Environmental Impact Statements and Regulations; Availability of EPA Comments, 61966-61967 [E6-17565]
Download as PDF
jlentini on PROD1PC65 with NOTICES
61966
Federal Register / Vol. 71, No. 203 / Friday, October 20, 2006 / Notices
Filed Date: October 6, 2006.
Accession Number: 20061013–0082.
Comment Date: 5 p.m. Eastern Time
on Friday, October 27, 2006.
Docket Numbers: ER07–34–000.
Applicants: Plains End II, LLC.
Description: Petition of Plains End III,
LLC for order accepting market-based
rate tariff for filing and granting waivers
and blanket approvals and request for
expedited action.
Filed Date: October 12, 2006.
Accession Number: 20061013–0081.
Comment Date: 5 p.m. Eastern Time
on Thursday, November 2, 2006.
Docket Numbers: ER96–1551–018.
Applicants: Public Service Company
of New Mexico.
Description: Public Service Company
of New Mexico submits a compliance
Electric Refund Report of Public Service
Company of New Mexico.
Filed Date: October 6, 2006.
Accession Number: 20061006–5052.
Comment Date: 5 p.m. Eastern Time
on Friday, October 27, 2006.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES07–1–000.
Applicants: Edison Sault Electric
Company.
Description: Edison Sault Electric Co
submits an application for authorization
to borrow under section 204 of the
Federal Power Act.
Filed Date: October 10, 2006.
Accession Number: 20061012–0099.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 24, 2006.
Take notice that the Commission
received the following foreign utility
company status filings:
Docket Numbers: FC07–1–000.
Applicants: Uskmouth Power
Limited.
Description: Uskmouth Power
Limited submits a Notice of Self
Certification.
Filed Date: October 3, 2006.
Accession Number: 20061003–5016.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 24, 2006.
Docket Numbers: FC07–2–000.
Applicants: Enel Latin America, LLC.
Description: Enel Latin America, LLC
submits a Self-Certification Of Foreign
Utility Company Status.
Filed Date: October 6, 2006.
Accession Number: 20061006–5064.
Comment Date: 5 p.m. Eastern Time
on Friday, October 27, 2006.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
VerDate Aug<31>2005
15:52 Oct 19, 2006
Jkt 211001
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17533 Filed 10–19–06; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6680–4]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 7, 2006 (71 FR 17845).
Draft EISs
EIS No. 20060278, ERP No. D–NOA–
A91074–00, North Atlantic Right
Whale Ship Strike Reduction Strategy,
To Implement the Operational
Measures to Reduce the Occurrence
and Severity of Vessel Collisions with
the Right Whale, Serious Injury and
Deaths Resulting from Collisions with
Vessels.
Summary: While EPA believes
Alternative 5 is the environmentally
preferred alternative, EPA does not
object to the proposed action.
Rating LO.
EIS No. 20060315, ERP No. D–AFS–
K65317–CA, Antelope-Pardee 500kV
Transmission Project, Construct,
Operate and Maintain a New 25.6mile 500kV Transmission Line, Rightof-Way Permit and Special Use
Authorization, Angeles National
Forest, Los Angeles County, CA.
Summary: EPA expressed
environmental concerns about potential
impacts to air quality, significant and
unavoidable cumulative impacts to
multiple resources and noise impacts on
sensitive receptors. The FEIS should
identify and commit to additional
mitigation measures for these impacts.
Rating EC2.
EIS No. 20060343, ERP No. D–WPA–
J08027–SD, White Wind Farm Project,
Construct a Large Utility-Scale WindPowered Electric Energy Generating
Facility, Sherman Township,
Brookings County, SD.
Summary: While EPA does not object
to the proposed action, clarification of
mitigation that could be implemented to
reduce bird/bat mortality in the project
area is requested.
Rating LO.
EIS No. 20060338, ERP No. DS–FHW–
J40135–MT, U.S. 93 Highway
E:\FR\FM\20OCN1.SGM
20OCN1
Federal Register / Vol. 71, No. 203 / Friday, October 20, 2006 / Notices
Ninepipe/Ronan Improvement
Project, from Dublin Gulch Road/Red
Horn Road, Funding, Special-UsePermit, NPDES Permit and U.S. Army
COE Section 404 Permit, Lake County,
MT.
Summary: EPA expressed
environmental concerns about impacts
to wetlands and aquatic habitat, as well
as impacts to wildlife and wildlife
movement, including the threatened
grizzly bear. EPA requested additional
information and mitigation on these
issues.
Rating EC2.
