Panhandle Eastern Pipe Line Company, LP; Notice of Proposed Changes in FERC Gas Tariff, 59763 [E6-16774]

Download as PDF Federal Register / Vol. 71, No. 196 / Wednesday, October 11, 2006 / Notices (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E6–16774 Filed 10–10–06; 8:45 am] [Docket No. RP06–617–000] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY October 3, 2006. pwalker on PRODPC60 with NOTICES Panhandle Eastern Pipe Line Company, LP; Notice of Proposed Changes in FERC Gas Tariff Federal Energy Regulatory Commission Take notice that on September 29, 2006, Panhandle Eastern Pipe Line Company, LP (Panhandle) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, the revised tariff sheets listed on Appendix A attached to the filing, to become effective November 1, 2006. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call VerDate Aug<31>2005 16:53 Oct 10, 2006 Jkt 211001 [Docket No. RP06–200–013] 59763 This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Rockies Express Pipeline LLC; Notice of Negotiated Rate Magalie R. Salas, Secretary. [FR Doc. E6–16767 Filed 10–10–06; 8:45 am] October 3, 2006. BILLING CODE 6717–01–P Take notice that on September 29, 2006, Rockies Express Pipeline LLC (REX) tendered for filing to become part of its FERC Gas Tariff, First Revised Volume No. 1, the following tariff sheets, with an effective date of October 1, 2006: Ninth Revised Sheet No. 22 Third Revised Sheet Mp/24 Frm 00049 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. RP06–631–000] SCG Pipeline, Inc.; Notice of Filing REX stated that a copy of this filing has been served upon all parties to this proceeding, REX’s customers, the Colorado Public Utilities Commission and the Wyoming Public Service Commission. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. PO 00000 DEPARTMENT OF ENERGY October 4, 2006. Take notice that on September 29, 2006, under General Terms and Conditions (GT&C) sections 12.8, 22, 25 and 26 of its FERC Gas Tariff, Original Volume No. 1 and Part 154 of the Commission’s regulations, 18 CFR part 154 (2006), SCG Pipeline, Inc. (SCG) submitted work papers calculating the anticipated balances as of October 31, 2006 in each of the following three accounts and the estimated amounts either owed to shippers by SCG or owed to SCG by shippers in order to clear each account: (1) The Fuel Retainage Quantity (FRQ) Deferred Account; (2) the System Balancing Cost Reconciliation Mechanism (SBCRM) Deferred Account; and (3) the interruptible transportation (IT) revenue account. SCG requests that the Commission approve its calculations and its treatment of balances to clear SCG’s FRQ, SBCRM and IT revenue accounts in connection with SCG’s closing of operations and the cancellation of its FERC Gas Tariff. SCG states that the affected SCG customers have agreed to this filing. SCG states that a copy of this filing has been served upon all of its customers and interested state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by E:\FR\FM\11OCN1.SGM 11OCN1

Agencies

[Federal Register Volume 71, Number 196 (Wednesday, October 11, 2006)]
[Notices]
[Page 59763]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-16774]



[[Page 59763]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP06-617-000]


Panhandle Eastern Pipe Line Company, LP; Notice of Proposed 
Changes in FERC Gas Tariff

October 3, 2006.
    Take notice that on September 29, 2006, Panhandle Eastern Pipe Line 
Company, LP (Panhandle) tendered for filing as part of its FERC Gas 
Tariff, Third Revised Volume No. 1, the revised tariff sheets listed on 
Appendix A attached to the filing, to become effective November 1, 
2006.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E6-16774 Filed 10-10-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.