Environmental Impacts Statements; Notice of Availability, 64702 [E6-18589]
Download as PDF
64702
Federal Register / Vol. 71, No. 213 / Friday, November 3, 2006 / Notices
Transport Study, New and Updated
Information, To Identify
Transportation Corridors that will
Improve Mobility and Efficiency
within Northeastern Aroostook
County and other portions of the U.S.
and Canada, U.S. Army COE Section
404 Permit, Endangered Species Act,
NPDES and Section 10 River and
Harbors Act, Aroostook, ME
Summary: EPA expressed
environmental concerns about the
potential impacts, and to wetlands and
other waters, water quality and air
quality, and concerns related to
secondary development. Rating EC2.
EIS No. 20060359, ERP No. DS–AFS–
K65286–CA, Watdog Project,
Additional Analysis to Supplement
Information, Feather River Ranger
District, Plumas National Forest, Butte
and Plumas Counties, CA
Summary: EPA expressed
environmental concerns about
watershed and old-forest wildlife
species impacts, and requested
additional information on post-project
BMP monitoring of water quality Best
Management Practices (BMPs). EPA
continues to recommend the selection of
Alternative D as less environmentally
damaging alternative. Rating EC2.
Final EISs
EIS No. 20060379, ERP No. F–BPA–
L08064–OR, Klondike III Wind
Project (300 megawatts {MW}) and
Biglow Canyon Wind Farm (400
megawatts {MW}) Integration Project,
Construction and Operation of a
Double-Circuit 230–Kilovolt (kV)
Transmission, Sherman County, OR
Summary: EPA does not object to the
proposed action.
EIS No. 20060394, ERP No. F–BIA–
K60036–CA, Elk Valley Rancheria
Martin Ranch 203.5-Acre Fee-to-Trust
Transfer and Casino/Resort Project,
Implementation, Federal Trust, Elk
Valley Rancheria Tribe, Crescent City,
Del Norte County, CA
mstockstill on PROD1PC68 with NOTICES
Summary: EPA’s concerns were
addressed in the FEIS; therefore, EPA
does not object to the proposed action.
EIS No. 20060369, ERP No. FB–COE–
K36100–CA, American River
Watershed Project, Post Authorization
Decision Document, Folsom Dam
Raise, Folsom Bridge Project, Proposal
to Construct a Permanent Bridge and
Roadway across the American River,
City of Folsom, Sacramento County,
CA
Summary: No formal comment letter
was sent to the preparing agency.
VerDate Aug<31>2005
15:24 Nov 02, 2006
Jkt 211001
Dated: October 31, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E6–18591 Filed 11–2–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER-FRL–6680–7]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements
Filed 10/23/2006 Through 10/27/2006
Pursuant to 40 CFR 1506.9.
EIS No, 20060443, Draft EIS, AFS, AK,
Baht Timber Sale Project, Proposes to
Harvest Timber and Temporary Road
Construction on Zarembo Island,
Wrangell Ranger District, Tongrass
National Forest, AK, Comment Period
Ends: 12/18/2006, Contact: Linda
Christian 907–874–7555
EIS No, 20060444, Draft EIS, COE, CA,
San Luis Rey Flood Control Project,
Operation and Maintenance of the
Vegetation and Sediment
Management, from College Blvd to the
Pacific Ocean, San Diego County, CA,
Comment Period Ends: 12/18/2006,
Contact: Tiffany Kayama 213–452–
3845
EIS No, 20060445, Draft EIS, NPS, MT,
Avalanche Hazard Reduction Project,
Issuance of Special Use Permit for the
Use of Explosives in the Park,
Burlington Northern Santa Fe
Railway, Glacier National Park,
Flathead National Forest, Flathead
and Glacier Counties, MT, Comment
Period Ends: 12/22/2006, Contact:
Mary Riddle 406–888–7898
EIS No, 20060446, Final EIS, COE , LA,
Port of Iberia Project, To Determine
the Feasibility of Deepening the
Existing Navigation Channels between
the POI and the Gulf of Mexico,
Portions of the Gulf Intracoastal
Waterway (GIWW) and Freshwater
Bayou (FWB), LA, Wait Period Ends:
12/04/2006, Contact: Nathan S. Dayan
504–862–2530
EIS No, 20060447, Final EIS, BLM, 00,
Devers-Palo Verde No. 2 Transmission
Line Project, Construction and
Operation a New 230-mile 500 kV
Electric Transmission Line between
Devers Substation in California and
Harquahala Generating Substation in
Arizona, Wait Period Ends: 12/04/
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
2006, Contact: Greg Hill 760–251–
4840
EIS No, 20060448, Final EIS, TVA, 00,
Nolichucky Reservoir Flood
Remediation Project, To Identify and
Evaluate Ways to Address Flooding
Effects of Nolichucky Dam and the
Accumulated Sediment in Nolichucky
Reservoir on Land and Property Not
Owned by the Federal Government,
NPDES Permit and U.S. COE Section
404 Permit, Cocke, Greene, Hamblen,
Jefferson, Unicoi, Washington
Counties, TN and Avery, Mitchell,
Yancey Counties, NC, Wait Period
Ends: 12/04/2006, Contact: Stanford
E. Davis 865–632–2915
EIS No, 20060449, Draft EIS, AFS, ID,
Salmon-Challis National Forest, Lost
River/Lemhi Grazing Allotments, To
Improve Range Condition and Trend,
Lost River and Ranger Districts,
Salmon-Challis National Forest, Butte,
Clark, Custer and Lemhi Counties, ID,
Comment Period Ends: 12/18/2006,
Contact: Karry Krieger 208–756–5102
EIS No, 20060450, Final EIS, NRS, MA,
Cape Cod Water Resources
Restoration Project, Restore Degraded
Salt Marshes, Restore Anadromous
Fish Passages, and Improve Water
Quality for Shellfishing Area, Cape
Cod, Barnstable County, MA, Wait
Period Ends: 12/04/2006, Contact:
Richard J. DeVergilio 413–253–4351
EIS No, 20060451, Final EIS, CGD, MA,
Neptune Liquefied Natural Gas (LNG),
Construction and Operation,
Deepwater Port License Application,
(Docket Number USCG–2004–22611)
Massachusetts Bay, Gloucester and
Boston, MA, Wait Period Ends: 12/04/
2006, Contact: Mark Prescott 202–
267–0225
Amended Notices
EIS No, 20060375, Draft EIS, FHW, MT,
Miller Creek Road Project, To Provide
Safe and Improved Access between
U.S. 93 and the Miller Creek Area,
Missoula County, MT , Comment
Period Ends: 12/06/2006, Contact:
Theodore Burch 406–449–5302 Ext.
