, if either spot is 21⁄2″, or more in length (g) Loose on axle ............................................................................................................................................. (h) Overheated; discoloration extending: (1) more than 4″ but less than 41⁄2″ .......................................................................................................... (2) 41⁄2″ or more ........................................................................................................................................ (i) Welded ......................................................................................................................................................... 215.105 Defective axle: (a)(1) Crack of 1″ or less .................................................................................................................................. (2) Crack of more than 1″ ................................................................................................................................ (3) Break ........................................................................................................................................................... (b) Gouge in surface that is between the wheel seats and is more than 1⁄8″ in depth ................................... (c) End collar with crack or break .................................................................................................................... (d) Journal overheated ..................................................................................................................................... (e) Journal surface has: a ridge; a depression; a circumferential score; corrugation; a scratch; a continuous streak; pitting; rust; or etching ............................................................................................................. 215.107 Defective plain bearing box: general: (a)(1) No visible free oil .................................................................................................................................... (2) Lubricating pad dry (no expression of oil observed when pad is compressed) ........................................ (b) Box lid is missing, broken, or open except to receive servicing ................................................................ (c) Contains foreign matter that can be expected to damage the bearing or have a detrimental effect on the lubrication of the journal and bearing ..................................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00012 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70601 APPENDIX B TO PART 215.—SCHEDULE OF CIVIL PENALTIES 1—Continued ycherry on PROD1PC64 with PROPOSALS2 Section Violation 215.109 Defective plain bearing box: journal lubrication system: (a) Lubricating pad has a tear .......................................................................................................................... (b) Lubricating pad scorched, burned, or glazed ............................................................................................. (c) Lubricating pad contains decaying or deteriorating fabric .......................................................................... (d) Lubricating pad has an exposed center core or metal parts contacting the journal .................................. (e) Lubricating pad is missing or not in contact with the journal ..................................................................... 215.111 Defective plain bearing: (a) Missing ........................................................................................................................................................ (b) Bearing liner is loose or has piece broken out ........................................................................................... (c) Overheated .................................................................................................................................................. 215.113 Defective plain bearing wedge: (a) Missing ........................................................................................................................................................ (b) Cracked ....................................................................................................................................................... (c) Broken ......................................................................................................................................................... (d) Not located in its design position ................................................................................................................ 215.115 Defective roller bearing: (a)(1) Overheated ............................................................................................................................................. (2)(i) Cap screw(s) loose .................................................................................................................................. (ii) Cap screw lock broken, missing or improperly applied .............................................................................. (3) Seal is loose or damaged, or permits leakage of lubricant ........................................................................ (b)(1) Not inspected and tested after derailment ............................................................................................. (2) Not disassembled after derailment ............................................................................................................. (3) Not repaired or replaced after derailment .................................................................................................. 215.117 Defective roller bearing adapter: (a) Cracked or broken ...................................................................................................................................... (b) Not in its design position ............................................................................................................................ (c) Worn on the crown ...................................................................................................................................... 215.119 Defective freight car truck: (a)(1) A side frame or bolster that is broken .................................................................................................... (2)(i) Side frame or bolster with crack of: 1⁄4″ or more, but less than 1″ ......................................................... (ii) 1″ or more ................................................................................................................................................... (b) A snubbing device that is ineffective or missing ........................................................................................ (c) Side bearing(s): (1) Assembly missing or broken ............................................................................................................... (2) In contact except by design ................................................................................................................. (3), (4) Total clearance at one end or at diagonally opposite sides of: (i) more than 3⁄4″ but not more than 1″ .............................................................................................. (ii) more than 1″ ................................................................................................................................. (d) Truck spring(s): (1) Do not maintain travel or load ............................................................................................................. (2) Compressed solid ................................................................................................................................ (3) Outer truck springs broken or missing: (i) Two outer springs .......................................................................................................................... (ii) Three or more outer springs ......................................................................................................... (e) Truck bolster-center plate interference ....................................................................................................... (f) Brake beam shelf support worn ................................................................................................................... 215.121 Defective car body: (a) Has less than 21⁄2″ clearance from the top of rail ...................................................................................... (b) Car center sill is: (1) Broken .................................................................................................................................................. (2) Cracked more than 6″ ......................................................................................................................... (3) Bent or buckled more than 21⁄2″ in any 6″ length ............................................................................... (c) Coupler carrier that is broken or missing ................................................................................................... (d) Car door not equipped with operative safety hangers ............................................................................... (e)(1) Center plate not properly secured .......................................................................................................... (2) Portion missing ........................................................................................................................................... (3) Broken ......................................................................................................................................................... (4) Two or more cracks .................................................................................................................................... (f) Broken sidesill, crossbearer, or body bolster .............................................................................................. 215.123 Defective couplers: (a) Shank bent out of alignment ....................................................................................................................... (b) Crack in highly stressed junction area ....................................................................................................... (c) Coupler knuckle broken or cracked ............................................................................................................ (d) Coupler knuckle pin or thrower that is missing or inoperative ................................................................... (e) Coupler retainer pin lock that is missing or broken .................................................................................... (f) Coupler with following conditions: locklift inoperative; no anticreep protection; or coupler lock is missing, inoperative, bent, cracked, or broken .................................................................................................... 215.125 Defective uncoupling device 215.127 Defective draft arrangement: (a) Draft gear that is inoperative ...................................................................................................................... (b) Yoke that is broken ..................................................................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00013 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Willful violation 3,000 5,000 5,000 5,000 6,500 4,500 7,500 7,500 7,500 9,000 8,500 5,000 8,500 11,000 7,500 11,000 8,500 5,000 6,500 5,000 11,000 7,500 9,000 7,500 8,500 6,500 3,000 3,000 6,500 5,000 6,500 11,000 9,000 4,500 4,500 9,000 7,500 9,000 5,000 6,500 5,000 7,500 9,000 7,500 8,500 5,000 6,500 5,000 11,000 7,500 9,000 7,500 8,500 6,500 11,000 9,000 5,000 6,500 7,500 9,000 5,000 5,000 7,500 7,500 5,000 6,500 6,500 5,000 7,500 9,000 9,000 7,500 5,000 7,500 8,500 5,000 5,000 5,000 8,500 8,500 5,000 8,500 5,000 5,000 11,000 7,500 7,500 7,500 11,000 11,000 7,500 11,000 7,500 7,500 3,000 5,000 5,000 5,000 3,000 4,500 7,500 7,500 7,500 4,500 5,000 5,000 7,500 7,500 5,000 5,000 7,500 7,500 70602 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX B TO PART 215.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section Violation (c) End of car cushioning unit is leaking or inoperative ................................................................................... (d) Vertical coupler pin retainer plate missing or has missing fastener .......................................................... (e) Draft key or draft key retainer that is inoperative or missing ..................................................................... (f) Follower plate that is missing or broken ...................................................................................................... 215.129 Defective cushioning device ................................................................................................................... Willful violation 5,000 8,500 8,500 5,000 5,000 7,500 11,000 11,000 7,500 7,500 5,000 7,500 3,000 3,000 3,000 4,500 4,500 4,500 Subpart C—Restricted Equipment 215.203 Restricted cars ........................................................................................................................................ Subpart D—Stenciling 215.301 215.303 215.305 General .................................................................................................................................................... Stenciling of restricted cars ..................................................................................................................... Stenciling of maintenance-of-way ........................................................................................................... 1 A penalty may be assessed against an individual only for a willful violation. Generally, when two or more violations of these regulations are discovered with respect to a single freight car that is placed or continued in service by a railroad, the appropriate penalties set forth above are aggregated up to a maximum of $11,000 per day. A failure to perform, with respect to a particular freight car, the predeparture inspection required by § 215.13 of this Part will be treated as a violation separate and distinct from, and in addition to, any substantive violative conditions found on the car. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. Failure to observe any condition for movement set forth in paragraphs (a) and (c) of § 215.9 will deprive the railroad of the benefit of the movement-for-repair provision and make the railroad and any responsible individuals liable for penalty under the particular regulatory section(s) concerning the substantive defect(s) present on the freight car at the time of movement. Maintenance-of-way equipment not stenciled in accordance with § 215.305 is subject to all requirements of this Part. See § 215.3(c)(3). The penalty schedule uses section numbers from 49 CFR part 215. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. PART 217—[AMENDED] 7. The authority citation for part 217 continues to read as follows: Authority: 49 U.S.C. 20103, 20107; 28 U.S.C. 2461, note; and 49 CFR 1.49. 8. Appendix A to part 217 is revised to read as follows: APPENDIX A TO PART 217.—SCHEDULE OF CIVIL PENALTIES 1 Section Violation 217.7 Operating Rules: (a) ..................................................................................................................................................................... (b) ..................................................................................................................................................................... (c) ...................................................................................................................................................................... 217.9 Operational tests and inspections: (a) Program ...................................................................................................................................................... (b) Record of program ...................................................................................................................................... (c) Record of tests and inspections ................................................................................................................. (d) Annual Summary ........................................................................................................................................ 217.11 Program of instruction on operating rules: (a) ..................................................................................................................................................................... (b) ..................................................................................................................................................................... Willful violation $6,500 6,500 6,500 $9,000 9,000 9,000 8,500 6,500 8,500 8,500 11,000 9,000 11,000 11,000 8,500 8,500 11,000 11,000 1 A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. PART 218—[AMENDED] 9. The authority citation for part 218 continues to read as follows: Authority: 49 U.S.C. 20103, 20107; 28 U.S.C. 2461, note; and 49 CFR 1.49. 10. Appendix A to part 218 is revised to read as follows: ycherry on PROD1PC64 with PROPOSALS2 APPENDIX A TO PART 218.—SCHEDULE OF CIVIL PENALTIES 1 Section Violation Willful violation Subpart B—Blue Signal Protection of Workmen 218.22 Utility employees: (a) Employee qualifications .............................................................................................................................. (b) Concurrent service ...................................................................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00014 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 $5,000 6,500 $7,500 9,000 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70603 APPENDIX A TO PART 218.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section Violation (c) Assignment conditions: (1) No controlling locomotive .................................................................................................................... (2) Empty cab ............................................................................................................................................ (3)(4) Improper communication ................................................................................................................. (5) Performing functions not listed ............................................................................................................ (d) Improper release ......................................................................................................................................... (f) More than three utility employees with one crew ........................................................................................ 218.23 Blue signal display .................................................................................................................................... 218.24 One-person crew: (a)(1) Equipment not coupled or insufficiently separated ................................................................................ (a)(2) Unoccupied locomotive cab not secured ............................................................................................... (b) Helper service ............................................................................................................................................. 218.25 Workmen on a main track ......................................................................................................................... 218.27 Workmen on track other than main track: (a) Protection provided except that signal not displayed at switch ................................................................. (b) through (e) .................................................................................................................................................. 218.29 Alternate methods of protection: (a)(1) protection provided except that signal not displayed at switch ............................................................. (a)(2) through (a)(8) .......................................................................................................................................... (b)(1) Protection provided except that signal not displayed at switch ............................................................. (b)(2) through (b)(4) .......................................................................................................................................... (c) Use of derails .............................................................................................................................................. (d) Emergency repairs ...................................................................................................................................... 218.30 Remotely controlled switches: (a) and (b) ......................................................................................................................................................... (c) ...................................................................................................................................................................... Willful violation 6,500 6,500 6,500 5,000 5,000 5,000 6,500 9,000 9,000 9,000 7,500 7,500 7,500 9,000 6,500 5,000 6,500 6,500 9,000 7,500 9,000 9,000 6,500 5,000 9,000 7,500 6,500 6,500 6,500 6,500 5,000 6,500 9,000 9,000 9,000 9,000 7,500 9,000 5,000 1,500 7,500 2,500 3,000 3,000 4,500 4,500 1,500 1,500 6,500 6,500 2,500 2,500 9,000 9,000 ........................ 3,000 ........................ 3,000 11,000 ........................ 4,500 4,500 Subpart C—Protection of Trains and Locomotives 218.35 Yard limits: (a) and (b) ......................................................................................................................................................... (c) ...................................................................................................................................................................... 218.37 Flag protection: (a) ..................................................................................................................................................................... (b) and (c) ......................................................................................................................................................... 218.39 Hump operations ....................................................................................................................................... 218.41 Noncompliance with hump operations rule ............................................................................................... Subpart D—Prohibition Against Tampering With Safety Devices 218.55 218.57 (ii) 218.59 Tampering ................................................................................................................................................. (i) Knowingly operating or permitting operation of disabled equipment ................................................... Willfully operating or permitting operation of disabled equipment .............................................................. Operation of disabled equipment .............................................................................................................. 1 Except as provided for in § 218.57, a penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where the circumstances warrant. See 49 CFR part 209, appendix A. The penalty schedule uses section numbers from 49 CFR part 218. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. PART 219—[AMENDED] 11. The authority citation for part 219 continues to read as follows: Authority: 49 U.S.C. 20103, 20107, 20140, 21301, 21304, 21311; 28 U.S.C. 2461, note; and 49 CFR 1.49(m). Appendix A to Part 219—Schedule of Civil Penalties 12. Appendix A to part 219 is revised to read as follows: The following chart lists the schedule of civil penalties: PENALTY SCHEDULE 1 ycherry on PROD1PC64 with PROPOSALS2 Section Violation Willful violation Subpart A—General 219.3 Application: Railroad does not have required program ....................................................................................................... 219.11 General conditions for chemical tests: (b)(1) Employee unlawfully refuses to participate in testing ............................................................................ VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00015 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 $5,000 $7,500 8,500 11,000 70604 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules PENALTY SCHEDULE 1—Continued Section Violation (b)(2) Employer fails to give priority to medical treatment ............................................................................... (b)(3) Employee fails to remain available ........................................................................................................ (b)(4) Employee tampers with specimen ......................................................................................................... (d) Employee unlawfully required to execute a waiver of rights ...................................................................... (e) Railroad used or authorized the use of coercion to obtain specimens ...................................................... (g) Failure to meet supervisory training requirements or program of instruction not available or program not complete ................................................................................................................................................. (h) Urine or blood specimens provided for Federal testing were used for non-authorized testing ................. 219.23 Railroad policies: (a) Failure to provide written notice of FRA test .............................................................................................. (b) Failure to provide written notice of basis for FRA test ............................................................................... (c) Use of subpart C form for other test ........................................................................................................... (d) Failure to provide educational materials ..................................................................................................... (e) Educational materials fail to explain requirements of this part and/or include required content ............... (f) Non-Federal provisions are clearly described as independent authority .................................................... Willful violation 8,500 8,500 8,500 5,000 1,500 11,000 11,000 11,000 7,500 2,500 6,500 8,500 9,000 11,000 3,000 3,000 3,000 1,500 1,500 1,500 4,500 4,500 4,500 2,500 2,500 2,500 8,500 ........................ 5,000 7,500 8,500 5,000 8,500 8,500 11,000 7,500 11,000 11,000 8,500 6,500 11,000 9,000 8,500 8,500 11,000 11,000 8,500 5,000 1,500 8,500 11,000 7,500 2,500 11,000 5,000 5,000 3,000 5,000 1,500 7,500 7,500 4,500 7,500 2,500 5,000 1,500 5,000 7,500 2,500 7,500 6,500 1,500 5,000 9,000 2,500 7,500 3,000 3,000 3,000 4,500 4,500 4,500 1,500 2,500 8,500 8,500 11,000 11,000 6,500 8,500 8,500 9,000 11,000 11,000 Subpart B—Prohibitions 219.101 Alcohol and drug use prohibited: Employee violates prohibition(s) ...................................................................................................................... 219.103 Prescribed and over-the-counter drugs: (a) Failure to train employee properly on requirements .................................................................................. 219.104 Responsive Action: (a) Failure to remove employee from covered service immediately ................................................................ (b) Failure to provide notice for removal .......................................................................................................... (c) Failure to provide prompt hearing ............................................................................................................... (d) Employee improperly returned to service ................................................................................................... 219.105 Railroad’s duty to prevent violations: (a) Employee improperly permitted to remain in covered service ................................................................... (b) Failure to exercise due diligence to assure compliance with prohibition ................................................... 219.107 Consequences of unlawful refusal: (a) Failure to disqualify an employee for nine months following a refusal ...................................................... (e) Employee unlawfully returned to service .................................................................................................... Subpart C—Post-Accident Toxicological Testing 219.201 Events for which testing is required: (a) Failure to test after qualifying event (each employee not tested is a violation) ........................................ (c)(1)(i) Failure to make good faith determination ........................................................................................... (c)(1)(ii) Failure to provide requested decision report to FRA ......................................................................... (c)(2) Testing performed after non-qualifying event ......................................................................................... 219.203 Responsibilities of railroads and employees: (a)(1)(i) and (a)(2)(i) Failure to properly test/exclude from testing .................................................................. (a)(1)(ii) and (a)(2)(ii) Non-covered service employee tested .......................................................................... (b)(1) Delay in obtaining specimens due to failure to make every reasonable effort ..................................... (c) Independent medical facility not utilized ..................................................................................................... (d) Failure to report event or contact FRA when intervention required ........................................................... 219.205 Specimen collection and handling: (a) Failure to observe requirements with respect to specimen collection, marking and handling .................. (b) Failure to provide properly prepared forms with specimens ...................................................................... (d) Failure to promptly or properly forward specimens .................................................................................... 219.207 Fatality: (a) Failure to test .............................................................................................................................................. (a)(1) Failure to ensure timely collection and shipment of required specimens .............................................. (b) Failure to request assistance when necessary .......................................................................................... 219.209 Reports of tests and refusals: (a)(1) Failure to provide telephonic report ....................................................................................................... (b) Failure to provide written report of refusal to test ...................................................................................... (c) Failure to maintain report explaining why test not conducted within 4 hours ............................................ 219.211 Analysis and follow-up: (c) Failure of MRO to report review of positive results to FRA ....................................................................... ycherry on PROD1PC64 with PROPOSALS2 Subpart D—Testing for Cause 219.300 Mandatory reasonable suspicion testing: (a)(1) Failure to test when reasonable suspicion criteria met ......................................................................... (a)(2) Tested when reasonable suspicion criteria not met .............................................................................. 219.301 Testing for reasonable cause: (a) Event did not occur during daily tour .......................................................................................................... (b)(2) Tested when accident/incident criteria not met ...................................................................................... (b)(3) Tested when operating rules violation criteria not met .......................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00016 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70605 PENALTY SCHEDULE 1—Continued Section Violation 219.302 Prompt specimen collection: (a) Specimen collection not conducted promptly ............................................................................................. Willful violation 5,000 7,500 5,000 7,500 5,000 7,500 5,000 7,500 6,500 5,000 3,000 8,500 3,000 3,000 8,500 6,500 5,000 9,000 7,500 4,500 11,000 4,500 4,500 11,000 9,000 7,500 6,500 9,000 5,000 7,500 5,000 5,000 8,500 6,500 5,000 8,500 6,500 7,500 7,500 11,000 9,000 7,500 11,000 9,000 6,500 9,000 5,000 7,500 1,500 3,000 2,500 4,500 3,000 3,000 1,500 4,500 4,500 2,500 3,000 3,000 1,500 4,500 4,500 2,500 5,000 5,000 5,000 7,500 7,500 7,500 5,000 5,000 5,000 7,500 7,500 7,500 Subpart E—Identification of Troubled Employees 219.401 Requirement for policies: (b) Failure to publish and/or implement required policy .................................................................................. 219.407 Alternate policies: (c) Failure to file agreement or other document or provide timely notice or revocation ................................. Subpart F—Pre-Employment Tests 219.501 Pre-employment tests: (a) Failure to perform pre-employment drug test before first time employee performs covered service ........ Subpart G—Random Testing Programs 219.601 Railroad random drug programs: (a)(1) Failure to file a random program ............................................................................................................ (a)(2) Failure to file amendment to program .................................................................................................... (b) Failure to meet random testing criteria ....................................................................................................... (b)(1)(i) Failure to use a neutral selection process .......................................................................................... (b)(2)(i)(B) Testing not spread throughout the year ......................................................................................... (b)(3) Testing not distributed throughout the day ............................................................................................ (b)(4) Advance notice provided to employee ................................................................................................... (b)(6) Testing when employee not on duty ...................................................................................................... 219.601A Failure to include covered service employee in pool ........................................................................... 219.602 Administrator’s determination of drug testing rate: (f) Total number of tests below minimum random drug testing rate ............................................................... 219.603 Participation in drug testing: Failure to document reason for not testing selected employee ....................................................................... 219.607 Railroad random alcohol programs: (a)(1) Failure to file a random alcohol program ............................................................................................... (a)(2) Failure to file amendment to program .................................................................................................... (b) Failure to meet random testing criteria ....................................................................................................... (b)(1) Failure to use a neutral selection process ............................................................................................. (b)(5) Testing when employee not on duty ...................................................................................................... (b)(8) Advance notice provided to employee ................................................................................................... 219.607A Failure to include covered service employee in pool ........................................................................... 219.608 Administrator’s determination of random alcohol testing rate: (e) Total number of tests below minimum random alcohol testing rate .......................................................... 219.609 Participation in alcohol testing: Failure to document reason for not testing selected employee ....................................................................... Subpart H—Drug and Alcohol Testing Procedures 219.701 Standards for drug and alcohol testing: (a) Failure to comply with part 40 procedures in subpart B, D, F, or G testing .............................................. (b) Testing not performed in a timely manner ................................................................................................. Subpart I—Annual Report 219.801 Reporting alcohol misuse prevention program results in a management information system: (a) Failure to submit MIS report on time .......................................................................................................... (c) Failure to submit accurate MIS report ........................................................................................................ (d) Failure to include required data .................................................................................................................. 219.803 Reporting drug misuse prevention program results in a management information system: (c) Failure to submit accurate MIS report ........................................................................................................ (d) Failure to submit MIS report on report ....................................................................................................... (e) Failure to include required data .................................................................................................................. ycherry on PROD1PC64 with PROPOSALS2 Subpart J—Recordkeeping Requirements 219.901 Retention of Alcohol Testing Records: (a) Failure to maintain records required to be kept by part 40 ........................................................................ (b) Failure to maintain records required to be kept for five years ................................................................... (c) Failure to maintain records required to be kept for two years ................................................................... 219.903 Retention of Drug Testing Records: (a) Failure to maintain records required to be kept by part 40 ........................................................................ (b) Failure to maintain records required to be kept for five years ................................................................... (c) Failure to maintain records required to be kept for two years ................................................................... 219.905 Access to facilities and records: VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00017 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70606 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules PENALTY SCHEDULE 1—Continued Section Violation (a) Failure to release records in this subpart in accordance with part 40 ....................................................... (b) Failure to permit access to facilities ........................................................................................................... (c) Failure to provide access to results of railroad alcohol and drug testing programs .................................. 6,500 8,500 8,500 Willful violation 9,000 11,000 11,000 1 A penalty may be assessed against an individual only for a willful violation. The FRA Administrator reserves the right to assess a penalty of up to $27,000 for any violation, including ones not listed in this penalty schedule, where circumstances warrant. See 49 CFR part 209, appendix A. PART 220—[AMENDED] 13. The authority citation for part 220 continues to read as follows: Authority: 49 U.S.C. 20102–20103, 20107, 21301–21302, 21304, 21311; 28 U.S.C. 2461, note; and 49 CFR 1.49. 14. Appendix C to part 220 is revised to read as follows: APPENDIX C TO PART 220.—SCHEDULE OF CIVIL PENALTIES 1 Section Violation 220.9 Requirements for trains ............................................................................................................................... 220.11 Requirements for roadway workers .......................................................................................................... 220.21 Railroad Operating rules; radio communications: (a) ..................................................................................................................................................................... (b) ..................................................................................................................................................................... 220.23 Publication of radio information ................................................................................................................ 220.25 Instruction of employees ........................................................................................................................... 220.27 Identification .............................................................................................................................................. 220.29 Statement of letters and numbers ............................................................................................................ 220.31 Initiating a transmission ............................................................................................................................ 220.33 Receiving a transmission .......................................................................................................................... 220.35 Ending a transmission ............................................................................................................................... 220.37 Voice test .................................................................................................................................................. 220.39 Continuous monitoring .............................................................................................................................. 220.41 [Reserved]. 220.43 Communication consistent with the rules ................................................................................................. 220.45 Complete communications ........................................................................................................................ 220.47 Emergencies ............................................................................................................................................. 220.49 Switching, backing or pushing .................................................................................................................. 220.51 Signal indications ...................................................................................................................................... 220.61 Radio transmission of mandatory directives ............................................................................................. Willful violation $8,500 6,500 $11,000 9,000 8,500 6,500 5,000 8,500 6,500 6,500 3,000 5,000 5,000 6,500 5,000 11,000 9,000 7,500 11,000 9,000 9,000 4,500 7,500 7,500 9,000 7,500 6,500 8,500 8,500 8,500 6,500 8,500 9,000 11,000 11,000 11,000 9,000 11,000 1 A penalty may be assessed against and only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. PART 221—[AMENDED] 15. The authority citation for part 221 continues to read as follows: Authority: 49 U.S.C. 20103, 20107; 28 U.S.C. 2461, note; and 49 CFR 1.49. 16. Appendix C to part 221 is revised to read as follows: APPENDIX C TO PART 221.—SCHEDULE OF CIVIL PENALTIES 1 ycherry on PROD1PC64 with PROPOSALS2 Section Violation 221.13 Marking device display: (a) device not present, not displayed, or not properly illuminated ................................................................... (d) device too close to rail ................................................................................................................................ 221.14 Marking devices: Use of unapproved or noncomplying device ................................................................ 221.15 Marking device inspection: (a) Failure to inspect at crew change .............................................................................................................. (b), (c) improper inspection .............................................................................................................................. 221.16 Inspection procedure: (a) Failure to obtain protection ......................................................................................................................... (b) Improper protection ..................................................................................................................................... 221.17 Movement of defective equipment ............................................................................................................ Willful violation $5,000 3,000 3,000 $7,500 4,500 4,500 3,000 3,000 4,500 4,500 5,000 5,000 15,000 7,500 7,500 17,500 1 A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. Where the conditions for movement of defective equipment set forth in § 221.17 of this Part are not met, the movement constitutes a violation of § 221.13 of this part. VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00018 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules PART 222—[AMENDED] 17. The authority citation for part 222 continues to read as follows: Authority: 49 U.S.C. 20103, 20107, 20153, 21301, 21304; 28 U.S.C. 2461, note; and 49 CFR 1.49. 70607 18. Appendix G to part 222 is revised to read as follows: APPENDIX G TO PART 222.—SCHEDULE OF CIVIL PENALTIES 1 Section Violation Willful violation Subpart B—Use of Locomotive Horns 222.21 Use of locomotive horn: (a) Failure to sound horn at grade crossing .................................................................................................... Failure to sound horn in proper pattern ........................................................................................................... (b) Failure to sound horn at least 15 and no more than 20 seconds before crossing .................................... Routine sounding of the locomotive horn more than 1⁄4-mile in advance of crossing ..................................... 222.33 Failure to sound horn when conditions of § 222.33 are not met ..................................................................... 222.45 Routine sounding of the locomotive horn at a grade crossing within a quiet zone ........................................ 222.49 (b) Failure to provide Grade Crossing Inventory Form information ................................................................. 222.59 (d) Routine sounding of the locomotive horn at a grade crossing equipped with wayside horn .................... $5,000 5,000 3,000 3,000 $7,500 7,500 4,500 4,500 6,500 9,000 3,000 4,500 1,500 2,500 1,500 2,500 1A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. PART 223—[AMENDED] 19. The authority citation for part 223 continues to read as follows: Authority: 49 U.S.C. 20102–03, 20133, 20701–20702, 21301–02, 21304; 28 U.S.C. 2461, note; and 49 CFR 1.49. 20. Appendix B to part 223 is revised to read as follows: APPENDIX B TO PART 223.—SCHEDULE OF CIVIL PENALTIES 1 Section Violation 223.9 New or rebuilt equipment: (a) Locomotives ................................................................................................................................................ (b) Cabooses .................................................................................................................................................... (c) Passenger cars ........................................................................................................................................... (d)(1), (d)(2): (i) Window not marked or instructions not posted .................................................................................... (ii) Window improperly marked or instructions improperly posted ............................................................ 223.11(c) Existing locomotives ................................................................................................................................ (d) Repair of window ........................................................................................................................................ 223.13(c) Existing cabooses ................................................................................................................................... (d) Repair of window ........................................................................................................................................ 