Maximum 40-Year Licensing Terms for Certain Fuel Cycle Facilities, 70441 [E6-20412]
Download as PDF
Federal Register / Vol. 71, No. 232 / Monday, December 4, 2006 / Notices
The entire meeting will be open to
public attendance.
The agenda for the subject meeting
shall be as follows:
Thursday, December 14, 2006–8:30
a.m. until the conclusion of business.
Friday, December 15, 2006–8:30 a.m.
until the conclusion of business.
The Subcommittee will review the
PRA for General Electric’s next
generation simplified boiling water
reactor, the ESBWR. The Subcommittee
will hear presentations by and hold
discussions with representatives of the
NRC staff and industry regarding this
matter. The Subcommittee will gather
information, analyze relevant issues and
facts, and formulate proposed positions
and actions, as appropriate, for
deliberation by the full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official, Mr. Eric A.
Thornsbury, (Telephone: 301–415–
8716) five days prior to the meeting, if
possible, so that appropriate
arrangements can be made. Electronic
recordings will be permitted.
Further information regarding this
meeting can be obtained by contacting
the Designated Federal Official between
7:30 a.m. and 4:15 p.m. (ET). Persons
planning to attend this meeting are
urged to contact the above named
individual at least two working days
prior to the meeting to be advised of any
potential changes to the agenda.
Dated: November 28, 2006.
Michael R. Snodderly,
Branch Chief, ACRS/ACNW.
[FR Doc. E6–20411 Filed 12–1–06; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Maximum 40-Year Licensing Terms for
Certain Fuel Cycle Facilities
Nuclear Regulatory
Commission.
ACTION: Notice.
mstockstill on PROD1PC61 with NOTICES
AGENCY:
SUMMARY: The U.S. Nuclear Regulatory
Commission (NRC) has established a
new policy extending the maximum
license term for certain 10 CFR Part 70
fuel cycle licensees who are required to
submit Integrated Safety Analysis (ISA)
summaries for approval. Such license
terms are being extended from the
current 10-year period to a 40-year
period, on the next renewal of the
affected license. The NRC is also
extending the maximum license term to
a 40-year period for new 10 CFR Part 70
license applicants, where the applicant
VerDate Aug<31>2005
11:51 Dec 01, 2006
Jkt 211001
is required to submit an ISA summary
for approval. The 10-year term has been
a matter of policy and practice since
1990 (55 FR 24948; June 19, 1990); it is
not codified in the regulations.
The NRC added Subpart H
requirements to 10 CFR part 70 on
September 18, 2000 (65 FR56211). The
Subpart H requirements apply to
licensees possessing greater than a
critical mass of special nuclear material.
Under Subpart H, both new applicants
and existing licensees are required to
conduct an ISA and submit an ISA
summary to the NRC for approval. An
ISA is a systematic analysis to identify
facility and external hazards; potential
accident sequences, including
likelihood and consequences; and items
relied on for safety to prevent potential
accidents or mitigate the consequences.
Licensees are required to keep their
ISAs up-to-date. In addition to the
initial ISA summary, licensees must
submit the following information to the
NRC: certain facility changes for the
NRC’s approval; annual summaries of
facility changes that did not need the
NRC’s preapproval; and annual updates
to the ISA summaries.
Before the Subpart H requirements
were implemented, the NRC relied on
the 10-year license renewal as the main
opportunity to review the facility safety
basis. Now, along with the annual
updates of the ISA summaries, the NRC
is conducting more frequent reviews of
the licensees’ facility safety basis.
Through the annual update of the ISA
summaries, the NRC is kept informed of
changes due to material degradation and
aging throughout the lifetime of a
facility. Thus, the Subpart H
requirements permit the NRC to
continue to support safe operations of
licensed facilities on an ongoing basis,
regardless of the duration of the license.
On August 24, 2006, the NRC staff
provided the Commission with a paper,
SECY–06–0186, ‘Increasing Licensing
Terms for Certain Fuel Cycle Facilities,’
which recommended that the
Commission approve a maximum
license term of 40 years for certain fuel
cycle facilities. The paper provided the
basis for the staff’s recommendation,
including a description of the link with
10 CFR Part 70 reviews and a discussion
of consistency with the NRC strategic
goals for safety and effectiveness. In
response to SECY–06–0186, the
Commission issued a staff requirements
memorandum (SRM) establishing the
new policy described above. The
Commission also approved of license
terms for less than 40 years, on a caseby-case basis, where there are concerns
with safety risk to the facility or in cases
involving a new process or technology.
PO 00000
Frm 00082
Fmt 4703
Sfmt 4703
70441
SECY–06–0186 and the SRM on
SECY–06–0186 are available in the
NRC’s Public Document Room or
electronically from the ADAMS Publicly
Available Records (PARS) component
on the NRC Web site, https://
www.nrc.gov (the Electronic Reading
Room).
FOR FURTHER INFORMATION CONTACT:
Breeda Reilly, Project Manager, Fuel
Manufacturing Branch, Fuel Facility
Licensing Directorate, Division of Fuel
Cycle Safety and Safeguards, Office of
Nuclear Material Safety and Safeguards,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555. Telephone:
(301) 415–8103; fax: (301) 415–5955; email: bmr@nrc.gov.
Dated at Rockville, Maryland this 21st day
of November, 2006.
For the U.S. Nuclear Regulatory
Commission.
