Dominion Transmission, Inc.; Notice of Compliance Filing, 61743-61744 [E6-17466]

Download as PDF Federal Register / Vol. 71, No. 202 / Thursday, October 19, 2006 / Notices authorization pursuant to Section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Magalie R. Salas, Secretary. [FR Doc. E6–17470 Filed 10–18–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP06–469–000] Dominion Cove Point LNG, LP; Notice of Application cprice-sewell on PROD1PC66 with NOTICES October 13, 2006. Take notice that on September 29, 2006, as supplemented on October 10, 2006, Dominion Cove Point LNG, LP (Cove Point LNG) filed an application in Docket No. CP06–469–000, pursuant to section 3 of the Natural Gas Act (NGA), for authority to construct, install, own, operate and maintain certain facilities at the Cove Point LNG import terminal at Cove Point, Maryland (Post Expansion Send-out Project). The details of this proposal are more fully set forth in the application that is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY (202) 502–8659. Any questions regarding this application should be directed to Anne E. Bomar, Vice President, Federal Regulations, Dominion Resources, Inc., 120 Tredegar Street, Richmond, Virginia 23219, or by phone at (804) 819–2134. Cove Point LNG says that the Post Expansion Send-out Project is designed to add three spare LNG send-out pumps, two auxiliary heaters to be used as an alternate heating source for existing waste heat vaporizers, and related electrical infrastructure improvements at the Dominion Cove Point LNG import terminal located in Calvert County, Maryland. The proposed facilities will also enhance the reliability of service at the LNG terminal for the Rate Schedule VerDate Aug<31>2005 14:50 Oct 18, 2006 Jkt 211001 LTD–1 customers (those who import LNG) under the Incremental Sendout Quantity (ISQ) provisions of Rate Schedule LTD–1, as shown in Exhibit P of the application. These LNG terminal facility improvements are expected to cost more than $21 million, however Cove Point LNG says that its proposed changes to the ISQ service in Rate Schedule LTD–1 does not create a subsidy, nor will it degrade service to existing customers or result in undue discrimination. Cove Point LNG requests that the Commission grant the requested authorization at the earliest practicable date, in order to ensure an in-service date of August 2008. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. Persons who wish to comment only on the environmental review of this project, or in support of or in opposition to this project, should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the applicant. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 61743 to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Comment Date: 5 p.m. Eastern Time on November 3, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–17471 Filed 10–18–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP04–365–004] Dominion Transmission, Inc.; Notice of Compliance Filing October 12, 2006. Take notice that on September 28, 2006, Dominion Transmission, Inc. (DTI) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, Sixth Revised Sheet No. 36 and Second Revised Sheet No. 36A, to become effective November 1, 2006. DTI states that the filing is being made in compliance with the Commission’s order issued on October 20, 2005, requiring DTI to change the proposed incremental transportation rate as the initial rate for service under Rate Schedule FTGSS. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before the date as indicated below. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public E:\FR\FM\19OCN1.SGM 19OCN1 61744 Federal Register / Vol. 71, No. 202 / Thursday, October 19, 2006 / Notices Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on October 17, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–17466 Filed 10–18–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E6–17487 Filed 10–18–06; 8:45 am] [Docket No. RP07–18–000] BILLING CODE 6717–01–P Eastern Shore Natural Gas Company; Notice of Proposed Changes in FERC Gas Tariff DEPARTMENT OF ENERGY October 13, 2006. Federal Energy Regulatory Commission Take notice that on October 10, 2006 Eastern Shore Natural Gas Company (Eastern Shore) tendered for filing revised tariff sheets, proposed to be effective October 1, 2006: cprice-sewell on PROD1PC66 with NOTICES Sixty-First Revised Sheet No. 7. Sixty-First Revised Sheet No. 8. 14:50 Oct 18, 2006 ECP Energy, LLC; Notice of Issuance of Order October 13, 2006. Eastern Shore states that copies of its filing have been mailed to its customers and interested state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically VerDate Aug<31>2005 [Docket Nos. ER06–1118–000; ER06–1118– 001; and ER06–1118–002] Jkt 211001 ECP Energy, LLC (ECP Energy) filed an application for market-based rate authority, with an accompanying tariff. The proposed market-based rate tariff provides for the sale of energy, capacity and ancillary services at market-based rates. ECP Energy also requested waivers of various Commission regulations. In particular, ECP Energy requested that the Commission grant blanket approval under 18 CFR part 34 of all future issuances of securities and assumptions of liability by ECP Energy. On September 7, 2006, pursuant to delegated authority, the Director, Division of Tariffs and Market Development—West, granted the requests for blanket approval under Part 34. The Director’s order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard or to protest the blanket approvals of issuances of securities or assumptions of liability by ECP Energy should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing motions to intervene or protest is November 13, 2006. Absent a request to be heard in opposition by the deadline above, ECP Energy is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of ECP Energy, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of ECP Energy’s issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Magalie R. Salas, Secretary. [FR Doc. E6–17476 Filed 10–18–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER06–1355–000; ER06–1355– 001] Evergreen Windpower, LLC; Notice of Issuance of Order October 13, 2006. Evergreen Windpower, LLC (Evergreen) filed an application for market-based rate authority, with an accompanying tariff. The proposed market-based rate tariff provides for the sale of energy and capacity at marketbased rates. Evergreen also requested waivers of various Commission regulations. In particular, Evergreen requested that the Commission grant E:\FR\FM\19OCN1.SGM 19OCN1

Agencies

[Federal Register Volume 71, Number 202 (Thursday, October 19, 2006)]
[Notices]
[Pages 61743-61744]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-17466]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP04-365-004]


Dominion Transmission, Inc.; Notice of Compliance Filing

October 12, 2006.
    Take notice that on September 28, 2006, Dominion Transmission, Inc. 
(DTI) tendered for filing as part of its FERC Gas Tariff, Third Revised 
Volume No. 1, Sixth Revised Sheet No. 36 and Second Revised Sheet No. 
36A, to become effective November 1, 2006.
    DTI states that the filing is being made in compliance with the 
Commission's order issued on October 20, 2005, requiring DTI to change 
the proposed incremental transportation rate as the initial rate for 
service under Rate Schedule FTGSS.
    Any person desiring to protest this filing must file in accordance 
with Rule 211 of the Commission's Rules of Practice and Procedure (18 
CFR 385.211). Protests to this filing will be considered by the 
Commission in determining the appropriate action to be taken, but will 
not serve to make protestants parties to the proceeding. Such protests 
must be filed on or before the date as indicated below. Anyone filing a 
protest must serve a copy of that document on all the parties to the 
proceeding.
    The Commission encourages electronic submission of protests in lieu 
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons 
unable to file electronically should submit an original and 14 copies 
of the protest to the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public

[[Page 61744]]

Reference Room in Washington, DC. There is an ``eSubscription'' link on 
the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed docket(s). For assistance with 
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or 
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on October 17, 2006.

Magalie R. Salas,
Secretary.
 [FR Doc. E6-17466 Filed 10-18-06; 8:45 am]
BILLING CODE 6717-01-P