Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests and Comments, 63311-63312 [E6-18097]
Download as PDF
63311
Federal Register / Vol. 71, No. 209 / Monday, October 30, 2006 / Notices
l. Deadline for filing additional study
requests and requests for cooperating
agency status: December 5, 2006.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Additional study requests and
requests for cooperating agency status
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
m. The application is not ready for
environmental analysis at this time.
n. The proposed project would utilize
the existing U.S. Army Corps of
Engineers’ Captain Anthony Meldahl
Locks and Dam, and would consist of:
(1) An intake approach channel; (2) an
intake structure, (3) a 248-foot-long by
210-foot-wide powerhouse containing
three generating units having a total
installed capacity of 105 megawatts, (4)
a tailrace channel; (5) a 5-mile-long,
138-kilovolt transmission line; and (6)
appurtenant facilities. The City of
Hamilton (Hamilton) is a municipal
preference entity that owns and operates
an electrical system. The project would
have an estimated annual generation of
489 gigawatt-hours, which would be
used to serve the needs of the customers
of Hamilton’s electric system.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or toll-
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the Kentucky State
Historic Preservation Officer (SHPO)
and the Ohio SHPO, as required by
§ 106, National Historic Preservation
Act, and the regulations of the Advisory
Council on Historic Preservation, 36,
CFR, at 800.4.
q. Procedural Schedule: The
application will be processed according
to the following Hydro Licensing
Schedule. Revisions to the schedule will
be made as appropriate.
h
h
Issue Acceptance or Deficiency Letter ....................................................................................................................................
Request Additional Information ..............................................................................................................................................
Issue Scoping Document for comments ..................................................................................................................................
Notice of application is ready for environmental analysis ....................................................................................................
Notice of the availability of the draft EA ................................................................................................................................
Notice of the availability of the final EA ................................................................................................................................
Magalie R. Salas,
Secretary.
[FR Doc. E6–18096 Filed 10–27–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests and Comments
sroberts on PROD1PC70 with NOTICES
October 18, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12736–000.
c. Date Filed: September 12, 2006.
d. Applicant: Hydro Matrix Limited
Partnership.
e. Name of Project: Falls
Hydroelectric Project.
f. Location: On Neuse River, in Wake
County, North Carolina. The Falls Dam
is owned and operated by the U.S. Army
Corps of Engineers.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
VerDate Aug<31>2005
02:16 Oct 28, 2006
Jkt 211001
h. Applicant Contact: Mr. James B.
Price, Ph.D., W. V. Hydro, Inc.,
Managing General Partner, P.O. Box
5550, Aiken, SC 29804,
jimpricehydro@bellsouth.net.
i. FERC Contact: Patricia W. Gillis at
(202) 502–8735.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Please include the project number (P–
12736–000) on any comments, protests,
or motions filed.
k. Description of Project: The
proposed project would utilize the
existing U.S. Army Corps of Engineers’
Falls Dam and would consist of: (1) A
proposed penstock; (2) a proposed
powerhouse containing two generating
units with a total generating capacity of
5000 kilowatts; (3) a proposed tailrace;
(4) a proposed 400-foot-long, 13.8
kilovolt transmission line; and (5)
appurtenant facilities. The project
would have an estimated annual
generation of approximately 20
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
January 2007.
January 2007.
March 2007.
June 2007.
December 2007.
June 2008.
gigawatt-hours and would be sold to a
local utility.
l. Location of Application: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit:
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
E:\FR\FM\30OCN1.SGM
30OCN1
sroberts on PROD1PC70 with NOTICES
63312
Federal Register / Vol. 71, No. 209 / Monday, October 30, 2006 / Notices
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
o. Competing Development
Application: Any qualified development
applicant desiring to file a competing
development application must submit to
the Commission, on or before a
specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
p. Notice of Intent: A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
VerDate Aug<31>2005
02:16 Oct 28, 2006
Jkt 211001
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001 (a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
s. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’, ‘‘NOTICE
OF INTENT’’, or ‘‘COMPETING
APPLICATION’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
t. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–18097 Filed 10–27–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests and Comments
October 18, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12737–000.
