Transcontinental Gas Pipe Line Corporation; Notice of Application for Abandonment, 62105-62106 [E6-17624]
Download as PDF
Federal Register / Vol. 71, No. 204 / Monday, October 23, 2006 / Notices
securities or assumptions of liability by
Pepperell Realty should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is November 15, 2006.
Absent a request to be heard in
opposition by the deadline above,
Pepperell Realty is authorized to issue
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of Pepperell Realty,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Pepperell Realty’s issuance
of securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17632 Filed 10–20–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on PROD1PC76 with NOTICES
[Docket Nos. ER06–1334–000; ER06–1334–
001]
Spindle Hill Energy LLC; Notice of
Issuance of Order
October 16, 2006.
Spindle Hill Energy LLC (Spindle
Hill) filed an application for marketbased rate authority, with an
VerDate Aug<31>2005
15:50 Oct 20, 2006
Jkt 211001
accompanying rate schedule. The
proposed market-based rate schedule
provides for the sale of energy, capacity
and ancillary services at market-based
rates. Spindle Hill also requested
waivers of various Commission
regulations. In particular, Spindle Hill
requested that the Commission grant
blanket approval under 18 CFR Part 34
of all future issuances of securities and
assumptions of liability by Spindle Hill.
On October 13, 2006, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
Spindle Hill should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is November 13, 2006.
Absent a request to be heard in
opposition by the deadline above,
Spindle Hill is authorized to issue
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of Spindle Hill, compatible
with the public interest, and is
reasonably necessary or appropriate for
such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Spindle Hill’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
62105
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17630 Filed 10–20–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–7–000]
Transcontinental Gas Pipe Line
Corporation; Notice of Application for
Abandonment
October 16, 2006.
Take notice that on October 11, 2006,
Transcontinental Gas Pipe Line
Corporation (Transco) tendered for
filing an application under section 7 of
the Natural Gas Act to abandon a
portion of the firm transportation
service provided to the City of Shelby,
North Carolina (Shelby) under Transco’s
Rate Schedule FT.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
E:\FR\FM\23OCN1.SGM
23OCN1
62106
Federal Register / Vol. 71, No. 204 / Monday, October 23, 2006 / Notices
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
November 7, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17624 Filed 10–20–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER06–1220–000]
USEG, LLP; Notice of Issuance of
Order
mstockstill on PROD1PC76 with NOTICES
October 16, 2006.
USEG, LLP (USEG) filed an
application for market-based rate
authority, with an accompanying rate
schedule. The proposed market-based
rate schedule provides for the sale of
energy, capacity and ancillary services
at market-based rates. USEG also
requested waivers of various
Commission regulations. In particular,
USEG requested that the Commission
grant blanket approval under 18 CFR
Part 34 of all future issuances of
securities and assumptions of liability
by USEG.
On July 28, 2006, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under Part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
USEG should file a motion to intervene
or protest with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is November 15, 2006.
Absent a request to be heard in
opposition by the deadline above, USEG
is authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
VerDate Aug<31>2005
15:50 Oct 20, 2006
Jkt 211001
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of USEG,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of USEG’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17628 Filed 10–20–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–461–000, ER06–461–
001]
Velocity Futures, L.P.; Notice of
Issuance of Order
October 16, 2006.
Velocity Futures, L.P. (Velocity) filed
an application for market-based rate
authority, with an accompanying rate
schedule. The proposed market-based
rate schedule provides for the sale of
energy and capacity at market-based
rates. Velocity also requested waivers of
various Commission regulations. In
particular, Velocity requested that the
Commission grant blanket approval
under 18 CFR part 34 of all future
issuances of securities and assumptions
of liability by Velocity.
On March 8, 2006, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
Velocity should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is November 15, 2006.
Absent a request to be heard in
opposition by the deadline above,
Velocity is authorized to issue securities
and assume obligations or liabilities as
a guarantor, indorser, surety, or
otherwise in respect of any security of
another person; provided that such
issuance or assumption is for some
lawful object within the corporate
purposes of Velocity, compatible with
the public interest, and is reasonably
necessary or appropriate for such
purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Velocity’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17633 Filed 10–20–06; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\23OCN1.SGM
23OCN1
Agencies
[Federal Register Volume 71, Number 204 (Monday, October 23, 2006)]
[Notices]
[Pages 62105-62106]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-17624]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP07-7-000]
Transcontinental Gas Pipe Line Corporation; Notice of Application
for Abandonment
October 16, 2006.
Take notice that on October 11, 2006, Transcontinental Gas Pipe
Line Corporation (Transco) tendered for filing an application under
section 7 of the Natural Gas Act to abandon a portion of the firm
transportation service provided to the City of Shelby, North Carolina
(Shelby) under Transco's Rate Schedule FT.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the date as indicated
below. Anyone filing an intervention or protest must serve a copy of
that document on the Applicant. Anyone filing an intervention or
protest on or before the intervention or protest date need not serve
motions to intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a
[[Page 62106]]
document is added to a subscribed docket(s). For assistance with any
FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time November 7, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6-17624 Filed 10-20-06; 8:45 am]
BILLING CODE 6717-01-P