Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 63309 [E6-18094]

Download as PDF Federal Register / Vol. 71, No. 209 / Monday, October 30, 2006 / Notices Commission’s Office of External Affairs at 1–866–208 FERC (3372) or through the Commission’s ‘‘eLibrary’’ which can be found online at https://www.ferc.gov. For assistance with the Commission’s ‘‘eLibrary’’, the helpline can be reached at 1–866–208–3676, TTY (202) 502– 8659, or at FERCOnlineSupport@ ferc.gov. In addition, the FERC now offers a free service called eSubscription that allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. To register for this service, go to https://www.ferc.gov/ esubscribenow.htm. If applicable, public meetings or site visits associated with this proposed project will be posted on the Commission’s calendar which can be found online at https://www.ferc.gov/ EventCalendar/EventsList.aspx. Magalie R. Salas, Secretary. [FR Doc. E6–18138 Filed 10–27–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests sroberts on PROD1PC70 with NOTICES October 18, 2006. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of license to change project design and capacity. b. Project No: 11437–016. c. Date Filed: September 26, 2006. d. Applicant: Hydro Matrix Partnership, Ltd. e. Name of Project: Jordan Dam Hydroelectric Project. f. Location: The project is located at the U.S. Army Corps of Engineers’ Jordan Dam on the Haw River in Chatham County, North Carolina. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: James B. Price, Hydro Matrix Partnership, Ltd., P.O. Box 5550, Aiken, S.C. 29804. Tel: (803) 642–2749. Also, Mayo Hydropower, LLC, 5400 Downing Street, Dover, FL 33527. Tel: (813) 659–1007. VerDate Aug<31>2005 02:16 Oct 28, 2006 Jkt 211001 i. FERC Contact: Any questions on this notice should be addressed to Vedula Sarma at (202) 502–6190 or vedula.sarma@ferc.gov. j. Deadline for filing comments and/ or motions: November 17, 2006. k. Description of Filing: Hydro Matrix Partnership, Ltd. proposes to install two large turbines instead of currently authorized 80 small turbines and generators. The proposal would change the authorized installed capacity from 8 megawatts (MW) to 4 MW, and the Project’s hydraulic capacity would decrease from 2,320 cubic feet per second (cfs) to 1,200 cfs. l. Locations of Applications: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call toll-free 1–866–208– 3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 63309 filing refers. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. Magalie R. Salas, Secretary. [FR Doc. E6–18094 Filed 10–27–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12658–001] E.ON U.S. Hydro 1 LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests October 18, 2006. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License. b. Project No.: 12658–001. c. Date Filed: October 10, 2006. d. Applicant: E.ON U.S. Hydro 1 LLC. e. Name of Project: Meldahl Hydroelectric Project. f. Location: On the Ohio River, near the City of Augusta, Bracken County, Kentucky. The existing dam is owned and operated by the U.S. Army Corps of Engineers (Corps). The project would occupy approximately 16 acres of United States lands administered by the Corps. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Mr. Michael S. Beer, E.ON U.S. Hydro 1 LLC, 220 West E:\FR\FM\30OCN1.SGM 30OCN1

Agencies

[Federal Register Volume 71, Number 209 (Monday, October 30, 2006)]
[Notices]
[Page 63309]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-18094]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application for Amendment of License and Soliciting 
Comments, Motions To Intervene, and Protests

October 18, 2006.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Amendment of license to change project design 
and capacity.
    b. Project No: 11437-016.
    c. Date Filed: September 26, 2006.
    d. Applicant: Hydro Matrix Partnership, Ltd.
    e. Name of Project: Jordan Dam Hydroelectric Project.
    f. Location: The project is located at the U.S. Army Corps of 
Engineers' Jordan Dam on the Haw River in Chatham County, North 
Carolina.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: James B. Price, Hydro Matrix Partnership, 
Ltd., P.O. Box 5550, Aiken, S.C. 29804. Tel: (803) 642-2749. Also, Mayo 
Hydropower, LLC, 5400 Downing Street, Dover, FL 33527. Tel: (813) 659-
1007.
    i. FERC Contact: Any questions on this notice should be addressed 
to Vedula Sarma at (202) 502-6190 or vedula.sarma@ferc.gov.
    j. Deadline for filing comments and/or motions: November 17, 2006.
    k. Description of Filing: Hydro Matrix Partnership, Ltd. proposes 
to install two large turbines instead of currently authorized 80 small 
turbines and generators. The proposal would change the authorized 
installed capacity from 8 megawatts (MW) to 4 MW, and the Project's 
hydraulic capacity would decrease from 2,320 cubic feet per second 
(cfs) to 1,200 cfs.
    l. Locations of Applications: A copy of the application is 
available for inspection and reproduction at the Commission in the 
Public Reference Room, located at 888 First Street, NE., Room 2A, 
Washington, DC 20426, or by calling (202) 502-8371. This filing may 
also be viewed on the Commission's Web site at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. You may 
also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
call toll-free 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov. For 
TTY, call (202) 502-8659. A copy is also available for inspection and 
reproduction at the address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filings must 
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. All documents (original and eight copies) 
should be filed with: Magalie R. Salas, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A 
copy of any motion to intervene must also be served upon each 
representative of the Applicant specified in the particular 
application.
    p. Agency Comments: Federal, State, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.
    q. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site at https://www.ferc.gov 
under the ``e-Filing'' link.

Magalie R. Salas,
Secretary.
 [FR Doc. E6-18094 Filed 10-27-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.