H.Q. Energy Services (U.S.), Inc. v. New York Independent System Operator, Inc.; PSEG Energy Resources & Trade LLC v. New York Independent System Operator, Inc.; Notice of Compliance Filing, 58852 [E6-16415]
Download as PDF
58852
Federal Register / Vol. 71, No. 193 / Thursday, October 5, 2006 / Notices
BPA’s solicitations and contracts
include notice of applicability and
availability of the BPI and the BFAI, as
appropriate, for the information of
offerors on particular purchases or
financial assistance transactions.
Issued in Portland, Oregon, on September
25, 2006.
Damian J. Kelly,
Manager, Supply Chain Policy and
Governance.
[FR Doc. E6–16459 Filed 10–4–06; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL01–19–008 and EL02–16–
008]
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 6, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–16415 Filed 10–4–06; 8:45 am]
BILLING CODE 6717–01–P
September 28, 2006.
mstockstill on PROD1PC61 with NOTICES
H.Q. Energy Services (U.S.), Inc. v.
New York Independent System
Operator, Inc.; PSEG Energy
Resources & Trade LLC v. New York
Independent System Operator, Inc.;
Notice of Compliance Filing
[CP06–462–000]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Take notice that on September 15,
2006, Consolidated Edison Company of
New York, Inc., New York State Electric
& Gas Corporation, Niagara Mohawk
Corporation d/b/a National Grid, Orange
and Rockland Utilities, Inc., Rochester
Gas and Electric Corporation, and the
New York Independent System
Operator, Inc. (NYSIO) filed a joint
refund report which sets forth the
payments collected and refunded by the
NYSIO, pursuant to the Commission’s
Order issued July 12, 2006.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
VerDate Aug<31>2005
15:42 Oct 04, 2006
Jkt 211001
Honeoye Storage Corporation; Notice
of Request Under Blanket
Authorization
September 28, 2006.
Take notice that on September 20,
2006, Honeoye Storage Corporation
(Honeoye), 4511 Egypt Road,
Canandaigua, New York 14424, filed in
Docket No. CP06–462–000, a request
pursuant to Sections 157.205 and
157.214 of the Commission’s
Regulations under the Natural Gas Act
(18 CFR 157.205 and 157.216) for
authorization to increase its cushion gas
capacity in its storage facility in Ontario
County, New York, under Honeoye’s
blanket certificate issued in Docket No.
CP00–95–000 pursuant to section 7(c) of
the Natural Gas Act, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@gerc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Honeoye seeks the authority to
increase it cushion gas capacity by
469,206 MMcf. All other authorized
conditions will remain the same
including the maximum reservoir
pressure and maximum working gas
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
capacity. Honeoye does not propose to
construct any new facilities. Moreover,
Honeoye does not require any activities
that involve ground disturbance or
changes to operational air or noise
requirements.
Any questions regarding this
application should be directed to David
A. T. Donohue, Honeoye Storage
Corporation, 535 Boylston Street, 12th
Floor, Boston, Massachusetts 02116, or
call (617) 536–0202.
Any person or the Commission’s Staff
may, within 45 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to Section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to Section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–16417 Filed 10–4–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL06–106–000]
Occidental Chemical Corporation;
Carville Energy LLC; Notice of Filing
September 28, 2006.
Take notice that on September 18,
2006, Occidental Chemical Corporation
and Carville Energy LLC filed a Petition
for Enforcement, pursuant to Section
210(h) of the Public Utility Regulatory
Policies Act of 1978 (PURPA),
requesting the Commission to exercise
its authority and initiate enforcement
action against the Louisiana Public
Service Commission to ensure that
PURPA regulations are properly and
lawfully implemented in Louisiana.
E:\FR\FM\05OCN1.SGM
05OCN1
Agencies
[Federal Register Volume 71, Number 193 (Thursday, October 5, 2006)]
[Notices]
[Page 58852]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-16415]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EL01-19-008 and EL02-16-008]
H.Q. Energy Services (U.S.), Inc. v. New York Independent System
Operator, Inc.; PSEG Energy Resources & Trade LLC v. New York
Independent System Operator, Inc.; Notice of Compliance Filing
September 28, 2006.
Take notice that on September 15, 2006, Consolidated Edison Company
of New York, Inc., New York State Electric & Gas Corporation, Niagara
Mohawk Corporation d/b/a National Grid, Orange and Rockland Utilities,
Inc., Rochester Gas and Electric Corporation, and the New York
Independent System Operator, Inc. (NYSIO) filed a joint refund report
which sets forth the payments collected and refunded by the NYSIO,
pursuant to the Commission's Order issued July 12, 2006.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on October 6, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6-16415 Filed 10-4-06; 8:45 am]
BILLING CODE 6717-01-P