Notice of Application for Amendment
of License and Soliciting Comments,
Motions To Intervene, and Protests
pwalker on PROD1PC61 with NOTICES
November 8, 2006.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Amendment of
License.
b. Project No: 12379–029.
c. Date Filed: September 7, 2006.
d. Applicant: Alaska Electric Light
and Power Company.
e. Name of Project: Lake Dorothy
Project.
f. Location: The project is located on
the Dorothy Creek, near Juneau, Alaska.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Corry V.
Hildebrand, Lake Dorothy Hydro Inc.,
5601 Tonsgard Court, Juneau, AK
99801–7201.
i. FERC Contact: Any questions on
this notice should be addressed to:
Anumzziatta Purchiaroni at (202) 219–
3297, or e-mail address:
anumzziatta.purchiaroni@Ferc.fed.us.
j. Deadline for filing comments and or
motions: November 24, 2006.
k. Description of Request: The
licensee is requesting the Commission’s
approval to excavate a 150-feet long
starter tunnel section prior construction
of the powerhouse. The licensee
proposes to construct the starter tunnel
as part of the contract for the Lake
Dorothy tap tunnel currently under
construction. The purpose of the tunnel
is to minimize disturbance or damage to
the powerhouse and adjacent facilities
from blasting activities associated with
the tunnel excavation.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. Information about this
filing may also be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
VerDate Aug<31>2005
20:27 Nov 15, 2006
Jkt 211001
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. All documents (original
and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–19329 Filed 11–15–06; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
November 8, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12699–000.
c. Date Filed: June 21, 2006 and
revised October 19, 2006.
d. Applicant: Erie Boulevard
Hydropower, LP.
e. Name and Location of Project: The
proposed Indian Lake Dam Project
would be located on the Indian River in
the Town of Indian Lake and Hamlet of
Sabael, Hamilton County, New York.
The project would include the existing
Indian Lake Dam which is owned by
Hudson River-Black River Regulating
District, a New York Public Benefit
Corporation.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant Contact: Mr. Jeffrey M.
Auser, Erie Boulevard Hydropower, LP,
225 Greenfield Parkway, Suite 201,
Liverpool, NY 13088, (315) 413–2821.
h. FERC Contact: Tom Papsidero,
(202) 502–6002.
i. Deadline for filing motions to
intervene, protests and comments: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number
(P–12699–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
E:\FR\FM\16NON1.SGM
16NON1
Agencies
[Federal Register Volume 71, Number 221 (Thursday, November 16, 2006)]
[Notices]
[Page 66772]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-19329]
[[Page 66772]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Amendment of License and Soliciting
Comments, Motions To Intervene, and Protests
November 8, 2006.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Amendment of License.
b. Project No: 12379-029.
c. Date Filed: September 7, 2006.
d. Applicant: Alaska Electric Light and Power Company.
e. Name of Project: Lake Dorothy Project.
f. Location: The project is located on the Dorothy Creek, near
Juneau, Alaska.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Corry V. Hildebrand, Lake Dorothy Hydro Inc.,
5601 Tonsgard Court, Juneau, AK 99801-7201.
i. FERC Contact: Any questions on this notice should be addressed
to: Anumzziatta Purchiaroni at (202) 219-3297, or e-mail address:
anumzziatta.purchiaroni@Ferc.fed.us.
j. Deadline for filing comments and or motions: November 24, 2006.
k. Description of Request: The licensee is requesting the
Commission's approval to excavate a 150-feet long starter tunnel
section prior construction of the powerhouse. The licensee proposes to
construct the starter tunnel as part of the contract for the Lake
Dorothy tap tunnel currently under construction. The purpose of the
tunnel is to minimize disturbance or damage to the powerhouse and
adjacent facilities from blasting activities associated with the tunnel
excavation.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. Information about this filing
may also be viewed on the Commission's Web site at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. You may
also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. All documents (original and eight copies)
should be filed with: Magalie R. Salas, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington DC 20426. A
copy of any motion to intervene must also be served upon each
representative of the Applicant specified in the particular
application.
p. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Magalie R. Salas,
Secretary.
[FR Doc. E6-19329 Filed 11-15-06; 8:45 am]