Dominion Transmission, Inc.; Notice of Compliance Filing, 61743-61744 [E6-17466]
Download as PDF
Federal Register / Vol. 71, No. 202 / Thursday, October 19, 2006 / Notices
authorization pursuant to Section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17470 Filed 10–18–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–469–000]
Dominion Cove Point LNG, LP; Notice
of Application
cprice-sewell on PROD1PC66 with NOTICES
October 13, 2006.
Take notice that on September 29,
2006, as supplemented on October 10,
2006, Dominion Cove Point LNG, LP
(Cove Point LNG) filed an application in
Docket No. CP06–469–000, pursuant to
section 3 of the Natural Gas Act (NGA),
for authority to construct, install, own,
operate and maintain certain facilities at
the Cove Point LNG import terminal at
Cove Point, Maryland (Post Expansion
Send-out Project). The details of this
proposal are more fully set forth in the
application that is on file with the
Commission and open to public
inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY (202)
502–8659.
Any questions regarding this
application should be directed to Anne
E. Bomar, Vice President, Federal
Regulations, Dominion Resources, Inc.,
120 Tredegar Street, Richmond, Virginia
23219, or by phone at (804) 819–2134.
Cove Point LNG says that the Post
Expansion Send-out Project is designed
to add three spare LNG send-out pumps,
two auxiliary heaters to be used as an
alternate heating source for existing
waste heat vaporizers, and related
electrical infrastructure improvements
at the Dominion Cove Point LNG import
terminal located in Calvert County,
Maryland. The proposed facilities will
also enhance the reliability of service at
the LNG terminal for the Rate Schedule
VerDate Aug<31>2005
14:50 Oct 18, 2006
Jkt 211001
LTD–1 customers (those who import
LNG) under the Incremental Sendout
Quantity (ISQ) provisions of Rate
Schedule LTD–1, as shown in Exhibit P
of the application. These LNG terminal
facility improvements are expected to
cost more than $21 million, however
Cove Point LNG says that its proposed
changes to the ISQ service in Rate
Schedule LTD–1 does not create a
subsidy, nor will it degrade service to
existing customers or result in undue
discrimination. Cove Point LNG
requests that the Commission grant the
requested authorization at the earliest
practicable date, in order to ensure an
in-service date of August 2008.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date,
file with the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, a motion to
intervene in accordance with the
requirements of the Commission’s Rules
of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
Persons who wish to comment only
on the environmental review of this
project, or in support of or in opposition
to this project, should submit an
original and two copies of their
comments to the Secretary of the
Commission. Environmental
commentors will be placed on the
Commission’s environmental mailing
list, will receive copies of the
environmental documents, and will be
notified of meetings associated with the
Commission’s environmental review
process. Environmental commentors
will not be required to serve copies of
filed documents on all other parties.
The Commission’s rules require that
persons filing comments in opposition
to the project provide copies of their
protests only to the applicant. However,
the non-party commentors will not
receive copies of all documents filed by
other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
61743
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Comment Date: 5 p.m. Eastern Time
on November 3, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17471 Filed 10–18–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP04–365–004]
Dominion Transmission, Inc.; Notice of
Compliance Filing
October 12, 2006.
Take notice that on September 28,
2006, Dominion Transmission, Inc.
(DTI) tendered for filing as part of its
FERC Gas Tariff, Third Revised Volume
No. 1, Sixth Revised Sheet No. 36 and
Second Revised Sheet No. 36A, to
become effective November 1, 2006.
DTI states that the filing is being made
in compliance with the Commission’s
order issued on October 20, 2005,
requiring DTI to change the proposed
incremental transportation rate as the
initial rate for service under Rate
Schedule FTGSS.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
the date as indicated below. Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
E:\FR\FM\19OCN1.SGM
19OCN1
61744
Federal Register / Vol. 71, No. 202 / Thursday, October 19, 2006 / Notices
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 17, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17466 Filed 10–18–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E6–17487 Filed 10–18–06; 8:45 am]
[Docket No. RP07–18–000]
BILLING CODE 6717–01–P
Eastern Shore Natural Gas Company;
Notice of Proposed Changes in FERC
Gas Tariff
DEPARTMENT OF ENERGY
October 13, 2006.
