Drawbridge Operation Regulations; Mill Neck Creek, Oyster Bay, NY, 61410 [E6-17385]

Download as PDF 61410 Federal Register / Vol. 71, No. 201 / Wednesday, October 18, 2006 / Rules and Regulations This deviation from the operating regulations is authorized under 33 CFR 117.35. remain in the closed position for six weekends from October 13, 2006 through November 20, 2006. This deviation is necessary to facilitate scheduled bridge maintenance. This deviation is effective from October 13, 2006 through November 20, 2006. DATES: Materials referred to in this document are available for inspection or copying at the First Coast Guard District, Bridge Branch Office, One South Street, New York, New York 10004, between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays. The telephone number is (212) 668–7165. The First Coast Guard District Bridge Branch Office maintains the public docket for this temporary deviation. ADDRESSES: Joe Arca, Project Officer, First Coast Guard District, at (212) 668–7165. FOR FURTHER INFORMATION CONTACT: The Amtrak Dock Bridge across the Passaic River at mile 5.0, at Harrison, New Jersey, has a vertical clearance in the closed position of 13 feet at mean high water and 20 feet at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.739(e). The owner of the Dock Bridge is the National Railroad Passenger Corporation (Amtrak). The bridge operator, the Port Authority Trans Hudson Corporation (PATH), requested a temporary deviation to facilitate scheduled bridge maintenance, replacement of the miter joints. The bridge will not be able to open while the bridge maintenance is underway. Under this temporary deviation, the Amtrak Dock Bridge may remain in the closed position for six weekends from October 13, 2006 through November 20, 2006. The weekend bridge closures shall begin each week at 11 p.m. on Friday and continue through 5 a.m. on Monday. In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible. Should the bridge maintenance authorized by this temporary deviation be completed before the end of the effective period published in this notice, the Coast Guard will rescind the remainder of this temporary deviation, and the bridge shall be returned to its normal operating schedule. Notice of the above action shall be provided to the public in the Local Notice to Mariners and the Federal Register, where practicable. hsrobinson on PROD1PC76 with RULES SUPPLEMENTARY INFORMATION: VerDate Aug<31>2005 15:59 Oct 17, 2006 Jkt 211001 Dated: October 10, 2006. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. E6–17390 Filed 10–17–06; 8:45 am] BILLING CODE 4910–15–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [CGD01–06–104] Drawbridge Operation Regulations; Mill Neck Creek, Oyster Bay, NY Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Bayville Bridge, across Mill Neck Creek, mile 0.1, at Oyster Bay, New York. This deviation, allows the bridge owner to open only one of the two moveable bascule spans for the passage of vessel traffic from October 28, 2006 through November 20, 2006. This deviation is necessary to facilitate scheduled bridge maintenance. DATES: This deviation is effective from October 28, 2006 through November 20, 2006. ADDRESSES: Materials referred to in this document are available for inspection or copying at the First Coast Guard District, Bridge Branch Office, One South Street, New York, New York, 10004, between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays. The telephone number is (212) 668–7165. The First Coast Guard District Bridge Branch Office maintains the public docket for this temporary deviation. FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First Coast Guard District, at (212) 668–7165. SUPPLEMENTARY INFORMATION: The Bayville Bridge, across Mill Neck Creek, mile 0.1, at Oyster Bay, New York, has a vertical clearance in the closed position of 9 feet at mean high water and 16 feet at mean low water. The existing regulation requires the bridge to open on demand. The owner of the bridge, County of Nassau, Department of Public Works, requested a temporary deviation to facilitate scheduled structural bridge PO 00000 Frm 00038 Fmt 4700 Sfmt 4700 repairs, rehabilitation of the two bascule spans. In order to perform the structural repairs, the bascule span undergoing work must remain in the closed position. Therefore, under this temporary deviation the Bayville Bridge across Mill Neck Creek, mile 0.1, at Oyster Bay, New York, shall open only one of the two movable spans for the passage of vessel traffic from October 28, 2006 through November 20, 2006. In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to normal operation as soon as possible. Should the bridge maintenance authorized by this temporary deviation be completed before the end of the effective period published in this notice, the Coast Guard will rescind the remainder of this temporary deviation, and the bridge shall be returned to its normal operating schedule. Notice of the above action shall be provided to the public in the Local Notice to Mariners and the Federal Register, where practicable. This deviation from the operating regulations is authorized under 33 CFR 117.35(b). Dated: October 3, 2006. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. E6–17385 Filed 10–17–06; 8:45 am] BILLING CODE 4910–15–P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 180 [EPA–HQ–OPP–2006–0792; FRL–8098–5] Flumioxazin; Pesticide Tolerances for Emergency Exemptions Environmental Protection Agency (EPA). ACTION: Final rule. AGENCY: SUMMARY: This regulation establishes a time-limited tolerance for residues of flumioxazin, 2-[7-fluoro-3,4-dihydro-3oxo-4-(2-propynyl)-2H-1,4-benzoxazin6-yl]-4,5,6,7-tetrahydro-1H-isoindole1,3(2H)-dione in or on alfalfa forage and alfalfa hay. This action is in response to EPA’s granting of an emergency exemption under section 18 of the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) authorizing use of the pesticide on alfalfa. This regulation establishes a maximum permissible level for residues of flumioxazin in this food commodity. E:\FR\FM\18OCR1.SGM 18OCR1

