Download as PDF 63311 Federal Register / Vol. 71, No. 209 / Monday, October 30, 2006 / Notices l. Deadline for filing additional study requests and requests for cooperating agency status: December 5, 2006. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Additional study requests and requests for cooperating agency status may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. m. The application is not ready for environmental analysis at this time. n. The proposed project would utilize the existing U.S. Army Corps of Engineers’ Captain Anthony Meldahl Locks and Dam, and would consist of: (1) An intake approach channel; (2) an intake structure, (3) a 248-foot-long by 210-foot-wide powerhouse containing three generating units having a total installed capacity of 105 megawatts, (4) a tailrace channel; (5) a 5-mile-long, 138-kilovolt transmission line; and (6) appurtenant facilities. The City of Hamilton (Hamilton) is a municipal preference entity that owns and operates an electrical system. The project would have an estimated annual generation of 489 gigawatt-hours, which would be used to serve the needs of the customers of Hamilton’s electric system. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll- free at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. With this notice, we are initiating consultation with the Kentucky State Historic Preservation Officer (SHPO) and the Ohio SHPO, as required by § 106, National Historic Preservation Act, and the regulations of the Advisory Council on Historic Preservation, 36, CFR, at 800.4. q. Procedural Schedule: The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. h h Issue Acceptance or Deficiency Letter .................................................................................................................................... Request Additional Information .............................................................................................................................................. Issue Scoping Document for comments .................................................................................................................................. Notice of application is ready for environmental analysis .................................................................................................... Notice of the availability of the draft EA ................................................................................................................................ Notice of the availability of the final EA ................................................................................................................................ Magalie R. Salas, Secretary. [FR Doc. E6–18096 Filed 10–27–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests and Comments sroberts on PROD1PC70 with NOTICES October 18, 2006. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: 12736–000. c. Date Filed: September 12, 2006. d. Applicant: Hydro Matrix Limited Partnership. e. Name of Project: Falls Hydroelectric Project. f. Location: On Neuse River, in Wake County, North Carolina. The Falls Dam is owned and operated by the U.S. Army Corps of Engineers. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). VerDate Aug<31>2005 02:16 Oct 28, 2006 Jkt 211001 h. Applicant Contact: Mr. James B. Price, Ph.D., W. V. Hydro, Inc., Managing General Partner, P.O. Box 5550, Aiken, SC 29804, jimpricehydro@bellsouth.net. i. FERC Contact: Patricia W. Gillis at (202) 502–8735. j. Deadline for filing comments, protests, and motions to intervene: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P– 12736–000) on any comments, protests, or motions filed. k. Description of Project: The proposed project would utilize the existing U.S. Army Corps of Engineers’ Falls Dam and would consist of: (1) A proposed penstock; (2) a proposed powerhouse containing two generating units with a total generating capacity of 5000 kilowatts; (3) a proposed tailrace; (4) a proposed 400-foot-long, 13.8 kilovolt transmission line; and (5) appurtenant facilities. The project would have an estimated annual generation of approximately 20 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 January 2007. January 2007. March 2007. June 2007. December 2007. June 2008. gigawatt-hours and would be sold to a local utility. l. Location of Application: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Competing Preliminary Permit: Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the E:\FR\FM\30OCN1.SGM 30OCN1 sroberts on PROD1PC70 with NOTICES 63312 Federal Register / Vol. 71, No. 209 / Monday, October 30, 2006 / Notices particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. o. Competing Development Application: Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. p. Notice of Intent: A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. q. Proposed Scope of Studies under Permit: A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. r. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified VerDate Aug<31>2005 02:16 Oct 28, 2006 Jkt 211001 comment date for the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; See 18 CFR 385.2001 (a)(1)(iii) and the instructions on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly encourages electronic filing. s. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE OF INTENT’’, or ‘‘COMPETING APPLICATION’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. t. Agency Comments: Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E6–18097 Filed 10–27–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests and Comments October 18, 2006. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: 12737–000. c. Date Filed: September 15, 2006. d. Applicant: Hydro Matrix Limited Partnership. e. Name of Project: Gathright Hydroelectric Project. PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 f. Location: On the Jackson River, in Alleghany County, Virginia. The Gathright Dam is owned and maintained by the U.S. Army Corps of Engineers. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)—825(r). h. Applicant Contact: Mr. Dean Edwards, Mayo Hydro LLC, General Partner, 5400 Downing Street, Dover, FL, 33527, (813) 966–4300, mayohydro@hotmail.com. i. FERC Contact: Patricia W. Gillis at (202) 502–8735. j. Deadline for filing comments, protests, and motions to intervene: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P– 12737–000) on any comments, protests, or motions filed. k. Description of Project: The proposed project would utilize the existing U.S. Army Corps of Engineers’ Gathright Dam and would consist of: (1) A proposed penstock; (2) a proposed powerhouse containing one generating unit with an installed capacity of 5,000kilowatts; (3) a proposed 1.7-mile-long, 46-kV transmission line; and (4) appurtenant facilities. The proposed project would have an estimated annual generation of approximately 20gigawatts. The applicant plans to sell the generated energy. l. Location of Application: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Competing Preliminary Permit— Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the E:\FR\FM\30OCN1.SGM 30OCN1

