Environmental Impact Statements and Regulations; Availability of EPA Comments, 59104-59105 [E6-16567]
Download as PDF
59104
Federal Register / Vol. 71, No. 194 / Friday, October 6, 2006 / Notices
Transcripts of the meeting will be
available immediately for a fee from Ace
Reporting Company (202–347–3700 or
1–800–336–6646). They will be
available for free on the Commission’s
eLibrary system and on the events
calendar approximately one week after
the meeting.
FERC conferences and meetings are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations please
send an e-mail to accessibility@ferc.gov
or call toll free (866) 208–3372 (voice)
or 202–502–8659 (TTY), or send a fax to
202–208–2106 with the required
accommodations.
Questions about the conference
should be directed to Saida Shaalan, by
e-mail at Saida.Shaalan@FERC.gov or
by phone at 202–502–8278.
Magalie R. Salas,
Secretary.
[FR Doc. E6–16539 Filed 10–5–06; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8228–8]
Access to Confidential Business
Information by ASRC Management
Services
Environmental Protection
Agency (EPA).
ACTION: Notice of access to data and
request for comments.
cprice-sewell on PROD1PC66 with NOTICES
AGENCY:
SUMMARY: EPA will authorize its
contractor, ASRC Management Services
(ASRCMS) to access Confidential
Business Information (CBI) which has
been submitted to EPA under the
authority of all sections of the Resource
Conservation and Recovery Act (RCRA)
of 1976, as amended. EPA has issued
regulations (40 CFR part 2, Subpart B)
that outline business confidentiality
provisions for the Agency and require
all EPA Offices that receive information
designated by the submitter as CBI to
abide by these provisions. ASRCMS will
provide support to the Office of Solid
Waste (OSW) in operating the RCRA CBI
Center (CBIC), a secure storage area that
contains all records/documents that are
received by OSW with a claim of
business confidentiality.
DATES: Access to confidential data
submitted to EPA will occur no sooner
than October 16, 2006.
ADDRESSES: Comments should be sent to
LaShan Haynes, Document Control
Officer, Office of Solid Waste (5305P),
U.S. Environmental Protection Agency,
VerDate Aug<31>2005
14:52 Oct 05, 2006
Jkt 211001
1200 Pennsylvania Avenue, NW.,
Washington, DC 20460. Comments
should be Identified as ‘‘Access to
Confidential Data.’’
FOR FURTHER INFORMATION CONTACT:
LaShan Haynes, Document Control
Officer, Office of Solid Waste (5305P),
U.S. Environmental Protection Agency,
1200 Pennsylvania Avenue, NW.,
Washington, DC 20460, 703–605–0516.
SUPPLEMENTARY INFORMATION:
1. Access to Confidential Business
Information
Under EPA Contract No. EP–W–05
052, ASRCMS will assist the
Information Management Branch,
within the Communications,
Information, and Resources
Management Division, of the Office of
Solid Waste (OSW) in operating the
RCRA Confidential Business
Information Center (CBIC). OSW
collects data from industry to support
the RCRA hazardous waste regulatory
program. Some of the data collected
from industry are claimed by industry to
contain trade secrets or CBI. In
accordance with the provisions of 40
CFR part 2, Subpart B, OSW has
established policies and procedures for
handling information collected from
industry, under the authority of RCRA,
including RCRA Confidential Business
Information Security Manuals. ASRCMS
shall protect from unauthorized
disclosure all information designated as
confidential and shall abide by all
RCRA CBI requirements, including
procedures outlines in the RCRA CBI
Security Manual. ASRCMS will also
provide data base management support
to the RCRA CBIC document tracking
system.
The U.S. Environmental Protection
Agency has issued regulations (40 CFR
part 2, subpart B) that outline business
confidentiality provisions for the
Agency and requires all EPA Office that
receive information designated by the
submitter as CBI to abide by these
provisions. ASRCMS will be authorized
to have access to RCRA CBI under the
EPA ‘‘Contractor Requirements for the
Control and Security of RCRA
Confidential Business Information
Security Manual.’’
EPA is issuing this notice to inform
all submitters of information under all
sections of RCRA that EPA will provide
ASRCMS access to the CBI records
located in the RCRA CBIC. Access to
RCRA CBI under this contract will take
place at EPA Headquarters only.
Contractor personnel will be required to
sign non-disclosure agreements and will
be briefed on appropriate security
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
procedures before they are permitted
access to confidential information.
Dated: August 18, 2006.
Matthew Hale,
Director, Office of Solid Waste.
[FR Doc. E6–16572 Filed 10–5–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6679–9]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 7, 2006 (71 FR 17845).
