Evergreen Windpower, LLC; Notice of Issuance of Order, 61744-61745 [E6-17492]
Download as PDF
61744
Federal Register / Vol. 71, No. 202 / Thursday, October 19, 2006 / Notices
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 17, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17466 Filed 10–18–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E6–17487 Filed 10–18–06; 8:45 am]
[Docket No. RP07–18–000]
BILLING CODE 6717–01–P
Eastern Shore Natural Gas Company;
Notice of Proposed Changes in FERC
Gas Tariff
DEPARTMENT OF ENERGY
October 13, 2006.
Federal Energy Regulatory
Commission
Take notice that on October 10, 2006
Eastern Shore Natural Gas Company
(Eastern Shore) tendered for filing
revised tariff sheets, proposed to be
effective October 1, 2006:
cprice-sewell on PROD1PC66 with NOTICES
Sixty-First Revised Sheet No. 7.
Sixty-First Revised Sheet No. 8.
14:50 Oct 18, 2006
ECP Energy, LLC; Notice of Issuance
of Order
October 13, 2006.
Eastern Shore states that copies of its
filing have been mailed to its customers
and interested state commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
VerDate Aug<31>2005
[Docket Nos. ER06–1118–000; ER06–1118–
001; and ER06–1118–002]
Jkt 211001
ECP Energy, LLC (ECP Energy) filed
an application for market-based rate
authority, with an accompanying tariff.
The proposed market-based rate tariff
provides for the sale of energy, capacity
and ancillary services at market-based
rates. ECP Energy also requested
waivers of various Commission
regulations. In particular, ECP Energy
requested that the Commission grant
blanket approval under 18 CFR part 34
of all future issuances of securities and
assumptions of liability by ECP Energy.
On September 7, 2006, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under Part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
ECP Energy should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is November 13, 2006.
Absent a request to be heard in
opposition by the deadline above, ECP
Energy is authorized to issue securities
and assume obligations or liabilities as
a guarantor, indorser, surety, or
otherwise in respect of any security of
another person; provided that such
issuance or assumption is for some
lawful object within the corporate
purposes of ECP Energy, compatible
with the public interest, and is
reasonably necessary or appropriate for
such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of ECP Energy’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17476 Filed 10–18–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–1355–000; ER06–1355–
001]
Evergreen Windpower, LLC; Notice of
Issuance of Order
October 13, 2006.
Evergreen Windpower, LLC
(Evergreen) filed an application for
market-based rate authority, with an
accompanying tariff. The proposed
market-based rate tariff provides for the
sale of energy and capacity at marketbased rates. Evergreen also requested
waivers of various Commission
regulations. In particular, Evergreen
requested that the Commission grant
E:\FR\FM\19OCN1.SGM
19OCN1
cprice-sewell on PROD1PC66 with NOTICES
Federal Register / Vol. 71, No. 202 / Thursday, October 19, 2006 / Notices
blanket approval under 18 CFR part 34
of all future issuances of securities and
assumptions of liability by Evergreen.
On September 19, 2006, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
Evergreen should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is November 13, 2006.
Absent a request to be heard in
opposition by the deadline above,
Evergreen is authorized to issue
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of Evergreen, compatible with
the public interest, and is reasonably
necessary or appropriate for such
purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Evergreen’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17492 Filed 10–18–06; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
14:50 Oct 18, 2006
Jkt 211001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–1223–000; ER06–1223–
001]
Fairchild Energy, LLC; Notice of
Issuance of Order
October 13, 2006.
Fairchild Energy, LLC (Fairchild) filed
an application for market-based rate
authority, with an accompanying tariff.
The proposed market-based rate tariff
provides for the sale of energy and
capacity at market-based rates. Fairchild
also requested waivers of various
Commission regulations. In particular,
Fairchild requested that the
Commission grant blanket approval
under 18 CFR part 34 of all future
issuances of securities and assumptions
of liability by Fairchild.
On September 7, 2006, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
Fairchild should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is November 13, 2006.
Absent a request to be heard in
opposition by the deadline above,
Fairchild is authorized to issue
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of Fairchild, compatible with
the public interest, and is reasonably
necessary or appropriate for such
purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Fairchild’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
61745
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17483 Filed 10–18–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–1261–000, ER06–1261–
001]
FPL Energy Mower County, LLC;
Notice of Issuance of Order
October 13, 2006.
FPL Energy Mower County, LLC (FPL
Mower) filed an application for marketbased rate authority, with an
accompanying rate schedule. The
proposed market-based rate schedule
provides for the sale of energy, capacity
and ancillary services at market-based
rates. FPL Mower also requested
waivers of various Commission
regulations. In particular, FPL Mower
requested that the Commission grant
blanket approval under 18 CFR Part 34
of all future issuances of securities and
assumptions of liability by FPL Mower.
On September 21, 2006, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under Part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
FPL Mower should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
E:\FR\FM\19OCN1.SGM
19OCN1
Agencies
[Federal Register Volume 71, Number 202 (Thursday, October 19, 2006)]
[Notices]
[Pages 61744-61745]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-17492]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER06-1355-000; ER06-1355-001]
Evergreen Windpower, LLC; Notice of Issuance of Order
October 13, 2006.
Evergreen Windpower, LLC (Evergreen) filed an application for
market-based rate authority, with an accompanying tariff. The proposed
market-based rate tariff provides for the sale of energy and capacity
at market-based rates. Evergreen also requested waivers of various
Commission regulations. In particular, Evergreen requested that the
Commission grant
[[Page 61745]]
blanket approval under 18 CFR part 34 of all future issuances of
securities and assumptions of liability by Evergreen.
On September 19, 2006, pursuant to delegated authority, the
Director, Division of Tariffs and Market Development--West, granted the
requests for blanket approval under part 34. The Director's order also
stated that the Commission would publish a separate notice in the
Federal Register establishing a period of time for the filing of
protests. Accordingly, any person desiring to be heard or to protest
the blanket approvals of issuances of securities or assumptions of
liability by Evergreen should file a motion to intervene or protest
with the Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the deadline for filing motions to
intervene or protest is November 13, 2006.
Absent a request to be heard in opposition by the deadline above,
Evergreen is authorized to issue securities and assume obligations or
liabilities as a guarantor, indorser, surety, or otherwise in respect
of any security of another person; provided that such issuance or
assumption is for some lawful object within the corporate purposes of
Evergreen, compatible with the public interest, and is reasonably
necessary or appropriate for such purposes.
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approvals of Evergreen's issuance of securities or
assumptions of liability.
Copies of the full text of the Director's Order are available from
the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426. The Order may also be viewed on the Commission's
Web site at https://www.ferc.gov, using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
filed to access the document. Comments, protests, and interventions may
be filed electronically via the Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6-17492 Filed 10-18-06; 8:45 am]
BILLING CODE 6717-01-P