Agencies

[Federal Register Volume 71, Number 201 (Wednesday, October 18, 2006)]
[Rules and Regulations]
[Page 61410]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-17385]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[CGD01-06-104]


Drawbridge Operation Regulations; Mill Neck Creek, Oyster Bay, NY

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, First Coast Guard District, has issued a 
temporary deviation from the regulation governing the operation of the 
Bayville Bridge, across Mill Neck Creek, mile 0.1, at Oyster Bay, New 
York. This deviation, allows the bridge owner to open only one of the 
two moveable bascule spans for the passage of vessel traffic from 
October 28, 2006 through November 20, 2006. This deviation is necessary 
to facilitate scheduled bridge maintenance.

DATES: This deviation is effective from October 28, 2006 through 
November 20, 2006.

ADDRESSES: Materials referred to in this document are available for 
inspection or copying at the First Coast Guard District, Bridge Branch 
Office, One South Street, New York, New York, 10004, between 7 a.m. and 
3 p.m., Monday through Friday, except Federal holidays. The telephone 
number is (212) 668-7165. The First Coast Guard District Bridge Branch 
Office maintains the public docket for this temporary deviation.

FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First 
Coast Guard District, at (212) 668-7165.

SUPPLEMENTARY INFORMATION: The Bayville Bridge, across Mill Neck Creek, 
mile 0.1, at Oyster Bay, New York, has a vertical clearance in the 
closed position of 9 feet at mean high water and 16 feet at mean low 
water. The existing regulation requires the bridge to open on demand.
    The owner of the bridge, County of Nassau, Department of Public 
Works, requested a temporary deviation to facilitate scheduled 
structural bridge repairs, rehabilitation of the two bascule spans.
    In order to perform the structural repairs, the bascule span 
undergoing work must remain in the closed position.
    Therefore, under this temporary deviation the Bayville Bridge 
across Mill Neck Creek, mile 0.1, at Oyster Bay, New York, shall open 
only one of the two movable spans for the passage of vessel traffic 
from October 28, 2006 through November 20, 2006.
    In accordance with 33 CFR 117.35(c), this work will be performed 
with all due speed in order to return the bridge to normal operation as 
soon as possible.
    Should the bridge maintenance authorized by this temporary 
deviation be completed before the end of the effective period published 
in this notice, the Coast Guard will rescind the remainder of this 
temporary deviation, and the bridge shall be returned to its normal 
operating schedule. Notice of the above action shall be provided to the 
public in the Local Notice to Mariners and the Federal Register, where 
practicable.
    This deviation from the operating regulations is authorized under 
33 CFR 117.35(b).

    Dated: October 3, 2006.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E6-17385 Filed 10-17-06; 8:45 am]
BILLING CODE 4910-15-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.