Wisconsin Public Power Inc.; Notice of Filing, 63300 [E6-18133]

Download as PDF 63300 Federal Register / Vol. 71, No. 209 / Monday, October 30, 2006 / Notices ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on November 13, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–18131 Filed 10–27–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on November 13, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–18133 Filed 10–27–06; 8:45 am] Wisconsin Public Power Inc.; Notice of Filing BILLING CODE 6717–01–P October 24, 2006. sroberts on PROD1PC70 with NOTICES [Docket No. EL07–8–000] DEPARTMENT OF ENERGY Take notice that on October 11, 2006, Wisconsin Public Power Inc (WPPI) filed an initial Rate Schedule No. 1 and supporting cost data which specifies its revenue requirement for cost based reactive supply and voltage control from Generation Sources Service, as to the resources located in one pricing area of the Midwest Independent Transmission System Operator, Inc (MISO). WPPI will provide the subject Reactive Power Service from its 20% joint ownership interest in Unit 4 of the Boswell Generating Station, which is located in the Minnesota Power Company pricing area with the control area administered by MISO. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the VerDate Aug<31>2005 02:16 Oct 28, 2006 Jkt 211001 Federal Energy Regulatory Commission [Docket No. EL07–9–000] Wisconsin Public Power Inc.; Notice of Filing intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on November 13, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–18134 Filed 10–27–06; 8:45 am] BILLING CODE 6717–01–P October 24, 2006. Take notice that on October 11, 2006, Wisconsin Public Power Inc. (WPPI) filed an initial Rate Schedule No. 2 and supporting cost data which specifies its revenue requirement for cost based reactive supply and voltage control from Generation Sources Service, as to the resources located in one pricing area of the Midwest Independent Transmission System Operator, Inc. (MISO). WPPI will provide the subject Reactive Power Service from Units 1 and 4 of the South Fond du Lac combustion turbine generating station, which is located in the Wisconsin Power & Light Company subzone of the American Transmission Company, LLC pricing zone within the control area administered by MISO. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP07–26–000] Wyoming Interstate Company, Ltd.; Notice of Tariff Filing October 20, 2006. Take notice that on October 17, 2006, Wyoming Interstate Company, Ltd. (WIC) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 2, Second Revised Sheet No. 5B and Third Revised Sheet No. 72C, to become effective November 17, 2006. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of E:\FR\FM\30OCN1.SGM 30OCN1

Agencies

[Federal Register Volume 71, Number 209 (Monday, October 30, 2006)]
[Notices]
[Page 63300]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-18133]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL07-8-000]


Wisconsin Public Power Inc.; Notice of Filing

October 24, 2006.
    Take notice that on October 11, 2006, Wisconsin Public Power Inc 
(WPPI) filed an initial Rate Schedule No. 1 and supporting cost data 
which specifies its revenue requirement for cost based reactive supply 
and voltage control from Generation Sources Service, as to the 
resources located in one pricing area of the Midwest Independent 
Transmission System Operator, Inc (MISO). WPPI will provide the subject 
Reactive Power Service from its 20% joint ownership interest in Unit 4 
of the Boswell Generating Station, which is located in the Minnesota 
Power Company pricing area with the control area administered by MISO.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on November 13, 2006.

Magalie R. Salas,
Secretary.
[FR Doc. E6-18133 Filed 10-27-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.