223.15(c) Existing passenger cars .......................................................................................................................... (d) Repair of window ........................................................................................................................................ 223.17 Identification of units ................................................................................................................................. Willful violation $3,000 3,000 3,000 $4,500 4,500 4,500 5,000 3,000 3,000 1,500 3,000 1,500 3,000 1,500 1,500 7,500 4,500 4,500 2,500 4,500 2,500 4,500 2,500 2,500 1 A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 U.S.C. 21301, 21304, and 49 CFR part 209, appendix A. The penalty schedule uses section numbers from 49 CFR part 223. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. PART 224—[AMENDED] 21. The authority citation for part 224 continues to read as follows: Authority: 49 U.S.C. 20103, 20107, 20148 and 21301; 28 U.S.C. 2461; and 49 CFR 1.49. 22. Appendix A to part 224 is revised to read as follows: ycherry on PROD1PC64 with PROPOSALS2 APPENDIX A TO PART 224.—SCHEDULE OF CIVIL PENALTIES1 Section Violation 224.103 Characteristics of retroreflective sheeting: (a)–(d) Retroreflective sheeting applied does not meet the requirements of § 224.103 ................................. 224.105 Sheeting dimensions and quantity .......................................................................................................... (a) Failure to apply minimum amount of retroreflective sheeting in accordance with Table ........................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00019 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 $3,000 3,000 3,000 Willful violation $4,500 4,500 4,500 70608 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX A TO PART 224.—SCHEDULE OF CIVIL PENALTIES1—Continued Section Violation (b) Applying retroreflective sheeting of wrong dimensions .............................................................................. 224.106 Location of retroreflective sheeting: (a), (b) Applying retroreflective sheeting in nonconforming pattern ................................................................. 224.107 Implementation schedule: (a)(1), (b)(1) Failure to apply retroreflective sheeting to new freight car or locomotive before equipment placed in service ........................................................................................................................................... (a)(2), (b)(2), (b)(4) Failure to apply retroreflective sheeting to existing freight car or locomotive in accordance with minimum schedule of paragraphs, (a)(2), (b)(2), (b)(4) ............................................................... 224.109 Inspection, repair, and replacement: (a)(1) Failure to perform inspection .................................................................................................................. (2) Failure to properly notify car owner of defect ............................................................................................. (3) Failure to retain written notification of defect for two years ....................................................................... (4) Failure to repair defect after notification ..................................................................................................... (b)(1) Failure to perform inspection .................................................................................................................. (2) Failure to repair defect ................................................................................................................................ Willful violation 3,000 4,500 3,000 4,500 3,000 4,500 3,000 4,500 3,000 3,000 3,000 3,000 3,000 3,000 4,500 4,500 4,500 4,500 4,500 4,500 1A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. The penalty schedule uses section numbers from 49 CFR part 224. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. PART 225—[AMENDED] 23. The authority citation for part 225 continues to read as follows: Authority: 49 U.S.C. 103, 322(a), 20103, 20107, 20901–02, 21301, 21302, 21311; 28 U.S.C. 2461, note; and 49 CFR 1.49. 24. Appendix A to part 225 is revised to read as follows: APPENDIX A TO PART 225.—SCHEDULE OF CIVIL PENALTIES 1 Section Violation ycherry on PROD1PC64 with PROPOSALS2 225.9 Telephonic reports of certain accidents/incidents ....................................................................................... 225.11 Reports of accidents/incidents .................................................................................................................. 225.12(a): Failure to file Railroad Employee Human Factor Attachment properly. (1) Employee identified ..................................................................................................................................... (2) No employee identified ............................................................................................................................... 225.12(b): (1) Failure to notify employee properly ............................................................................................................ (2) Notification of employee not involved in accident ...................................................................................... 225.12(c): Failure of employing railroad to provide requested information properly ........................................................ 225.12(d): (1) Failure to revise report when identity becomes known .............................................................................. (2) Failure to notify after late identification ....................................................................................................... 225.12(f)(1): Submission of notice if employee dies as result of the reported accident ...................................................... 225.12(g): Willfully false accident statement by employee ............................................................................................... 225.13 Late reports ............................................................................................................................................... 225.17(d) Alcohol or drug involvement ................................................................................................................. 225.23 Joint operations ......................................................................................................................................... 225.25 Recordkeeping .......................................................................................................................................... 225.27 Retention of records .................................................................................................................................. 225.33: (1) Failure to adopt the Internal Control Plan .................................................................................................. (2) Inaccurate reporting due to failure to comply with the Internal Control Plan ............................................. (3) Failure to comply with the intimidation/harassment policy in the Internal Control Plan ............................ 225.35 Access to records and reports .................................................................................................................. Willful violation $1,500 6,500 $2,500 9,000 6,500 3,000 9,000 4,500 6,500 6,500 9,000 9,000 1,500 2,500 6,500 6,500 9,000 9,000 6,500 9,000 ........................ 1,500 8,500 (1) 5,000 1,500 9,000 2,500 11,000 (1 ) 7,500 2,500 6,500 6,500 6,500 8,500 9,000 9,000 9,000 11,000 1 A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. A failure to comply with § 225.23 constitutes a violation of § 225.11. For purposes of §§ 225.25 and 225.27 of this part, each of the following constitutes a single act of noncompliance: (1) a missing or incomplete log entry for a particular employee’s injury or illness; or (2) a missing or incomplete log record for a particular rail equipment accident or incident. Each day a violation continues is a separate offense. The penalty schedule uses section numbers from 49 CFR part 225. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00020 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules PART 228—[AMENDED] 25. The authority citation for part 228 continues to read as follows: Authority: 49 U.S.C. 20103, 20107, 21101– 21108; 28 U.S.C. 2461, note and 49 CFR 1.49. 70609 26. Appendix B to part 228 is revised to read as follows: APPENDIX B TO PART 228.—SCHEDULE OF CIVIL PENALTIES 1 Section Violation Willful violation Subpart B—Records and Reporting 228.9 Railroad records .......................................................................................................................................... 228.11 Hours of duty records ............................................................................................................................... 228.17 Dispatcher’s record ................................................................................................................................... 228.19 Monthly reports of excess service ............................................................................................................ $5,000 1,500 5,000 1,500 $7,500 2,500 7,500 2,500 1 A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. PART 229—[AMENDED] 27. The authority citation for part 229 continues to read as follows: Authority: 49 U.S.C. 20102–20103, 20107, 20133, 20137–20138, 20143, 20701–20703, 21301–21302, 21304; 28 U.S.C. 2461, note; and 49 CFR 1.49 (c), (m). 28. Appendix B to part 229 is revised to read as follows: APPENDIX B TO PART 229.—SCHEDULE OF CIVIL PENALTIES 1 Violation Section 2 Willful violation $1,500–6,500 (1) 1,500 5,000 3,000 (1) $2,500–9,000 (1 ) 2,500 7,500 4,500 (1 ) 3,000 1,500 1,500 4,500 2,500 2,500 3,000 4,500 3,000 4,500 1,500 1,500 1,500 1,500 1,500 2,500 2,500 2,500 2,500 2,500 3,000 6,500 3,000 3,000 4,500 9,000 4,500 4,500 3,000 3,000 3,000 3,000 1,500 4,500 4,500 4,500 4,500 2,500 5,000 5,000 1,500–6,500 5,000 7,500 7,500 2,500–9,000 7,500 Subpart A—General 229.7 facts 229.9 229.11 229.13 229.17 219.19 Prohibited acts: Safety deficiencies not governed by specific regulations: To be assessed on relevant ...................................................................................................................................................................... Movement of noncomplying locomotives .................................................................................................... Locomotive identification ........................................................................................................................... Control of locomotives .............................................................................................................................. Accident reports ........................................................................................................................................ Prior waivers ............................................................................................................................................. ycherry on PROD1PC64 with PROPOSALS2 Subpart B—Inspection and Tests 229.21 Daily inspection: (a)(b): (1) Inspection overdue ...................................................................................................................................... (2) Inspection report not made, improperly executed, or not retained ............................................................ (c) Inspection not performed by a qualified person ......................................................................................... 229.23 Periodic inspection: General (a)(b): (1) Inspection overdue .............................................................................................................................. (2) Inspection performed improperly or at a location where the underneath portion cannot be safely inspected ................................................................................................................................................ (c)(d): (1) Form missing ....................................................................................................................................... (2) Form not properly displayed ................................................................................................................ (3) Form improperly executed ................................................................................................................... (e) Replace Form FRA F 6180–49A by April 2 ............................................................................................... (f) Secondary record of the information reported on Form FRA F 6180.49A ................................................. 229.25 (a) through (e)(4) Tests: Every periodic inspection ......................................................................................... (e)(5) Ineffective maintenance .......................................................................................................................... 229.27 Annual tests .............................................................................................................................................. 229.29 Biennial tests ............................................................................................................................................. 229.31 (a) Biennial hydrostatic tests of main reservoirs .............................................................................................. (b) Biennial hammer tests of main reservoirs .................................................................................................. (c) Drilled telltale holes in welded main reservoirs .......................................................................................... (d) Biennial tests of aluminum main reservoirs ................................................................................................ 229.33 Out-of-use credit ....................................................................................................................................... Subpart C—Safety Requirements 229.41 229.43 229.45 229.46 Protection against personal injury ............................................................................................................. Exhaust and battery gases General condition: To be assessed based on relevant facts ................................................................... Brakes: General ........................................................................................................................................ VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00021 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70610 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX B TO PART 229.—SCHEDULE OF CIVIL PENALTIES 1—Continued ycherry on PROD1PC64 with PROPOSALS2 Section 2 Violation 229.47 Emergency brake valve ............................................................................................................................ 229.49 Main reservoir system: (a)(1) Main reservoir safety valve .................................................................................................................... (2) Pneumatically actuated control reservoir .................................................................................................... (b)(c) Main reservoir governors ........................................................................................................................ 229.51 Aluminum main reservoirs ........................................................................................................................ 229.53 Brake gauges ............................................................................................................................................ 229.55 Piston travel .............................................................................................................................................. 229.57 Foundation brake gear .............................................................................................................................. 229.59 Leakage ..................................................................................................................................................... 229.61 Draft system .............................................................................................................................................. 229.63 Lateral motion ........................................................................................................................................... 229.64 Plain bearing ............................................................................................................................................. 229.65 Spring rigging ............................................................................................................................................ 229.67 Trucks ........................................................................................................................................................ 229.69 Side bearings ............................................................................................................................................ 229.71 Clearance above top of rail ....................................................................................................................... 229.73 Wheel sets ................................................................................................................................................ 229.75 Wheel and tire defects: (a), (d) Slid flat or shelled spot(s): (1) One spot 21⁄2″ or more but less than 3″ in length ...................................................................................... (2) One spot 3″ or more in length ............................................................................................................. (3) Two adjoining spots each of which is 2″ or more in length but less than 21⁄2″ in length ................... (4) Two adjoining spots each of which are at least 2″ in length, if either spot is 21⁄2″ or more in length (b) Gouge or chip in flange of: (1) more than 11⁄2″ but less than 15⁄8″ in length; and more than 1⁄2″ but less than 5⁄8″ in width ............. (2) 15⁄8″ or more in length and 5/8″ or more in width ............................................................................... (c) Broken rim ................................................................................................................................................... (e) Seam in tread ............................................................................................................................................. (f) Flange thickness of: (1) 7⁄8″ or less but more than 13⁄16″ ........................................................................................................... (2) 13⁄16″ or less ......................................................................................................................................... (g) Tread worn hollow ...................................................................................................................................... (h) Flange height of: (1) 11⁄2″ or greater but less than 15⁄8″ ...................................................................................................... (2) 15⁄8″ or more ........................................................................................................................................ (i) Tire thickness ............................................................................................................................................... (j) Rim thickness: (1) Less than 1″ in road service and 3⁄4″ in yard service ......................................................................... (2) 15⁄16″ or less in road service and 11⁄16″ in yard service ...................................................................... (k): (1) Crack of less than 1″ ........................................................................................................................... (2) Crack of 1″ or more ............................................................................................................................. (3) Break .................................................................................................................................................... (l) Loose wheel or tire ...................................................................................................................................... (m) Welded wheel or tire .................................................................................................................................. 229.77 Current collectors ...................................................................................................................................... 229.79 Third rail shoes and beams. ..................................................................................................................... 229.81 Emergency pole; shoe insulation .............................................................................................................. 229.83 Insulation or grounding ............................................................................................................................. 229.85 Door and cover plates marked ‘‘Danger’’ ................................................................................................. 229.87 Hand operated switches ........................................................................................................................... 229.89 Jumpers; cable connections: (a) Jumpers and cable connections; located and guarded .............................................................................. (b) Condition of jumpers and cable connections ............................................................................................. 229.91 Motors and generators .............................................................................................................................. 229.93 Safety cut-off device ................................................................................................................................. 229.95 Venting ...................................................................................................................................................... 229.97 Grounding fuel tanks ................................................................................................................................. 229.99 Safety hangers .......................................................................................................................................... 229.101 Engines: (a) Temperature and pressure alarms, controls, and switches ....................................................................... (b) Warning notice ............................................................................................................................................ (c) Wheel slip/slide protection .......................................................................................................................... 229.103 Safe working pressure; factor of safety .................................................................................................. 229.105 Steam generator number ........................................................................................................................ 229.107 Pressure gauge ....................................................................................................................................... 229.109 Safety valves ........................................................................................................................................... 229.111 Water-flow indicator ................................................................................................................................ 229.113 Warning notice ........................................................................................................................................ 229.115 Slip/slide alarms ...................................................................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00022 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Willful violation 5,000 7,500 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 3,000 3,000 3,000 3,000 5,000 5,000 1,500 5,000 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 4,500 4,500 4,500 4,500 7,500 7,500 2,500 7,500 5,000 6,500 5,000 6,500 7,500 9,000 7,500 9,000 5,000 6,500 8,500 5,000 7,500 9,000 11,000 7,500 5,000 6,500 5,000 7,500 9,000 7,500 5,000 6,500 5,000 7,500 9,000 7,500 5,000 6,500 7,500 9,000 5,000 6,500 8,500 8,500 5,000 3,000 3,000 5,000 6,500 3,000 3,000 7,500 9,000 11,000 11,000 7,500 4,500 4,500 7,500 9,000 4,500 4,500 5,000 5,000 5,000 5,000 5,000 5,000 5,000 7,500 7,500 7,500 7,500 7,500 7,500 7,500 3,000 5,000 3,000 5,000 1,500 5,000 5,000 5,000 5,000 5,000 4,500 7,500 4,500 7,500 2,500 7,500 7,500 7,500 7,500 7,500 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70611 APPENDIX B TO PART 229.—SCHEDULE OF CIVIL PENALTIES 1—Continued ycherry on PROD1PC64 with PROPOSALS2 Section 2 Violation 229.117 Speed indicators ..................................................................................................................................... 229.119 Cabs, floors, and passageways: (a)(1) Cab set not securely mounted or braced ............................................................................................... (2) Insecure or improper latching device ......................................................................................................... (b) Cab windows of lead locomotive ................................................................................................................ (c) Floors, passageways, and compartments .................................................................................................. (d) Ventilation and heating arrangement .......................................................................................................... (e) Continuous barrier ...................................................................................................................................... (f) Containers for fuses and torpedoes ............................................................................................................ 229.121 Locomotive cab noise ............................................................................................................................. 229.123 Pilots, snowplows, end plates ................................................................................................................. 229.125 (a) Headlights ................................................................................................................................................... (d) Auxiliary lights ............................................................................................................................................. 229.127 Cab lights ................................................................................................................................................ 229.129 Audible warning device: (a) prescribed sound levels .............................................................................................................................. arrangement of device ...................................................................................................................................... (b) testing .......................................................................................................................................................... (c) test procedures ........................................................................................................................................... (c)(10) records of tests ..................................................................................................................................... 229.131 Sanders ................................................................................................................................................... 229.135 Event Recorders: (a) Lead locomotive without in-service event recorder .................................................................................... (b) Failure to meet equipment requirements .................................................................................................... (c) Unauthorized removal or failure to remove from service ........................................................................... (d) Improper response to out of service event recorder .................................................................................. (e) Failure to preserve data or unauthorized extraction of data ...................................................................... (g) Tampering with device or data ................................................................................................................... 229.137 Sanitation, general: (a) Sanitation compartment in lead unit, complete failure to provide required items ...................................... (1) Ventilation ................................................................................................................................................... (2) Door missing ............................................................................................................................................... (2)(i) Door doesn’t close ................................................................................................................................... (2)(ii) No modesty lock ..................................................................................................................................... (3) Not equipped with toilet in lead .................................................................................................................. (4) Not equipped with washing system ............................................................................................................ (5) Lack of paper .............................................................................................................................................. (6) Lack of trash receptacle ............................................................................................................................. (b) Exceptions: (1)(i) Commuter service, failure to meet conditions of exception ............................................................. (1)(ii) Switching service, failure to meet conditions of exception ............................................................. (1)(iii) Transfer service, failure to meet conditions of exception ............................................................... (1)(iv) Class III, failure to meet conditions of exception ........................................................................... (1)(v) Tourist, failure to meet conditions of exception .............................................................................. (1)(vi) Control cab locomotive, failure to meet conditions of exception ................................................... (2) Noncompliant toilet .............................................................................................................................. (c) Defective/unsanitary toilet in lead unit ........................................................................................................ (1)–(5) Failure to meet conditions of exception ............................................................................................... (d) Defective/unsanitary unit; failure to meet conditions for trailing position ................................................... (e) Defective/sanitary unit; failure to meet conditions for switching/transfer service ....................................... (f) Paper, washing, trash holder; failure to equip prior to departure ............................................................... (g) Inadequate ventilation; failure to repair or move prior to departure ........................................................... (h) Door closure/modesty lock; failure to repair or move ................................................................................ (i) Failure to retain/maintain of equipped units ................................................................................................ (j) Failure to equip new units/in-cab facility ...................................................................................................... (k) Failure to provide potable water ................................................................................................................. 229.139 Servicing requirements: (a) Lead occupied unit not sanitary .................................................................................................................. (b) Components not present/operating ............................................................................................................ (c) Occupied unit in switching, transfer service, in trailing position not sanitary ............................................. (d) Defective unit used more than 10 days ...................................................................................................... (e) Failure to repair defective modesty lock ..................................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00023 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Willful violation 5,000 7,500 3,000 3,000 3,000 3,000 5,000 5,000 5,000 5,000 3,000 4,500 4,500 4,500 4,500 7,500 7,500 7,500 7,500 4,500 5,000 5,000 3,000 7,500 7,500 4,500 5,000 5,000 5,000 5,000 5,000 1,500 7,500 7,500 7,500 7,500 7,500 2,500 5,000 5,000 5,000 5,000 5,000 5,000 7,500 7,500 7,500 7,500 7,500 7,500 5,000 3,000 3,000 3,000 1,500 5,000 3,000 3,000 3,000 7,500 4,500 4,500 4,500 2,500 7,500 4,500 4,500 4,500 1,500 1,500 1,500 1,500 1,500 1,500 3,000 3,000 3,000 3,000 3,000 3,000 3,000 1,500 3,000 3,000 3,000 2,500 2,500 2,500 2,500 2,500 2,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 2,500 4,500 4,500 4,500 3,000 1,500 1,500 3,000 1,500 4,500 2,500 2,500 4,500 2,500 70612 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX B TO PART 229.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 2 229.141 Violation Body structure, MU locomotives ............................................................................................................. 5,000 Willful violation 7,500 1A penalty may be assessed against an individual only for a willful violation. Generally, when two or more violations of these regulations are discovered with respect to a single locomotive that is used by a railroad, the appropriate penalties set forth above are aggregated up to a maximum of $11,000 per day. However, a failure to perform, with respect to a particular locomotive, any of the inspections and tests required under subpart B of this part will be treated as a violation separate and distinct from, and in addition to, any substantive violative conditions found on that locomotive. Moreover, the Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. Failure to observe any condition for movement set forth in § 229.9 will deprive the railroad of the benefit of the movement-for-repair provision and make the railroad and any responsible individuals liable for penalty under the particular regulatory section(s) concerning the substantive defect(s) present on the locomotive at the time of movement. Failure to comply with § 229.19 will result in the lapse of any affected waiver. 2 The penalty schedule uses section numbers from 49 CFR part 229. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. PART 230—[AMENDED] 29. The authority citation for part 230 continues to read as follows: Authority: 49 U.S.C. 20103, 20107, 20702; 28 U.S.C. 2461, note; and 49 CFR 1.49. 30. Appendix D to part 230 is revised to read as follows: APPENDIX D TO PART 230.—SCHEDULE OF CIVIL PENALTIES Section Violation Willful violation Subpart A—General ycherry on PROD1PC64 with PROPOSALS2 230.11 (a) (b) 230.12 230.13 (a) Repair of non-complying conditions: Failure to repair non-complying steam locomotive prior to use in service ................................................ Failure of owner and/or operator to approve repairs made prior to use of steam locomotive .................. Movement of non-complying steam locomotive ....................................................................................... Daily inspection: (b): (1) Inspection overdue .............................................................................................................................. (2) Inspection not performed by qualified person ..................................................................................... (c) Inspection report not made, improperly executed or not retained ............................................................. 230.14 Thirty-one service day inspection: (a): (1) Inspection overdue .............................................................................................................................. (2) Inspection not performed by qualified person ..................................................................................... (b) Failure to notify FRA ................................................................................................................................... (c) Inspection report not made, improperly executed, not properly filed ......................................................... 230.15 Ninety-two service day inspection: (a): (1) Inspection overdue .............................................................................................................................. (2) Inspection not performed by qualified person ..................................................................................... (b) Inspection report not made, improperly executed, not properly filed ......................................................... 230.16 Annual inspection: (a): (1) Inspection overdue .............................................................................................................................. (2) Inspection not performed by qualified person ..................................................................................... (b) Failure to notify FRA ................................................................................................................................... (c) Inspection report not made, improperly executed, not properly filed ......................................................... 230.17 One thousand four hundred seventy-two service day inspection: (a): (1) Inspection overdue .............................................................................................................................. (2) Inspection not performed by qualified person ..................................................................................... (b) Inspection report not made, improperly executed, not properly maintained, not properly filed ................. 230.18 Service days: (a) Service day record not available for inspection ......................................................................................... (b) Failure to file service day report with FRA Regional Administrator ........................................................... (c) Failure to complete all 1,472 service day inspection items prior to returning retired steam locomotive to service ........................................................................................................................................................... 230.19 Posting of forms: (a) FRA Form No. 1: (1) FRA Form No. 1 not properly filled out ............................................................................................... (2) FRA Form No. 1 not properly displayed ............................................................................................. (b) FRA Form No. 3: (1) FRA Form No. 3 not properly filled out ............................................................................................... (2) FRA Form No. 3 not properly displayed ............................................................................................. VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00024 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 $3,000 3,000 (1) $4,500 4,500 (1 ) 5,000 3,000 3,000 7,500 4,500 4,500 5,000 3,000 3,000 3,000 7,500 4,500 4,500 4,500 5,000 3,000 3,000 7,500 4,500 4,500 5,000 3,000 3,000 3,000 7,500 4,500 4,500 4,500 5,000 3,000 3,000 7,500 4,500 4,500 3,000 3,000 4,500 4,500 5,000 7,500 3,000 3,000 4,500 4,500 3,000 3,000 4,500 4,500 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70613 APPENDIX D TO PART 230.—SCHEDULE OF CIVIL PENALTIES—Continued Section Violation 230.20 Alteration and repair reports: (a) Alterations: (1) Failure to properly file FRA Form No. 19 with FRA Regional Administrator ...................................... (2) FRA Form No. 19 not properly filled out ............................................................................................. (3) FRA Form No. 19 not properly maintained ......................................................................................... (b) Repairs to unstayed portions of the boiler: (1) FRA Form No. 19 not properly filled out ............................................................................................. (2) FRA Form No. 19 not properly maintained ......................................................................................... (c) Repairs to stayed portions of the boiler: (1) FRA Form No. 19 not properly filled out ............................................................................................. (2) FRA Form No. 19 not properly maintained ......................................................................................... 230.21 Failure to properly document steam locomotive number Change ........................................................... Willful violation 3,000 3,000 3,000 4,500 4,500 4,500 3,000 3,000 4,500 4,500 3,000 3,000 3,000 4,500 4,500 4,500 5,000 7,500 8,500 8,500 11,000 11,000 3,000 4,500 6,500 9,000 3,000 3,000 4,500 4,500 5,000 6,500 7,500 9,000 6,500 9,000 6,500 6,500 9,000 9,000 5,000 5,000 3,000 7,500 7,500 4,500 5,000 5,000 7,500 7,500 5,000 7,500 5,000 7,500 5,000 5,000 7,500 7,500 5,000 7,500 5,000 7,500 3,000 4,500 3,000 4,500 5,000 5,000 5,000 7,500 7,500 7,500 3,000 4,500 ycherry on PROD1PC64 with PROPOSALS2 Subpart B—Boilers and Appurtenances 230.22 Failure to properly report accident resulting from failure of steam locomotive boiler or part or appurtenance thereof .................................................................................................................................................... 230.23 Responsibility for general construction and safe working pressure: (a) Failure to properly establish safe working pressure for steam locomotive boiler ...................................... (b) Placing steam locomotive in service before safe working pressure for boiler has been established ....... 230.24 Maximum allowable stress values on boiler components: (a) Use of materials not of sufficient tensile strength ...................................................................................... (b) Use of a safety factor value of less than 4 when using the code of original construction in boiler calculations ........................................................................................................................................................ 230.25 Maximum allowable stresses on stays and braces: (a) Exceeding allowable stress values on fire box and/or combustion chamber ............................................ (b) Exceeding allowable stress values on round, rectangular or gusset braces ............................................. 230.29 Inspection and repair: (a): (1) Failure of owner and/or operator to inspect and repair any steam locomotive boiler and/or appurtenance under control thereof ............................................................................................................... (2) Failure to remove steam locomotive from service when considered necessary to do so .................. (b): (1) Failure of perform repairs in accordance with accepted industry standards ...................................... (2) Owner and/or operator returning steam locomotive boiler and/or appurtenances to service before they are in good condition and safe and suitable for service ............................................................... 230.30 Lap-joint seam boilers, Failure to properly inspect ................................................................................... 230.31 Flues to be removed: (a): (1) Failure to remove all flues when inspecting boiler .............................................................................. (2) Failure to enter boiler and clean and inspect ...................................................................................... (b) Failure to remove superheater flues when deemed necessary to do so ................................................... 230.32 Time and method of inspection: (a) Failure to perform 1,472 service day inspection when required to do so .................................................. (b) Failure to properly inspect boiler during 1,472 service day inspection ...................................................... 230.33 Welded repairs and alterations: (a) Failure to obtain permission before welding on unstayed portions of boiler containing alloy or carbon steel with carbon content over .25 percent carbon ...................................................................................... (b) Failure to perform welding on unstayed portions of boiler containing carbon steel not exceeding .25 percent carbon in accordance with a nationally accepted standard for boiler repairs ................................ (c): (1) Failure to submit written request for approval before performing weld buildup on wasted areas of unstayed boiler surfaces that exceed 100 square inches or the smaller of 25 percent of minimum required wall thickness or 1⁄2 inch ......................................................................................................... (2) Repairing wasted sheets ..................................................................................................................... 230.34 Riveted repairs and alterations: (a) Failure to obtain approval before making riveted alterations on unstayed portions of the boiler; failure to do riveting in accordance with established railroad practices or accepted national standards for boiler repairs ........................................................................................................................................................... (b) Failure to perform riveted repairs on unstayed boiler portions in accordance with established railroad practices or accepted national standards for boiler repairs ......................................................................... (c) Failure to perform riveted repairs on stayed boiler portions in accordance with established railroad practices or accepted national standards for boiler repairs ......................................................................... 230.35 Failure to raise temperature of steam locomotive boiler to 70 degrees F. before applying hydrostatic pressure to the boiler ........................................................................................................................................... 230.36 Hydrostatic testing of boilers: (a) Failure to perform hydrostatic test of boiler as required ............................................................................ (b) Failure to properly perform hydrostatic test ................................................................................................ (c) Failure to properly inspect boiler after conducting hydrostatic test above MAWP .................................... 230.37 Failure to perform proper steam test or inspection of boiler after completion of repair or alteration to boiler ..................................................................................................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00025 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70614 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX D TO PART 230.—SCHEDULE OF CIVIL PENALTIES—Continued ycherry on PROD1PC64 with PROPOSALS2 Section Violation 230.38 Telltale holes: (a) Failure to have telltale holes as required in staybolts ................................................................................ (b) Failure to have proper telltale holes in reduced body staybolts ................................................................ (c) Failure to keep telltales holes when so required ........................................................................................ 230.39 Broken staybolts: (a) Boiler in service with excess number of broken staybolts ......................................................................... (b) Failure to replace staybolts when required to do so; to properly replace staybolts when so required; to inspect adjacent staybolts when replacing broken staybolts ....................................................................... (c) Failure to count leaking, plugged, or missing telltale holes as broken staybolts ....................................... (d) Closing telltale holes by prohibited means ................................................................................................. 