Drawbridge Operation Regulations; Long Island, New York Inland Waterway from East Rockaway Inlet to Shinnecock Canal, Jones Beach, NY, 66673 [E6-19313]
Download as PDF
Federal Register / Vol. 71, No. 221 / Thursday, November 16, 2006 / Rules and Regulations
excluded, under figure 2–1, paragraph
(32)(e) of the Instruction, from further
environmental documentation because
it has been determined that the
promulgation of operating regulations
for drawbridges are categorically
excluded.
List of Subjects in 33 CFR Part 117
Bridges.
Regulations
For the reasons discussed in the
preamble, the Coast Guard amends 33
CFR part 117 as follows:
I
PART 117—DRAWBRIDGE
OPERATION REGULATIONS
1. The authority citation for part 117
continues to read as follows:
I
Authority: 33 U.S.C. 499; 33 CFR 1.05–1(g);
Department of Homeland Security Delegation
No. 0170.1; section 117.255 also issued under
the authority of Pub. L. 102–587, 106 Stat.
5039.
2. § 117.1005 is revised to read as
follows:
I
§ 117.1005
Chincoteague Channel.
The draw of the SR 175 Bridge, mile
3.5, at Chincoteague shall open on
demand from midnight to 6 a.m., and
every one and a half hours from 6 a.m.
to midnight (at 6 a.m., 7:30 a.m., 9 a.m.,
10:30 a.m., 12 p.m., 1:30 p.m., 3 p.m.,
4:30 p.m., 6 p.m., 7:30 p.m., 9 p.m.
10:30 p.m. and midnight); except from
7 a.m. to 5 p.m. on the last consecutive
Wednesday and Thursday in July, the
draw need not be opened.
Dated: November 1, 2006.
L.L. Hereth,
Rear Admiral, United States Coast Guard,
Commander, Fifth Coast Guard District.
[FR Doc. 06–9237 Filed 11–15–06; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–06–130]
rmajette on PROD1PC67 with RULES1
Drawbridge Operation
Regulations;Long Island, New York
Inland Waterway from East Rockaway
Inlet to Shinnecock Canal, Jones
Beach, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
VerDate Aug<31>2005
17:16 Nov 15, 2006
Jkt 211001
deviation from the regulation governing
the operation of the Loop Parkway
Bridge across Long Creek at mile 0.7, at
Jones Beach, New York. Under this
temporary deviation, the Loop Parkway
Bridge need not open for the passage of
vessel traffic from 8:30 a.m. through
11:30 a.m. and 1:30 p.m. through 4:30
p.m., daily, from November 5, 2006
through December 20, 2006. A single
bridge opening for all inbound
commercial fishing vessels shall be
provided, if a request to open the bridge
is given, during the 1:30 p.m. to 4:30
p.m. bridge closure period. This
deviation is necessary to facilitate
scheduled bridge maintenance.
DATES: This deviation is effective from
November 5, 2006 through December
20, 2006.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at the First Coast Guard
District, Bridge Branch Office, One
South Street, New York, New York,
10004, between 7 a.m. and 4 p.m.,
Monday through Friday, except Federal
holidays. The telephone number is (212)
668–7165. The First Coast Guard
District Bridge Branch Office maintains
the public docket for this temporary
deviation.
Judy
Leung-Yee, Project Officer, First Coast
Guard District, at (212) 668–7195.
SUPPLEMENTARY INFORMATION: The Loop
Parkway Bridge, across Long Creek at
mile 0.7, at Jones Beach, New York, has
a vertical clearance in the closed
position of 21 feet at mean high water
and 25 feet at mean low water. The
existing drawbridge operation
regulations are listed at 33 CFR
117.799(f).
The owner of the bridge, New York
State Department of Transportation,
requested a temporary deviation to
complete bridge painting operations.
The bridge will not be able to open
while the bridge painting operation is
underway.
Under this temporary deviation, the
Loop Parkway Bridge across Long Creek
at mile 0.7, need not open for the
passage of vessel traffic from 8:30 a.m.
through 11:30 a.m. and from 1:30 p.m.
through 4:30 p.m., daily, from
November 5, 2006 through December
20, 2006. All inbound commercial
fishing vessels shall be provided a
single bridge opening during the 1:30
p.m. through 4:30 p.m. bridge closure
period each day provided a bridge
opening request is given by calling the
number posted at the bridge.