Final EISs
EIS No. 20060377, ERP No. F–FRC–
L05235–WA, Baker River
Hydroelectric Project, Application to
Relicense the Upper Baker and Lower
Baker Developments, Mt. BakerSnoqualmie National Forest, Baker
River, Whatcom and Skagit Counties,
WA.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: October 17, 2006.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E6–17565 Filed 10–19–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6680–3]
jlentini on PROD1PC65 with NOTICES
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental
Impact Statements filed 10/9/2006
through 10/13/2006 pursuant to 40 CFR
1506.9.
EIS No. 20060418, Draft EIS, FHW, WA,
East Lake Sammamish Master Plan
Trail, Design and Construct an
Alternative Non-Motorized
Transportation and Multi-Use
Recreational Trail, Funding and U.S.
Army COE Section 404 Permit, King
County, WA, Comment Period Ends:
12/19/2006, Contact: James Leonard
360–753–9408.
EIS No. 20060419, Final EIS, NPS, KY,
Abraham Lincoln Birthplace National
Historic Site, General Management
Plan, Implementation, LaRue County,
KY, Wait Period Ends: 11/20/2006,
Contact: Amy Wirsching, 404–562–
3124.
VerDate Aug<31>2005
15:52 Oct 19, 2006
Jkt 211001
EIS No. 20060420, Draft Supplement,
AFS, IN, German Ridge Restoration
Project, New Information on 2006
Land and Resource Management Plan
and on the Inadequate Effects
Analysis, Implementation, Hoosier
National Forest, Tell City Ranger
District, Perry County, IN, Comment
Period Ends: 12/04/2006, Contact:
Ron Ellis, 812–276–4733.
EIS No. 20060421, Final EIS, AFS, OR,
Blue Mountain Land Exchange—
Oregon Project, Proposed Exchange of
Federal and Non-Federal Lands,
Malheur, Umatilla, and WallowaWhitman National Forests, Baker,
Grant, Morrow, Umatilla, Union and
Wallowa Counties, OR, Wait Period
Ends: 11/20/2006, Contact: Alicia
Glassford, 541–426–5689.
EIS No. 20060422, Final EIS, FHW, LA,
I–49 South Wax Lake Outlet to
Berwick Route US–90, Transportation
Improvements, Funding and Right-ofWay Acquisition, St. Mary Parish, LA,
Wait Period Ends: 11/27/2006,
Contact: William C. Farr 225–757–
7615.
EIS No. 20060423, Draft EIS, MMS, AK,
Chukchi Sea Planning Area Oil and
Gas Lease Sale 193 and Seismic
Surveying Activities, Offshore Marine
Environment, Chukchi Sea Coastal
Plain, and the North Slope Borough of
Alaska, Comment Period Ends: 12/26/
2006, Contact: Harry Luton, 703–787–
1690.
EIS No. 20060424, Final Supplement,
FRC, 00, Northeast (NE)–07 Project,
Construction and Operation of
Natural Gas Pipeline Facilities,
Millennium Pipeline Project–Phase I,
U.S. Army COE Section 10 and 404
Permits, several counties, NY, Morris
County, NJ and Fairfield and New
Haven Counties, CT, Wait Period
Ends: 11/20/2006, Contact: McLane
Layton, 1–866–208–3372.
EIS No. 20060425, Final EIS, AFS, CA,
Kings River Project, Proposal to
Restore Historical Pre-1850 Forest
Conditions, Implementation, High
Sierra Ranger District, Sierra National
Forest, Fresno County, CA, Wait
Period Ends: 11/20/2006, Contact: Ray
Porter 559–855–5355.
EIS No. 20060426, Final EIS, AFS, 00,
North Zone Range 05 Project,
Reauthorizing Livestock Grazing on
Eight Existing Allotments, Black Hill
National Forest, Bearlodge and
Northern Hills Ranger Districts, Crook
County, WY and Lawrence County,
SD, Wait Period Ends: 11/20/2006,
Contact: Alice Allen, 605–673–4853.
EIS No. 20060427, Draft EIS, BLM, NM,
Special Status Species Resource
Management Plan Amendment,
Managing Public Land and Federal
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
61967
Minerals in Portions of Chaves, Eddy,
Lea and Roosevelt Counties, NM,
Comment Period Ends: 1/8/2007,
Contact: Howard Parman, 505–627–
0212.
EIS No. 20060428, Final Supplement,
STB, MT, Tongue River III Western
Alignment Construction and
Operation, Alternative Route for the
southernmost portion of the 41-mile
Ashland to Decker Rail Line, U.S.
Army COE Section 404 Permit,
Rosebud and Bighorn Counties, MT,
Wait Period Ends: 11/20/2006,
Contact: Kenneth Blodgett, 202–565–
1554.
EIS No. 20060429, Final EIS, UAF, NM,
New Mexico Training Initiative,
Proposal to Modify the Training
Airspace New Cannon Air Force Base
(AFB), NM, Wait Period Ends: 11/20/
2006, Contact: Jack C. Bush, 703–604–
5264.