Gary S. Janosko,
Deputy Director, Fuel Facility Licensing
Directorate, Division of Fuel Cycle Safety and
Safeguards, Office of Nuclear Material Safety
and Safeguards.
[FR Doc. E6–20412 Filed 12–1–06; 8:45 am]
BILLING CODE 7590–01–P
OFFICE OF PERSONNEL
MANAGEMENT
No FEAR Act Notice
Office of Personnel
Management.
ACTION: Notice.
AGENCY:
SUMMARY: Pursuant to 29 CFR part 724,
the Office of Personnel Management
(OPM) has implemented Title II of the
Notification and Federal Employee
Antidiscrimination and Retaliation Act
(No FEAR Act) of 2002, concerning
OPM’s obligation (along with other
Federal agencies) to provide notice to all
its employees, former employees, and
applicants for Federal employment
about the rights and remedies available
under the applicable Federal
Antidiscrimination Laws and
Whistleblower Protection Laws. OPM’s
No FEAR Act notice is available on
OPM’s Web site at https://www.opm.gov/
about_opm/nofear/.
FOR FURTHER INFORMATION CONTACT:
Stephen T. Shih, Chief, Center for Equal
Employment Opportunity, by telephone
at (202) 606–2460, by facsimile at (202)
606–1841, or by e-mail at eeo@opm.gov.
No FEAR Act Notice
On May 15, 2002, Congress enacted
the ‘‘Notification and Federal Employee
Antidiscrimination and Retaliation Act
of 2002,’’ which is now known as the
No FEAR Act. One purpose of the Act
E:\FR\FM\04DEN1.SGM
04DEN1
Agencies
[Federal Register Volume 71, Number 232 (Monday, December 4, 2006)]
[Notices]
[Page 70441]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-20412]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Maximum 40-Year Licensing Terms for Certain Fuel Cycle Facilities
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has established a
new policy extending the maximum license term for certain 10 CFR Part
70 fuel cycle licensees who are required to submit Integrated Safety
Analysis (ISA) summaries for approval. Such license terms are being
extended from the current 10-year period to a 40-year period, on the
next renewal of the affected license. The NRC is also extending the
maximum license term to a 40-year period for new 10 CFR Part 70 license
applicants, where the applicant is required to submit an ISA summary
for approval. The 10-year term has been a matter of policy and practice
since 1990 (55 FR 24948; June 19, 1990); it is not codified in the
regulations.
The NRC added Subpart H requirements to 10 CFR part 70 on September
18, 2000 (65 FR56211). The Subpart H requirements apply to licensees
possessing greater than a critical mass of special nuclear material.
Under Subpart H, both new applicants and existing licensees are
required to conduct an ISA and submit an ISA summary to the NRC for
approval. An ISA is a systematic analysis to identify facility and
external hazards; potential accident sequences, including likelihood
and consequences; and items relied on for safety to prevent potential
accidents or mitigate the consequences.
Licensees are required to keep their ISAs up-to-date. In addition
to the initial ISA summary, licensees must submit the following
information to the NRC: certain facility changes for the NRC's
approval; annual summaries of facility changes that did not need the
NRC's preapproval; and annual updates to the ISA summaries.
Before the Subpart H requirements were implemented, the NRC relied
on the 10-year license renewal as the main opportunity to review the
facility safety basis. Now, along with the annual updates of the ISA
summaries, the NRC is conducting more frequent reviews of the
licensees' facility safety basis. Through the annual update of the ISA
summaries, the NRC is kept informed of changes due to material
degradation and aging throughout the lifetime of a facility. Thus, the
Subpart H requirements permit the NRC to continue to support safe
operations of licensed facilities on an ongoing basis, regardless of
the duration of the license.
On August 24, 2006, the NRC staff provided the Commission with a
paper, SECY-06-0186, `Increasing Licensing Terms for Certain Fuel Cycle
Facilities,' which recommended that the Commission approve a maximum
license term of 40 years for certain fuel cycle facilities. The paper
provided the basis for the staff's recommendation, including a
description of the link with 10 CFR Part 70 reviews and a discussion of
consistency with the NRC strategic goals for safety and effectiveness.
In response to SECY-06-0186, the Commission issued a staff requirements
memorandum (SRM) establishing the new policy described above. The
Commission also approved of license terms for less than 40 years, on a
case-by-case basis, where there are concerns with safety risk to the
facility or in cases involving a new process or technology.
SECY-06-0186 and the SRM on SECY-06-0186 are available in the NRC's
Public Document Room or electronically from the ADAMS Publicly
Available Records (PARS) component on the NRC Web site, https://
www.nrc.gov (the Electronic Reading Room).
FOR FURTHER INFORMATION CONTACT: Breeda Reilly, Project Manager, Fuel
Manufacturing Branch, Fuel Facility Licensing Directorate, Division of
Fuel Cycle Safety and Safeguards, Office of Nuclear Material Safety and
Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555.
Telephone: (301) 415-8103; fax: (301) 415-5955; e-mail: bmr@nrc.gov.
Dated at Rockville, Maryland this 21st day of November, 2006.
For the U.S. Nuclear Regulatory Commission.
Gary S. Janosko,
Deputy Director, Fuel Facility Licensing Directorate, Division of Fuel
Cycle Safety and Safeguards, Office of Nuclear Material Safety and
Safeguards.
[FR Doc. E6-20412 Filed 12-1-06; 8:45 am]
BILLING CODE 7590-01-P