240, Revision of FR Notice Published
09/15/2006: Extend Comment Period
from 11/06/2006 to 12/06/2006
Dated: October 31, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E6–18589 Filed 11–2–06; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\03NON1.SGM
03NON1
Agencies
[Federal Register Volume 71, Number 213 (Friday, November 3, 2006)]
[Notices]
[Page 64702]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-18589]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6680-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly Receipt of Environmental Impact Statements
Filed 10/23/2006 Through 10/27/2006
Pursuant to 40 CFR 1506.9.
EIS No, 20060443, Draft EIS, AFS, AK, Baht Timber Sale Project,
Proposes to Harvest Timber and Temporary Road Construction on Zarembo
Island, Wrangell Ranger District, Tongrass National Forest, AK, Comment
Period Ends: 12/18/2006, Contact: Linda Christian 907-874-7555
EIS No, 20060444, Draft EIS, COE, CA, San Luis Rey Flood Control
Project, Operation and Maintenance of the Vegetation and Sediment
Management, from College Blvd to the Pacific Ocean, San Diego County,
CA, Comment Period Ends: 12/18/2006, Contact: Tiffany Kayama 213-452-
3845
EIS No, 20060445, Draft EIS, NPS, MT, Avalanche Hazard Reduction
Project, Issuance of Special Use Permit for the Use of Explosives in
the Park, Burlington Northern Santa Fe Railway, Glacier National Park,
Flathead National Forest, Flathead and Glacier Counties, MT, Comment
Period Ends: 12/22/2006, Contact: Mary Riddle 406-888-7898
EIS No, 20060446, Final EIS, COE , LA, Port of Iberia Project, To
Determine the Feasibility of Deepening the Existing Navigation Channels
between the POI and the Gulf of Mexico, Portions of the Gulf
Intracoastal Waterway (GIWW) and Freshwater Bayou (FWB), LA, Wait
Period Ends: 12/04/2006, Contact: Nathan S. Dayan 504-862-2530
EIS No, 20060447, Final EIS, BLM, 00, Devers-Palo Verde No. 2
Transmission Line Project, Construction and Operation a New 230-mile
500 kV Electric Transmission Line between Devers Substation in
California and Harquahala Generating Substation in Arizona, Wait Period
Ends: 12/04/2006, Contact: Greg Hill 760-251-4840
EIS No, 20060448, Final EIS, TVA, 00, Nolichucky Reservoir Flood
Remediation Project, To Identify and Evaluate Ways to Address Flooding
Effects of Nolichucky Dam and the Accumulated Sediment in Nolichucky
Reservoir on Land and Property Not Owned by the Federal Government,
NPDES Permit and U.S. COE Section 404 Permit, Cocke, Greene, Hamblen,
Jefferson, Unicoi, Washington Counties, TN and Avery, Mitchell, Yancey
Counties, NC, Wait Period Ends: 12/04/2006, Contact: Stanford E. Davis
865-632-2915
EIS No, 20060449, Draft EIS, AFS, ID, Salmon-Challis National Forest,
Lost River/Lemhi Grazing Allotments, To Improve Range Condition and
Trend, Lost River and Ranger Districts, Salmon-Challis National Forest,
Butte, Clark, Custer and Lemhi Counties, ID, Comment Period Ends: 12/
18/2006, Contact: Karry Krieger 208-756-5102
EIS No, 20060450, Final EIS, NRS, MA, Cape Cod Water Resources
Restoration Project, Restore Degraded Salt Marshes, Restore Anadromous
Fish Passages, and Improve Water Quality for Shellfishing Area, Cape
Cod, Barnstable County, MA, Wait Period Ends: 12/04/2006, Contact:
Richard J. DeVergilio 413-253-4351
EIS No, 20060451, Final EIS, CGD, MA, Neptune Liquefied Natural Gas
(LNG), Construction and Operation, Deepwater Port License Application,
(Docket Number USCG-2004-22611) Massachusetts Bay, Gloucester and
Boston, MA, Wait Period Ends: 12/04/2006, Contact: Mark Prescott 202-
267-0225
Amended Notices
EIS No, 20060375, Draft EIS, FHW, MT, Miller Creek Road Project, To
Provide Safe and Improved Access between U.S. 93 and the Miller Creek
Area, Missoula County, MT , Comment Period Ends: 12/06/2006, Contact:
Theodore Burch 406-449-5302 Ext. 240, Revision of FR Notice Published
09/15/2006: Extend Comment Period from 11/06/2006 to 12/06/2006
Dated: October 31, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-18589 Filed 11-2-06; 8:45 am]
BILLING CODE 6560-50-P