230.40 Time and method of staybolt testing: (a) Failure to hammer test staybolts when so required ................................................................................... (b) Failure to properly hammer test staybolts .................................................................................................. 230.41 Flexible staybolts with caps: (a) Failure to inspect flexible staybolts as required ......................................................................................... (b) Failure to replace broken flexible staybolts; failure to close inner ends of telltale holes as required ....... (c) Failure to report removal of flexible staybolts caps and other tests on FRA Form No. 3 when so required ............................................................................................................................................................ (d) Failure to remove staybolt caps or otherwise test when FRA inspector or steam locomotive owner and/ or operator consider it necessary to do so ................................................................................................... 230.42 Failure to have accurate boiler steam gauge where engine crew can conveniently read ....................... 230.43 Failure to have gauge siphon of proper capacity on steam gauge supply pipe; failure to properly clean, maintain the steam gauge supply pipe ..................................................................................................... 230.44 Failure to test steam gauge when so required ......................................................................................... 230.45 Failure to properly test and/or set steam gauge ...................................................................................... 230.46 Failure to attach to boiler backhead metal badge plate showing allowable steam pressure .................. 230.47 Boiler Number: (a) (b) (c) Failure to stamp builder’s number on boiler when number is known ............................................. 230.48 Number and capacity of safety relief valves: (a) Failure to equip steam locomotive boiler with proper safety relief valves ................................................. (b) Failure to provide additional safety relief valve capacity when so required .............................................. 230.49 Setting of safety relief valves: (a) Safety relief valve(s) set and/or adjusted by person not competent to do so ........................................... (b) Safety relief valve(s) not set to open at prescribed pressure(s) ................................................................ (c) Safety relief valve(s) not properly set ......................................................................................................... (d) Set pressure of lowest safety relief valve not properly indicated ............................................................... 230.50 Failure to test and adjust safety relief valves when required to do so .................................................... 230.51 Failure to equip steam locomotive boiler with at least 2 properly installed water glasses ...................... 230.52 Failure to properly equip water glasses .................................................................................................... 230.53 Failure to properly clean water glass valves and/or gauge cocks when required to do so ..................... 230.54 Testing and maintenance: (a) Failure to properly test water glasses and/or gauge cocks ....................................................................... (b) Failure to properly maintain gauge cocks, water column drain valves, and/or water glass valves ........... 230.55 Tubular type water and lubricator glasses and shields: (a) Failure to renew tubular type water glasses as required ........................................................................... (b) Failure to properly shield tubular water glasses and/or lubricator glasses ................................................ (c) Failure to properly locate and/or maintain water glasses and/or water glass shields ............................... 230.56 Failure to equip water glass with suitable lamp ....................................................................................... 230.57 Injectors and feedwater pumps: (a) Failure to equip steam locomotive with proper means for delivering water to the boiler .......................... (b) Failure to properly test and/or maintain injectors, feedwater pumps, boiler checks, delivery pipes, feed water pipes, tank hose, tank valves ............................................................................................................. (c) Failure to properly brace injectors, feedwater pumps, and/or associated piping ....................................... 230.58 Flue plugs: (a) Plugging flue plugs when not otherwise permitted ..................................................................................... (b) Improperly plugging flue plugs, when otherwise permitted ........................................................................ 230.59 Failure to remove and properly clean fusible boiler plugs when required to do so; failure to properly note removal ........................................................................................................................................................ 230.60 Time of washing: (a) Failure to thoroughly wash boiler when required to do so ......................................................................... (b) Failure to remove washout plugs, arch tube plugs, thermic siphon plugs, circulator plugs, water bar plugs when washing locomotive boiler ......................................................................................................... (c) Failure to examine and/or properly maintain washout plugs, washout plug sleeves, threaded openings (d) Failure to clean fusible plugs when required to do so ............................................................................... 230.61 Arch tubes, water bar tubes, circulators and thermic siphons: (a) Failure to clean, wash, inspect arch tubes, water bar tubes, circulators and thermic siphons as required ............................................................................................................................................................ (b) Failure to renew arch tubes, water bar tubes; failure to repair or renew circulators, thermic siphons when required ............................................................................................................................................... (c) Failure to properly inspect and/or replace as necessary arch tubes, water bar tubes, circulators ........... 230.62 Failure to properly inspect and/or repair or replace as necessary dry pipes subject to pressure ........... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00026 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Willful violation 3,000 3,000 3,000 4,500 4,500 4,500 5,000 7,500 5,000 5,000 5,000 7,500 7,500 7,500 3,000 3,000 4,500 4,500 3,000 3,000 4,500 4,500 3,000 4,500 3,000 6,500 4,500 9,000 3,000 3,000 3,000 3,000 4,500 4,500 4,500 4,500 3,000 4,500 6,500 6,500 9,000 9,000 6,500 6,500 6,500 3,000 5,000 3,000 6,500 3,000 9,000 9,000 9,000 4,500 7,500 4,500 9,000 4,500 3,000 5,000 4,500 7,500 3,000 3,000 3,000 3,000 4,500 4,500 4,500 4,500 6,500 9,000 6,500 3,000 9,000 4,500 3,000 3,000 4,500 4,500 5,000 7,500 3,000 4,500 5,000 5,000 5,000 7,500 7,500 7,500 3,000 4,500 5,000 5,000 6,500 7,500 7,500 9,000 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70615 APPENDIX D TO PART 230.—SCHEDULE OF CIVIL PENALTIES—Continued ycherry on PROD1PC64 with PROPOSALS2 Section Violation 230.63 Failure to properly inspect smoke box, steam pipes, pressure parts when required to do so ................ 230.64 Failure to remove from service steam locomotive boiler leaking under lagging from condition which may reduce safety and/or repair the boiler before returning to service .............................................................. 230.65 Failure to keep steam locomotive boiler, piping, appurtenances in repair so steam does not obscure vision .................................................................................................................................................................... 230.66 Failure to properly oversee general design, construction, maintenance of steam locomotive(s) and tender(s) ............................................................................................................................................................... 230.67 Failure to ensure all steam locomotives and tenders are properly inspected and repaired and/or all defects are properly repaired and steam locomotive and/or tender are in good condition, safe and suitable for service before being returned to service ........................................................................................................ 230.68 Failure to equip steam locomotive that operates in excess of 20 miles per hour over the general system with speed indicator maintained to ensure accurate functioning ................................................................. 230.69 Failure to equip steam locomotive with properly supported ash pan with operating mechanism that may be safely operated and securely closed ...................................................................................................... 230.70 Safe condition: (a) Failure to perform proper pre-departure inspection when so required ...................................................... (b) Failure to properly equip steam locomotive with brake pipe valve clearly identified as ‘‘Emergency Brake Valve’’ ................................................................................................................................................. 230.71 Orifice testing of air compressors: (a)(b): Failure to properly test and/or maintain air compressor(s) capacity ........................................................ 230.72 Testing main reservoirs: (a) Failure to properly test main reservoir(s) when required ........................................................................... (b) Impermissibly or improperly drilling main reservoir .................................................................................... (c) Impermissibly using NDE method to measure wall thickness of main reservoirs ..................................... (d) Failure to use appropriate method of NDE testing of wall thickness of welded or riveted longitudinal lap seam main reservoir(s); failure to withdraw main reservoir(s) from service when testing reveals insufficient wall thickness ....................................................................................................................................... 230.73 Air gauges: (a) Failure to equip steam locomotive with properly located air gauge(s) that are no more than 3 psi in error ............................................................................................................................................................... (b) Failure to test air gauge(s) when so required ............................................................................................ (c) Failure to properly test air gauge(s) ........................................................................................................... 230.74 Failure to properly clean and/or test all air brake valves, related dirt collectors, filters when required to do so .................................................................................................................................................................... 230.75 Failure to properly stencil or display date of testing and cleaning and initials of shop or station performing work ......................................................................................................................................................... 230.76 Piston travel: (a) Insufficient minimum piston travel .............................................................................................................. (b) Excessive piston travel when steam locomotive is stationary ................................................................... 230.77 Foundation brake gear: (a) Failure to properly maintain foundation brake gear ................................................................................... (b) Foundation brake gear less than 2.5 inches above rail ............................................................................. 230.78 Leakage: (a): (1) Failure to test for leakage from main reservoir or related piping as required .................................... (2) Failure to repair excessive leakage from main reservoir or related piping leakage ........................... (b) Failure to test for brake cylinder as required ............................................................................................. (c): (1) Failure to test for leakage from steam locomotive brake pipe as required ........................................ (2) Failure to repair excessive brake pipe leakage .................................................................................. 230.79 Train signal system: (1) Failure to test the train signal system or other form of on-board communication as required .................. (2) Failure to repair train signal system or other on-board communication when not safe or suitable for service ........................................................................................................................................................... 230.80 Cabs: (a) Steam locomotive cab not safe and suitable for service ........................................................................... (b) Steam pipes: Construction, attachment ...................................................................................................... (c) Oil-burning steam locomotive, cab-enclosed .............................................................................................. 230.81 Cab aprons: (a) Cab apron, general provisions .................................................................................................................... (b) Cab apron, insufficient width ...................................................................................................................... 230.82 Fire doors: (a) Safe and suitable for service, general provisions ...................................................................................... (b) Construction and maintenance of mechanically operated fire doors ......................................................... (c) Construction and maintenance of hand-operated fire doors. ..................................................................... 230.83 Cylinder cocks: (1) Failure to properly equip with cylinder cocks ............................................................................................. (2) Failure to properly maintain cylinder cocks ................................................................................................ 230.84 Sanders: (1) Inoperable sanders ..................................................................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00027 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Willful violation 5,000 7,500 5,000 7,500 3,000 4,500 3,000 4,500 6,500 9,000 3,000 4,500 3,000 4,500 3,000 4,500 3,000 4,500 3,000 4,500 3,000 3,000 3,000 4,500 4,500 4,500 5,000 7,500 3,000 3,000 3,000 4,500 4,500 4,500 3,000 4,500 3,000 4,500 3,000 3,000 4,500 4,500 3,000 3,000 4,500 4,500 3,000 3,000 3,000 4,500 4,500 4,500 3,000 3,000 4,500 4,500 3,000 4,500 3,000 4,500 3,000 3,000 3,000 4,500 4,500 4,500 3,000 3,000 4,500 4,500 3,000 3,000 3,000 4,500 4,500 4,500 3,000 3,000 4,500 4,500 3,000 4,500 70616 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX D TO PART 230.—SCHEDULE OF CIVIL PENALTIES—Continued ycherry on PROD1PC64 with PROPOSALS2 Section Violation (2) Failure to test sanders ................................................................................................................................ 230.85 Audible warning devices: (a) General provisions ...................................................................................................................................... (b) Sound level measurements, Failure to properly take ................................................................................. 230.86 Required illumination: (a) General provisions ...................................................................................................................................... (b) Dimming device, Failure to properly equip with ......................................................................................... (c) Multiple locomotives, Failure of lead locomotive to display headlight ........................................................ 230.87 Cab lights: Failure to properly equip with ................................................................................................. 230.88 Throttles: Failure to properly maintain, equip ........................................................................................... 230.89 Reverse gear: (a) General provisions ...................................................................................................................................... (b) Air-operated power reverse gear ................................................................................................................ (c) Power reverse gear reservoirs .................................................................................................................... 230.90 Draw gear and draft systems: (a) Maintenance and testing ............................................................................................................................. (b) Safety bars and chains, general ................................................................................................................. (c) Safety bars and chains, minimum length ................................................................................................... (d) Lost motion between steam locomotive and tender ................................................................................... (e) Spring buffers: Improper application, compression .................................................................................... 230.91 Chafing irons: Improper application, maintenance ................................................................................... 230.92 Draw gear, draft systems: Improperly maintained, fastened .................................................................... 230.93 Pistons and piston rods: (a) Failure to properly inspect, maintain, renew .............................................................................................. (b) Fasteners: Failure to keep tight, properly equip ......................................................................................... 230.94 Crossheads: Improperly maintained, excess clearance ........................................................................... 230.95 Guides: Failure to securely fasten, properly maintain .............................................................................. 230.96 Main, side, valve motion rods: (a) General ....................................................................................................................................................... (b) Repairs ........................................................................................................................................................ (1) Failure to make in accordance with accepted national standard ........................................................ (2) Failure to submit written request for approval prior to welding ........................................................... (c) Bearings and bushings ............................................................................................................................... (d) Rod side motion: Excessive motion ........................................................................................................... (e) Oil, grease cups: Failure to securely fasten, properly equip ...................................................................... (f) Main rod bearings: (1) excessive bore ..................................................................................................................................... (2) excessive lost motion .......................................................................................................................... (g) Side rod bearings, excessive bore ............................................................................................................. 230.97 Crank pins: (a) General provisions ...................................................................................................................................... (b) Maintenance: Failure to maintain in safe, suitable condition ..................................................................... 230.98 Driving, trailing, engine truck axles: (a) Condemning defects ................................................................................................................................... (b) Journal diameter: Failure to stamp on end of axle .................................................................................... 230.99 Tender truck axle: Insufficient diameter .................................................................................................... 230.100 Defects in tender truck axles and journals: (a) Tender truck axle condemning defects ...................................................................................................... (b) Tender truck journal condemning defects .................................................................................................. 230.101 Steam locomotive driving journal boxes: (a) Driving journal boxes: Failure to properly maintain .................................................................................... (b) Broken bearings: Failure to renew ............................................................................................................. (c) Loose bearings: Failure to repair or renew ................................................................................................ 230.102 Tender plain bearing journal boxes: Failure to repair ............................................................................ 230.103 Tender roller bearing journal boxes: Failure to properly maintain ......................................................... 230.104 Driving box shoes and wedges: Failure to properly maintain ................................................................ 230.105 Lateral motion: (a) Condemning limits: Total lateral motion in excess of ................................................................................. (b) Limits exceeded, failure to demonstrate conditions require additional lateral motion ............................... (c) Interferes with other parts of steam locomotive ......................................................................................... 230.106 Steam locomotive frame: (a) Failure to properly inspect and/or maintain ................................................................................................ (b) Broken frames, not properly patched or secured ....................................................................................... 230.107 Tender frame and body: (a) Failure to properly maintain ........................................................................................................................ (b) Height difference between tender deck and steam locomotive cab floor or deck excessive .................... (c) Gangway minimum width excessive ........................................................................................................... (d) Tender frame condemning defects ............................................................................................................. 230.108 Steam locomotive leading and trailing trucks: (a) Failure to properly maintain ........................................................................................................................ (b) Safety chain, suitable safety chain not provided ........................................................................................ VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00028 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Willful violation 3,000 4,500 3,000 3,000 4,500 4,500 3,000 3,000 3,000 3,000 3,000 4,500 4,500 4,500 4,500 4,500 3,000 3,000 3,000 4,500 4,500 4,500 3,000 3,000 3,000 3,000 3,000 3,000 3,000 4,500 4,500 4,500 4,500 4,500 4,500 4,500 3,000 3,000 3,000 3,000 4,500 4,500 4,500 4,500 3,000 3,000 3,000 3,000 3,000 3,000 3,000 4,500 4,500 4,500 4,500 4,500 4,500 4,500 3,000 3,000 3,000 4,500 4,500 4,500 3,000 3,000 4,500 4,500 3,000 1,500 3,000 4,500 2,500 4,500 3,000 3,000 4,500 4,500 3,000 3,000 3,000 3,000 3,000 3,000 4,500 4,500 4,500 4,500 4,500 4,500 3,000 3,000 3,000 4,500 4,500 4,500 3,000 6,500 4,500 9,000 3,000 3,000 3,000 5,000 4,500 4,500 4,500 7,500 3,000 3,000 4,500 4,500 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70617 APPENDIX D TO PART 230.—SCHEDULE OF CIVIL PENALTIES—Continued Section Violation ycherry on PROD1PC64 with PROPOSALS2 (c) Insufficient truck clearance ......................................................................................................................... 230.109 Tender trucks: (a): (1) Tender truck frames ............................................................................................................................ (2) Tender truck center plate .................................................................................................................... (b) Tender truck bolsters: Failure to properly maintain .................................................................................... (c) Condemning defects, springs and/or spring rigging ................................................................................... (d) Truck securing arrangement: Not properly maintained .............................................................................. (e) Side bearings, truck centering devices ....................................................................................................... (f) Friction side bearings: Run in contact ......................................................................................................... (g): (1) Side bearings, failure to equip rear trucks with ................................................................................... (2) Insufficient clearance of ....................................................................................................................... 230.110 Pilots: (a) General provisions ...................................................................................................................................... (b) Clearance, insufficient or excessive ........................................................................................................... 230.111 Spring rigging: (a) Arrangement of springs and equalizers ...................................................................................................... (b) Spring or spring rigging condemning defects ............................................................................................. 230.112 Wheels and tires: (a) Improperly Mounted, excess variance in axle diameter ............................................................................. (b) Out of gage ................................................................................................................................................. (c) Flange distance variance, excessive .......................................................................................................... (d) Tire thickness, insufficient ........................................................................................................................... (e) Tire width, insufficient ................................................................................................................................. 230.113 Wheels and tire defects: (1) Failure to repair ........................................................................................................................................... (2) Welding on, except as otherwise provided for ........................................................................................... (a) Cracks or breaks in ..................................................................................................................................... (b) Flat spots .................................................................................................................................................... (c) Chipped flange ............................................................................................................................................ (d) Broken rim ................................................................................................................................................... (e) Shelled-out spots ........................................................................................................................................ (f) Seams .......................................................................................................................................................... (g) Worn flanges, excessive wear .................................................................................................................... (h) Worn treads, excessive wear ..................................................................................................................... (i) Flange height, insufficient or excessive ....................................................................................................... (j) Rim thickness, insufficient ............................................................................................................................ (k) Wheel diameter, excessive variance .......................................................................................................... 230.114 Wheel centers: (a) Filling blocks and shims .............................................................................................................................. (b) Wheel center condemning limits, failure to repair ...................................................................................... (c) Wheel center repairs ................................................................................................................................... (d) Counterbalance maintenance ..................................................................................................................... 230.115 Feed water tanks: (a) General provisions ...................................................................................................................................... (b) Inspection frequency, failure to inspect as required ................................................................................... (c) Top of tender: Improperly maintained and/or equipped ............................................................................. 230.116 Oil tanks: (1) Failure to properly maintain ........................................................................................................................ (2) Failure to equip with complying safety cut-off device ................................................................................ Willful violation 3,000 4,500 3,000 3,000 5,000 3,000 3,000 3,000 3,000 4,500 4,500 7,500 4,500 4,500 4,500 4,500 3,000 3,000 4,500 4,500 3,000 3,000 4,500 4,500 3,000 3,000 4,500 4,500 5,000 3,000 3,000 3,000 3,000 7,500 4,500 4,500 4,500 4,500 3,000 5,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 4,500 7,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 3,000 3,000 3,000 3,000 4,500 4,500 4,500 4,500 3,000 3,000 3,000 4,500 4,500 4,500 6,500 8,500 9,000 11,000 1 A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. Failure to observe any condition for movement set forth in § 230.12 will deprive the railroad of the benefit of the movement-for-repair provision and make the railroad and any responsible individuals liable for penalty under the particular regulatory section(s) concerning the substantive defect(s) present on the locomotive at the time of movement. Failure to comply with § 230.12 will result in the lapse of any affected waiver. Generally, when two or more violations of these regulations are discovered with respect to a single locomotive that is used by a railroad, the appropriate penalties set forth are aggregated up to a maximum of $11,000 per day. However, a failure to perform, with respect to a particular locomotive, any of the inspections and tests required under this part, will be treated as a violation separate and distinct from, and in addition to, any substantive violative conditions found on that locomotive. The penalty schedule uses section numbers from 49 CFR part 230. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. PART 231—[AMENDED] 31. The authority citation for part 231 continues to read as follows: VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 Authority: 49 U.S.C. 20103, 20107, 20702; 28 U.S.C. 2461, note; and 49 CFR 1.49. PO 00000 Frm 00029 Fmt 4701 Sfmt 4702 32. Appendix A to part 231 is revised to read as follows: E:\FR\FM\05DEP2.SGM 05DEP2 70618 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX A TO PART 231.—SCHEDULE OF CIVIL PENALTIES 1 ycherry on PROD1PC64 with PROPOSALS2 Section 110.A1 110.A2 110.A3 110.B1 110.B2 110.B3 110.B4 110.B5 110.B6 110.B8 114.B2 114.B3 120.A1 120.A2 120.A3 120.B1 120.B2 120.C1 120.C2 120.C3 120.C4 124.A1 124.A2 124.A3 124.A4 124.B1 124.B2 124.B3 124.C1 124.C2 126.A1 126.A2 126.A3 126.B1 126.B2 126.C1 126.C2 126.C3 126.C4 128.A1 128.A2 128.A3 128.B1 128.B2 128.C1 128.C2 128.D1 128.D2 128.D3 130.A1 130.A2 130.A3 130.B1 130.B2 130.B3 132.A1 132.A2 132.A3 132.B1 132.B2 134.A1 134.A2 134.A3 134.B1 134.B2 134.C1 134.C2 134.C3 134.C4 134.D1 136.A1 Violation Hand Brake or Hand Brake Part Missing ................................................................................................. Hand Brake or Hand Brake Part Broken .................................................................................................. Hand Brake or Hand Brake Part Loose or Worn ..................................................................................... Hand Brake Inoperative ............................................................................................................................ Hand Brake Inefficient .............................................................................................................................. Hand Brake Improperly Applied ............................................................................................................... Hand Brake Incorrectly located ................................................................................................................ Hand Brake Shaft Welded or Wrong Dimension ..................................................................................... Hand Brake Shaft Not Retained in Operating Position ............................................................................ Hand Brake or Hand Brake Parts Wrong Design .................................................................................... Hand Brake Wheel or Lever Has Insufficient Clearance Around Rim or Handle .................................... Hand Brake Wheel/Lever Clearance Insufficient to Vertical Plane Through Inside Face of Knuckle ..... Brake Step Missing Except by Design ..................................................................................................... Brake Step or Brace Broken or Decayed ................................................................................................. Brake Step or Brace Loose ...................................................................................................................... Brake Step or Brace Bent ........................................................................................................................ Brake Step or Wrong Dimensions ............................................................................................................ Brake Step Improperly Applied ................................................................................................................ Brake Step Improperly Located ................................................................................................................ Brake Step With Less Than 4″ Clearance to Vertical Plane through Inside Face of Knuckle ................ Brake Step Obstructed or Otherwise Unsafe ........................................................................................... Running Board Missing or Part Missing Except By Design ..................................................................... Running Board Broken or Decayed ......................................................................................................... Running Board Loose Presents a Tripping Hazard or Other Unsafe Condition ...................................... Running Board Wrong Material ................................................................................................................ Running Board Bent to the Extent that It is Unsafe ................................................................................. Running Board Wrong Dimensions .......................................................................................................... Running Board Wrong Location ............................................................................................................... Running Board Improperly Applied .......................................................................................................... Running Board Obstructed ....................................................................................................................... End Platform Missing or Part Except By Design ..................................................................................... End Platform Broken or Decayed ............................................................................................................. End Platform Loose .................................................................................................................................. End Platform or Brace Bent ..................................................................................................................... End Platform Wrong Dimensions ............................................................................................................. End Platform Improperly Applied ............................................................................................................. End Platform With Less Than Required Clearance to Vertical Plane Through Inside Knuckle .............. End Platform Improperly Located ............................................................................................................. End Platform Obstructed .......................................................................................................................... Platform or Switching Step Missing .......................................................................................................... Platform or Switching Step Broken or Decayed ....................................................................................... Platform or Switching Step Loose ............................................................................................................ Platform or Switching Step Bent .............................................................................................................. Platform or Switching Step Does Not Meet the Required Location or Dimensions ................................ Platform or Switching Step Improperly Applied or Repaired ................................................................... Platform or Switching Step Obstructed .................................................................................................... Switching Step Back Stop or Kick Plate Missing ..................................................................................... Switching Step Not Illuminated When Required ...................................................................................... Non-Illuminated Step Not Painted Contrasting Color .............................................................................. Sill Step or Additional Tread, Missing ...................................................................................................... Sill Step or Additional Tread, Broken ....................................................................................................... Sill Step or Additional Tread, Loose ......................................................................................................... Sill Step or Additional Tread, Bent ........................................................................................................... Sill Step or Additional Tread, Having Wrong Dimensions or Improperly Located ................................... Sill Step Improperly Applied ..................................................................................................................... Side Missing Step ..................................................................................................................................... Side Door Step Broken ............................................................................................................................. Side Door Step Loose .............................................................................................................................. Side Door Step Bent ................................................................................................................................. Side Door Step Having Wrong Dimensions ............................................................................................. Ladder Missing ......................................................................................................................................... Ladder Broken .......................................................................................................................................... Ladder Loose ............................................................................................................................................ Ladder Bent .............................................................................................................................................. Ladder Having Wrong Dimensions ........................................................................................................... Ladder Improperly Applied ....................................................................................................................... Ladder Having Insufficient Clearance or Improperly Located .................................................................. Ladder Wrong Design .............................................................................................................................. Ladder Wrong Material ............................................................................................................................. End Clearance Insufficient ....................................................................................................................... Ladder Tread or Handholds Missing ........................................................................................................ VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00030 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 $6,500 6,500 5,000 6,500 5,000 5,000 3,000 3,000 3,000 3,000 3,000 3,000 6,500 6,500 5,000 5,000 3,000 3,000 3,000 3,000 5,000 6,500 6,500 6,500 3,000 5,000 3,000 3,000 3,000 5,000 6,500 6,500 5,000 3,000 3,000 3,000 3,000 3,000 5,000 6,500 6,500 5,000 5,000 3,000 5,000 5,000 3,000 3,000 1,500 6,500 6,500 5,000 5,000 3,000 3,000 6,500 6,500 5,000 5,000 3,000 6,500 6,500 5,000 5,000 3,000 3,000 3,000 3,000 3,000 3,000 6,500 Willful violation $9,000 9,000 7,500 9,000 7,500 7,500 4,500 4,500 4,500 4,500 4,500 4,500 9,000 9,000 7,500 7,500 4,500 4,500 4,500 4,500 7,500 9,000 9,000 9,000 4,500 7,500 4,500 4,500 4,500 7,500 9,000 9,000 7,500 4,500 4,500 4,500 4,500 4,500 7,500 9,000 9,000 7,500 7,500 4,500 7,500 7,500 4,500 4,500 2,500 9,000 9,000 7,500 7,500 4,500 4,500 9,000 9,000 7,500 7,500 4,500 9,000 9,000 7,500 7,500 4,500 4,500 4,500 4,500 4,500 4,500 9,000 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70619 APPENDIX A TO PART 231.—SCHEDULE OF CIVIL PENALTIES 1 Section 136.A2 136.A3 136.B1 136.B2 136.C1 136.C2 136.C3 136.C4 136.C5 138.A1 138.A2 138.A3 138.B1 138.B2 138.C1 138.C2 138.C3 140.A1 140.A2 140.B1 140.C1 140.C2 140.D1 140.D2 144.A1 144.B1 144.C1 145.A1 145.A2 145.B1 145.B2 145.B3 146.A 146.B 231.31 Violation Ladder Tread or Handhold Broken ........................................................................................................... Ladder Tread or Handhold Loose Except By Design .............................................................................. Ladder Tread or Handhold Bent to The Extent That It May Be Unsafe .................................................. Ladder Tread or Handhold Wrong Dimensions ....................................................................................... Ladder Tread or Handhold Improperly Applied ........................................................................................ Ladder Tread or Handhold Having Wrong Clearance ............................................................................. Ladder or Handhold Improperly Located ................................................................................................. Ladder Tread or Handhold Obstructed .................................................................................................... Ladder Tread Without Footguards ........................................................................................................... Hand or Safety Railing Missing ................................................................................................................ Hand or Safety Railing Broken ................................................................................................................. Hand or Safety Railing Loose Except by Design ..................................................................................... Hand or Safety Railing Bent ..................................................................................................................... Hand or Safety Railing Wrong Dimensions .............................................................................................. Hand or Safety Railing Improperly Applied .............................................................................................. Hand or Safety Railing Having Less Than the Required Clearance ....................................................... Hand or Safety Railing Improperly Located ............................................................................................. Uncoupling Lever Missing ........................................................................................................................ Uncoupling Lever Broken or Disconnected .............................................................................................. Uncoupling Lever Bent Will Not Safely and Reasonably Function As Intended ..................................... Uncoupling Lever Bracket Bent Lever Will Not Function Properly .......................................................... Uncoupling Lever Bracket Broken or Missing .......................................................................................... Uncoupling Lever Wrong Dimension ........................................................................................................ Uncoupling Lever With Improper Handle Clearance ............................................................................... Coupler Missing ........................................................................................................................................ Coupler Height Incorrect ........................................................................................................................... Coupler Inoperative .................................................................................................................................. Kick Plates Missing ................................................................................................................................... Kick Plates Broken ................................................................................................................................... Kick Plates Wrong Dimensions ................................................................................................................ Kick Plates Improper Clearance ............................................................................................................... Kick Plates Insecure Or Improperly Applied ............................................................................................ Notice or Stencil not Posted on Cabooses with Running Boards Removed ............................................. Safe Means not Provided to Clean or Maintain Windows of Caboose ..................................................... Drawbars, standard height ........................................................................................................................ 6,500 5,000 5,000 3,000 3,000 3,000 3,000 5,000 5,000 6,500 6,500 5,000 5,000 3,000 3,000 3,000 3,000 5,000 5,000 5,000 5,000 5,000 3,000 3,000 6,500 3,000 5,000 3,000 3,000 3,000 3,000 3,000 1,500 1,500 5,000 Willful violation 9,000 7,500 7,500 4,500 4,500 4,500 4,500 7,500 7,500 9,000 9,000 7,500 7,500 4,500 4,500 4,500 4,500 7,500 7,500 7,500 7,500 7,500 4,500 4,500 9,000 4,500 7,500 4,500 4,500 4,500 4,500 4,500 2,500 2,500 7,500 1 A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. 2 This schedule uses section numbers from FRA’s Safety Appliance Defect Code, a restatement of the CFR text in a reorganized format. For convenience, and as an exception to FRA’s general policy, penalty citations will cite the defect code rather than the CFR. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR and/or statutory citation in place of the defect code section cited in the penalty demand letter. PART 232—[AMENDED] 33. The authority citation for part 232 continues to read as follows: Authority: 49 U.S.C. 20102–20103, 20107, 20133, 20141, 20301–20303, 20306, 21301– 21302, 21304; 28 U.S.C. 2461, note; and 49 CFR 1.49. 34. Appendix A to part 232 is revised to read as follows: APPENDIX A TO PART 232.—SCHEDULE OF CIVIL PENALTIES Section Violation Willful violation ycherry on PROD1PC64 with PROPOSALS2 Subpart A—General 232.15 Movement of power brake defects: (a) Improper movement, general ...................................................................................................................... (11) Failure to make determinations and provide notification of en route defect ..................................... (b) Complete failure to tag ............................................................................................................................... (1) Insufficient tag or record ...................................................................................................................... (2), (4) Improper removal of tag ................................................................................................................ (3) Failure to retain record of tag .............................................................................................................. (c) Improper loading or purging ........................................................................................................................ (e) Improper placement of defective equipment .............................................................................................. 232.19 Availability of records ................................................................................................................................ (1) $5,000 5,000 1,500 5,000 5,000 5,000 5,000 (1) (1 ) $7,500 7,500 2,500 7,500 7,500 7,500 7,500 (1 ) 5,000 6,500 7,500 9,000 Subpart B—General Requirements 232.103 All train brake systems: (a)–(c), (h)–(i) Failure to meet general design requirements ........................................................................... (d) Failure to have proper percentage of operative brakes from Class I brake test ....................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00031 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70620 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX A TO PART 232.—SCHEDULE OF CIVIL PENALTIES—Continued Section Violation (e) Operating with less than 85 percent operative brakes ............................................................................... (f) Improper use of car with inoperative or ineffective brakes ......................................................................... (g) Improper display of piston travel ................................................................................................................ (m) Failure to stop train with excess air flow or gradient ................................................................................ (n) Securement of unattended equipment: (1) Failure to apply sufficient number of hand brakes; failure to develop or implement procedure to verify number applied ............................................................................................................................ (2) Failure to initiate emergency ............................................................................................................... (3) Failure to apply hand brakes on locomotives ..................................................................................... (4) Failure to adopt or comply with procedures for securing unattended locomotive .............................. (o) Improper adjustment of air regulating devices ........................................................................................... (p) Failure to hold supervisors jointly responsible ........................................................................................... 232.105 Locomotives: (a) Air brakes not in safe and suitable condition ............................................................................................. (b) Not equipped with proper hand or parking brake ....................................................................................... (c)(1) Failure to inspect/repair hand or parking brake ..................................................................................... (2) Failure to properly stencil, tag, or record ................................................................................................... (d) Excess leakage from equalizing reservoir .................................................................................................. (e) Improper use of feed or regulating valve braking ...................................................................................... (f) Improper use of passenger position ............................................................................................................ (g) Brakes in operative condition ..................................................................................................................... 232.107 Air sources/cold weather operations: (a)(1), (2) Failure to adopt or comply with monitoring program for yard air sources ...................................... (3) Failure to maintain records ......................................................................................................................... (b) Failure to blow condensation ...................................................................................................................... (c) Use of improper chemicals ......................................................................................................................... (d) Failure to equip or drain yard air reservoirs ............................................................................................... (e) Failure to adopt or comply cold weather operating procedures ................................................................. 232.109 Dynamic brakes: (a) Failure to provide information ..................................................................................................................... (b) Failure to make repairs ............................................................................................................................... (c) Failure to properly tag ................................................................................................................................. (d) Failure to maintain record of repair ............................................................................................................ (e) Improper deactivation ................................................................................................................................. (f) Improper use of locomotive as controlling unit ............................................................................................ (g) Locomotive not properly equipped with indicator ....................................................................................... (h) Rebuilt locomotive not properly equipped .................................................................................................. (j) Failure to adopt or comply with dynamic brake operating rules ................................................................. (k) Failure to adopt or comply with training on operating procedures ............................................................. 232.111 Train handling information: (a) Failure to adopt and comply with procedures ............................................................................................ (b) Failure to provide specific information ........................................................................................................ Willful violation 6,500 5,000 5,000 5,000 9,000 7,500 7,500 7,500 6,500 5,000 5,000 6,500 5,000 5,000 9,000 7,500 7,500 9,000 7,500 7,500 6,500 6,500 5,000 3,000 5,000 5,000 5,000 6,500 9,000 9,000 7,500 4,500 7,500 7,500 7,500 9,000 6,500 5,000 6,500 6,500 6,500 6,500 9,000 7,500 9,000 9,000 9,000 9,000 5,000 5,000 3,000 1,500 5,000 5,000 5,000 5,000 6,500 6,500 7,500 7,500 4,500 2,500 7,500 7,500 7,500 7,500 9,000 9,000 6,500 5,000 9,000 7,500 8,500 5,000 6,500 6,500 6,500 8,500 11,000 7,500 9,000 9,000 9,000 11,000 1 8,500 11,000 9,000 7,500 4,500 7,500 7,500 ycherry on PROD1PC64 with PROPOSALS2 Subpart C—Inspection and Testing Requirements 232.203 Training requirements: (a) Failure to develop or adopt program .......................................................................................................... (b)(1)–(9) Failure to address or comply with specific required item or provision of program ......................... (c) Failure to adopt or comply with two-way EOT program ............................................................................. (d) Failure to adopt or comply with retaining valve program ........................................................................... (e) Failure to maintain adequate records ......................................................................................................... (f) Failure to adopt and comply with periodic assessment plan ...................................................................... 232.205 Class I brake test—initial terminal inspection: (a) Complete failure to perform inspection ....................................................................................................... (c)(1)–(4), (6)–(8) Partial failure to perform inspection .................................................................................... (c)(5) Failure to properly adjust piston travel (per car) .................................................................................... (d) Failure to use carman when required ......................................................................................................... (e) Failure to provide proper notification .......................................................................................................... (f) Failure to void compressed air .................................................................................................................... 232.207 Class IA brake tests—1,000-mile inspection: (a) Complete failure to perform inspection ....................................................................................................... (b)(1)–(6) Partial failure to perform inspection ................................................................................................. (c) Failure to properly designate location ......................................................................................................... (c)(1) Failure to perform at designated location ............................................................................................... (c)(2) Failure to provide notification ................................................................................................................. 232.209 Class II brake tests—intermediate inspection: (a) Complete failure to perform inspection ....................................................................................................... (b)(1)–(5), (c) Partial failure to perform inspection ........................................................................................... (d) Failure to conduct Class I after Class II pick-up ........................................................................................ 232.211 Class III brake tests—trainline continuity inspection: (a) Complete failure to perform inspection ....................................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00032 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 6,500 5,000 3,000 5,000 5,000 1 6,500 5,000 5,000 5,000 5,000 1 6,500 9,000 7,500 7,500 7,500 7,500 5,000 (1) 9,000 7,500 ( 1) 6,500 9,000 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70621 APPENDIX A TO PART 232.—SCHEDULE OF CIVIL PENALTIES—Continued Section Violation (b)(1)–(4), (c) Partial failure to perform inspection ........................................................................................... (d) Failure to restore air pressure at rear ........................................................................................................ 232.213 Extended haul trains: (a)(1) Failure to properly designate an extended haul train ............................................................................ (a)(2)–(3), (5)(i), (8) Failure to perform inspections ......................................................................................... (a)(4) Failure to remove defective car (per car) ............................................................................................... (a)(5)(ii), (6) Failure to conduct inbound inspection ......................................................................................... (a)(7) Failure to maintain record of defects (per car) ...................................................................................... (b) Improper movement or use of extended haul train .................................................................................... 232.215 Transfer train brake tests: (a) Failure to perform inspection ...................................................................................................................... (b) Failure to perform on cars added ............................................................................................................... 232.217 Train brake system tests conducted using yard air: (a) Failure to use suitable device ..................................................................................................................... (b) Improper connection of air test device ....................................................................................................... (c) Failure to properly perform inspection ........................................................................................................ (d) Failure to calibrate test device .................................................................................................................... (e) Failure to use accurate device ................................................................................................................... 232.219 Double heading and helper service: (a) Failure to perform inspection or inability to control brakes ........................................................................ (b) Failure to make visual inspection ............................................................................................................... (c) Use of improper helper link device ............................................................................................................. Willful violation 5,000 5,000 7,500 7,500 6,500 (1) 3,000 6,500 3,000 6,500 9,000 (1 ) 4,500 9,000 4,500 9,000 6,500 5,000 9,000 7,500 5,000 6,500 (1) 5,000 5,000 7,500 9,000 (1 ) 7,500 7,500 5,000 5,000 5,000 7,500 7,500 7,500 5,000 5,000 3,000 3,000 5,000 7,500 7,500 4,500 4,500 7,500 5,000 5,000 7,500 7,500 5,000 7,500 5,000 7,500 5,000 7,500 6,500 5,000 6,500 5,000 5,000 6,500 6,500 9,000 7,500 9,000 7,500 7,500 6,500 9,000 5,000 5,000 6,500 5,000 7,500 7,500 9,000 7,500 8,500 11,000 6,500 5,000 6,500 9,000 7,500 9,000 Subpart D—Periodic Maintenance and Testing Requirements 232.303 General requirements: (b)–(d) Failure to conduct inspection or test when car on repair track ........................................................... (e) Improper movement of equipment for testing ............................................................................................ (e)(1) Failure to properly tag equipment for movement ................................................................................... (e)(2)–(4) Failure to retain record or improper removal of tag or card ............................................................ (f) Failure to stencil or track test information ................................................................................................... 232.305 Single car tests: (a) Failure to test in accord with required procedure ....................................................................................... (b)–(c) Failure to perform test .......................................................................................................................... 232.309 Repair track air brake test and single car test equipment and devices: (a)–(f) Failure to properly test or calibrate ....................................................................................................... Subpart E—End-of-Train Devices 232.403 Design standards for one-way devices: (a)–(g) Failure to meet standards .................................................................................................................... 232.405 Design standards for two-way devices: (a)–(i) Failure to meet standards ...................................................................................................................... 232.407 Operating requirements for two-way devices: (b) Failure to equip a train ................................................................................................................................ (c) Improper purchase ...................................................................................................................................... (f)(1) Failure of device to be armed and operable ........................................................................................... (f)(2) Insufficient battery charge ....................................................................................................................... (f)(3) Failure to activate the device .................................................................................................................. (g) Improper handling of en route failure, freight or other non-passenger ...................................................... (h) Improper handling of en route failure, passenger ...................................................................................... 232.409 Inspection and testing of devices: (a) Failure to have unique code ....................................................................................................................... (b) Failure to compare quantitative values ....................................................................................................... (c) Failure to test emergency capability ........................................................................................................... (d) Failure to properly calibrate ........................................................................................................................ ycherry on PROD1PC64 with PROPOSALS2 Subpart F—Introduction of New Brake System Technology 232.503 Process to introduce new technology: (b) Failure to obtain FRA approval ................................................................................................................... 232.505 Pre-revenue service acceptance testing plan: (a) Failure to obtain FRA approval ................................................................................................................... (b) Failure to comply with plan ......................................................................................................................... (f) Failure to test previously used technology .................................................................................................. 1 A penalty may be assessed against an individual only for a willful violation. Generally, when two or more violations of these regulations are discovered with respect to a single unit of equipment that is placed or continued in service by a railroad, the appropriate penalties set forth above are aggregated up to a maximum of $11,000 per day. Although the penalties listed for failure to perform the brake inspections and tests under § 232.205 through § 232.209 may be assessed for each train that is not properly inspected, failure to perform any of the inspections and tests required under those sections will be treated as a violation separate and distinct from, and in addition to, any substantive volatile conditions found on the equipment contained in the train consist. Moreover, the Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00033 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70622 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules Failure to observe any condition for movement of defective equipment set forth in § 232.15(a) will deprive the railroad of the benefit of the movement-for-repair provision and make the railroad and any responsible individuals liable for penalty under the particular regulatory section(s) concerning the substantive defect(s) present on the equipment at the time of movement. Failure to provide any of the records or plans required by this part pursuant to § 232.19 will be considered a failure to maintain or develop the record or plan and will make the railroad liable for penalty under the particular regulatory section(s) concerning the retention or creation of the document involved. Failure to properly perform any of the inspections specifically referenced in § 232.209, § 232.213, and § 232.217 may be assessed under each section of this part or this chapter, or both, that contains the requirements for performing the referenced inspection. PART 233—[AMENDED] 35. The authority citation for part 233 continues to read as follows: Authority: 49 U.S.C. 20103, 20107; 28 U.S.C. 2461, note; and 49 CFR 1.49. 36. Appendix A to part 233 is revised to read as follows: APPENDIX A TO PART 233.—SCHEDULE OF CIVIL PENALTIES 1 Section 233.5 233.7 233.9 Violation Accidents resulting from signal failure ........................................................................................................ Signal failure reports ................................................................................................................................... Annual reports ............................................................................................................................................. $5,000 3,000 1,500 Willful violation $7,500 4,500 2,500 1 A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. PART 234—[AMENDED] 37. The authority citation for part 234 continues to read as follows: Authority: 49 U.S.C. 20103, 20107; 28 U.S.C. 2461, note; and 49 CFR 1.49. 38. Appendix A to part 234 is revised to read as follows: APPENDIX A TO PART 234.—SCHEDULE OF CIVIL PENALTIES 1 Section 2 Violation Willful violation Subpart B—Reports 234.7 234.9 Accidents involving grade crossing signal failure ....................................................................................... Grade crossing signal system failure reports ............................................................................................ $5,000 3,000 $7,500 4,500 3,000 6,500 4,500 9,000 8,500 8,500 3,000 6,500 6,500 3,000 11,000 11,000 4,500 9,000 9,000 4,500 5,000 5,000 3,000 5,000 3,000 7,500 7,500 4,500 7,500 4,500 6,500 6,500 3,000 5,000 5,000 3,000 1,500 9,000 9,000 4,500 7,500 7,500 4,500 2,500 3,000 5,000 6,500 6,500 8,500 3,000 4,500 7,500 9,000 9,000 11,000 4,500 Subpart C—Response to Reports of Warning System Malfunction 234.101 Employee notification rules ..................................................................................................................... 234.103 Timely response to report of malfunction ............................................................................................... 234.105 Activation failure: (a) Failure to notify—train crews ...................................................................................................................... Other railroads ........................................................................................................................................... (b) Failure to notify law enforcement agency ................................................................................................... (c) Failure to comply with—flagging requirements ........................................................................................... Speed restrictions ...................................................................................................................................... (d) Failure to activate horn or whistle .............................................................................................................. 234.106 Partial activation: (a) Failure to notify—train crews ...................................................................................................................... Other railroads ........................................................................................................................................... (b) Failure to notify law enforcement agency ................................................................................................... (c) Failure to comply with—flagging requirements speed restrictions ............................................................. (d) Failure to activate horn or whistle .............................................................................................................. 234.107 False activation: (a) Failure to notify—train crews ...................................................................................................................... Other railroads ........................................................................................................................................... (b) Failure to notify law enforcement agency ................................................................................................... (c) Failure to comply with—flagging requirements ........................................................................................... Speed restrictions ...................................................................................................................................... (d) Failure to activate horn or whistle .............................................................................................................. 234.109 Recordkeeping ........................................................................................................................................ ycherry on PROD1PC64 with PROPOSALS2 Subpart D—Maintenance, Inspection, and Testing Maintenance 234.201 234.203 234.205 234.207 234.209 234.211 VerDate Aug<31>2005 Standards: Location of plans .............................................................................................................................. Control circuits ................................................................................................................................. Operating characteristics of warning system apparatus ................................................................. Adjustment, repair, or replacement of component .......................................................................... Interference with normal functioning of system ............................................................................... Locking of warning system apparatus ............................................................................................. 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00034 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70623 APPENDIX A TO PART 234.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 2 Violation 234.213 Grounds ........................................................................................................................................... 234.215 Standby power system .................................................................................................................... 234.217 Flashing light units ........................................................................................................................... 234.219 Gate arm lights and light cable ........................................................................................................ 234.221 Lamp voltage ................................................................................................................................... 234.223 Gate arm .......................................................................................................................................... 234.225 Activation of warning system ........................................................................................................... 234.227 Train detection apparatus ................................................................................................................ 234.229 Shunting sensitivity .......................................................................................................................... 234.231 Fouling wires .................................................................................................................................... 234.233 Rail joints ......................................................................................................................................... 234.235 Insulated rail joints ........................................................................................................................... 234.237 Switch equipped with circuit controller ............................................................................................ 234.239 Tagging of wires and interference of wires or tags with signal apparatus ..................................... 234.241 Protection of insulated wire; splice in underground wire ................................................................. 234.243 Wire on pole line and aerial cable ................................................................................................... 234.245 Signs ................................................................................................................................................ Inspections and Tests: 234.247 Purpose of inspections and tests; removal from service of relay or device failing to meet test requirements .................................................................................................................................................... 234.249 Ground tests .................................................................................................................................... 234.251 Standby power ................................................................................................................................. 234.253 Flashing light units and lamp voltage .............................................................................................. 234.255 Gate arm and gate mechanism ....................................................................................................... 234.257 Warning system operation ............................................................................................................... 234.259 Warning time .................................................................................................................................... 234.261 Highway traffic signal pre-emption .................................................................................................. 234.263 Relays .............................................................................................................................................. 234.265 Timing relays and timing devices .................................................................................................... 234.267 Insulation resistance tests, wires in trunking and cables ................................................................ 234.269 Cut-out circuits ................................................................................................................................. 234.271 Insulated rail joints, bond wires, and track connections .................................................................. 234.273 Results of tests ................................................................................................................................ 234.275 Processor-Based Systems ............................................................................................................... Willful violation 5,000 8,500 3,000 3,000 5,000 3,000 8,500 8,500 8,500 6,500 6,500 8,500 3,000 3,000 5,000 5,000 3,000 7,500 11,000 4,500 4,500 7,500 4,500 11,000 11,000 11,000 9,000 9,000 11,000 4,500 4,500 7,500 7,500 4,500 6,500 6,500 5,000 3,000 3,000 6,500 5,000 5,000 5,000 5,000 5,000 8,500 5,000 1,500 6,500 9,000 9,000 7,500 4,500 4,500 9,000 7,500 7,500 7,500 7,500 7,500 11,000 7,500 2,500 9,000 1 A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. 2 The penalty schedule uses section numbers from 49 CFR part 234. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. PART 235—[AMENDED] 39. The authority citation for part 235 continues to read as follows: Authority: 49 U.S.C. 20103, 20107; 28 U.S.C. 2461, note; and 49 CFR 1.49. 40. Appendix A to part 235 is revised to read as follows: APPENDIX A TO PART 235.—SCHEDULE OF CIVIL PENALTIES 1 Section 235.5 Violation Changes requiring filing of application ........................................................................................................ $3,000 Willful violation $4,500 1A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. PART 236—[AMENDED] ycherry on PROD1PC64 with PROPOSALS2 41. The authority citation for part 236 continues to read as follows: VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 Authority: 49 U.S.C. 20103, 20107; 28 U.S.C. 2461, note and 49 CFR 1.49. PO 00000 Frm 00035 Fmt 4701 Sfmt 4702 42. Appendix A to part 236 is revised to read as follows: E:\FR\FM\05DEP2.SGM 05DEP2 70624 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX A TO PART 236.—SCHEDULE OF CIVIL PENALTIES 1 Section Violation Willful violation ycherry on PROD1PC64 with PROPOSALS2 Subpart A—Rules and Instructions—All Systems General: 236.0 Applicability, minimum requirements ................................................................................................... 236.1 Plans, where kept ................................................................................................................................ 236.2 Grounds ............................................................................................................................................... 236.3 Locking of signal apparatus housings: (a) Power interlocking machine cabinet not secured against unauthorized entry .................................... (b) other violations ..................................................................................................................................... 236.4 Interference with normal functioning of device .................................................................................... 236.5 Design of control circuits on closed circuit principle ........................................................................... 236.6 Hand-operated switch equipped with switch circuit controller ............................................................. 236.7 Circuit controller operated by switch-and-lock movement ................................................................... 236.8 Operating characteristics of electro-magnetic, electronic, or electrical apparatus .............................. 236.9 Selection of circuits through indicating or annunciating instruments .................................................. 236.10 Electric locks, force drop type; where required ................................................................................. 236.11 Adjustment, repair, or replacement of component ............................................................................ 236.12 Spring switch signal protection; where required ................................................................................ 236.13 Spring switch; selection of signal control circuits through circuit controller ...................................... 236.14 Spring switch signal protection; requirements ................................................................................... 236.15 Timetable instructions ........................................................................................................................ 236.16 Electric lock, main track releasing circuit: (a) Electric lock releasing circuit on main track extends into fouling circuit where turnout not equipped with derail at clearance point either pipe-connected to switch or independently locked, electrically ... (b) other violations ..................................................................................................................................... 236.17 Pipe for operating connections, requirements ................................................................................... 236.18 Software management control plan: Failure to develop and adopt a plan ......................................................................................................... Failure to fully implement plan .................................................................................................................. Inadequate plan ......................................................................................................................................... Roadway Signals and Cab Signals— 236.21 Location of roadway signals .............................................................................................................. 236.22 Semaphore signal arm; clearance to other objects ........................................................................... 236.23 Aspects and indications ..................................................................................................................... 236.24 Spacing of roadway signals ............................................................................................................... 236.26 Buffing device, maintenance .............................................................................................................. Track Circuits— 236.51 Track circuit requirements: (a) Shunt fouling circuit used where permissible speed through turnout greater than 45 m.p.h ............. (b) Track relay not in de-energized position or device that functions as track relay not in its most restrictive state when train, locomotive, or car occupies any part of track circuit, except fouling section of turnout of hand-operated main-track crossover ......................................................................... (c) other violations ..................................................................................................................................... 236.52 Relayed cut-section ........................................................................................................................... 236.53 Track circuit feed at grade crossing .................................................................................................. 236.54 Minimum length of track circuit .......................................................................................................... 236.55 Dead section; maximum length ......................................................................................................... 236.56 Shunting sensitivity ............................................................................................................................ 236.57 Shunt and fouling wires: (a) Shunt or fouling wires do not consist of at least two discrete conductors ......................................... (b) other violations ..................................................................................................................................... 236.58 Turnout, fouling section: (a) Rail joint in shunt fouling section not bonded ..................................................................................... (b) other violations ..................................................................................................................................... 236.59 Insulated rail joints ............................................................................................................................. 236.60 Switch shunting circuit; use restricted ............................................................................................... Wires and Cables— 236.71 Signal wires on pole line and aerial cable ......................................................................................... 236.73 Open-wire transmission line; clearance to other circuits ................................................................... 236.74 Protection of insulated wire; splice in underground wire ................................................................... 236.76 Tagging of wires and interference of wires or tags with signal apparatus ....................................... Inspections and Tests; All Systems— 236.101 Purpose of inspection and tests; removal from service or relay or device failing to meet test requirements .................................................................................................................................................... 236.102 Semaphore or search-light signal mechanism ................................................................................ 236.103 Switch circuit controller or point detector ........................................................................................ 236.104 Shunt fouling circuit ......................................................................................................................... 236.105 Electric lock ...................................................................................................................................... 236.106 Relays ............................................................................................................................................. 236.107 Ground tests ................................................................................................................................... 236.108 Insulation resistance tests, wires in trunking and cables: VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00036 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 $5,000 6,500 6,500 $7,500 9,000 9,000 3,000 3,000 8,500 8,500 6,500 6,500 5,000 3,000 3,000 6,500 5,000 5,000 5,000 3,000 4,500 4,500 11,000 11,000 9,000 9,000 7,500 4,500 4,500 9,000 7,500 7,500 7,500 4,500 6,500 6,500 3,000 9,000 9,000 4,500 5,000 5,000 5,000 7,500 7,500 7,500 6,500 3,000 5,000 6,500 6,500 9,000 4,500 7,500 9,000 9,000 6,500 9,000 8,500 6,500 6,500 6,500 6,500 6,500 6,500 11,000 9,000 9,000 9,000 9,000 9,000 9,000 6,500 5,000 9,000 7,500 6,500 5,000 6,500 6,500 9,000 7,500 9,000 9,000 6,500 5,000 5,000 3,000 9,000 7,500 7,500 4,500 5,000 6,500 6,500 5,000 5,000 5,000 5,000 7,500 9,000 9,000 7,500 7,500 7,500 7,500 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70625 APPENDIX A TO PART 236.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section Violation (a) Circuit permitted to function on a conductor having insulation resistance value less than 200,000 ohms ...................................................................................................................................................... (b) other violations ..................................................................................................................................... 236.109 Time releases, timing relays and timing devices ........................................................................... 236.110 Results of tests ............................................................................................................................... Willful violation 6,500 5,000 5,000 1,500 9,000 7,500 7,500 2,500 6,500 6,500 6,500 6,500 8,500 5,000 9,000 9,000 9,000 9,000 11,000 7,500 6,500 5,000 5,000 6,500 9,000 7,500 7,500 7,500 6,500 6,500 6,500 5,000 6,500 6,500 6,500 9,000 9,000 9,000 7,500 9,000 9,000 9,000 6,500 5,000 5,000 9,000 7,500 7,500 6,500 9,000 6,500 6,500 9,000 9,000 6,500 6,500 9,000 9,000 5,000 6,500 5,000 6,500 5,000 6,500 3,000 3,000 3,000 3,000 3,000 3,000 3,000 6,500 7,500 9,000 7,500 9,000 7,500 9,000 4,500 4,500 4,500 4,500 4,500 4,500 4,500 9,000 5,000 5,000 5,000 5,000 5,000 5,000 6,500 5,000 5,000 5,000 7,500 7,500 7,500 7,500 7,500 7,500 9,000 7,500 7,500 7,500 Subpart B—Automatic Block Signal Systems 236.201 236.202 236.203 236.204 236.205 236.206 Track circuit control of signals ........................................................................................................ Signal governing movements over hand-operated switch ............................................................. Hand-operated crossover between main tracks; protection ........................................................... Track signaled for movements in both directions, requirements ................................................... Signal control circuits; requirements .............................................................................................. Battery or power supply with respect to relay; location ................................................................. ycherry on PROD1PC64 with PROPOSALS2 Subpart C—Interlocking 236.207 Electric lock on hand-operated switch; control: (a) Approach or time locking of electric lock on hand-operated switch can be defeated by unauthorized use of emergency device which is not kept sealed in the non-release position .......................... (b) other violations ..................................................................................................................................... 236.301 Where signals shall be provided .................................................................................................... 236.302 Track circuits and route locking ...................................................................................................... 236.303 Control circuits for signals, selection through circuit controller operated by switch points or by switch locking mechanism ............................................................................................................................ 236.304 Mechanical locking or same protection effected by circuits ........................................................... 236.305 Approach or time locking ................................................................................................................ 236.306 Facing point lock or switch-and-lock movement ............................................................................ 236.307 Indication locking ............................................................................................................................ 236.308 Mechanical or electric locking or electric circuits; requisites ......................................................... 236.309 Loss of shunt protection; where required ....................................................................................... (a) Loss of shunt of five seconds or less permits release of route locking of power-operated switch, movable point frog, or derail .................................................................................................................. (b) Other violations .................................................................................................................................... 236.310 Signal governing approach to home signal .................................................................................... 236.311 Signal control circuits, selection through track relays or devices functioning as track relays and through signal mechanism contacts and time releases at automatic interlocking ....................................... 236.312 Movable bridge, interlocking of signal appliances with bridge devices: (a) Emergency bypass switch or device not locked or sealed ................................................................. (b) other violations ..................................................................................................................................... 