Notice of Effectiveness of Exempt Wholesale Generator Status, 65481-65482 [E6-18812]
Download as PDF
65481
Federal Register / Vol. 71, No. 216 / Wednesday, November 8, 2006 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Institution of Proceeding and
Refund Effective Date
November 1, 2006.
California Independent System Operator, Inc ........................................................................................
ISO New England, Inc ..............................................................................................................................
PJM Interconnection, LLC ........................................................................................................................
Midwest Independent Transmission System Operator, Inc ...................................................................
NewYork Independent System Operator, Inc .........................................................................................
Southwest Power Pool, Inc ......................................................................................................................
On October 25, 2006, the Commission
issued an order that instituted a
proceeding in the above-referenced
dockets, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e, concerning the justness and
reasonableness of the tariffs of the
independent system operators (ISOs)
and regional transmission organizations
(RTOs).
The refund effective date in the
above-docketed proceedings,
established pursuant to section 206(b) of
the FPA, will be the date of publication
of this notice in the Federal Register.
Magalie R. Salas,
Secretary.
[FR Doc. E6–18809 Filed 11–7–06; 8:45 am]
No. EL07–4–
No. EL07–5–
No. EL07–6–
November 1, 2006.
BILLING CODE 6717–01–P
Mt. Tom Generating Company LLC ........................................................................................................
BG Dighton Power, LLC ...........................................................................................................................
FPL Energy Oliver Wind, LLC .................................................................................................................
Allegheny Ridge Wind Farm, LLC ..........................................................................................................
Noble Clinton Windpark I, LLC ..............................................................................................................
Noble Ellenburg Windpark, LLC .............................................................................................................
Noble Altona Windpark, LLC ..................................................................................................................
Noble Bliss Windpark, LLC .....................................................................................................................
Hawks Nest Hydro LLC ............................................................................................................................
cprice-sewell on PRODPC62 with NOTICES
No. EL07–3–
Notice of Effectiveness of Exempt
Wholesale Generator Status
Evergreen Wind Power, LLC ....................................................................................................................
Jkt 211001
No. EL07–2–
Federal Energy Regulatory
Commission
Spanish Ford Wind Park 2, LLC .............................................................................................................
15:11 Nov 07, 2006
No. EL07–1–
DEPARTMENT OF ENERGY
CalPeak Power LLC ..................................................................................................................................
VerDate Aug<31>2005
Docket
000.
Docket
000.
Docket
000.
Docket
000.
Docket
000.
Docket
000.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
E:\FR\FM\08NON1.SGM
08NON1
Docket
000.
Docket
000.
Docket
000.
Docket
000.
Docket
000.
Docket
000.
Docket
000.
Docket
000.
Docket
000.
Docket
000.
Docket
000.
Docket
000.
No. EG06–68–
No. EG06–69–
No. EG06–71–
No. EG06–72–
No. EG06–73–
No. EG06–74–
No. EG06–75–
No. EG06–76–
No. EG06–77–
No. EG06–78–
No. EG06–79–
No. EG06–80–
65482
Federal Register / Vol. 71, No. 216 / Wednesday, November 8, 2006 / Notices
Take notice that during the month of
October 2006, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Magalie R. Salas,
Secretary.
[FR Doc. E6–18812 Filed 11–7–06; 8:45 am]
BILLING CODE 6717–01–P
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–18808 Filed 11–7–06; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
CenterPoint Energy Gas Transmission
Company; Notice of Negotiated Rate
Filing
Federal Energy Regulatory
Commission
November 1, 2006.
cprice-sewell on PRODPC62 with NOTICES
[Docket No. RP96–200–155]
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Texas Eastern Transmission, LP;
Notice of Supplemental Filing
15:11 Nov 07, 2006
[Docket No. RP07–27–001]
BILLING CODE 6717–01–P
Take notice that on October 27, 2006,
CenterPoint Energy Gas Transmission
Company (CEGT) tendered for filing and
approval an amendment to a negotiated
rate agreement between CEGT and
Anadarko Energy Services Company
and will be effective November 1, 2006.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, N.E., Washington, D.C.
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
VerDate Aug<31>2005
Magalie R. Salas,
Secretary.
[FR Doc. E6–18811 Filed 11–7–06; 8:45 am]
Jkt 211001
DEPARTMENT OF ENERGY
November 1, 2006.
Take notice that on October 27, 2006,
Texas Eastern Transmission, LP (Texas
Eastern) submitted for filing as part of
its FERC Gas Tariff, Seventh Revised
Volume No. 1, Sub Third Revised Sheet
No. 610, proposed to be effective on
November 18, 2006.
Texas Eastern states that it is
supplementing its filing submitted on
October 18, 2006, in the captioned
docket (October 18 Filing) with the
revised tariff sheet in order to reinstate
the language of Section 14.9(A) of the
General Terms and Conditions of its
Tariff that was inadvertently deleted by
the October 18 Filing.
Texas Eastern states that copies of its
filing have been mailed to all affected
customers and interested state
commissions, as well as all parties on
the official service list.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. RP03–323–011]
Williston Basin Interstate Pipeline
Company; Notice of Negotiated Rate
November 1, 2006.
Take notice that on October 27, 2006,
Williston Basin Interstate Pipeline
Company (Williston Basin) tendered for
filing with the Commission a revised
negotiated Rate Schedule FT–1 Service
Agreement. The proposed effective date
of the Service Agreement is November
1, 2006.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
E:\FR\FM\08NON1.SGM
08NON1
Agencies
[Federal Register Volume 71, Number 216 (Wednesday, November 8, 2006)]
[Notices]
[Pages 65481-65482]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-18812]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator Status
November 1, 2006.
CalPeak Power LLC................ Docket No. EG06-68-000.
Spanish Ford Wind Park 2, LLC.... Docket No. EG06-69-000.
Evergreen Wind Power, LLC........ Docket No. EG06-71-000.
Mt. Tom Generating Company LLC... Docket No. EG06-72-000.
BG Dighton Power, LLC............ Docket No. EG06-73-000.
FPL Energy Oliver Wind, LLC...... Docket No. EG06-74-000.
Allegheny Ridge Wind Farm, LLC... Docket No. EG06-75-000.
Noble Clinton Windpark I, LLC.... Docket No. EG06-76-000.
Noble Ellenburg Windpark, LLC.... Docket No. EG06-77-000.
Noble Altona Windpark, LLC....... Docket No. EG06-78-000.
Noble Bliss Windpark, LLC........ Docket No. EG06-79-000.
Hawks Nest Hydro LLC............. Docket No. EG06-80-000.
[[Page 65482]]
Take notice that during the month of October 2006, the status of
the above-captioned entities as Exempt Wholesale Generators became
effective by operation of the Commission's regulations. 18 CFR
366.7(a).
Magalie R. Salas,
Secretary.
[FR Doc. E6-18812 Filed 11-7-06; 8:45 am]
BILLING CODE 6717-01-P