Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 66772 [E6-19329]

Download as PDF 66772 Federal Register / Vol. 71, No. 221 / Thursday, November 16, 2006 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests pwalker on PROD1PC61 with NOTICES November 8, 2006. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of License. b. Project No: 12379–029. c. Date Filed: September 7, 2006. d. Applicant: Alaska Electric Light and Power Company. e. Name of Project: Lake Dorothy Project. f. Location: The project is located on the Dorothy Creek, near Juneau, Alaska. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Corry V. Hildebrand, Lake Dorothy Hydro Inc., 5601 Tonsgard Court, Juneau, AK 99801–7201. i. FERC Contact: Any questions on this notice should be addressed to: Anumzziatta Purchiaroni at (202) 219– 3297, or e-mail address: anumzziatta.purchiaroni@Ferc.fed.us. j. Deadline for filing comments and or motions: November 24, 2006. k. Description of Request: The licensee is requesting the Commission’s approval to excavate a 150-feet long starter tunnel section prior construction of the powerhouse. The licensee proposes to construct the starter tunnel as part of the contract for the Lake Dorothy tap tunnel currently under construction. The purpose of the tunnel is to minimize disturbance or damage to the powerhouse and adjacent facilities from blasting activities associated with the tunnel excavation. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. Information about this filing may also be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or VerDate Aug<31>2005 20:27 Nov 15, 2006 Jkt 211001 e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘e-Filing’’ link. Magalie R. Salas, Secretary. [FR Doc. E6–19329 Filed 11–15–06; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments November 8, 2006. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: 12699–000. c. Date Filed: June 21, 2006 and revised October 19, 2006. d. Applicant: Erie Boulevard Hydropower, LP. e. Name and Location of Project: The proposed Indian Lake Dam Project would be located on the Indian River in the Town of Indian Lake and Hamlet of Sabael, Hamilton County, New York. The project would include the existing Indian Lake Dam which is owned by Hudson River-Black River Regulating District, a New York Public Benefit Corporation. f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). g. Applicant Contact: Mr. Jeffrey M. Auser, Erie Boulevard Hydropower, LP, 225 Greenfield Parkway, Suite 201, Liverpool, NY 13088, (315) 413–2821. h. FERC Contact: Tom Papsidero, (202) 502–6002. i. Deadline for filing motions to intervene, protests and comments: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Please include the project number (P–12699–000) on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. E:\FR\FM\16NON1.SGM 16NON1

Agencies

[Federal Register Volume 71, Number 221 (Thursday, November 16, 2006)]
[Notices]
[Page 66772]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-19329]



[[Page 66772]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application for Amendment of License and Soliciting 
Comments, Motions To Intervene, and Protests

November 8, 2006.
    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Amendment of License.
    b. Project No: 12379-029.
    c. Date Filed: September 7, 2006.
    d. Applicant: Alaska Electric Light and Power Company.
    e. Name of Project: Lake Dorothy Project.
    f. Location: The project is located on the Dorothy Creek, near 
Juneau, Alaska.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Corry V. Hildebrand, Lake Dorothy Hydro Inc., 
5601 Tonsgard Court, Juneau, AK 99801-7201.
    i. FERC Contact: Any questions on this notice should be addressed 
to: Anumzziatta Purchiaroni at (202) 219-3297, or e-mail address: 
anumzziatta.purchiaroni@Ferc.fed.us.
    j. Deadline for filing comments and or motions: November 24, 2006.
    k. Description of Request: The licensee is requesting the 
Commission's approval to excavate a 150-feet long starter tunnel 
section prior construction of the powerhouse. The licensee proposes to 
construct the starter tunnel as part of the contract for the Lake 
Dorothy tap tunnel currently under construction. The purpose of the 
tunnel is to minimize disturbance or damage to the powerhouse and 
adjacent facilities from blasting activities associated with the tunnel 
excavation.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. Information about this filing 
may also be viewed on the Commission's Web site at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. You may 
also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filings must 
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. All documents (original and eight copies) 
should be filed with: Magalie R. Salas, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington DC 20426. A 
copy of any motion to intervene must also be served upon each 
representative of the Applicant specified in the particular 
application.
    p. Agency Comments: Federal, State, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.
    q. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site at https://www.ferc.gov 
under the ``e-Filing'' link.

Magalie R. Salas,
Secretary.
[FR Doc. E6-19329 Filed 11-15-06; 8:45 am]
BILLING CODE 6717-01-P