236.314 Electric lock for hand-operated switch or derail: (a) Approach or time locking of electric lock at hand-operated switch or derail can be defeated by unauthorized use of emergency device which is not kept sealed in non-release position ...................... (b) other violations ..................................................................................................................................... Rules and Instructions— 236.326 Mechanical locking removed or disarranged; requirement for permitting train movements through interlocking ....................................................................................................................................... 236.327 Switch, movable-point frog or split-point derail .............................................................................. 236.328 Plunger of facing-point .................................................................................................................... 236.329 Bolt lock .......................................................................................................................................... 236.330 Locking dog of switch and lock movement .................................................................................... 236.334 Point detector .................................................................................................................................. 236.335 Dogs, stops and trunnions of mechanical locking .......................................................................... 236.336 Locking bed .................................................................................................................................... 236.337 Locking faces of mechanical locking; fit ......................................................................................... 236.338 Mechanical locking required in accordance with locking sheet and dog chart .............................. 236.339 Mechanical locking; maintenance requirements ............................................................................ 236.340 Electromechanical interlocking machine; locking between electrical and mechanical levers ....... 236.341 Latch shoes, rocker links, and quadrants ...................................................................................... 236.342 Switch circuit controller ................................................................................................................... Inspection and Tests— 236.376 Mechanical locking ......................................................................................................................... 236.377 Approach locking ............................................................................................................................ 236.378 Time locking .................................................................................................................................... 236.379 Route locking .................................................................................................................................. 236.380 Indication locking ............................................................................................................................ 236.381 Traffic locking .................................................................................................................................. 236.382 Switch obstruction test .................................................................................................................... 236.383 Valve locks, valves, and valve magnets ........................................................................................ 236.384 Cross protection .............................................................................................................................. 236.386 Restoring feature on power switches ............................................................................................. VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00037 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70626 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX A TO PART 236.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 236.387 Violation Movable bridge locking ................................................................................................................... Willful violation 6,500 9,000 8,500 8,500 8,500 8,500 8,500 8,500 11,000 11,000 11,000 11,000 11,000 11,000 6,500 9,000 6,500 9,000 6,500 5,000 9,000 7,500 1,500 1,500 2,500 2,500 5,000 7,500 6,500 6,500 5,000 3,000 6,500 5,000 5,000 3,000 5,000 6,500 5,000 3,000 5,000 3,000 9,000 9,000 7,500 4,500 9,000 7,500 7,500 4,500 7,500 9,000 7,500 4,500 7,500 4,500 3,000 3,000 5,000 3,000 3,000 3,000 5,000 3,000 3,000 3,000 5,000 1,500 3,000 3,000 3,000 3,000 5,000 3,000 4,500 4,500 7,500 4,500 4,500 4,500 7,500 4,500 4,500 4,500 7,500 2,500 4,500 4,500 4,500 4,500 7,500 4,500 3,000 3,000 4,500 4,500 5,000 7,500 5,000 7,500 Subpart D—Traffic Control Systems Standards 236.401 Automatic block signal system and interlocking standards applicable to traffic control systems: 236.402 Signals controlled by track circuits and control operator ................................................................ 236.403 Signals at controlled point ............................................................................................................... 236.404 Signals at adjacent control points .................................................................................................... 236.405 Track signaled for movements in both directions, change of direction of traffic ............................ 236.407 Approach or time locking; where required ....................................................................................... 236.408 Route locking ................................................................................................................................... 236.410 Locking, hand-operated switch; requirements: (a) Hand-operated switch on main track not electrically or mechanically locked in normal position where signal not provided to govern movement to main track, movements made at speeds in excess of 20 m.p.h., and train or engine movements may clear main track ........................................... (b) Hand-operated switch on signaled siding not electrically or mechanically locked in normal position where signal not provided to govern movements to signaled siding, train movements made at speeds in excess of 30 m.p.h., and train or engine movements may clear signaled siding ................ (c) Approach or time locking of electric lock at hand-operated switch can be defeated by use of emergency release device of electric lock which is not kept sealed in non-release position ...................... (d) other violations ..................................................................................................................................... Rules and Instructions— 236.426 Interlocking rules and instructions applicable to traffic control systems ......................................... 236.476 Interlocking inspections and tests applicable to traffic control systems .......................................... ycherry on PROD1PC64 with PROPOSALS2 Subpart E—Automatic Train Stop, Train Control and Cab Signal Systems Standards 236.501 Forestalling device and speed control ............................................................................................. 236.502 Automatic brake application, initiation by restrictive block conditions stopping distance in advance ............................................................................................................................................................. 236.503 Automatic brake application; initiation when predetermined rate of speed exceeded .................... 236.504 Operations interconnected with automatic block-signal system ...................................................... 236.505 Proper operative relation between parts along roadway and parts on locomotive ......................... 236.506 Release of brakes after automatic application ................................................................................ 236.507 Brake application; full service .......................................................................................................... 236.508 Interference with application of brakes by means of brake valve ................................................... 236.509 Two or more locomotives coupled ................................................................................................... 236.511 Cab signals controlled in accordance with block conditions stopping distance in advance ........... 236.512 Cab signal indication when locomotive enters blocks ..................................................................... 236.513 Audible indicator .............................................................................................................................. 236.514 Interconnection of cab signal system with roadway signal system ................................................. 236.515 Visibility of cab signals ..................................................................................................................... 236.516 Power supply ................................................................................................................................... Rules and Instructions; Roadway— 236.526 Roadway element not functioning properly ..................................................................................... 236.527 Roadway element insulation resistance .......................................................................................... 236.528 Restrictive condition resulting from open hand-operated switch; requirement ............................... 236.529 Roadway element inductor; height and distance from rail .............................................................. 236.531 Trip arm; height and distance from rail ........................................................................................... 236.532 Strap iron inductor; use restricted ................................................................................................... 236.534 Rate of pressure reduction; equalizing reservoir or brake pipe ...................................................... 236.551 Power supply voltage ....................................................................................................................... 236.552 Insulation resistance ........................................................................................................................ 236.553 Seal, where required ........................................................................................................................ 236.554 Rate of pressure reduction; equalizing reservoir or brake pipe ...................................................... 236.555 Repaired or rewound receiver coil ................................................................................................... 236.556 Adjustment of relay .......................................................................................................................... 236.557 Receiver; location with respect to rail .............................................................................................. 236.560 Contact element, mechanical trip type; location with respect to rail ............................................... 236.562 Minimum rail current required .......................................................................................................... 236.563 Delay time ........................................................................................................................................ 236.564 Acknowledging time ......................................................................................................................... 236.565 Provision made for preventing operation of pneumatic brake-applying apparatus by doubleheading clock; requirement ........................................................................................................................... 236.566 Locomotive of each train operating in train stop, train control or cab signal territory; equipped ... 236.567 Restrictions imposed when device fails and/or is cut out en route: (a) Report not made to designated officer at next available point of communication after automatic train stop, train control, or cab signal device fails and/or is cut en route ............................................. (b) Train permitted to proceed at speed exceeding 79 m.p.h. where automatic train stop, train control, or cab signal device fails and/or is cut out en route when absolute block established in advance of train on which device is inoperative ...................................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00038 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70627 APPENDIX A TO PART 236.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section Violation (c) other violations ..................................................................................................................................... 236.568 Difference between speeds authorized by roadway signal and cab signal; action ........................ Inspection and Tests; Roadway— 236.576 Roadway element ............................................................................................................................ 236.577 Test, acknowledgement, and cut-in circuits .................................................................................... Inspection and Tests; Locomotive— 236.586 Daily or after trip test ....................................................................................................................... 236.587 Departure test: (a) Test of automatic train stop, train control, or cab signal apparatus on locomotive not made on departure of locomotive from initial terminal if equipment on locomotive not cut out between initial terminal and equipped territory .................................................................................................................. (b) Test of automatic train stop, train control, or cab signal apparatus on locomotive not made immediately on entering equipped territory, if equipment on locomotive cut out between initial terminal and equipped territory ............................................................................................................................ (c) Automatic train stop, train control, or cab signal apparatus on locomotive making more than one trip within 24-hour period not given departure test within corresponding 24-hour period .................... (d) other violations ..................................................................................................................................... 236.588 Periodic test ..................................................................................................................................... 236.589 Relays .............................................................................................................................................. 236.590 Pneumatic apparatus: (a) Automatic train stop, train control, or cab signal apparatus not inspected and cleaned at least once every 736 days ............................................................................................................................. (b) other violations ..................................................................................................................................... Willful violation 3,000 3,000 4,500 4,500 3,000 3,000 4,500 4,500 5,000 7,500 6,500 9,000 6,500 9,000 6,500 5,000 6,500 5,000 9,000 7,500 9,000 7,500 5,000 5,000 7,500 7,500 Subpart F—Dragging Equipment and Slide Detectors and Other Similar Protective Devices; Standards 236.601 Signals controlled by devices; location ............................................................................................ 6,500 9,000 6,500 6,500 9,000 9,000 6,500 6,500 9,000 9,000 5,000 6,500 7,500 9,000 6,500 6,500 8,500 9,000 9,000 11,000 8,500 5,000 8,500 11,000 7,500 11,000 5,000 7,500 6,500 6,500 6,500 3,000 5,000 5,000 9,000 9,000 9,000 4,500 7,500 7,500 3,000 3,000 3,000 1,500 5,000 5,000 5,000 4,500 4,500 4,500 2,500 7,500 7,500 7,500 ycherry on PROD1PC64 with PROPOSALS2 Subpart H—Standards for Processor-Based Signal and Train Control Systems 236.905 Railroad Safety Program Plan (RSPP): (a) Failure to develop and submit RSPP when required .......................................................................... (b) Failure to obtain FRA approval for a modification to RSPP ............................................................... 236.907 Product Safety Plan (PSP): (a) Failure to develop a PSP .................................................................................................................... (b) Failure to submit a PSP when required .............................................................................................. 236.909 Minimum Performance Standard: (a) Failure to make analyses or documentation available ........................................................................ (b) Failure to determine that the standard has been met ......................................................................... 236.913 Notification to FRA of PSPs: (a) Failure to prepare a PSP or PSP amendment as required ................................................................ (b) Failure to submit a PSP or PSP amendment as required .................................................................. (c) Field testing without authorization or approval .................................................................................... 236.915 Implementation and operation: (a) Operation of product without authorization or approval ...................................................................... (b) Failure to comply with PSP ................................................................................................................. (c) Interference with normal functioning safety-critical product ................................................................ (d) Failure to determine cause and adjust, repair or replace without undue delay or take appropriate action pending repair ............................................................................................................................. 236.917 Retention of records: (a) Failure to maintain records as required .............................................................................................. (b) Failure to report inconsistency ............................................................................................................ (c) Failure to take prompt countermeasures ............................................................................................. (d) Failure to provide final report .............................................................................................................. 236.919 Operations and Maintenance Manual .............................................................................................. 236.921 Training and qualification program, general .................................................................................... 236.923 Task analysis and basic requirements: (a) Failure to develop an acceptable training program ............................................................................. (b) Failure to train persons as required .................................................................................................... (c) Failure to conduct evaluation of training program as required ........................................................... (d) Failure to maintain records as required .............................................................................................. 236.925 Training specific to control office personnel .................................................................................... 236.927 Training specific to locomotive engineers and other operating personnel ...................................... 236.929 Training specific to roadway workers .............................................................................................. 1 The Administrator reserves the right to assess a civil penalty of up to $27,000 per day for any violation where circumstances warrant See 49 CFR part 209, appendix A. A penalty may be assessed against an individual only for a willful violation The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant See 49 CFR part 209, appendix A The penalty schedule uses section numbers from 49 CFR part 236 If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s) For convenience, penalty citations will cite the CFR section and the penalty code, if any FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00039 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70628 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules PART 238—[AMENDED] 43. The authority citation for part 238 continues to read as follows: Authority: 49 U.S.C. 20103, 20107, 20133, 20141, 20302–20303, 20306, 20701–20702, 21301–21302, 21304; 28 U.S.C. 2461, note; 49 CFR 1.49. 44. Appendix A to part 238 is revised to read as follows: APPENDIX A TO PART 238.—SCHEDULE OF CIVIL PENALTIES 1 Section 2 Violation Willful violation Subpart A—General 238.15 Movement of power brake defects: (b) Improper movement from Class I or IA brake test ..................................................................................... (c) Improper movement of en route defect ...................................................................................................... (2), (3) Insufficient tag or record ............................................................................................................... (4) Failure to determine percent operative brake ..................................................................................... (d) Failure to follow operating restrictions ........................................................................................................ (e) Failure to follow restrictions for inoperative front or rear unit .................................................................... 238.17 Movement of other than power brake defects: 1 (c)(4), (5) Insufficient tag or record .................................................................................................................. (d) Failure to inspect or improper use of roller bearings ................................................................................. (e) Improper movement of defective safety appliances ................................................................................... 238.19 Reporting and tracking defective equipment: (a) Failure to have reporting or tracking system .............................................................................................. (b) Failure to retain records .............................................................................................................................. (c) Failure to make records available ............................................................................................................... (d) Failure to list power brake repair points ..................................................................................................... $6,500 5,000 1,500 5,000 6,500 5,000 $9,000 7,500 2,500 7,500 9,000 7,500 1,500 5,000 5,000 2,500 7,500 7,500 8,500 3,000 1,500 3,000 11,000 4,500 2,500 4,500 6,500 1,500 6,500 6,500 6,500 9,000 2,500 9,000 9,000 9,000 6,500 6,500 6,500 9,000 9,000 9,000 6,500 5,000 6,500 9,000 7,500 9,000 6,500 5,000 5,000 5,000 9,000 7,500 7,500 7,500 6,500 6,500 6,500 6,500 6,500 6,500 3,000 6,500 5,000 5,000 5,000 5,000 9,000 9,000 9,000 9,000 9,000 9,000 4,500 9,000 7,500 7,500 7,500 7,500 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 Subpart B—Safety Planning and General Requirements 238.103 Fire protection plan/fire safety: (a) Failure to use proper materials ................................................................................................................... (b) Improper certification .................................................................................................................................. (c) Failure to consider fire safety on new equipment ...................................................................................... (d) Failure to perform fire safety analysis ........................................................................................................ (e) Failure to develop, adopt or comply with procedures ................................................................................ 238.105 Train electronic hardware and software safety: (a), (b), (c) Failure to develop and maintain hardware and software safety ................................................... (d) Failure to include required design features ................................................................................................ (e) Failure to comply with hardware and software safety program ................................................................. 238.107 Inspection, testing, and maintenance plan: (b) Failure to develop plan ............................................................................................................................... (b)(1)–(5) Failure of plan to address specific item ........................................................................................... (d) Failure to conduct annual review ................................................................................................................ 238.109 Training, qualification, and designation program: (a) Failure to develop or adopt program .......................................................................................................... (b)(1)–(4) Failure of plan to address specific item ........................................................................................... (b)(5)–(12) Failure to comply with specific required provision the program .................................................... (b)(13) Failure to maintain adequate records .................................................................................................. 238.111 Pre-revenue service acceptance testing plan: (a) Failure to properly test previously used equipment ................................................................................... (b)(1) Failure to develop plan ........................................................................................................................... (b)(2) Failure to submit plan to FRA ................................................................................................................ (b)(3) Failure to comply with plan .................................................................................................................... (b)(4) Failure to document results of testing .................................................................................................... (b)(5) Failure to correct safety deficiencies or impose operating limits ........................................................... (b)(6) Failure to maintain records ..................................................................................................................... (b)(7) Failure to obtain FRA approval .............................................................................................................. 238.113 Emergency window exits ........................................................................................................................ 238.115 Emergency lighting .................................................................................................................................. 238.117 Protection against personal injury ........................................................................................................... 238.119 Rim-stamped straight plate wheels ......................................................................................................... ycherry on PROD1PC64 with PROPOSALS2 Subpart C—Specific Requirements for Tier I Equipment 238.203 238.205 238.207 238.209 238.211 238.213 238.215 238.217 238.219 238.221 238.223 Static end strength .................................................................................................................................. Anti-climbing mechanism ........................................................................................................................ Link between coupling mechanism and car body .................................................................................. Forward-facing end structure of locomotives .......................................................................................... Collision posts ......................................................................................................................................... Corner posts ............................................................................................................................................ Rollover strength ..................................................................................................................................... Side structure .......................................................................................................................................... Truck-to-car-body attachment ................................................................................................................. Glazing .................................................................................................................................................... Fuel tanks ................................................................................................................................................ VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00040 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70629 APPENDIX A TO PART 238.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 2 Violation 238.225 Electrical System ..................................................................................................................................... 238.227 Suspension system ................................................................................................................................. 239.229 Safety appliances—general: (e) Failure to properly identify equipment (per car) ......................................................................................... (g) Failure to adopt or comply with inspection plan ......................................................................................... (h) Failure to use qualified person (per car) .................................................................................................... (i) Failure to properly conduct initial or periodic inspection (per car) .............................................................. (j) Failure to take proper remedial action (per car) .......................................................................................... (k) Failure to maintain records (per car) .......................................................................................................... 238.230 Safety appliance—new equipment: (b)(2) Failure to identify welded appliance (per car) ........................................................................................ (b)(3) Failure to receive approval for use (per car) ......................................................................................... (c)(2) Failure to make proper repair (per car) .................................................................................................. 238.231 Brake System (a)–(g), (i)–(n) .................................................................................................................. (h)(1), (2) Hand or parking brake missing or inoperative ................................................................................ (h)(3) Hand or parking brake inspection or record (per car) ........................................................................... (h)(4) Hand or parking brake not applied to hold equipment unattended on grade or prematurely released 238.233 Interior fittings and surfaces .................................................................................................................... 238.235 Doors ....................................................................................................................................................... 238.237 Automated monitoring ............................................................................................................................. Willful violation 5,000 5,000 7,500 7,500 5,000 5,000 5,000 5,000 5,000 3,000 7,500 7,500 7,500 7,500 7,500 4,500 5,000 5,000 5,000 5,000 6,500 5,000 6,500 5,000 5,000 5,000 7,500 7,500 7,500 7,500 9,000 7,500 9,000 7,500 7,500 7,500 1 5,000 5,000 1 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 5,000 6,500 5,000 7,500 9,000 7,500 6,500 9,000 5,000 6,500 6,500 5,000 7,500 9,000 9,000 7,500 5,000 6,500 5,000 7,500 9,000 7,500 5,000 6,500 7,500 9,000 5,000 6,500 7,500 9,000 5,000 6,500 6,500 6,500 6,500 6,500 5,000 5,000 5,000 5,000 5,000 7,500 9,000 9,000 9,000 9,000 9,000 7,500 7,500 7,500 7,500 7,500 8,500 11,000 ycherry on PROD1PC64 with PROPOSALS2 Subpart D—Inspection, Testing, and Maintenance Requirements for Tier I Equipment 238.303 Exterior mechanical inspection of passenger equipment: (a)(1) Failure to perform mechanical inspection .............................................................................................. (a)(2) Failure to inspect secondary brake system ........................................................................................... (b) Failure to perform inspection on car added to train ................................................................................... (c) Failure to utilize properly qualified personnel ............................................................................................. (e)(1) Products of combustion not released outside cab ................................................................................. (e)(2) Battery not vented or gassing excessively ............................................................................................. (e)(3) Coupler not in proper condition .............................................................................................................. (e)(4) No device under drawbar pins or connection pins ................................................................................ (e)(5) Suspension system and spring rigging not in proper condition ............................................................. (e)(6) Truck not in proper condition ................................................................................................................. (e)(7) Side bearing not in proper condition ...................................................................................................... (e)(8) Wheel not in proper condition: (i), (iv) Flat spot(s) and shelled spot(s): (A) One spot 21⁄2″ or more but less than 3″ in length ....................................................................... (B) One spot 3″ or more in length ..................................................................................................... (C) Two adjoining spots each of which is 2″ or more in length but less than 21⁄2″ in length ........... (D) Two adjoining spots each of which are at least 2″ in length, if either spot is 21⁄27″ or more in length .............................................................................................................................................. (ii) Gouge or chip in flange: (A) More than 11⁄2″ but less than 15⁄8″ in length; and more than 1⁄2″ but less than 5⁄8″ in width ..... (B) 15⁄8″ or more in length and 5⁄8″ or more in width ........................................................................ (iii) Broken rim ........................................................................................................................................... (v) Seam in tread ...................................................................................................................................... (vi) Flange thickness of: (A) 7⁄8″ or less but more than ............................................................................................................ (B) 13⁄16″ or less ................................................................................................................................. (vii) Tread worn hollow .............................................................................................................................. (viii) Flange height of: (A) 11⁄2″ or greater but less than 15⁄8″ ............................................................................................... (B) 15⁄8″ or more ................................................................................................................................ (ix) Rim thickness: (A) Less than 1″ ................................................................................................................................. (B) 15⁄16″ or less ................................................................................................................................. (x) Crack or break in flange, tread, rim, plate, or hub: (A) Crack of less than 1″ ................................................................................................................... (B) Crack of 1″ or more ..................................................................................................................... (C) Break ............................................................................................................................................ (xi) Loose wheel ........................................................................................................................................ (xii) Welded wheel ..................................................................................................................................... (e)(10) Improper grounding or insulation ......................................................................................................... (e)(11) Jumpers or cable connections not in proper condition ........................................................................ (e)(12) Door or cover plate not properly marked ............................................................................................. (e)(13) Buffer plate not properly placed ........................................................................................................... (e)(14) Diaphragm not properly placed or aligned ........................................................................................... (e)(15) Secondary braking system not in operating mode or contains known defect ..................................... (e)(16) Roller bearings: (i) Overheated ........................................................................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00041 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70630 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX A TO PART 238.—SCHEDULE OF CIVIL PENALTIES 1—Continued ycherry on PROD1PC64 with PROPOSALS2 Section 2 Violation (ii) Cap screw loose or missing ................................................................................................................. (iii) Cap screw lock broken or missing ...................................................................................................... (iv) Seal loose, damaged, or leaks lubricant ............................................................................................ (g) Record of inspection: (1), (4) Failure to maintain record of inspection ....................................................................................... (2) Record contains insufficient information .............................................................................................. (e)(17) Air compressor inoperative ................................................................................................................... 238.305 Interior mechanical inspection of passenger cars: (a) Failure to perform inspection ...................................................................................................................... (b) Failure to utilize properly qualified personnel ............................................................................................. (c)(1) Failure to protect against personal injury ............................................................................................... (c)(2) Floors not free of condition that creates hazard .................................................................................... (c)(3) Access to manual door release not in place .......................................................................................... (c)(4) Emergency equipment not in place ........................................................................................................ (c)(5) Emergency brake valve not stenciled or marked ................................................................................... (c)(6) Door or cover plates not properly marked ............................................................................................. (c)(7) Safety signage not in place or legible .................................................................................................... (c)(8) Trap door unsafe or improperly secured ................................................................................................ (c)(9) Vestibule steps not illuminated ............................................................................................................... (c)(10) Door not safely operate as intended .................................................................................................... (c)(11) Seat broken, loose, or not properly attached ....................................................................................... (e) Record of inspection: (1), (4) Failure to maintain record of inspection ....................................................................................... (2) Record contains insufficient information .............................................................................................. (f) Record of inspection: (1), (4) Failure to maintain record of inspection ....................................................................................... (2) Record contains insufficient information .............................................................................................. 238.307 Periodic mechanical inspection of passenger cars and unpowered vehicles: (a) Failure to perform periodic mechanical inspection ..................................................................................... (b) Failure to utilize properly qualified personnel ............................................................................................. (c)(1) Seat or seat attachment broken or loose ............................................................................................... (c)(2) Luggage rack broken or loose ................................................................................................................ (c)(3) Bed, bunks, or restraints broken or loose .............................................................................................. (c)(4) Emergency window exit not properly operate ........................................................................................ (c)(5) Emergency lighting not operational ........................................................................................................ (c)(6) Switches not in proper condition ............................................................................................................ (c)(7) Coupler not in proper condition .............................................................................................................. (c)(8) Truck not equipped with securing arrangement ..................................................................................... (c)(9) Truck center casting cracked or broken ................................................................................................. (c)(10) General conditions endangering crew, passengers ............................................................................. (c)(13) Hand or parking brake test not performed ........................................................................................... (d)(1) Manual door release does not operate as intended .............................................................................. (d)(2) Hand or parking brake inspection not performed .................................................................................. (e)(1) Failure to maintain record of inspection ................................................................................................. (i)–(iv) Record contains insufficient information ........................................................................................ (f)(1) Record of inspection: (i) Failure to maintain record of inspection ............................................................................................... (ii) Record contains insufficient information .............................................................................................. 238.309 Periodic brake equipment maintenance: (b) Failure to perform on MU locomotive ......................................................................................................... (c) Failure to perform on conventional locomotive ........................................................................................... (d) Failure to perform on passenger coaches or other unpowered vehicle .................................................... (e) Failure to perform on cab car ..................................................................................................................... (f) Record of periodic maintenance: (1), (2) Failure to maintain record or stencil ............................................................................................. 238.311 Single car tests: (a) Failure to test in accord with required procedure ....................................................................................... (b) Failure to utilize properly qualified personnel ............................................................................................. (c), (e) Failure to perform single car test ......................................................................................................... (f) Improper movement of car for testing ......................................................................................................... (g) Failure to test after repair or replacement of component ........................................................................... 238.313 Class I brake test: (a) Failure to perform on commuter or short distance intercity passenger train ............................................. (b) Failure to perform on long-distance intercity passenger train .................................................................... (c) Failure to perform on cars added to passenger train ................................................................................. (d) Failure to utilized properly qualified personnel ........................................................................................... (f) Passenger train used from Class I brake test with less than 100% operative brakes ............................... (g) Partial failure to perform inspection on a passenger train ......................................................................... (3) Failure to adjust piston travel (per car) ............................................................................................... (h) Failure to maintain record ........................................................................................................................... (j) Failure to perform additional Class I brake test .......................................................................................... VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00042 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 Willful violation 5,000 3,000 5,000 7,500 4,500 7,500 5,000 3,000 5,000 7,500 4,500 7,500 1 3,000 3,000 5,000 5,000 3,000 3,000 3,000 3,000 3,000 5,000 3,000 5,000 5,000 4,500 4,500 7,500 7,500 4,500 4,500 4,500 4,500 4,500 7,500 4,500 7,500 7,500 3,000 1,500 4,500 2,500 3,000 1,500 4,500 2,500 1 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 6,500 5,000 5,000 5,000 5,000 3,000 3,000 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 9,000 7,500 7,500 7,500 7,500 4,500 4,500 3,000 1,500 4,500 2,500 5,000 5,000 5,000 5,000 7,500 7,500 7,500 7,500 3,000 4,500 5,000 5,000 5,000 3,000 3,000 7,500 7,500 7,500 4,500 4,500 1 8,500 11,000 11,000 9,000 9,000 9,000 9,000 7,500 4,500 11,000 1 8,500 6,500 6,500 6,500 6,500 5,000 3,000 8,500 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70631 APPENDIX A TO PART 238.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 2 Violation (j)(3) Failure to maintain record ........................................................................................................................ 238.315 Class IA brake test: (a) Failure to perform inspection ...................................................................................................................... (d) Failure to utilize properly qualified personnel ............................................................................................. (e) Passenger train used from Class IA brake test with improper percentage of operative brakes ............... (f) Partial failure to perform inspection on passenger train ............................................................................. 