Draft EISs
EIS No. 20060088, ERP No. D–FTA–
J40173–CO, Denver Union Station
(DUS) Project, Transportation
Improvement, Multimodal
Transportation Center for the Metro
Denver Region, Funding and NPDES
Permit, City and County Denver, CO.
Summary: EPA expressed
environmental concerns about indirect
effects of development around future
train stations in outlying areas
surrounding Denver, and suggested that
specific mitigation measures to reduce
dust and diesel emissions be written as
requirements in construction contracts.
Rating EC1.
EIS No. 20060277, ERP No. D–NNS–
G06013–NM, Los Alamos National
Laboratory Continued Operations, Los
Alamos County, NM
Summary: EPA does not object to the
preferred alternative. Rating LO.
EIS No. 20060283, ERP No. D–FHW–
J40174–UT, Riverdale Road Project
(UT–26), Improvement Mobility and
Safety between 1900 West in Roy, UT
and U.S. Highway 89 (Washington
Boulevard) in Odgen, UT, Cities of
Roy, Riverdale, South Ogden and
Ogden, Weber County, UT
Summary: EPA does not object to the
preferred alternative. Rating LO.
EIS No. 20060297, ERP No. D–FHW–
E40809–NC, NC–24 Transportation
Improvements, from west of I–95 to I–
40, Funding, U.S. Army COE 404
E:\FR\FM\06OCN1.SGM
06OCN1
Federal Register / Vol. 71, No. 194 / Friday, October 6, 2006 / Notices
cprice-sewell on PROD1PC66 with NOTICES
Permit, Cumberland, Sampson, and
Duplin Counties, NC
Summary: EPA expressed
environmental concerns about
residential relocations, potential
indirect and cumulative impacts, and
impacts to wetlands. Rating EC2.
EIS No. 20060313, ERP No. D–BIA–
J39035–MT, Kerr Hydroelectric
Project, Proposed Drought
Management Plan, Implementation,
Flathead Lake, MT
Summary: EPA expressed concerns
about potential adverse impacts to
aquatic biota and water quality, and
requested additional information to
fully assess and mitigate impacts of the
management actions. Rating EC2.
EIS No. 20060324, ERP No. D–AFS–
J65470–MT, Cabin Gulch Vegetation
Treatment Project, Restore FireAdapted Ecosystems., Reduce
Hazardous Fuels, and Water Quality
Tributaries to Deep Creek, Helena
National Forest, Townsend Ranger
District, Broadwater County, MT
Summary: EPA expressed
environmental concerns about
improving water quality and reducing
sediment delivery. EPA supports
decommissioning and recontouring of
Forest Road 4181, which has adversely
affected water quality and fisheries
habitat in West Fork Cabin Gulch. EPA
requested additional information on
project monitoring and suggested
additional analysis to assess and
mitigate potential impacts to aquatic
resources from herbicide application.
Rating EC2.
EIS No. 20060340, ERP No. D–AFS–
J65471–00, Custer National Forest
Weed Management, To Implement
Specific Invasive Weed Treatments,
Carbon, Stillwater, Sweetgrass, Park,
Powder River, Rosebud and Carter
Counties, MT and Harding County,
SD
Summary: EPA supports the proposed
action to prevent the establishment and
spread of weeds. EPA did not identify
any potential environmental impacts
requiring substantive changes to the
proposal, but recommended that
additional information on the causes of
weed spread, additional cultural weed
control methods (seeding), and a more
definitive commitment to aquatic
monitoring be considered. Rating LO.
Final EISs
EIS No. 20040327, ERP No. F–AFS–
J65404–UT, Trout Slope West Timber
Project, Harvesting Timber, Ashley
National Forest, Vernal Ranger
District, Uintah County, UT
Summary: EPA continues to express
environmental concerns about impacts
VerDate Aug<31>2005
14:52 Oct 05, 2006
Jkt 211001
to aquatic resources from the road
system and soil compaction from project
activities.
EIS No. 20060322, ERP No. F–BLM–
J02043–CO, Northern San Juan Basin
Coal Bed Methane Project, Proposal to
Drill 300 Wells to Produce National
Gas from Coal Beds on Federal, State
and Private Owned Lands, SpecialUse-Permit, Application for Permit to
Drill and U.S. Army COE Section 404
Permit, LaPlata and Archuleta
Counties, CO
Summary: The Final EIS includes a
new alternative which implements a
development buffer zone and addresses
EPA’s request for information
concerning monitoring, mitigation and
additional safety measures. However,
EPA continues to have concerns about
potential impacts to water quality from
the pipeline and related roads across
high landslide areas and the high
potential for hazards spills. EPA
recommends that the BLM further
develop a structured decision
framework and implementation strategy
for the step-wise approach to drilling in
the highly sensitive Fruitland
Formation.
