Notice of Effectiveness of Exempt Wholesale Generator Status, 65481-65482 [E6-18812]

Download as PDF 65481 Federal Register / Vol. 71, No. 216 / Wednesday, November 8, 2006 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Institution of Proceeding and Refund Effective Date November 1, 2006. California Independent System Operator, Inc ........................................................................................ ISO New England, Inc .............................................................................................................................. PJM Interconnection, LLC ........................................................................................................................ Midwest Independent Transmission System Operator, Inc ................................................................... NewYork Independent System Operator, Inc ......................................................................................... Southwest Power Pool, Inc ...................................................................................................................... On October 25, 2006, the Commission issued an order that instituted a proceeding in the above-referenced dockets, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e, concerning the justness and reasonableness of the tariffs of the independent system operators (ISOs) and regional transmission organizations (RTOs). The refund effective date in the above-docketed proceedings, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Magalie R. Salas, Secretary. [FR Doc. E6–18809 Filed 11–7–06; 8:45 am] No. EL07–4– No. EL07–5– No. EL07–6– November 1, 2006. BILLING CODE 6717–01–P Mt. Tom Generating Company LLC ........................................................................................................ BG Dighton Power, LLC ........................................................................................................................... FPL Energy Oliver Wind, LLC ................................................................................................................. Allegheny Ridge Wind Farm, LLC .......................................................................................................... Noble Clinton Windpark I, LLC .............................................................................................................. Noble Ellenburg Windpark, LLC ............................................................................................................. Noble Altona Windpark, LLC .................................................................................................................. Noble Bliss Windpark, LLC ..................................................................................................................... Hawks Nest Hydro LLC ............................................................................................................................ cprice-sewell on PRODPC62 with NOTICES No. EL07–3– Notice of Effectiveness of Exempt Wholesale Generator Status Evergreen Wind Power, LLC .................................................................................................................... Jkt 211001 No. EL07–2– Federal Energy Regulatory Commission Spanish Ford Wind Park 2, LLC ............................................................................................................. 15:11 Nov 07, 2006 No. EL07–1– DEPARTMENT OF ENERGY CalPeak Power LLC .................................................................................................................................. VerDate Aug<31>2005 Docket 000. Docket 000. Docket 000. Docket 000. Docket 000. Docket 000. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\08NON1.SGM 08NON1 Docket 000. Docket 000. Docket 000. Docket 000. Docket 000. Docket 000. Docket 000. Docket 000. Docket 000. Docket 000. Docket 000. Docket 000. No. EG06–68– No. EG06–69– No. EG06–71– No. EG06–72– No. EG06–73– No. EG06–74– No. EG06–75– No. EG06–76– No. EG06–77– No. EG06–78– No. EG06–79– No. EG06–80– 65482 Federal Register / Vol. 71, No. 216 / Wednesday, November 8, 2006 / Notices Take notice that during the month of October 2006, the status of the abovecaptioned entities as Exempt Wholesale Generators became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Magalie R. Salas, Secretary. [FR Doc. E6–18812 Filed 11–7–06; 8:45 am] BILLING CODE 6717–01–P Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–18808 Filed 11–7–06; 8:45 am] DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing Federal Energy Regulatory Commission November 1, 2006. cprice-sewell on PRODPC62 with NOTICES [Docket No. RP96–200–155] original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Texas Eastern Transmission, LP; Notice of Supplemental Filing 15:11 Nov 07, 2006 [Docket No. RP07–27–001] BILLING CODE 6717–01–P Take notice that on October 27, 2006, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing and approval an amendment to a negotiated rate agreement between CEGT and Anadarko Energy Services Company and will be effective November 1, 2006. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public VerDate Aug<31>2005 Magalie R. Salas, Secretary. [FR Doc. E6–18811 Filed 11–7–06; 8:45 am] Jkt 211001 DEPARTMENT OF ENERGY November 1, 2006. Take notice that on October 27, 2006, Texas Eastern Transmission, LP (Texas Eastern) submitted for filing as part of its FERC Gas Tariff, Seventh Revised Volume No. 1, Sub Third Revised Sheet No. 610, proposed to be effective on November 18, 2006. Texas Eastern states that it is supplementing its filing submitted on October 18, 2006, in the captioned docket (October 18 Filing) with the revised tariff sheet in order to reinstate the language of Section 14.9(A) of the General Terms and Conditions of its Tariff that was inadvertently deleted by the October 18 Filing. Texas Eastern states that copies of its filing have been mailed to all affected customers and interested state commissions, as well as all parties on the official service list. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. RP03–323–011] Williston Basin Interstate Pipeline Company; Notice of Negotiated Rate November 1, 2006. Take notice that on October 27, 2006, Williston Basin Interstate Pipeline Company (Williston Basin) tendered for filing with the Commission a revised negotiated Rate Schedule FT–1 Service Agreement. The proposed effective date of the Service Agreement is November 1, 2006. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and E:\FR\FM\08NON1.SGM 08NON1

Agencies

[Federal Register Volume 71, Number 216 (Wednesday, November 8, 2006)]
[Notices]
[Pages 65481-65482]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-18812]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Effectiveness of Exempt Wholesale Generator Status

November 1, 2006.

CalPeak Power LLC................  Docket No. EG06-68-000.
Spanish Ford Wind Park 2, LLC....  Docket No. EG06-69-000.
Evergreen Wind Power, LLC........  Docket No. EG06-71-000.
Mt. Tom Generating Company LLC...  Docket No. EG06-72-000.
BG Dighton Power, LLC............  Docket No. EG06-73-000.
FPL Energy Oliver Wind, LLC......  Docket No. EG06-74-000.
Allegheny Ridge Wind Farm, LLC...  Docket No. EG06-75-000.
Noble Clinton Windpark I, LLC....  Docket No. EG06-76-000.
Noble Ellenburg Windpark, LLC....  Docket No. EG06-77-000.
Noble Altona Windpark, LLC.......  Docket No. EG06-78-000.
Noble Bliss Windpark, LLC........  Docket No. EG06-79-000.
Hawks Nest Hydro LLC.............  Docket No. EG06-80-000.
 


[[Page 65482]]

    Take notice that during the month of October 2006, the status of 
the above-captioned entities as Exempt Wholesale Generators became 
effective by operation of the Commission's regulations. 18 CFR 
366.7(a).

Magalie R. Salas,
Secretary.
[FR Doc. E6-18812 Filed 11-7-06; 8:45 am]
BILLING CODE 6717-01-P