238.317 Class II brake test: (a) Failure to perform inspection ...................................................................................................................... (b) Failure to utilize properly qualified personnel ............................................................................................. (c) Improper use of defective equipment from Class II brake test .................................................................. 238.319 Running brake tests: (a), (b) Failure to perform test .......................................................................................................................... 238.321 Out-of-service credit ................................................................................................................................ Willful violation 3,000 4,500 1 6,500 9,000 7,500 9,000 7,500 5,000 6,500 5,000 1 5,000 5,000 5,000 7,500 7,500 7,500 3,000 3,000 4,500 4,500 5,000 5,000 5,000 7,500 7,500 7,500 5,000 5,000 5,000 5,000 7,500 7,500 7,500 7,500 5,000 5,000 5,000 5,000 5,000 5,000 7,500 7,500 7,500 7,500 7,500 7,500 5,000 5,000 1,500 3,000 7,500 7,500 2,500 4,500 5,000 5,000 7,500 7,500 5,000 5,000 5,000 5,000 5,000 7,500 7,500 7,500 7,500 7,500 6,500 6,500 5,000 5,000 6,500 5,000 5,000 5,000 5,000 5,000 5,000 9,000 9,000 7,500 7,500 9,000 7,500 7,500 7,500 7,500 7,500 7,500 5,000 5,000 5,000 5,000 5,000 [Reserved] 5,000 5,000 5,000 5,000 7,500 7,500 7,500 7,500 7,500 ........................ 7,500 7,500 7,500 7,500 ycherry on PROD1PC64 with PROPOSALS2 Subpart E—Specific Requirements for Tier II Passenger Equipment 238.403 Crash energy management .................................................................................................................... 238.405 Longitudinal static compressive strength ................................................................................................ 238.407 Anti-climbing mechanism ........................................................................................................................ 238.409 Forward end structures of power car cabs: (a) Center collision post ................................................................................................................................... (b) Side collision posts ..................................................................................................................................... (c) Corner posts ................................................................................................................................................ (d) Skin ............................................................................................................................................................. 238.411 Rear end structures of power car cabs: (a) Corner posts ............................................................................................................................................... (b) Collision posts ............................................................................................................................................. 238.413 End structures of trailer cars ................................................................................................................... 238.415 Rollover strength ..................................................................................................................................... 238.417 Side loads ............................................................................................................................................... 238.419 Truck-to-car-body and truck component attachment .............................................................................. 238.421 Glazing: (b) End-facing exterior glazing ......................................................................................................................... (c) Alternate glazing requirements ................................................................................................................... (d) Glazing securement .................................................................................................................................... (e) Stenciling ..................................................................................................................................................... 238.423 Fuel tanks: (a) External fuel tanks ...................................................................................................................................... (b) Internal fuel tanks ....................................................................................................................................... 238.425 Electrical system: (a) Circuit protection ......................................................................................................................................... (b) Main battery system .................................................................................................................................... (c) Power dissipation resistors ......................................................................................................................... (d) Electromagnetic interference and compatibility .......................................................................................... 238.427 Suspension system ................................................................................................................................. 238.429 Safety Appliances: (a) Couplers ...................................................................................................................................................... (b) Hand/parking brakes ................................................................................................................................... (d) Handrail and handhold missing .................................................................................................................. (d)(1)–(8) Handrail or handhold improper design ............................................................................................ (e) Sill step missing .......................................................................................................................................... (e)(1)–(11) Sill step improper design ............................................................................................................... (g) Optional safety appliances .......................................................................................................................... 238.431 Brake system .......................................................................................................................................... 238.433 Draft System ........................................................................................................................................... 238.435 Interior fittings and surfaces .................................................................................................................... 238.437 Emergency communication ..................................................................................................................... 238.439 Doors: (a) Exterior side doors ...................................................................................................................................... (b) Manual override feature .............................................................................................................................. (c) Notification to crew of door status .............................................................................................................. (d) Emergency back-up power ......................................................................................................................... (f) End door kick-out panel or pop-out window ................................................................................................ (g) Marking and instructions ............................................................................................................................. 238.441 Emergency roof hatch entrance location ................................................................................................ 238.443 Headlights ............................................................................................................................................... 238.445 Automated monitoring ............................................................................................................................. 238.447 Train operator’s controls and power car cab layout ............................................................................... Subpart F—Inspection, Testing, and Maintenance Requirements for Tier II Passenger Equipment 238.503 Inspection, testing, and maintenance requirements: VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00043 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70632 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX A TO PART 238.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 2 Violation (a) Failure to develop inspection, testing, and maintenance program or obtain FRA approval ...................... (b) Failure to comply with provisions of the program ...................................................................................... (c) Failure to ensure equipment free of conditions which endanger safety of crew, passengers, or equipment .............................................................................................................................................................. (d) Specific safety inspections: (1)(i) Failure to perform Class I brake test or equivalent ......................................................................... (1)(ii) Partial failure to perform Class I brake test or equivalent .............................................................. (2)(i) Failure to perform exterior mechanical inspection ........................................................................... (2)(ii) Failure to perform interior mechanical inspection ........................................................................... (g) Failure to perform scheduled maintenance as required in program .......................................................... (h) Failure to comply with training, qualification and designation program ..................................................... (i) Failure to develop or comply with standard procedures for performing inspection, tests, and maintenance ............................................................................................................................................................ (j) Failure to conduct annual review ................................................................................................................. (k) Failure to establish or utilize quality control program ................................................................................. Willful violation 8,500 6,500 11,000 9,000 5,000 7,500 8,500 6,500 1 5,000 1 3,000 5,000 6,500 11,000 9,000 7,500 4,500 7,500 9,000 5,000 6,500 6,500 7,500 9,000 9,000 6,500 6,500 5,000 5,000 9,000 9,000 7,500 7,500 Subpart G—Specific Safety Planning Requirements for Tier II Passenger Equipment 238.603 Safety plan: (a) Failure to develop safety operating plan .................................................................................................... (b) Failure to develop procurement plan .......................................................................................................... (1)–(7) Failure to develop portion of plan ................................................................................................. (c) Failure to maintain documentation .............................................................................................................. 1 A penalty may be assessed against an individual only for a willful violation. Generally when two or more violations of these regulations are discovered with respect to a single unit of passenger equipment that is placed or continued in service by a railroad, the appropriate penalties set forth above are aggregated up to a maximum of $11,000 per day. However, failure to perform, with respect to a particular unit of passenger equipment, any of the inspections and tests required under subparts D and F of this part will be treated as a violation separate and distinct from, and in addition to, any substantive violative conditions found on that unit of passenger equipment. Moreover, the Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. Failure to observe any condition for movement of defective equipment set forth in § 238.17 will deprive the railroad of the benefit of the movement-for-repair provision and make the railroad and any responsible individuals liable for penalty under the particular regulatory section(s) concerning the substantive defect(s) present on the unit of passenger equipment at the time of movement. Failure to observe any condition for the movement of passenger equipment containing defective safety appliances, other than power brakes, set forth in § 238.17(e) will deprive the railroad of the movement-forrepair provision and make the railroad and any responsible individuals liable for penalty under the particular regulatory section(s) contained in part 231 of this chapter or § 238.429 concerning the substantive defective condition. The penalties listed for failure to perform the exterior and interior mechanical inspections and tests required under § 238.303 and § 238.305 may be assessed for each unit of passenger equipment contained in a train that is not properly inspected. Whereas, the penalties listed for failure to perform the brake inspections and tests under § 238.313 through § 238.319 may be assessed for each train that is not properly inspected. 2 The penalty schedule uses section numbers from 49 CFR part 238. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. PART 239—[AMENDED] 45. The authority citation for part 239 continues to read as follows: Authority: 49 U.S.C. 20102–20103, 20105– 20114, 20133, 21301, 21304, and 21311; 28 U.S.C. 2461, note; and 49 CFR 1.49(c), (g), (m). 46. Appendix A to part 239 is revised to read as follows: APPENDIX A TO PART 239.—SCHEDULE OF CIVIL PENALTIES 1 Section 2 Violation Willful violation ycherry on PROD1PC64 with PROPOSALS2 Subpart B—Specific Requirements 239.101 (a) Failure of a railroad to adopt a written emergency preparedness plan ............................................ (a)(1) Failure of the plan to provide for: (i) Initial or on-board notifications by an on-board crewmember .............................................................. (ii) Notification of outside emergency responders by control center ........................................................ (a)(2) Failure of the plan to provide for: (i) Initial or periodic training of on-board personnel .................................................................................. (ii) Initial or periodic training of control center personnel ......................................................................... (iii) Completion of initial training of all on-board and control center personnel by the specified date ..... (iv) Completion of initial training of all newly hired on-board and control center personnel by the specified date ................................................................................................................................................ (v) Adequate procedures to evaluate and test on-board and control center personnel for qualification under the emergency preparedness plan ............................................................................................. (vi) Adequate on-board staffing ................................................................................................................. VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00044 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 $8,500 $11,000 5,000 5,000 7,500 7,500 5,000 5,000 5,000 7,500 7,500 7,500 5,000 7,500 5,000 5,000 7,500 7,500 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70633 APPENDIX A TO PART 239.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 2 Violation (a)(3) Failure of a host railroad involved in joint operations to coordinate applicable portions of the emergency preparedness plan with the railroad or railroads providing or operating a passenger train service operation ....................................................................................................................................................... (a)(4) Failure of the plan to address: (i) Readiness procedures for emergencies in tunnels .............................................................................. (ii) Readiness procedures for emergencies on an elevated structure or in electrified territory ............... (iii) Coordination efforts involving adjacent rail modes of transportation .................................................. (a)(5) Failure of the plan to address relationships with on-line emergency responders by providing for: (i) The development and availability of training programs ........................................................................ (ii) Invitations to emergency responders to participate in emergency simulations ................................... (iii) Distribution of applicable portions of the current emergency preparedness plan .............................. (a)(6) Failure of the plan to provide for, or the railroad to include on board each train and maintain and replace: (i) Emergency equipment .......................................................................................................................... (ii) First-aid kits .......................................................................................................................................... (iii) Emergency lighting .............................................................................................................................. (a)(7) Failure of the plan to provide for emergency instructions inside each passenger car or to include additional safety awareness information ...................................................................................................... 239.103 Failure to conduct a required full-scale simulation in accordance with the frequency schedule ........... 239.105 Debriefing and critique: (a) Failure to conduct a debriefing and critique session after an emergency or full-scale simulation ............ (d)(1) Failure to maintain a record ................................................................................................................... (i) Failure to include date or location of the emergency or simulation ..................................................... (ii) Failure to include date or location of the debriefing and critique session ........................................... (iii) Failure to include names of participants in the debriefing and critique session ................................ (d)(2) Failure to make record available ............................................................................................................ 239.107 Emergency exits: (a)(1), (a)(2): (i) Door not marked or instructions not posted ......................................................................................... (ii) Door improperly marked or instructions 1,000–2,000 improperly posted ........................................... (b)(1) Failure to provide for scheduled inspection, maintenance, and repair of emergency windows and doors ............................................................................................................................................................. (b)(2): (i) Failure to test a representative sample of emergency windows .......................................................... (ii) Emergency windows tested too infrequently ....................................................................................... (b)(3) Failure to repair an inoperative emergency window or door exit .......................................................... (c): (i) Failure to maintain a record .................................................................................................................. (ii) Failure to make record available ......................................................................................................... (d)(1) Insufficient limits or controls on accessibility to records ........................................................................ (d)(2) Missing terminal ...................................................................................................................................... (d)(3) Inability of railroad to produce information in a usable format for immediate review ............................ (d)(4) Failure by railroad to designate an authorized representative .............................................................. (d)(5) Failure to make record available ............................................................................................................ Willful violation 5,000 7,500 5,000 5,000 5,000 7,500 7,500 7,500 5,000 5,000 5,000 7,500 7,500 7,500 5,000 5,000 5,000 7,500 7,500 7,500 3,000 5,000 4,500 7,500 5,000 3,000 1,500 1,500 1,500 1,500 7,500 4,500 2,500 2,500 2,500 2,500 5,000 5,000 7,500 7,500 5,000 7,500 5,000 3,000 5,000 7,500 4,500 7,500 5,000 1,500 5,000 1,500 1,500 1,500 1,500 7,500 2,500 7,500 2,500 2,500 2,500 2,500 6,500 1,500 5,000 9,000 2,500 7,500 1,500 1,500 2,500 2,500 1,500 1,500 2,500 2,500 5,000 1,500 7,500 2,500 5,000 5,000 1,500 1,500 1,500 7,500 7,500 2,500 2,500 2,500 Subpart C—Review, Approval, and Retention of Emergency Preparedness Plans 239.201 (a): Filing and approval: (i) Failure of a railroad to file a written emergency preparedness plan ................................................... (ii) Failure to designate a primary person to contact for plan review ....................................................... (iii) Failure of a railroad to file an amendment to its plan ......................................................................... (b)(1), (b)(2): (i) Failure of a railroad to correct a plan deficiency .................................................................................. (ii) Failure to provide FRA with a corrected copy of the plan ................................................................... (b)(3): (i) Failure of a railroad to correct an amendment deficiency .................................................................... (ii) Failure to file a corrected plan amendment with FRA ......................................................................... 239.203 Retention of emergency preparedness plan: (1) Failure to retain a copy of the plan or an amendment to the plan ............................................................ (2) Failure to make record available ................................................................................................................ ycherry on PROD1PC64 with PROPOSALS2 Subpart D—Operational (Efficiency) Tests; Inspection of Records and Recordkeeping 239.301 Operational (efficiency) tests: (a) Testing Program ......................................................................................................................................... (b)(1) Failure to maintain a record ................................................................................................................... (b)(2) Record improperly completed ................................................................................................................ (c)(1) Failure to retain a copy of the record ..................................................................................................... (c)(2) Failure to make record available ............................................................................................................ 239.303 Electronic recordkeeping: VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00045 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70634 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX A TO PART 239.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 2 Violation (a) Insufficient limits or controls on accessibility to records ............................................................................ (b) Missing terminal .......................................................................................................................................... (c) Inability of railroad to produce information in a usable format for immediate review ................................ (d) Failure by railroad to designate an authorized representative ................................................................... (e) Failure to make record available ................................................................................................................ 3,000 1,500 1,500 1,500 1,500 Willful violation 4,500 2,500 2,500 2,500 2,500 1 A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 U.S.C. 21301, 21304, and 49 CFR part 209, appendix A. 2 The penalty schedule uses section numbers from 49 CFR part 239. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. PART 240—[AMENDED] 47. The authority citation for part 240 continues to read as follows: Authority: 49 U.S.C. 20103, 20107, 20135, 21301, 21304, 21311; 28 U.S.C. 2461, note; and 49 CFR 149. 48. Appendix A to part 240 is revised to read as follows: APPENDIX A TO PART 240.—SCHEDULE OF CIVIL PENALTIES 1 Section 2 Violation Willful violation ycherry on PROD1PC64 with PROPOSALS2 Subpart B—Component Elements 240.101 Program Failures: (a) Failure to have program ............................................................................................................................. (b) Program that fails to address a subject ...................................................................................................... 240.103 Failure to: (a) follow Appendix B ....................................................................................................................................... (d) resubmit, when directed by FRA ................................................................................................................ 240.104 Allowing uncertified person to operate non-traditional locomotives ....................................................... 240.105 Failure to have or execute adequate procedure for selection of supervisors ........................................ 240.107 Classes of Service: (a) Failure to designate classes of service ...................................................................................................... 240.109 Limitations on considering prior conduct records: (a) Failure to have procedure for determining eligibility .................................................................................. (e) Considering excluded data ......................................................................................................................... (f), (g) Failure to provide timely review opportunity ......................................................................................... 240.111 Furnishing Motor Vehicle Records: (a) Failure to action required to make information available ........................................................................... (b) Failure to request: (1) local record .......................................................................................................................................... (2) NDR record .......................................................................................................................................... (f) Failure to request additional record ............................................................................................................. (g) Failure to notify of absence of license ........................................................................................................ (h) Failure to submit request in timely manner ................................................................................................ (i) Failure to report within 48 hours or railroad taking certification action for not reporting earlier than 48 hours ............................................................................................................................................................. 240.113 Furnishing prior employment information: (a) Failure to take action required to make information available ................................................................... (b) Failure to request record ............................................................................................................................ 240.115 Criteria for considering prior motor vehicle conduct: (b) Considering excluded data ......................................................................................................................... (c) Failure to: (1) consider data ....................................................................................................................................... (3)–(4) properly act in response to data ................................................................................................... 240.117 Consideration of Operational Rules Compliance Records: (a) Failure to have program and procedures ................................................................................................... (b)–(j) Failure to have adequate program or procedure .................................................................................. 240.119 Consideration of substance abuse/rules compliance Records: (a) Failure to have program and procedures ................................................................................................... (b)–(e) Failure to have adequate program or procedure ................................................................................. 240.121 Failure to have adequate procedure for determining acuity ................................................................... (f) Failure of engineer to notify ......................................................................................................................... 240.123 Failure to have— (b) adequate procedures for continuing education .......................................................................................... (c) adequate procedures for training new engineers ....................................................................................... 240.125 Failure to have— (a) adequate procedures for testing knowledge .............................................................................................. VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00046 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 $8,500 5,000 $11,000 7,500 1,500 1,500 6,500 5,000 2,500 2,500 9,000 7,500 5,000 7,500 5,000 5,000 5,000 7,500 7,500 7,500 1,500 2,500 1,500 1,500 1,500 1,500 1,500 2,500 2,500 2,500 2,500 2,500 1,500 2,500 1,500 1,500 2,500 2,500 5,000 7,500 8,500 3,000 11,000 4,500 8,500 5,000 11,000 7,500 8,500 5,000 5,000 5,000 11,000 7,500 7,500 7,500 5,000 5,000 7,500 7,500 5,000 7,500 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70635 APPENDIX A TO PART 240.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 2 Violation (d) adequate procedures for documenting testing ........................................................................................... 240.127 Failure to have— (a) adequate procedures for evaluating skill performance .............................................................................. (c) adequate procedures for documenting skills testing .................................................................................. 240.129 Failure to have— (a)–(b) adequate procedures for monitoring performance ............................................................................... Willful violation 5,000 7,500 5,000 5,000 7,500 7,500 5,000 7,500 1,500 3,000 1,500 5,000 5,000 1,500 2,500 4,500 2,500 7,500 7,500 2,500 5,000 8,500 5,000 7,500 11,000 7,500 8,500 5,000 5,000 5,000 11,000 7,500 7,500 7,500 5,000 5,000 5,000 7,500 7,500 7,500 8,500 5,000 11,000 7,500 6,500 1,500 1,500 1,500 1,500 9,000 2,500 2,500 2,500 2,500 6,500 5,000 1,500 5,000 9,000 7,500 2,500 7,500 5,000 3,000 1,500 5,000 7,500 4,500 2,500 7,500 5,000 3,000 7,500 4,500 1,500 1,500 (—) 2,500 2,500 11,000 3,000 4,500 3,000 3,000 4,500 4,500 3,000 3,000 1,500 4,500 4,500 2,500 1,500 1,500 (—) 2,500 2,500 11,000 8,500 3,000 11,000 4,500 ycherry on PROD1PC64 with PROPOSALS2 Subpart C—Implementation of the Process 240.201 Schedule for implementation: (a) Failure to select supervisors by specified date .......................................................................................... (b) Failure to identify grandfathered engineers ................................................................................................ (c) Failure to issue certificate to engineer ........................................................................................................ (d) Allowing uncertified person to operate ....................................................................................................... (e)–(g) Certifying without complying with subpart C ........................................................................................ (h)–(i) Failure to issue certificate to engineer .................................................................................................. 240.203 (a) Designating a person as a supervisor without determining that— (1) person knows and understands this part ............................................................................................ (2) person can test and evaluate engineers ............................................................................................. (3) person has experience to prescribe remedies .................................................................................... (b) Certifying a person without determining that— (1) person meets the eligibility criteria ...................................................................................................... (2) person meets the medical criteria ....................................................................................................... (3) person has demonstrated knowledge ................................................................................................. (4) person has demonstrated skills ........................................................................................................... (c) Certifying a person without determining that— (1) person has completed training program .............................................................................................. (2) person meets the eligibility criteria ...................................................................................................... (3) time has elapsed ................................................................................................................................. 240.205 Procedures for determining eligibility based on prior safety conduct: (a) Selecting person lacking eligibility .............................................................................................................. (d) Failure to have basis for taking action ....................................................................................................... 240.207 Ineligibility based on medical condition: (a) Selecting person lacking proper acuity ....................................................................................................... (b) Failure to have basis for finding of proper acuity ....................................................................................... (c) Acuity examinations performed by unauthorized person ........................................................................... (d) Failure to note need for device to achieve acuity ...................................................................................... (e) Failure to use device needed for proper acuity .......................................................................................... 240.209 Demonstrating knowledge: (b) Failure to properly determine knowledge ................................................................................................... (c) Improper test procedure .............................................................................................................................. (d) Failure to document test results ................................................................................................................. (e) Allowing person to operate despite test failure .......................................................................................... 240.211 Demonstrating skills: (b) Failure to properly determine knowledge ................................................................................................... (c) Improper test procedure .............................................................................................................................. (d) Failure to document test results ................................................................................................................. (e) Allowing person to operate despite test failure .......................................................................................... 240.213 Completion of approved training program: (a) Failure to properly determine ...................................................................................................................... (b) Failure to document successful program completion ................................................................................. 240.215 Supporting information: (a), (f)–(h) Failure to have a record ................................................................................................................. (b) Failure to have complete record ................................................................................................................. (i) Falsification of record ................................................................................................................................... 240.217 Time limits for making determinations: (a), (c) Exceeding time limit ............................................................................................................................. 240.219 Denial of certification: (a) Failure to notify or provide opportunity for comment ................................................................................. (c) Failure to notify, provide data, or untimely notification ............................................................................... 240.221 Identification of persons: (a)–(c) Failure to have a record ....................................................................................................................... (d) Failure to update a record .......................................................................................................................... (e)–(f) Failure to make a record available ........................................................................................................ 240.223 Certificate criteria: (a) Improper certificate ..................................................................................................................................... (b) Failure to designate those with signatory authority .................................................................................... (d) Falsification of certificate ............................................................................................................................ 240.225 Railroad Relying on Determination of Another: (a) Failure to address in program or failure to require newly hired engineer to take entire training program (2) Reliance on wrong class of service ............................................................................................................ VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00047 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2 70636 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules APPENDIX A TO PART 240.—SCHEDULE OF CIVIL PENALTIES 1—Continued Section 2 Violation (3) Failure to familiarize person with new operational territory ........................................................................ (4) Failure to determine knowledge ................................................................................................................. (5) Failure to determine performance skills ..................................................................................................... 240.227 Railroad Relying on Requirements of a Different Country: (a) Joint operator reliance: (1) on person not employed ...................................................................................................................... (2) on person who fails to meet Canadian requirements ......................................................................... (b) Canadian railroad reliance: (1) on person not employed ...................................................................................................................... (2) on person who fails to meet Canadian requirements ......................................................................... 240.229 Requirements for Joint Operations Territory: (a) Allowing uncertified person to operate ....................................................................................................... (b) Certifying without making determinations or relying on another railroad ................................................... (c) Failure of: (1) controlling railroad certifying without determining certification status, knowledge, skills, or familiarity with physical characteristics .......................................................................................................... (2) employing railroad to determine person’s certified and qualified status for controlling railroad ......... (3) person to notify employing railroad of lack of qualifications ............................................................... (d) Failure to provide qualified person ............................................................................................................. 240.231 Persons Qualified on Physical Characteristics in Other Than Joint Operations: (a) Person unqualified, no exception applies or railroad does not adequately address in program ............... (b) Failure to have a pilot: (1) for engineer who has never been qualified ......................................................................................... (2) for engineer previously qualified .......................................................................................................... Willful violation 3,000 3,000 3,000 4,500 4,500 4,500 1,500 1,500 2,500 2,500 1,500 1,500 2,500 2,500 3,000 6,500 4,500 9,000 8,500 8,500 8,500 3,000 11,000 11,000 11,000 4,500 8,500 11,000 8,500 5,000 11,000 7,500 3,000 4,500 8,500 1,500 1,500 1,500 11,000 2,500 2,500 2,500 6,500 6,500 6,500 6,500 6,500 6,500 9,000 9,000 9,000 9,000 9,000 9,000 1,500 1,500 8,500 8,500 2,500 2,500 11,000 11,000 3,000 3,000 3,000 3,000 6,500 4,500 4,500 4,500 4,500 9,000 1,500 3,000 2,500 4,500 Subpart D—Program Administration 240.301 Failure to have system for certificate replacement ................................................................................. 240.303 Monitoring operations: (a) Failure to have program ............................................................................................................................. (b) Failure to observe each person annually ................................................................................................... (c) Failure to test each person annually .......................................................................................................... (d) Failure to test properly ................................................................................................................................ 240.305 Prohibited Conduct: (a) Unlawful: (1) passing of stop signal .......................................................................................................................... (2) control of speed ................................................................................................................................... (3) brake tests ........................................................................................................................................... (4) occupancy of main track ...................................................................................................................... (5) tampering or operation with disabled safety device ............................................................................ (6) supervisor, pilot, or instructor fails to take appropriate action ............................................................ (b) Failure of engineer to: (1) carry certificate .................................................................................................................................... (2) display certificate when requested ...................................................................................................... (c) Failure of engineer to notify railroad of limitations or railroad requiring engineer to exceed limitations ... (d) Failure of engineer to notify railroad of denial or revocation ..................................................................... 240.307 Revocation of Certification: (a) Failure to withdraw person from service .................................................................................................... (b) Failure to notify, provide hearing opportunity, or untimely procedures ...................................................... (c)–(h) Failure of railroad to comply with hearing or waiver procedures ......................................................... (j) Failure of railroad to make record ............................................................................................................... (k) Failure of railroad to conduct reasonable inquiry or make good faith determination ................................. 240.309 Oversight Responsibility Report: (a) Failure to report or to report on time .......................................................................................................... (b)–(h) Incomplete or inaccurate report ........................................................................................................... ycherry on PROD1PC64 with PROPOSALS2 1 A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 CFR part 209, appendix A. 2 The penalty schedule uses section numbers from 49 CFR part 240. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. PART 241—[AMENDED] 49. The authority citation for part 241 continues to read as follows: VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 Authority: 49 U.S.C. 20103, 20107, 21301, 21304, 21311; 28 U.S.C. 2461, note; 49 CFR 1.49. PO 00000 Frm 00048 Fmt 4701 Sfmt 4702 50. Appendix B to part 241 is revised to read as follows: E:\FR\FM\05DEP2.SGM 05DEP2 Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / Proposed Rules 70637 APPENDIX B TO PART 241.—SCHEDULE OF CIVIL PENALTIES 1 Section 2 Violation 241.9 (a) Requiring or permitting extraterritorial dispatching of a railroad operation ........................................... (b) Failing to notify FRA about extraterritorial dispatching of a railroad operation in an emergency situation 241.11 Conducting a railroad operation that is extraterritorially dispatched: (a)(1) Generally ................................................................................................................................................ (a)(2) In an emergency situation—where dispatching railroad fails to notify FRA of the extraterritorial dispatching ......................................................................................................................................................... 241.13 Requiring or permitting track to be used for the conduct of a railroad operation that is extraterritorially dispatched: (a)(1) Generally ................................................................................................................................................ (a)(2) In an emergency situation—where dispatching railroad fails to notify FRA of the extraterritorial dispatching ......................................................................................................................................................... 1A Willful violation $6,500 6,500 $9,000 9,000 6,500 9,000 1,500 2,500 6,500 9,000 1,500 2,500 penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to $27,000 for any violation where circumstances warrant. See 49 U.S.C. 21301, 21304 and 49 CFR part 209, appendix A. 2 The penalty schedule uses section numbers from 49 CFR part 241. If more than one item is listed as a type of violation of a given section, each item is also designated by a ‘‘penalty code,’’ which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ. Issued in Washington, DC on November 16, 2006. Joseph H. Boardman, Administrator. [FR Doc. E6–20031 Filed 12–4–06; 8:45 am] ycherry on PROD1PC64 with PROPOSALS2 BILLING CODE 4910–06–P VerDate Aug<31>2005 13:38 Dec 04, 2006 Jkt 211001 PO 00000 Frm 00049 Fmt 4701 Sfmt 4702 E:\FR\FM\05DEP2.SGM 05DEP2