EIS No. 20060346, ERP No. F–SFW–
K64026–CA, San Diego Bay National
Wildlife Refuge Comprehensive
Conservation Plan, Implementation,
Sweetwater Marsh and South San
Diego Bay Units, San Diego County,
CA
Summary: EPA does not object to the
proposed action.
EIS No. 20060350, ERP No. F–BLM–
L65496–AK, Ring of Fire Resource
Management Plan, Implementation,
Alaska Peninsula , Kodiak Island and
Aleutian Islands, AK
Summary: EPA does not object to the
proposed action.
EIS No. 20060363, ERP No. F–SFW–
F64006–IL, Crab Orchard National
Wildlife Refuge Comprehensive
Conservation Plan (CCP),
Implementation, Williamson, Jackson
and Unicon Counties, IL
Summary: EPA does not object to the
proposed action.
Dated: October 3, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E6–16567 Filed 10–5–06; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
59105
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6679–8]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 09/25/2006 through 09/29/2006
Pursuant to 40 CFR 1506.9.
EIS No. 20060394, Final EIS, BIA, CA,
Elk Valley Rancheria Martin Ranch
203.5—Acre Fee-to-Trust Transfer and
Casino/Resort Project,
Implementation, Federal Trust, Elk
Valley Rancheria Tribe, Crescent City,
Del Norte County, CA, Wait Period
Ends: 11/06/2006, Contact: John
Rydzik 916–978–6042.
EIS No. 20060395, Draft EIS, FRC, 00,
Klamath Hydroelectric Project,
Continued Operation for Hydropower
License FERC No. 2082–27, Klamath
River, Klamath County, OR and
Siskiyou County, CA, Comment
Period Ends: 11/24/2006, Contact:
John Mudre 202–502–8902.
EIS No. 20060396, Final EIS, NPS, WY,
Grand Teton National Park
Transportation Plan, Implementation,
Grand Teton National Park, Teton
County, WY, Wait Period Ends: 11/
06/2006, Contact: Mary Gibson Scott
307–739–3410.
EIS No. 20060397, Final EIS, NAS, 00,
Programmatic—Development of
Advanced Radioisotope Power
Systems, Two New Advanced RPS’s:
Multi-Mission Radioisotope
Thermoelectric Generator (MMRTG)
and Stirling Radioisotope Generator
(SRG), Wait Period Ends: 11/06/2006,
Contact: Kenneth M. Kumor 202–358–
1112.
EIS No. 20060398, Final EIS, AFS, UT,
Upper Strawberry Allotments
Grazing, Authorize Liverstock
Grazing, Heber Ranger District, Uinta
National Forest, Wasatch County, UT,
Wait Period Ends: 11/06/2006,
Contact: Pam Jarnecke 775–635–4144.
EIS No. 20060399, Draft EIS, USA, VA,
Fort Lee, Virginia and Fort A. P. Hill,
Virginia Project, Implementation of
Base Closure and Realignment (BRAC)
Recommendations and Other Army
Actions, Prince George County,
Petersburg, Virginia Hopewell,
Virginia; Caroline County, Essex
County, VA, Comment Period Ends:
11/20/2006Contact: Karen Wilson
703–602–2861.
EIS No. 20060400, Draft EIS, USA, TX,
Fort Sam Houston, Texas Project, Base
E:\FR\FM\06OCN1.SGM
06OCN1
Agencies
[Federal Register Volume 71, Number 194 (Friday, October 6, 2006)]
[Notices]
[Pages 59104-59105]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-16567]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6679-9]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 7, 2006 (71 FR 17845).
Draft EISs
EIS No. 20060088, ERP No. D-FTA-J40173-CO, Denver Union Station (DUS)
Project, Transportation Improvement, Multimodal Transportation Center
for the Metro Denver Region, Funding and NPDES Permit, City and County
Denver, CO.
Summary: EPA expressed environmental concerns about indirect
effects of development around future train stations in outlying areas
surrounding Denver, and suggested that specific mitigation measures to
reduce dust and diesel emissions be written as requirements in
construction contracts. Rating EC1.
EIS No. 20060277, ERP No. D-NNS-G06013-NM, Los Alamos National
Laboratory Continued Operations, Los Alamos County, NM
Summary: EPA does not object to the preferred alternative. Rating
LO.