EIS No. 20060430, Draft EIS, BLM, WY,
Eagle Butte West Coal Lease
Application, Issuance of Lease for a
Tract of Federal Coal, Wyoming
Powder River Basin, Campbell
County, WY, Comment Period Ends:
12/18/2006, Contact: Nancy Doelger,
307–261–7627.
EIS No. 20060431, Draft EIS, COE, NC,
PCS Phosphate Mine Continuation,
Proposes Continue Mining of the
Phosphate Reserve in an
Economically Viable Fashion,
Beaufort County, NC, Comment
Period Ends: 12/6/2006, Contact: Tom
Walker, 838–271–7980 Ext 222.
EIS No. 20060432, Final EIS, NRC, MI,
GENERIC—License Renewal of
Nuclear Plants, Supplement 27 to
NUREG–1437, Regarding Palisade
Nuclear Plant (TAC NO. MC6434),
Located in Covert Township, Van
Buren County, MI, Wait Period Ends:
11/20/2006, Contact: Bo M. Pham,
301–415–8450.
EIS No. 20060433, Final EIS, NOA, 00,
Pacific Coast Groundfish Fishery
Management Plan, Proposed
Acceptable Biological Catch and
Optimum Yield Specifications and
Management Measures for the 2007–
2008 Pacific Coast Groundfish Fishery
and Amendment 16–4 Rebuilding
Plans for Seven Depleted Pacific Coast
Groundfish Species, WA, OR and CA,
Wait Period Ends: 11/20/2006,
Contact: Robert Lohn, 206–526–6150.
EIS No. 20060434, Draft Supplement,
AFS, AK, Kenai Winter Access
Project, Updated Information on New
Alternative, Develop a Winter Access
Management Plan for 2006/2007
Winter Season, Implementation,
Seward Ranger District, Chugach
National Forest, Located on the Kenai
Peninsula in Southcentral, AK,
E:\FR\FM\20OCN1.SGM
20OCN1
Agencies
[Federal Register Volume 71, Number 203 (Friday, October 20, 2006)]
[Notices]
[Pages 61966-61967]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-17565]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6680-4]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 7, 2006 (71 FR 17845).
Draft EISs
EIS No. 20060278, ERP No. D-NOA-A91074-00, North Atlantic Right Whale
Ship Strike Reduction Strategy, To Implement the Operational Measures
to Reduce the Occurrence and Severity of Vessel Collisions with the
Right Whale, Serious Injury and Deaths Resulting from Collisions with
Vessels.
Summary: While EPA believes Alternative 5 is the environmentally
preferred alternative, EPA does not object to the proposed action.
Rating LO.
EIS No. 20060315, ERP No. D-AFS-K65317-CA, Antelope-Pardee 500kV
Transmission Project, Construct, Operate and Maintain a New 25.6-mile
500kV Transmission Line, Right-of-Way Permit and Special Use
Authorization, Angeles National Forest, Los Angeles County, CA.
Summary: EPA expressed environmental concerns about potential
impacts to air quality, significant and unavoidable cumulative impacts
to multiple resources and noise impacts on sensitive receptors. The
FEIS should identify and commit to additional mitigation measures for
these impacts.
Rating EC2.
EIS No. 20060343, ERP No. D-WPA-J08027-SD, White Wind Farm Project,
Construct a Large Utility-Scale Wind-Powered Electric Energy Generating
Facility, Sherman Township, Brookings County, SD.
Summary: While EPA does not object to the proposed action,
clarification of mitigation that could be implemented to reduce bird/
bat mortality in the project area is requested.
Rating LO.
EIS No. 20060338, ERP No. DS-FHW-J40135-MT, U.S. 93 Highway
[[Page 61967]]
Ninepipe/Ronan Improvement Project, from Dublin Gulch Road/Red Horn
Road, Funding, Special-Use-Permit, NPDES Permit and U.S. Army COE
Section 404 Permit, Lake County, MT.
Summary: EPA expressed environmental concerns about impacts to
wetlands and aquatic habitat, as well as impacts to wildlife and
wildlife movement, including the threatened grizzly bear. EPA requested
additional information and mitigation on these issues.
Rating EC2.
Final EISs
EIS No. 20060377, ERP No. F-FRC-L05235-WA, Baker River Hydroelectric
Project, Application to Relicense the Upper Baker and Lower Baker
Developments, Mt. Baker-Snoqualmie National Forest, Baker River,
Whatcom and Skagit Counties, WA.
Summary: No formal comment letter was sent to the preparing agency.
Dated: October 17, 2006.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E6-17565 Filed 10-19-06; 8:45 am]
BILLING CODE 6560-50-P