Federal Energy Regulatory
Commission
Take notice that on October 10, 2006
Eastern Shore Natural Gas Company
(Eastern Shore) tendered for filing
revised tariff sheets, proposed to be
effective October 1, 2006:
cprice-sewell on PROD1PC66 with NOTICES
Sixty-First Revised Sheet No. 7.
Sixty-First Revised Sheet No. 8.
14:50 Oct 18, 2006
ECP Energy, LLC; Notice of Issuance
of Order
October 13, 2006.
Eastern Shore states that copies of its
filing have been mailed to its customers
and interested state commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
VerDate Aug<31>2005
[Docket Nos. ER06–1118–000; ER06–1118–
001; and ER06–1118–002]
Jkt 211001
ECP Energy, LLC (ECP Energy) filed
an application for market-based rate
authority, with an accompanying tariff.
The proposed market-based rate tariff
provides for the sale of energy, capacity
and ancillary services at market-based
rates. ECP Energy also requested
waivers of various Commission
regulations. In particular, ECP Energy
requested that the Commission grant
blanket approval under 18 CFR part 34
of all future issuances of securities and
assumptions of liability by ECP Energy.
On September 7, 2006, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under Part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
ECP Energy should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is November 13, 2006.
Absent a request to be heard in
opposition by the deadline above, ECP
Energy is authorized to issue securities
and assume obligations or liabilities as
a guarantor, indorser, surety, or
otherwise in respect of any security of
another person; provided that such
issuance or assumption is for some
lawful object within the corporate
purposes of ECP Energy, compatible
with the public interest, and is
reasonably necessary or appropriate for
such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of ECP Energy’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–17476 Filed 10–18–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–1355–000; ER06–1355–
001]
Evergreen Windpower, LLC; Notice of
Issuance of Order
October 13, 2006.
Evergreen Windpower, LLC
(Evergreen) filed an application for
market-based rate authority, with an
accompanying tariff. The proposed
market-based rate tariff provides for the
sale of energy and capacity at marketbased rates. Evergreen also requested
waivers of various Commission
regulations. In particular, Evergreen
requested that the Commission grant
E:\FR\FM\19OCN1.SGM
19OCN1
Agencies
[Federal Register Volume 71, Number 202 (Thursday, October 19, 2006)]
[Notices]
[Pages 61743-61744]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-17466]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP04-365-004]
Dominion Transmission, Inc.; Notice of Compliance Filing
October 12, 2006.
Take notice that on September 28, 2006, Dominion Transmission, Inc.
(DTI) tendered for filing as part of its FERC Gas Tariff, Third Revised
Volume No. 1, Sixth Revised Sheet No. 36 and Second Revised Sheet No.
36A, to become effective November 1, 2006.
DTI states that the filing is being made in compliance with the
Commission's order issued on October 20, 2005, requiring DTI to change
the proposed incremental transportation rate as the initial rate for
service under Rate Schedule FTGSS.
Any person desiring to protest this filing must file in accordance
with Rule 211 of the Commission's Rules of Practice and Procedure (18
CFR 385.211). Protests to this filing will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Such protests
must be filed on or before the date as indicated below. Anyone filing a
protest must serve a copy of that document on all the parties to the
proceeding.
The Commission encourages electronic submission of protests in lieu
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons
unable to file electronically should submit an original and 14 copies
of the protest to the Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public
[[Page 61744]]
Reference Room in Washington, DC. There is an ``eSubscription'' link on
the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on October 17, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6-17466 Filed 10-18-06; 8:45 am]
BILLING CODE 6717-01-P