EIS No. 20060283, ERP No. D-FHW-J40174-UT, Riverdale Road Project (UT-
26), Improvement Mobility and Safety between 1900 West in Roy, UT and
U.S. Highway 89 (Washington Boulevard) in Odgen, UT, Cities of Roy,
Riverdale, South Ogden and Ogden, Weber County, UT
Summary: EPA does not object to the preferred alternative. Rating
LO.
EIS No. 20060297, ERP No. D-FHW-E40809-NC, NC-24 Transportation
Improvements, from west of I-95 to I-40, Funding, U.S. Army COE 404
[[Page 59105]]
Permit, Cumberland, Sampson, and Duplin Counties, NC
Summary: EPA expressed environmental concerns about residential
relocations, potential indirect and cumulative impacts, and impacts to
wetlands. Rating EC2.
EIS No. 20060313, ERP No. D-BIA-J39035-MT, Kerr Hydroelectric Project,
Proposed Drought Management Plan, Implementation, Flathead Lake, MT
Summary: EPA expressed concerns about potential adverse impacts to
aquatic biota and water quality, and requested additional information
to fully assess and mitigate impacts of the management actions. Rating
EC2.
EIS No. 20060324, ERP No. D-AFS-J65470-MT, Cabin Gulch Vegetation
Treatment Project, Restore Fire-Adapted Ecosystems., Reduce Hazardous
Fuels, and Water Quality Tributaries to Deep Creek, Helena National
Forest, Townsend Ranger District, Broadwater County, MT
Summary: EPA expressed environmental concerns about improving water
quality and reducing sediment delivery. EPA supports decommissioning
and recontouring of Forest Road 4181, which has adversely affected
water quality and fisheries habitat in West Fork Cabin Gulch. EPA
requested additional information on project monitoring and suggested
additional analysis to assess and mitigate potential impacts to aquatic
resources from herbicide application. Rating EC2.
EIS No. 20060340, ERP No. D-AFS-J65471-00, Custer National Forest Weed
Management, To Implement Specific Invasive Weed Treatments, Carbon,
Stillwater, Sweetgrass, Park, Powder River, Rosebud and Carter
Counties, MT and Harding County, SD
Summary: EPA supports the proposed action to prevent the
establishment and spread of weeds. EPA did not identify any potential
environmental impacts requiring substantive changes to the proposal,
but recommended that additional information on the causes of weed
spread, additional cultural weed control methods (seeding), and a more
definitive commitment to aquatic monitoring be considered. Rating LO.
Final EISs
EIS No. 20040327, ERP No. F-AFS-J65404-UT, Trout Slope West Timber
Project, Harvesting Timber, Ashley National Forest, Vernal Ranger
District, Uintah County, UT
Summary: EPA continues to express environmental concerns about
impacts to aquatic resources from the road system and soil compaction
from project activities.
EIS No. 20060322, ERP No. F-BLM-J02043-CO, Northern San Juan Basin Coal
Bed Methane Project, Proposal to Drill 300 Wells to Produce National
Gas from Coal Beds on Federal, State and Private Owned Lands, Special-
Use-Permit, Application for Permit to Drill and U.S. Army COE Section
404 Permit, LaPlata and Archuleta Counties, CO
Summary: The Final EIS includes a new alternative which implements
a development buffer zone and addresses EPA's request for information
concerning monitoring, mitigation and additional safety measures.
However, EPA continues to have concerns about potential impacts to
water quality from the pipeline and related roads across high landslide
areas and the high potential for hazards spills. EPA recommends that
the BLM further develop a structured decision framework and
implementation strategy for the step-wise approach to drilling in the
highly sensitive Fruitland Formation.
EIS No. 20060346, ERP No. F-SFW-K64026-CA, San Diego Bay National
Wildlife Refuge Comprehensive Conservation Plan, Implementation,
Sweetwater Marsh and South San Diego Bay Units, San Diego County, CA
Summary: EPA does not object to the proposed action.
EIS No. 20060350, ERP No. F-BLM-L65496-AK, Ring of Fire Resource
Management Plan, Implementation, Alaska Peninsula , Kodiak Island and
Aleutian Islands, AK
Summary: EPA does not object to the proposed action.
EIS No. 20060363, ERP No. F-SFW-F64006-IL, Crab Orchard National
Wildlife Refuge Comprehensive Conservation Plan (CCP), Implementation,
Williamson, Jackson and Unicon Counties, IL
Summary: EPA does not object to the proposed action.
Dated: October 3, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-16567 Filed 10-5-06; 8:45 am]
BILLING CODE 6560-50-P