Agencies

[Federal Register Volume 71, Number 233 (Tuesday, December 5, 2006)]
[Proposed Rules]
[Pages 70590-70637]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-20031]



[[Page 70589]]

-----------------------------------------------------------------------

Part II





Department of Transportation





-----------------------------------------------------------------------



Federal Railroad Administration



-----------------------------------------------------------------------



49 CFR Parts 213, 214 et al.



Proposed Revisions to the Schedules of Civil Penalties for a Violation 
of a Federal Railroad Safety Law or Federal Railroad Administration 
Safety Regulation; Proposed Rule

Federal Register / Vol. 71, No. 233 / Tuesday, December 5, 2006 / 
Proposed Rules

[[Page 70590]]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration

49 CFR Parts 213, 214, 215, 217, 218, 219, 220, 221, 222, 223, 224, 
225, 228, 229, 230, 231, 232, 233, 234, 235, 236, 238, 239, 240, 
and 241

[Docket No. FRA-2006-25274]
RIN 2130-AB81


Proposed Revisions to the Schedules of Civil Penalties for a 
Violation of a Federal Railroad Safety Law or Federal Railroad 
Administration Safety Regulation

AGENCY: Federal Railroad Administration (FRA), Department of 
Transportation (DOT).

ACTION: Proposed schedules of civil penalties with request for 
comments.

-----------------------------------------------------------------------

SUMMARY: FRA is issuing for comment proposed statements of agency 
policy that would amend the 25 schedules of civil penalties (Schedules) 
issued as appendixes to FRA's safety regulations to reflect more 
accurately the safety risks associated with a violation of each section 
or subsection of the regulations, as well as to make sure that the 
civil monetary penalty amounts (CMP) are consistent across all the 
safety regulations. These proposed revisions to the Schedules are being 
published to inform members and representatives of the regulated 
community and the general public of the amount of the civil penalty 
that a respondent would likely be assessed for a given violation and to 
invite their comments on those proposed amounts. In addition, FRA is 
proposing to correct any obvious errors or omissions in the Schedules.

DATES: Written comments must be received by January 4, 2007. Comments 
received after that date will be considered to the extent possible 
without incurring additional delay or expense.

ADDRESSES: Comments: Comments related to this Docket No. FRA 2006-
25274, Notice No. 1, may be submitted by any of the following methods:
     Web Site: https://dms.dot.gov. Follow the instructions for 
submitting comments on the DOT electronic docket site.
     Fax: 202-493-2251.
     Mail: Docket Management Facility, U.S. Department of 
Transportation, 400 Seventh Street, SW., Nassif Building, Room PL-401, 
Washington, DC 20590.
     Hand Delivery: Room PL-401 on the plaza level of the 
Nassif Building, 400 Seventh Street, SW., Washington, DC between 9 a.m. 
and 5 p.m. Monday through Friday, except Federal holidays.
     Federal eRulemaking Portal: Go to https://
www.regulations.gov. Follow the online instructions for submitting 
comments.
    Instructions: All submissions must include the agency name and 
docket number or Regulatory Identification Number (RIN) for this 
rulemaking. Note that all comments received will be posted without 
change to https://dms.dot.gov including any personal information.
    Docket: For access to the docket to read background documents or 
comments received go to https://dms.dot.gov at any time or to PL-401 on 
the plaza level of the Nassif Building, 400 Seventh Street, SW., 
Washington, DC between 9 a.m. and 5 p.m., Monday through Friday, except 
Federal Holidays.

FOR FURTHER INFORMATION CONTACT: Edward Pritchard, Director, Office of 
Safety Assurance and Compliance, FRA, 1120 Vermont Avenue, NW., 
Washington, DC 20590 (telephone 202-493-6247), 
edward.pritchard@dot.gov; or Carolina Mirabal, Trial Attorney, Office 
of Chief Counsel, FRA, 1120 Vermont Avenue, NW., Mail Stop 10, 
Washington, DC 20590 (telephone 202-493-6043), 
carolina.mirabal@dot.gov.

SUPPLEMENTARY INFORMATION:

Table of Contents for Supplementary Information

I. Background
II. FRA's Approach to Reevaluating the Schedules of Civil Penalties
III. Rankings of the Sections or Subsections of Each of the Rail 
Safety Regulations
    A. Motive Power and Equipment Regulations (CFR Parts 215, 218 
(Partially), 223, 224, 229, 230, 231, 232, 238, and 239 (Partially))
    B. Track and Workplace Safety Regulations (CFR Parts 213 and 
214)
    C. Grade Crossing Signal Systems and Signal and Train Control 
Regulations (CFR Parts 233, 234, 235, and 236)
    D. Operating Practices Regulations (CFR Parts 214, 217, 218 
(Partially), 219, 220, 221, 222, 225, 228, 239 (Partially), 240, and 
241)
List of Subjects in 49 CFR Parts 213, 214, 215, 217, 218, 219, 220, 
221, 222, 223, 224, 225, 228, 229, 230, 231, 232, 233, 234, 235, 
236, 238, 239, 240, and 241

I. Background

    FRA last published comprehensive revisions to the Schedules of its 
safety regulations on December 29, 1988. 53 FR 52918. The revisions 
reflected the higher maximum penalty amounts made available by the 
enactment of the Rail Safety Improvement Act of 1988 (RSIA) (Pub. L. 
100-342). 53 FR 52918. With the exception of the penalties relating to 
the hours of service laws (49 U.S.C. Ch. 211), RSIA raised the maximum 
CMP for any ordinary violation from $2,500 to $10,000 (the ordinary 
maximum) and to $20,000 (the aggravated maximum) for a grossly 
negligent violation or a pattern of repeated violations that has 
created an imminent hazard of death or injury or caused death or 
injury. Therefore, FRA published amendments to the Schedules in order 
to ``give effect to the full range of civil penalties * * * permitted 
to be assessed for violation of specific regulations.'' 53 FR 52918. 
These amendments revised not only the maximum civil penalty amount for 
any violation, but also the individual line-item penalties for specific 
sections or subsections of the regulations.
    The Rail Safety Enforcement and Review Act (RSERA) of 1992 (Pub. L. 
102-365) increased the maximum CMP from $1,000 to $10,000 and in some 
cases to $20,000, for a violation of the hours of service laws, making 
these penalty amounts uniform with those of FRA's other regulatory 
provisions. RSERA also increased the minimum CMP from $250 to $500 for 
all of FRA's regulatory provisions.
    Since the publication of the Schedules in 1988, FRA has only 
adjusted its minimum and ordinary or aggravated maximum CMPs to conform 
to the mandates of the Federal Civil Penalties Inflation Adjustment Act 
of 1990 (Inflation Act). The Inflation Act required that an agency 
adjust by regulation each maximum CMP, or range of minimum and maximum 
CMPs within that agency's jurisdiction by October 23, 1996, and adjust 
those penalty amounts once every four years thereafter to reflect 
inflation. Public Law 101-410, 104 Stat. 890, 28 U.S.C. 2461, note, as 
amended by Section 31001(s)(1) of the Debt Collection Improvement Act 
of 1996, Public Law 104-134, 110 Stat. 1321-373, April 26, 1996. In the 
Inflation Act, Congress found a way to counter the effect that 
inflation has had on the CMPs by having the agencies charged with 
enforcement responsibility administratively adjust the CMPs. Currently 
FRA's minimum CMP is $550, the ordinary maximum is $11,000, and the 
aggravated maximum is $27,000 (for when a ``grossly negligent violation 
or pattern of repeated violations has caused an imminent hazard of 
death or injury to individuals, or has caused death or injury'').
    The Inflation Act requires only that the minimum, maximum and 
aggravated maximum civil penalty for a violation be adjusted, not that 
the guideline penalty amounts for a specific type of violation be 
adjusted; therefore, FRA

[[Page 70591]]

has not adjusted the line-item guideline penalties found in the 
Schedules in conjunction with its adjustments of the minimum, maximum 
and aggravated maximum civil penalties. FRA's practice has been to 
issue Schedules assigning to each section or subsection of the 
regulations specific dollar amounts for initial penalty assessments. 
These Schedules (and all line-item penalty amounts found within them) 
are statements of agency policy that specify the CMP that FRA will 
ordinarily assess for the violation of a particular section or 
subsection of a safety regulation, and are published to inform members 
of the regulated community of the amount that they are likely to be 
assessed for a given violation within the range of $550 to $11,000. The 
Schedules are ``meant to provide guidance as to FRA's policy in 
predictable situations, not to bind FRA from using the full range of 
penalty authority where extraordinary circumstances warrant.'' 49 CFR 
part 209, App. A. Thus, regardless of the amounts shown in the 
Schedules, FRA continues to reserve the right to assess an amount other 
than that listed in the Schedules based on the circumstances of the 
alleged violation, as well as the statutory maximum CMP of up to 
$27,000 per violation in situations ``where a grossly negligent 
violation or a pattern of repeated violations has caused an imminent 
hazard of death or injury to individuals, or has caused death or 
injury.''

II. FRA's Approach to Reevaluating the Schedules of Civil Penalties

    The Federal Railroad Administrator is authorized as the delegate of 
the Secretary of Transportation to enforce the Federal railroad safety 
statutes (49 U.S.C. Ch. 201-213) and regulations, including the 
statutory civil penalty provisions at 49 U.S.C. Ch. 213. 49 CFR 1.49. 
FRA currently has 25 regulations that contain Schedules.\1\ FRA is 
proposing to amend each of the line-item penalty amounts contained 
within the Schedules for each of the regulations. In addition, FRA 
would correct any obvious errors or omissions in the Schedules. For 
example, FRA would add a line-item penalty for any existing section or 
subsection that has been inadvertently omitted from an existing 
Schedule, such as 49 CFR 213.110. FRA would also correct obvious 
spelling or typographical errors that are caught during the review 
process. Because the Schedules are statements of agency policy, FRA has 
authority to issue these amendments without having to follow the notice 
and comment procedures under the Administrative Procedure Act, 5 U.S.C. 
553(b)(3)(A). Nevertheless, FRA is providing members and 
representatives of the regulated community and the general public with 
an opportunity to comment on the proposed line-item penalty amounts 
before amending the Schedules.
---------------------------------------------------------------------------

    \1\ FRA is not amending the Schedule found in 49 CFR part 210 
because that part is enforcing the Railroad Noise Emission Standards 
established by the Environmental Protection Agency in 40 CFR part 
201.
---------------------------------------------------------------------------

    In reevaluating the penalty amounts in the Schedules, FRA has 
developed the following Severity Scale (Severity Scale) for setting the 
line-item penalty amounts for each of the provisions in the safety 
regulations:

Severity Scale for Setting Line-Item Penalty Amounts in FRA Penalty 
Schedules

    FRA's regulations are intended either to prevent a railroad 
accident/incident or to mitigate the consequences if one were to occur. 
For the most severe ratings on the scale, FRA concentrated on the 
degrees of likelihood that an accident/incident \2\ will occur or that 
graver consequences will occur as a result of failing to comply with 
the section. The following severity scale is intended to reflect this 
focus:
---------------------------------------------------------------------------

    \2\ ``Accidents/incidents'' is defined at 49 CFR 225.5 and 
225.19(c). The term includes highway-rail grade crossing accidents/
incidents, rail equipment accidents/incidents, and accidents/
incidents resulting in death, injury, or occupational illness. A 
highway-rail grade crossing accident/incident is ``[a]ny impact 
between railroad on-track equipment and an automobile, bus, truck, 
motorcycle, bicycle, farm vehicle, or pedestrian at a highway-rail 
grade crossing.'' 49 CFR 225.5, read in light of 49 CFR 225.19(c). 
Rail equipment accidents/incidents are defined in 49 CFR 225.19(c) 
to include ``collisions, derailments, fires, explosions, acts of 
God, and other events involving the operation of on-track equipment 
(standing or moving) * * * that result in damage to railroad 
property that is greater than the reporting threshold.'' Currently 
the reporting threshold is $7,700. 70 FR 754141, 75417 (Dec. 20, 
2005).
---------------------------------------------------------------------------

    Level A--Very High Probability--Failure of railroad to comply with 
this section or subsection of the Code of Federal Regulations (CFR) is 
extremely likely to result in one or more of the following events, but 
does not create an imminent hazard of death or injury to individuals or 
causes an actual death or injury \3\:
---------------------------------------------------------------------------

    \3\ FRA has statutory authority to assess civil penalties in the 
range of $550 (minimum) to $11,000 (maximum) for ordinary violations 
of its regulations. FRA may only assess a penalty at the statutory 
maximum of $27,000 ``when a grossly negligent violation or a pattern 
of repeated violations has caused an imminent hazard of death or 
injury to individuals, or has caused death or injury.'' A $27,000 
statutory maximum penalty is the equivalent of a Level A Plus and is 
therefore off the scale.
---------------------------------------------------------------------------

    1. Rail equipment accident/incident; or
    2. Other accident/incident (not a rail equipment accident/
incident).
    FRA is proposing to issue a CMP guideline for Level ``A'' of $8,500 
for ordinary violations and $11,000 for willful violations of the 
regulations.
    Level B--High Probability--Failure of railroad to comply with this 
section or subsection of the CFR is more likely than not to result in 
the occurrence of:
    1. Rail equipment accident/incident; or
    2. Other accident/incident (not a rail equipment accident/
incident).
    FRA is proposing to issue a CMP guideline for Level ``B'' of $6,500 
for ordinary violations and $9,000 for willful violations of the 
regulations.
    For the following levels, FRA is not only addressing the likelihood 
that noncompliance will or could contribute to an accident or 
aggravated consequences if an accident occurred, but also the 
importance of maintaining compliance in order to prevent violations of 
these CFR sections or subsections from becoming leading accident causes 
in the future.
    Level C--Moderate Probability--Failure of railroad to comply with 
this section or subsection of the CFR substantially increases the 
likelihood that one of the following will occur:
    1. Rail equipment accident/incident; or
    2. Other accident/incident (not a rail equipment accident/
incident).
    FRA is proposing to issue a CMP guideline for Level ``C'' of $5,000 
for ordinary violations and $7,500 for willful violations of the 
regulations.
    Level D--Minor Probability--Failure of the railroad to comply with 
this section or subsection of the CFR slightly increases the likelihood 
that one of the following will occur:
    1. Rail equipment accident/incident; or
    2. Other accident/incident (not a rail equipment accident/
incident).
    FRA is proposing to issue a CMP guideline for Level ``D'' of $3,000 
for ordinary violations and $4,500 for willful violations of the 
regulations.
    Level E--Minimal Probability--Failure to comply with this CFR 
section or subsection does not increase the likelihood that a rail 
equipment accident/incident or other accident/incident will occur, 
except in special circumstances, such as if the noncompliance is 
willful or widespread. Nevertheless, noncompliance with any one of 
these provisions undercuts the effectiveness of the Federal railroad 
safety program, and could compromise the safety of rail operations.
    Example: Violation of Sec.  225.13--Late Reports--Submitting a late 
accident/

[[Page 70592]]

incident report to FRA does not increase the likelihood that a rail 
equipment accident/incident or other accident/incident will occur. 
Widespread noncompliance with that provision, however, could lead to 
inaccuracies in Federal accident databases, which in turn could delay 
FRA's response to emerging safety problems.
    FRA is proposing to issue a CMP guideline for Level ``E'' of $1,500 
for ordinary violations and $2,500 for willful violations of the 
regulations.
    As the Severity Scale shows, there are five different degrees of 
probabilities, ranging from A (the most severe) to E (the least severe 
of the types of violations). In developing the rankings (A through E), 
FRA concentrated on the degrees of likelihood that an accident/incident 
will occur or that graver consequences will occur as a result of the 
failure to comply with the particular section or subsection of the 
safety regulations. The Severity Scale was then used by FRA to assign a 
ranking (from A to E) to each of the provisions of the particular 
safety regulations that it has responsibility for administering and 
enforcing. The resulting line-item penalty amounts for each of the 
sections or subsections of the safety regulations affected reflect 
FRA's determination, based on safety data and industry knowledge, of 
how likely the violation of a particular section or subsection is to 
result in a rail equipment accident/incident or other type of accident/
incident. FRA not only increased the penalty amounts in some instances, 
but also reduced the penalty amounts for some sections or subsections 
where it determined that a violation of the particular regulation 
constituted less of a safety risk. A determination by FRA that a CFR 
section or subsection does not increase the likelihood than a rail 
equipment accident/incident or other accident will occur, however, does 
not mean that this section or subsection is inconsequential to the 
effectiveness of the Federal railroad safety program or to the overall 
safety of railroad operations.
    The new Schedules will continue to have two categories of 
violations: Ordinary and willful. See 49 CFR part 209, App. A for a 
discussion of ``willful'' violations. The ordinary penalties apply to 
railroads or other respondents, except individuals, while the 
``willful'' column applies to willful violations committed by railroads 
or other respondents, including individuals. Each Schedule lists the 
CFR section or subsection in the left hand column, with the 
corresponding penalties listed in the columns next to it. The only 
exception continues to be 49 CFR part 231; what are listed in the left 
hand column of the Schedule are the FRA ``defect codes'' \4\ for that 
part, and not the corresponding CFR sections. The reason for this 
continues to be the fact that the defect codes are organized by the 
type of safety appliance, which makes them easier to use, than the 
section numbers of part 231, which are organized primarily by car type. 
Nevertheless, if necessary, every defect code can be traced to a 
specific regulatory provision in part 231 or statutory provision in 49 
U.S.C. Chapter 203, or both.
---------------------------------------------------------------------------

    \4\ Defect codes were developed by FRA in order to facilitate 
computerization of inspection data generated by FRA inspectors by 
providing a digital format for every CFR section. Defect codes are 
analytical tools only and are subject to change without notice.
---------------------------------------------------------------------------

    The following chart summarizes the proposed guideline amounts for 
ordinary and willful violations by severity level:

------------------------------------------------------------------------
                                                  Ordinary     Willful
                Severity level                   violations   violations
------------------------------------------------------------------------
Level A.......................................       $8,500      $11,000
Level B.......................................        6,500        9,000
Level C.......................................        5,000        7,500
Level D.......................................        3,000        4,500
Level E.......................................        1,500        2,500
------------------------------------------------------------------------

III. Rankings of the Sections or Subsections of Each of the Rail Safety 
Regulations

    Although the railroad industry's overall safety record has improved 
over the last decade, significant train accidents/incidents continue to 
occur. As a result, the FRA's safety program is being guided by careful 
analysis of accident/incident, inspection, and other safety data. FRA 
has also directed both its regulatory and compliance efforts toward the 
areas that involve the highest of safety risks, in order to reduce the 
number and severity of accidents/incidents caused by a failure to 
comply with those safety regulations. Therefore, the goal of the new 
line-item penalty amounts for each of the Schedules is to reflect the 
different degrees of probability that a violation of a particular CFR 
section or subsection will result in a rail equipment accident/incident 
or other accident/incident, in order to improve the overall safety of 
railroad operations.

A. Motive Power and Equipment Regulations (MP&E) (49 CFR Parts 215, 218 
(Partially), 223, 224, 229, 230, 231, 232, 238, and 239 (Partially))

    In reevaluating the line-item penalty amounts for each of the CFR 
sections or subsections found in Parts 215, 218 (partially), 223, 224, 
229, 231, 232, 238, and 239 (partially) of the CFR, FRA took into 
consideration, among other factors, the nationwide list of ``Top 10'' 
MP&E defects. The defects are listed in the table below, in descending 
order, according to the number of times that each defect was determined 
to have caused a rail equipment accident/incident, excluding highway-
rail grade crossing accidents/incidents that are also classified as 
rail equipment accidents/incidents (hereinafter) ``train accidents,'' 
between 2002 and 2005.

------------------------------------------------------------------------
 
------------------------------------------------------------------------
Journal (roller bearing) overheated-- Coupler/draft system defects
 (158)                                 (car)--(55)
Truck bolster stiff--(78)             Electrically caused fire
                                       (locomotive)--(50)
Side bearing clearance insufficient-- Coupler retainer pin/cross key--
 (67)                                  (48)
Broken rim--(62)                      Damaged flange or tread (built
                                       up)--(45)
Pantograph defect (locomotive)--(59)  Rigging down or dragging--(43)
------------------------------------------------------------------------

    The CFR sections or subsections that relate to the defects 
associated with greater safety risks have received more severe rankings 
in the Schedules, and as such now carry higher CMP amounts. For 
example, a violation of 49 CFR 215.103(d)(3), which is a defective 
wheel rim with a crack of one inch or more, received an ``A'' severity 
ranking (and a proposed guideline penalty amount of $8,500) because of 
the high safety risk that the defect will cause a broken-rim 
derailment. In addition, the FRA applied the Severity Scale in order to 
determine the degrees of likelihood that any type of accident/incident 
will occur as a result of noncompliance with the regulations.

B. Track and Workplace Safety Regulations (49 CFR Parts 213 and 214)

    In recent years, most of the serious accidents/incidents (train 
collisions or derailments resulting in a release of hazardous materials 
or harm to rail passengers, rail employees, or the general public) 
resulted from human factor or track causes. Over the last five years 34 
percent of train accidents were caused by track defects. In an effort 
to reduce track accidents, FRA is focusing its track inspections on the 
areas of highest risks and encouraging inspectors to recommend 
enforcement action on the kinds of violations that are considered 
leading causes of track-caused train accidents. Therefore, in 
evaluating the line-item penalty amounts for all the sections or 
subsections, FRA took into consideration the leading causes of

[[Page 70593]]

track-related train accidents when applying the Severity Scale to the 
Track Safety Standards. For example, 49 CFR 213.53(b)--Gage--received 
an ``A'' (and a proposed penalty guideline amount of $8,500) ranking 
because it is one of the leading causes of track-related train 
accidents.
    In ranking the sections or subsections of 49 CFR part 214 (Part 
214)--Railroad Workplace Safety, FRA took into consideration not only 
the probability that an accident/incident could result if a violation 
occurred, but also the fact that the accident/incident could result in 
serious injury or death. One example of the rankings for part 214 is 
the ranking for the second type of violation of section 214.103, which 
requires bridge workers to use fall protection. This subsection 
received a ranking of ``A'' (and a proposed guideline penalty of 
$8,500) because a violation of the subsection could result in serious 
injury or death, as evidenced by the several bridge worker fatalities 
in the past 10 years due to the failure to use fall protection.

C. Grade Crossing Signal Systems and Signal and Train Control 
Regulations (CFR Parts 233, 234, 235, and 236)

    FRA applied the Severity Scale to each of the sections in Parts 
233, 234, 235, and 236, in order to determine the appropriate rankings 
for each of the sections or subsections of the regulations. In the area 
of signal and train control (S&TC), FRA followed the Severity Scale, 
which concentrates on the potential for an accident/incident resulting 
from noncompliance. While there are relatively few train accidents 
associated with S&TC causes and few highway-rail grade crossing 
accidents/incidents associated with S&TC causes that have occurred in 
recent years, it is imperative that the Schedules still reflect the 
levels of risks associated with the violation of these CFR sections or 
subsections, in order to prevent future S&TC-caused accidents.