In accordance with 33 CFR 117.35(c),
this work will be performed with all due
FOR FURTHER INFORMATION CONTACT:
PO 00000
Frm 00031
Fmt 4700
Sfmt 4700
66673
speed in order to return the bridge to
normal operation as soon as possible.
Should the bridge maintenance
authorized by this temporary deviation
be completed before the end of the
effective period published in this notice,
the Coast Guard will rescind the
remainder of this temporary deviation,
and the bridge shall be returned to its
normal operating schedule. Notice of
the above action shall be provided to the
public in the Local Notice to Mariners
and the Federal Register, where
practicable.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: 31 October 2006.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E6–19313 Filed 11–15–06; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–06–122]
RIN 1625–AA09
Drawbridge Operation Regulations;
Thames River, New London, CT
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
SUMMARY: The Coast Guard has
temporarily changed the drawbridge
operation regulations that govern the
Amtrak Bridge across the Thames River,
mile 0.8, at New London, Connecticut.
This temporary final rule allows the
bridge owner to open the bridge on a
temporary opening schedule from
November 15, 2006 through May 15,
2007. This temporary final rule is
necessary to facilitate bridge pier
repairs.
This rule is effective from
November 15, 2006 through May 15,
2007.
DATES:
Comments and material
received from the public, as well as
documents indicated in this preamble as
being available in the docket, are part of
docket (CGD01–06–122) and are
available for inspection or copying at
the First Coast Guard District, Bridge
Branch Office, one South Street, New
York, New York, between 7 a.m. and 3
p.m., Monday through Friday, except
Federal holidays.
ADDRESSES:
E:\FR\FM\16NOR1.SGM
16NOR1
Agencies
[Federal Register Volume 71, Number 221 (Thursday, November 16, 2006)]
[Rules and Regulations]
[Page 66673]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-19313]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-06-130]
Drawbridge Operation Regulations;Long Island, New York Inland
Waterway from East Rockaway Inlet to Shinnecock Canal, Jones Beach, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Loop Parkway Bridge across Long Creek at mile 0.7, at Jones Beach, New
York. Under this temporary deviation, the Loop Parkway Bridge need not
open for the passage of vessel traffic from 8:30 a.m. through 11:30
a.m. and 1:30 p.m. through 4:30 p.m., daily, from November 5, 2006
through December 20, 2006. A single bridge opening for all inbound
commercial fishing vessels shall be provided, if a request to open the
bridge is given, during the 1:30 p.m. to 4:30 p.m. bridge closure
period. This deviation is necessary to facilitate scheduled bridge
maintenance.
DATES: This deviation is effective from November 5, 2006 through
December 20, 2006.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at the First Coast Guard District, Bridge Branch
Office, One South Street, New York, New York, 10004, between 7 a.m. and
4 p.m., Monday through Friday, except Federal holidays. The telephone
number is (212) 668-7165. The First Coast Guard District Bridge Branch
Office maintains the public docket for this temporary deviation.
FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First
Coast Guard District, at (212) 668-7195.
SUPPLEMENTARY INFORMATION: The Loop Parkway Bridge, across Long Creek
at mile 0.7, at Jones Beach, New York, has a vertical clearance in the
closed position of 21 feet at mean high water and 25 feet at mean low
water. The existing drawbridge operation regulations are listed at 33
CFR 117.799(f).
The owner of the bridge, New York State Department of
Transportation, requested a temporary deviation to complete bridge
painting operations. The bridge will not be able to open while the
bridge painting operation is underway.
Under this temporary deviation, the Loop Parkway Bridge across Long
Creek at mile 0.7, need not open for the passage of vessel traffic from
8:30 a.m. through 11:30 a.m. and from 1:30 p.m. through 4:30 p.m.,
daily, from November 5, 2006 through December 20, 2006. All inbound
commercial fishing vessels shall be provided a single bridge opening
during the 1:30 p.m. through 4:30 p.m. bridge closure period each day
provided a bridge opening request is given by calling the number posted
at the bridge.
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to normal operation as
soon as possible.
Should the bridge maintenance authorized by this temporary
deviation be completed before the end of the effective period published
in this notice, the Coast Guard will rescind the remainder of this
temporary deviation, and the bridge shall be returned to its normal
operating schedule. Notice of the above action shall be provided to the
public in the Local Notice to Mariners and the Federal Register, where
practicable.
This deviation from the operating regulations is authorized under
33 CFR 117.35.
Dated: 31 October 2006.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E6-19313 Filed 11-15-06; 8:45 am]
BILLING CODE 4910-15-P