c. Date Filed: September 15, 2006.
d. Applicant: Hydro Matrix Limited
Partnership.
e. Name of Project: Gathright
Hydroelectric Project.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
f. Location: On the Jackson River, in
Alleghany County, Virginia. The
Gathright Dam is owned and maintained
by the U.S. Army Corps of Engineers.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)—825(r).
h. Applicant Contact: Mr. Dean
Edwards, Mayo Hydro LLC, General
Partner, 5400 Downing Street, Dover,
FL, 33527, (813) 966–4300,
mayohydro@hotmail.com.
i. FERC Contact: Patricia W. Gillis at
(202) 502–8735.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Please include the project number (P–
12737–000) on any comments, protests,
or motions filed.
k. Description of Project: The
proposed project would utilize the
existing U.S. Army Corps of Engineers’
Gathright Dam and would consist of: (1)
A proposed penstock; (2) a proposed
powerhouse containing one generating
unit with an installed capacity of 5,000kilowatts; (3) a proposed 1.7-mile-long,
46-kV transmission line; and (4)
appurtenant facilities. The proposed
project would have an estimated annual
generation of approximately 20gigawatts. The applicant plans to sell
the generated energy.
l. Location of Application: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
E:\FR\FM\30OCN1.SGM
30OCN1
Agencies
[Federal Register Volume 71, Number 209 (Monday, October 30, 2006)]
[Notices]
[Pages 63311-63312]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-18097]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting Motions
To Intervene, Protests and Comments
October 18, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 12736-000.
c. Date Filed: September 12, 2006.
d. Applicant: Hydro Matrix Limited Partnership.
e. Name of Project: Falls Hydroelectric Project.
f. Location: On Neuse River, in Wake County, North Carolina. The
Falls Dam is owned and operated by the U.S. Army Corps of Engineers.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. James B. Price, Ph.D., W. V. Hydro, Inc.,
Managing General Partner, P.O. Box 5550, Aiken, SC 29804,
jimpricehydro@bellsouth.net.
i. FERC Contact: Patricia W. Gillis at (202) 502-8735.
j. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Please include the project
number (P-12736-000) on any comments, protests, or motions filed.
k. Description of Project: The proposed project would utilize the
existing U.S. Army Corps of Engineers' Falls Dam and would consist of:
(1) A proposed penstock; (2) a proposed powerhouse containing two
generating units with a total generating capacity of 5000 kilowatts;
(3) a proposed tailrace; (4) a proposed 400-foot-long, 13.8 kilovolt
transmission line; and (5) appurtenant facilities. The project would
have an estimated annual generation of approximately 20 gigawatt-hours
and would be sold to a local utility.
l. Location of Application: A copy of the application is available
for inspection and reproduction at the Commission in the Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item h
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Competing Preliminary Permit: Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the
[[Page 63312]]
particular application (see 18 CFR 4.36). Submission of a timely notice
of intent allows an interested person to file the competing preliminary
permit application no later than 30 days after the specified comment
date for the particular application. A competing preliminary permit
application must conform with 18 CFR 4.30(b) and 4.36.
o. Competing Development Application: Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
p. Notice of Intent: A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
q. Proposed Scope of Studies under Permit: A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; See 18 CFR 385.2001 (a)(1)(iii) and
the instructions on the Commission's Web site under ``e-filing'' link.
The Commission strongly encourages electronic filing.
s. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', ``MOTION TO INTERVENE'',
``NOTICE OF INTENT'', or ``COMPETING APPLICATION'', as applicable, and
the Project Number of the particular application to which the filing
refers. Any of the above-named documents must be filed by providing the
original and the number of copies provided by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. A copy of any motion to
intervene must also be served upon each representative of the Applicant
specified in the particular application.
t. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6-18097 Filed 10-27-06; 8:45 am]
BILLING CODE 6717-01-P