Agencies

[Federal Register Volume 71, Number 209 (Monday, October 30, 2006)]
[Notices]
[Pages 63311-63312]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-18097]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepted for Filing and Soliciting Motions 
To Intervene, Protests and Comments

October 18, 2006.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permit.
    b. Project No.: 12736-000.
    c. Date Filed: September 12, 2006.
    d. Applicant: Hydro Matrix Limited Partnership.
    e. Name of Project: Falls Hydroelectric Project.
    f. Location: On Neuse River, in Wake County, North Carolina. The 
Falls Dam is owned and operated by the U.S. Army Corps of Engineers.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. James B. Price, Ph.D., W. V. Hydro, Inc., 
Managing General Partner, P.O. Box 5550, Aiken, SC 29804, 
jimpricehydro@bellsouth.net.
    i. FERC Contact: Patricia W. Gillis at (202) 502-8735.
    j. Deadline for filing comments, protests, and motions to 
intervene: 60 days from the issuance date of this notice.
    All documents (original and eight copies) should be filed with 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426. Please include the project 
number (P-12736-000) on any comments, protests, or motions filed.
    k. Description of Project: The proposed project would utilize the 
existing U.S. Army Corps of Engineers' Falls Dam and would consist of: 
(1) A proposed penstock; (2) a proposed powerhouse containing two 
generating units with a total generating capacity of 5000 kilowatts; 
(3) a proposed tailrace; (4) a proposed 400-foot-long, 13.8 kilovolt 
transmission line; and (5) appurtenant facilities. The project would 
have an estimated annual generation of approximately 20 gigawatt-hours 
and would be sold to a local utility.
    l. Location of Application: A copy of the application is available 
for inspection and reproduction at the Commission in the Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item h 
above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Competing Preliminary Permit: Anyone desiring to file a 
competing application for preliminary permit for a proposed project 
must submit the competing application itself, or a notice of intent to 
file such an application, to the Commission on or before the specified 
comment date for the

[[Page 63312]]

particular application (see 18 CFR 4.36). Submission of a timely notice 
of intent allows an interested person to file the competing preliminary 
permit application no later than 30 days after the specified comment 
date for the particular application. A competing preliminary permit 
application must conform with 18 CFR 4.30(b) and 4.36.
    o. Competing Development Application: Any qualified development 
applicant desiring to file a competing development application must 
submit to the Commission, on or before a specified comment date for the 
particular application, either a competing development application or a 
notice of intent to file such an application. Submission of a timely 
notice of intent to file a development application allows an interested 
person to file the competing application no later than 120 days after 
the specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    p. Notice of Intent: A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    q. Proposed Scope of Studies under Permit: A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    r. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper; See 18 CFR 385.2001 (a)(1)(iii) and 
the instructions on the Commission's Web site under ``e-filing'' link. 
The Commission strongly encourages electronic filing.
    s. Filing and Service of Responsive Documents: Any filings must 
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'', ``MOTION TO INTERVENE'', 
``NOTICE OF INTENT'', or ``COMPETING APPLICATION'', as applicable, and 
the Project Number of the particular application to which the filing 
refers. Any of the above-named documents must be filed by providing the 
original and the number of copies provided by the Commission's 
regulations to: The Secretary, Federal Energy Regulatory Commission, 
888 First Street, NE., Washington, DC 20426. A copy of any motion to 
intervene must also be served upon each representative of the Applicant 
specified in the particular application.
    t. Agency Comments: Federal, State, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

Magalie R. Salas,
Secretary.
[FR Doc. E6-18097 Filed 10-27-06; 8:45 am]