D. Operating Practices Regulations (CFR Parts 217, 218 (Partially), 
219, 220, 221, 222, 225, 228, 239 (Partially), 240, and 241)

    Over the last five years, human-factor-related causes have 
accounted for 38 percent of all train accidents. A review of the FRA's 
Office of Safety database indicated that the top four human factor 
causes contributing to train accidents are as follows: (1) Switch 
improperly lined; (2) shoving movement, absence of employee on, at or 
ahead of movement; (3) shoving movement, failure to control; and (4) 
buff/slack action excess, train handling. These top causes are often 
involved in violations of such regulations as 49 CFR part 220, Railroad 
Communications. A review of the top four causes for human factors train 
accidents between 2001 and 2005 showed that these causes accounted for 
2,175 reportable train accidents/incidents (including 12 employee 
fatalities, 389 employee injuries, and $60,550,000 in rail and 
equipment damages). Therefore, when applying the Severity Scale to the 
CFR sections or subsections, FRA considered all of this safety 
information in order to ensure that each line-item penalty amount 
reflected the likelihood that noncompliance would result in a train 
accident/incident, or that graver consequences would occur as a result 
of failing to comply with the section or subsection of the regulations 
\5\.
---------------------------------------------------------------------------

    \5\ FRA has separately proposed that additional Railroad 
Operating Rules be incorporated in the Federal regulations and made 
directly enforceable. The notice of proposed rulemaking was issued 
on October 12, 2006, and included additional amendments to the 
Schedules of Parts 217 and 218. See 71 FR 60372.
---------------------------------------------------------------------------

List of Subjects

 49 CFR Part 213

    Bridges, Occupational safety and health, Penalties, Railroad 
safety, Reporting and recordkeeping requirements.

49 CFR Part 214

    Bridges, Occupational safety and health, Penalties, Railroad 
safety, Reporting and recordkeeping requirements.

49 CFR Part 215

    Freight, Penalties, Railroad safety, Reporting and recordkeeping 
requirements.

49 CFR Part 217

    Penalties, Railroad safety, Reporting and recordkeeping 
requirements.

49 CFR Part 218

    Occupational safety and health, Penalties, Railroad employees, 
Railroad safety, Reporting and recordkeeping requirements.

49 CFR Part 219

    Alcohol abuse, Drug abuse, Drug testing, Penalties, Railroad 
safety, Reporting and recordkeeping requirements, safety, 
Transportation.

49 CFR Part 220

    Penalties, Radio, Railroad safety.

49 CFR Part 221

    Penalties, Railroad safety, reporting and recordkeeping 
requirements.

49 CFR Part 222

    Administrative practice and procedure, Penalties, Railroad safety, 
Reporting and recordkeeping requirements.

49 CFR Part 223

    Glass and glass products, Penalties, Railroad safety, Reporting and 
recordkeeping requirements.

49 CFR Part 224

    Incorporation by reference, Penalties, Railroad locomotive safety, 
Railroad safety, Reporting and recordkeeping requirements.

49 CFR Part 225

    Investigations, Penalties, Railroad safety, Reporting and 
recordkeeping requirements.

49 CFR Part 228

    Penalties, Railroad employees, Reporting and recordkeeping 
requirements.

49 CFR Part 229

    Penalties, Railroad safety, Reporting and recordkeeping 
requirements.

49 CFR Part 230

    Penalties, Railroad safety, Reporting and recordkeeping 
requirements.

49 CFR Part 231

    Penalties, Railroad safety.

49 CFR Part 232

    Penalties, Railroad safety, Reporting and recordkeeping 
requirements.

49 CFR Part 233

    Penalties, Railroad safety, Reporting and recordkeeping 
requirements.

49 CFR Part 234

    Highway safety, Penalties, Railroad safety, Reporting and 
recordkeeping requirements.

49 CFR Part 235

    Administrative practice and procedure, Penalties, Railroad safety, 
Reporting and recordkeeping requirements.

49 CFR Part 236

    Penalties, Railroad safety, Reporting and recordkeeping 
requirements.

49 CFR Part 238

    Fire prevention, Penalties, Railroad safety, Reporting and 
recordkeeping requirements.

49 CFR Part 239

    Penalties, Railroad safety, Reporting and recordkeeping.

[[Page 70594]]

49 CFR Part 240

    Administrative practice and procedure, Penalties, Railroad 
employees, Railroad safety, Reporting and recordkeeping requirements.

49 CFR Part 241

    Communications, Penalties, Railroad safety, Reporting and 
recordkeeping requirements.

    In consideration of the foregoing, FRA proposes to amend Parts 213, 
214, 215, 217, 218, 219, 220, 221, 222, 223, 224, 225, 228, 229, 230, 
231, 232, 233, 234, 235, 236, 238, 239, 240, and 241 of Subtitle B, 
Chapter II of Title 49 of the Code of Federal Regulations as follows:

PART 213--[AMENDED]

    1. The authority citation for part 213 continues to read as 
follows:

    Authority: 49 U.S.C. 20102-20114 and 20142; 28 U.S.C. 2461, 
note; and 49 CFR 1.49(m).

    2. Appendix B to part 213 is revised to read as follows:

        Appendix B to Part 213.--Schedule of Civil Penalties \1\
------------------------------------------------------------------------
                                                              Willful
               Section \2\                   Violation       violation
------------------------------------------------------------------------
                           Subpart A--General
------------------------------------------------------------------------
213.4(a) Excepted track \2\.............          $5,000          $7,500
213.4(b) Excepted track \2\.............           6,500           9,000
213.4(c) Excepted track \2\.............           6,500           9,000
213.4(d) Excepted track \2\.............           6,500           9,000
213.4(e):
    (1) Excepted track..................           6,500           9,000
    (2) Excepted track..................           6,500           9,000
    (3) Excepted track..................           6,500           9,000
    (4) Excepted track..................           6,500           9,000
213.4(f) Excepted track.................           3,000           4,500
213.7 Designation of qualified persons             5,000           7,500
 to supervise certain renewals and
 inspect track..........................
213.9 Classes of track: Operating speed            8,500          11,000
 limits.................................
213.11 Restoration or renewal of track             5,000           7,500
 under traffic conditions...............
213.13 Measuring track not under load...           6,500           9,000
------------------------------------------------------------------------
                           Subpart B--Roadbed
------------------------------------------------------------------------
213.33 Drainage.........................           6,500           9,000
213.37 Vegetation.......................           5,000           7,500
------------------------------------------------------------------------
                        Subpart C--Track Geometry
------------------------------------------------------------------------
213.53 Gage.............................           8,500          11,000
213.55 Alignment........................           6,500           9,000
213.57 Curves; elevation and speed                 6,500           9,000
 limitations............................
213.59 Elevation of curved track; runoff           6,500           9,000
213.63 Track surface....................           6,500           9,000
------------------------------------------------------------------------
                       Subpart D--Track Structure
------------------------------------------------------------------------
213.103 Ballast; general................           5,000           7,500
213.109 Crossties
    (a) Material used...................           3,000           4,500
    (b) Distribution of ties............           6,500           9,000
    (c) Sufficient number of                       5,000           7,500
     nondefective ties..................
    (d) Sufficient number of                       5,000           7,500
     nondefective ties (effective 9/21/
     2000)..............................
    (f) Joint ties......................           5,000           7,500
    (g) Track constructed without                  5,000           7,500
     crossties..........................
213.110 Gage restraint measurement
 systems
    (a) through (b) Notification........           5,000           7,500
    (c) Design requirements.............           6,500           9,000
    (g) through (i) Exception reports...           5,000           7,500
    (j) Data integrity..................           6,500           9,000
    (k) Training........................           5,000           7,500
    (l) Remedial actions................           8,500          11,000
    (m) PTLF............................           6,500           9,000
    (n) Recordkeeping...................           5,000           7,500
    (o) Inspection frequency............           8,500          11,000
213.113 Defective rails.................           8,500          11,000
213.115 Rail end mismatch...............           5,000           7,500
213.119 Continuous welded rail
    (a) CWR plan filed with FRA.........           6,500           9,000
    (b) CWR fastening requirements......           6,500           9,000
    (c) CWR rail temperature                       6,500           9,000
     requirements.......................
    (d) CWR alignment monitoring                   6,500           9,000
     requirements.......................
    (e) Procedures for controlling train           6,500           9,000
     speed on CWR track.................
    (f) CWR track inspections...........           6,500           9,000
    (g) CWR joint bar inspections.......           6,500           9,000

[[Page 70595]]

 
    (h) CWR training....................           6,500           9,000
    (i) CWR recordkeeping requirements..           6,500           9,000
213.121(a) Rail joints..................           6,500           9,000
213.121(b) Rail joints..................           6,500           9,000
213.121(c) Rail joints..................           8,500          11,000
213.121(d) Rail joints..................           6,500           9,000
213.121(e) Rail joints..................           6,500           9,000
213.121(f) Rail joints..................           6,500           9,000
213.121(g) Rail joints..................           6,500           9,000
213.121(h) Rail joints..................           6,500           9,000
213.122 Torch cut rail..................           6,500           9,000
213.123 Tie plates......................           5,000           7,500
213.127 Rail fastenings.................           6,500           9,000
213.133 Turnouts and track crossings,              5,000           7,500
 generally..............................
213.135 Switches:
    (a) through (g).....................           6,500           9.000
    (h) chipped or worn points..........           6,500           9,000
213.137 Frogs...........................           6,500           9,000
213.139 Spring rail frogs...............           6,500           9,000
213.141 Self-guarded frogs..............           5,000           7,500
213.143 Frog guard rails and guard                 6,500           9,000
 faces; gage............................
------------------------------------------------------------------------
          Subpart E--Track Appliances and Track-Related Devices
------------------------------------------------------------------------
213.205 Derails.........................           5,000           7,500
------------------------------------------------------------------------
                          Subpart F--Inspection
------------------------------------------------------------------------
213.233 Track inspections...............           5,000           7,500
213.235 Switches, crossings, transition            5,000           7,500
 devices................................
213.237 Inspection of rail..............           6,500           9,000
213.239 Special inspections.............           5,000           7,500
213.241 Inspection records..............           5,000           7,500
------------------------------------------------------------------------
                          Subpart G--High Speed
------------------------------------------------------------------------
213.305 Designation of qualified                   8,500          11,000
 individuals; general qualifications....
213.307 Class of track; operating speed            8,500          11,000
 limits.................................
213.309 Restoration or renewal of track            8,500          11,000
 under traffic conditions...............
213.311 Measuring track not under load..           6,500           9,000
213.319 Drainage........................           5,000           7,500
213.321 Vegetation......................           5,000           7,500
213.323 Track gage......................           8,500          11,000
213.327 Alignment.......................           8,500          11,000
213.329 Curves, elevation and speed                8,500          11,000
 limits.................................
213.331 Track surface...................           8,500          11,000
213.333 Automated vehicle inspection               8,500          11,000
 systems................................
213.335 Crossties
    (a) Material used...................           5,000           7,500
    (b) Distribution of ties............           6,500           9,000
    (c) Sufficient number of                       5,000           7,500
     nondefective ties, non-concrete....
    (d) Sufficient number of                       8,500          11,000
     nondefective, concrete ties........
    (e) Joint ties......................           8,500          11,000
    (f) Track constructed without                  8,500          11,000
     crossties..........................
    (g) Non-defective ties surrounding             8,500          11,000
     defective ties.....................
    (h) Tie plates......................           8,500          11,000
    (i) Tie plates......................           8,500          11,000
213.337 Defective rails.................           8,500          11,000
213.339 Inspection of rail in service...           8,500          11,000
213.341 Inspection of new rail..........           8,500          11,000
213.343 Continuous welded rail (a)                 8,500          11,000
 through (h)............................
213.345 Vehicle qualification testing              8,500          11,000
 (a) through (b)........................
    (c) through (e).....................           8,500          11,000
213.347 Automotive or railroad crossings           6,500           9,000
 at grade...............................
213.349 Rail end mismatch...............           6,500           9,000
213.351(a) Rail joints..................           8,500          11,000
213.351(b) Rail joints..................           8,500          11,000
213.351(c) Rail joints..................           8,500          11,000
213.351(d) Rail joints..................           8,500          11,000
213.351(e) Rail joints..................           6,500           9,000
213.351(f) Rail joints..................           8,500          11,000

[[Page 70596]]

 
213.351(g) Rail joints..................           8,500          11,000
213.352 Torch cut rails.................           5,000           7,500
213.353 Turnouts, crossovers, transition           8,500          11,000
 devices................................
213.355 Frog guard rails and guard                 6,500           9,000
 faces; gage............................
213.357 Derails.........................           5,000           7,500
213.359 Track stiffness.................           8,500          11,000
213.361 Right of way....................           5,000           7,500
213.365 Visual inspections..............           8,500          11,000
213.367 Special inspections.............           8,500          11,000
213.369 Inspections records.............           5,000          7,500
------------------------------------------------------------------------
\1\ A penalty may be assessed against an individual only for a willful
  violation. The Administrator reserves the right to assess a penalty of
  up to $27,000 for any violation where circumstances warrant. See 49
  CFR part 209, appendix A.
\2\ In addition to assessment of penalties for each instance of
  noncompliance with the requirements identified by this footnote, track
  segments designated as excepted track that are or become ineligible
  for such designation by virtue of noncompliance with any of the
  requirements to which this footnote applies are subject to all other
  requirements of part 213 until such noncompliance is remedied.

PART 214--[AMENDED]

    3. The authority citation for part 214 continues to read as 
follows:

    Authority: 49 U.S.C. 20103, 20107; 28 U.S.C. 2461, note; and 49 
CFR 1.49.

    4. Appendix A to part 214 is revised to read as follows:

        Appendix A to Part 214.--Schedule of Civil Penalties \1\
------------------------------------------------------------------------
                                                              Willful
                 Section                     Violation       violation
------------------------------------------------------------------------
                Subpart B--Bridge Worker Safety Standards
------------------------------------------------------------------------
214.103 Fall protection:
    (i) Failure to provide fall                   $6,500          $9,000
     protection.........................
    (ii) Failure to use fall protection.           8,500          11,000
214.105 Standards and practices:
    (a) General:
        (1) Fall protection used for               5,000           7,500
         other purposes.................
        (2) Failure to remove from                 5,000           7,500
         service........................
        (3) Failure to protect from                5,000           7,500
         deterioration..................
        (4) Failure to inspect and                 6,500           9,000
         remove.........................
        (5) Failure to train............           6,500           9,000
        (6) Failure to provide for                 6,500           9,000
         prompt rescue..................
        (7) Failure to prevent damage...           5,000           7,500
        (8) Failure to use proper                  5,000           7,500
         connectors.....................
        (9) Failure to use proper                  5,000           7,500
         anchorages.....................
    (b) Fall arrest system:
        (1)-(17) Failure to provide                5,000           7,500
         conforming equipment...........
    (c) Safety net systems:
        (1) Failure to install close to            5,000           7,500
         workplace......................
        (2) Failure to provide fall                6,500           9,000
         arrest if over 30 feet.........
        (3) Failure to provide for                 6,500           9,000
         unobstructed fall..............
        (4) Failure to test.............           5,000           7,500
        (5) Failure to use proper                  5,000           7,500
         equipment......................
        (6) Failure to prevent contact             6,500           9,000
         with surface below.............
        (7) Failure to properly install.           6,500           9,000
        (8) Failure to remove defective            6,500           9,000
         nets...........................
        (9) Failure to inspect..........           6,500           9,000
        (10) Failure to remove objects..           3,000           4,500
        (11)-(13) Failure to use                   5,000           7,500
         conforming equipment...........
214.107 Working over water:
    (a)(i) Failure to provide life vest.           6,500           9,000
    (ii) Failure to use life vest.......  ..............           9,000
    (c) Failure to inspect..............           5,000           7,500
    (e)(i) Failure to provide ring buoys           6,500           9,000
    (ii) Failure to use ring buoys......           5,000           7,500
    (f)(i) Failure to provide skiff.....           5,000           7,500
    (ii) Failure to use skiff...........  ..............           7,500
214.109 Scaffolding:
    (a)-(f) Failure to provide                     6,500           9,000
     conforming equipment...............
214.113 Head protection:
    (a)(i) Failure to provide...........           6,500           9,000
    (ii) Failure to use.................  ..............           9,000
    (b) or (c) Failure to provide                  5,000           7,500
     conforming equipment...............

[[Page 70597]]

 
214.115 Foot protection:
    (a)(i) Failure to require use of....           5,000           7,500
    (ii) Failure to use.................  ..............           7,500
214.117 Eye and face protection:
    (a)(i) Failure to provide...........           5,000           7,500
    (ii) Failure to use.................  ..............           4,500
    (b) Failure to use conforming                  5,000           7,500
     equipment..........................
    (c) Use of defective equipment......           5,000           7,500
    (d) Failure to provide for                     5,000           7,500
     corrective lenses..................
------------------------------------------------------------------------
                Subpart C--Roadway Worker Protection Rule
------------------------------------------------------------------------
214.303 Railroad on-track safety
 programs, generally:
    (a) Failure of a railroad to                   8,500          11,000
     implement an On-track Safety
     Program............................
    (b) On-track Safety Program of a               8,500          11,000
     railroad includes no internal
     monitoring procedure...............
214.305 Compliance Dates:
    Failure of a railroad to comply by             5,000           7,500
     the specified dates................
214.307 Review and approval of
 individual on-track safety programs by
 FRA:
    (a)(i) Failure to notify FRA of                5,000           7,500
     adoption of On-track Safety Program
    (ii) Failure to designate primary              5,000           7,500
     person to contact for program
     review.............................
214.309 On-track safety program
 documents:
    (1) On-track Safety Manual not                 6,500           9,000
     provided to prescribed employees...
    (2) On-track Safety Program                    5,000           7,500
     documents issued in fragments......
214.311 Responsibility of employers:
    (b) Roadway worker required by                 8,500          11,000
     employer to foul a track during an
     unresolved challenge...............
    (c) Roadway workers not provided               6,500           9,000
     with written procedure to resolve
     challenges of on-track safety
     procedures.........................
214.313 Responsibility of individual
 roadway workers:
    (a) Failure to follow railroad's on-  ..............          11,000
     track safety rules.................
    (b) Roadway worker fouling a track    ..............          11,000
     when not necessary in the
     performance of duty................
    (c) Roadway worker fouling a track    ..............          11,000
     without ascertaining that provision
     is made for on-track safety........
    (d) Roadway worker failing to notify  ..............          11,000
     employer of determination of
     improper on-track safety provisions
214.315 Supervision and communication:
    (a) Failure of employer to provide             8,500          11,000
     job briefing.......................
    (b) Incomplete job briefing.........           6,500           9,000
    (c)(i) Failure to designate roadway            6,500           9,000
     worker in charge of roadway work
     group..............................
    (ii) Designation of more than one              5,000           7,500
     roadway worker in charge of one
     roadway work group.................
    (iii) Designation of non-qualified             6,500           9,000
     roadway worker in charge of roadway
     work group.........................
    (d)(i) Failure to notify roadway               6,500           9,000
     workers of on-track safety
     procedures in effect...............
    (ii) Incorrect information provided            6,500           9,000
     to roadway workers regarding on-
     track safety procedures in effect..
    (iii) Failure to notify roadway                6,500           9,000
     workers of change in on-track
     safety procedures..................
    (e)(i) Failure of lone worker to      ..............           7,500
     communicate with designated
     employee for daily job briefing....
    (ii) Failure of employer to provide            6,500           9,000
     means for lone worker to receive
     daily job briefing.................
214.317 On-track safety procedures,
 generally:
    On-track safety rules conflict with            8,500          11,000
     this part..........................
214.319 Working limits, generally:
    (a) Non-qualified roadway worker in            8,500          11,000
     charge of working limits...........
    (b) More than one roadway worker in            6,500           9,000
     charge of working limits on the
     same track segment.................
    (c)(1) Working limits released                 8,500          11,000
     without notifying all affected
     roadway workers....................
    (2) Working limits released before             8,500          11,000
     all affected roadway workers are
     otherwise protected................
214.321 Exclusive track occupancy:
    (a) Improper transmission of                   5,000           7,500
     authority for exclusive track
     occupancy..........................
    (b)(1) Failure to repeat authority    ..............           7,500
     for exclusive track occupancy to
     issuing employee...................
    (2) Failure to retain possession of   ..............           9,000
     written authority for exclusive
     track occupancy....................
    (3) Failure to record authority for   ..............           9,000
     exclusive track occupancy when
     issued.............................
    (c) Limits of exclusive track                  8,500          11,000
     occupancy not identified by proper
     physical features..................
    (d)(1) Movement authorized into                8,500          11,000
     limits of exclusive track occupancy
     without authority of roadway worker
     in charge..........................
    (2) Movement authorized within                 8,500          11,000
     limits of exclusive track occupancy
     without authority of roadway worker
     in charge..........................
    (3) Movement within limits of                  8,500          11,000
     exclusive track occupancy exceeding
     restricted speed without authority
     of roadway worker in charge........
214.323 Foul time:
    (a) Foul time authority overlapping            8,500          11,000
     movement authority of train or
     equipment..........................
    (b) Failure to repeat foul time                6,500           9,000
     authority to issuing employee......
214.325 Train coordination:
    (a) Train coordination limits                  6,500           9,000
     established where more than one
     train is authorized to operate.....
    (b)(1) Train coordination                      5,000           7,500
     established with train not visible
     to roadway worker at the time......
    (2) Train coordination established    ..............           7,500
     with moving train..................
    (3) Coordinated train moving without           6,500           9,000
     authority of roadway worker in
     charge.............................
    (4) Coordinated train releasing                6,500           9,000
     movement authority while working
     limits are in effect...............

[[Page 70598]]

 
214.327 Inaccessible track:
    (a) Improper control of entry to               6,500           9,000
     inaccessible track.................
    (5) Remotely controlled switch not             6,500           9,000
     properly secured by control
     operator...........................
    (b) Train or equipment moving within           6,500           9,000
     inaccessible track limits without
     permission of roadway worker in
     charge.............................
    (c) Unauthorized train or equipment            6,500           9,000
     located within inaccessible track
     limits.............................
214.329 Train approach warning provided
 by watchmen/lookouts:
    (a) Failure to give timely warning    ..............          11,000
     of approaching train...............
    (b)(1) Failure of watchman/lookout    ..............           9,000
     to give full attention to detecting
     approach of train..................
    (2) Assignment of other duties to              6,500           9,000
     watchman/lookout...................
    (c) Failure to provide proper                  5,000           7,500
     warning signal devices.............
    (d) Failure to maintain position to            6,500           9,000
     receive train approach warning
     signal.............................
    (e) Failure to communicate proper              6,500           9,000
     warning signal.....................
    (f)(1) Assignment of non-qualified             6,500           9,000
     person as watchman/lookout.........
    (2) Non-qualified person accepting             5,000           7,500
     assignment as watchman/lookout.....
    (g) Failure to properly equip a                5,000           7,500
     watchman/lookout...................
214.331 Definite train location:
    (a) Definite train location                    6,500           9,000
     established where prohibited.......
    (b) Failure to phase out definite              5,000           7,500
     train location by required date....
    (d)(1) Train location information              6,500           9,000
     issued by unauthorized person......
    (2) Failure to include all trains              8,500          11,000
     operated on train location list....
    (5) Failure to clear track 10         ..............           9,000
     minutes before earliest departure
     time of train at last station prior
     to work location, or failure to
     remain clear until such train
     passed.............................
    (6) Train passing station before               8,500          11,000
     time shown in train location list..
    (7) Non-qualified person using                 6,500           9,000
     definite train location to
     establish on-track safety..........
214.333 Informational line-ups of
 trains:
    (a) Informational line-ups of trains           8,500          11,000
     used for on-track safety where
     prohibited.........................
    (b) Informational line-up procedures           8,500          11,000
     inadequate to protect roadway
     workers............................
    (c) Failure to discontinue                     5,000           7,500
     informational line-ups by required
     date...............................
214.335 On-track safety procedures for
 roadway work groups:
    (a) Failure to provide on-track                8,500          11,000
     safety for a member of a roadway
     work group.........................
    (b) Member of roadway work group               6,500           9,000
     fouling a track without authority
     of employee in charge..............
    (c) Failure to provide train                   8,500          11,000
     approach warning or working limits
     on adjacent track where required...
214.337 On-track safety procedures for
 lone workers:
    (b) Failure by employer to permit              8,500          11,000
     individual discretion in use of
     individual train detection.........
    (c)(1) Individual train detection              6,500           9,000
     used by non-qualified employee.....
    (2) Use of individual train                    5,000           7,500
     detection while engaged in heavy or
     distracting work...................
    (3) Use of individual train                    5,000           7,500
     detection in controlled point or
     manual interlocking................
    (4) Use of individual train                    8,500          11,000
     detection with insufficient
     visibility.........................
    (5) Use of individual train           ..............           7,500
     detection with interfering noise...
    (6) Use of individual train           ..............           9,000
     detection while a train is passing.
    (d) Failure to maintain access to     ..............          11,000
     place of safety clear of live
     tracks.............................
    (e) Lone worker unable to maintain    ..............           9,000
     vigilant lookout...................
    (f)(1) Failure to prepare written     ..............           4,500
     statement of on-track safety.......
    (2) Incomplete written statement of   ..............           4,500
     on-track safety....................
    (3) Failure to produce written        ..............           4,500
     statement of on-track safety to FRA
214.339 Audible warning from trains:
    (a) Failure to require audible                 5,000           7,500
     warning from trains................
    (b) Failure of train to give audible           5,000           7,500
     warning where required.............
214.341 Roadway maintenance machines:
    (a) Failure of on-track safety                 8,500          11,000
     program to include provisions for
     safety near roadway maintenance
     machines...........................
    (b) Failure to provide operating               5,000           7,500
     instructions.......................
    (1) Assignment of non-qualified                6,500           9,000
     employee to operate machine........
    (2) Operator unfamiliar with safety            6,500           9,000
     instructions for machine...........
    (3) Roadway worker working with                6,500           9,000
     unfamiliar machine.................
    (c) Roadway maintenance machine not            8,500          11,000
     clear of passing trains or
     operation of machine component
     closer than four feet to adjacent
     track without procedural
     instructions.......................
214.343 Training and qualification,
 general:
    (a)(1) Failure of railroad program             6,500           9,000
     to include training provisions.....
    (2) Failure to provide initial                 6,500           9,000
     training...........................
    (b) Failure to provide annual                  6,500           9,000
     training...........................
    (c) Assignment of non-qualified                6,500           9,000
     railroad employees to provide on-
     track safety.......................
    (d)(1) Failure to maintain records             5,000           7,500
     of qualifications..................
    (2) Incomplete records of                      5,000           7,500
     qualifications.....................
    (3) Failure to provide records of              5,000           7,500
     qualifications to FRA..............
214.345 Training for all roadway workers           6,500           9,000
214.347 Training and qualification for
 lone workers.
214.349 Training and qualification of
 watchmen/lookouts.
214.351 Training and qualification of
 flagmen.
214.353 Training and qualification of
 roadway workers who provide on-track
 safety for roadway work groups.

[[Page 70599]]

 
214.355 Training and qualification in on-
 track safety for operators of roadway
 maintenance machines.
------------------------------------------------------------------------
Subpart D--On-Track Roadway Maintenance Machines and Hi-
                      Rail Vehicles
------------------------------------------------------------------------
214.503 Good-faith challenges;
 procedures for notification and
 resolution:
    (a) Failure of employee to notify     ..............           9,000
     employer that the machine or
     vehicle does not comply with this
     subpart or has a condition
     inhibiting safe operation..........
    (b) Roadway worker required to                 8,500          11,000
     operate machine or vehicle when
     good-faith challenge not resolved..
    (c) Failure of employer to have or             8,500          11,000
     follow written procedures to
     resolve good-faith challenges......
214.505 Required environmental control
 and protection systems for new on-track
 roadway maintenance machines with
 enclosed cabs:
    (a) Failure to equip new machines              8,500          11,000
     with required systems..............
    (b)
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.