Drawbridge Operation Regulations; Kennebec River, Bath and Woolwich, ME, 58286 [E6-16318]
Download as PDF
58286
Federal Register / Vol. 71, No. 191 / Tuesday, October 3, 2006 / Rules and Regulations
speed in order to return the bridge to
normal operation as soon as possible.
Should the bridge maintenance
authorized by this temporary deviation
be completed before the end of the
effective period published in this notice,
the Coast Guard will rescind the
remainder of this temporary deviation,
and the bridge shall be returned to its
normal operating schedule. Notice of
the above action shall be provided to the
public in the Local Notice to Mariners
and the Federal Register, where
practicable.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: September 25, 2006.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E6–16316 Filed 10–2–06; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–06–120]
Drawbridge Operation Regulations;
Kennebec River, Bath and Woolwich,
ME
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Carlton Bridge
across the Kennebec River at mile 14.0,
between Bath and Woolwich, Maine.
Under this temporary deviation, the
bridge may remain in the closed
position from 7 a.m. on October 16,
2006 through 8 p.m., on October 17,
2006. This deviation is necessary to
facilitate scheduled bridge maintenance.
DATES: This deviation is effective from
October 16, 2006 through October 17,
2006.
John
McDonald, Project Officer, First Coast
Guard District, at (617) 223–8364.
FOR FURTHER INFORMATION CONTACT:
The
Carlton Bridge, across the Kennebec
River at mile 14.0, between Bath and
Woolwich, Maine, has a vertical
clearance in the closed position of 10
feet at mean high water and 16 feet at
mean low water. The existing
drawbridge operation regulations are
listed at 33 CFR 117.525.
The owner of the bridge, Maine
Department of Transportation, requested
a temporary deviation to facilitate
scheduled bridge maintenance,
replacement of the bridge lift cables.
The bridge will not be able to open
while the bridge maintenance is
underway.
Under this temporary deviation, the
Carlton Bridge need not open for the
passage of vessel traffic from 7 a.m. on
October 16, 2006 through 8 p.m. on
October 17, 2006.
In accordance with 33 CFR 117.35(c),
this work will be performed with all due
speed in order to return the bridge to
normal operation as soon as possible.
Should the bridge maintenance
authorized by this temporary deviation
be completed before the end of the
effective period published in this notice,
the Coast Guard will rescind the
remainder of this temporary deviation,
and the bridge shall be returned to its
normal operating schedule. Notice of
the above action shall be provided to the
public in the Local Notice to Mariners
and the Federal Register, where
practicable.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
SUPPLEMENTARY INFORMATION:
Dated: September 25, 2006.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E6–16318 Filed 10–2–06; 8:45 am]
BILLING CODE 4910–15–P
Materials referred to in this
document are available for inspection or
copying at the First Coast Guard
District, Bridge Branch Office, 408
Atlantic Avenue, Boston, Massachusetts
02110, between 7 a.m. and 3 p.m.,
Monday through Friday, except Federal
holidays. The telephone number is (617)
223–8364. The First Coast Guard
District Bridge Branch Office maintains
the public docket for this temporary
deviation.
mstockstill on PROD1PC61 with RULES
ADDRESSES:
VerDate Aug<31>2005
14:44 Oct 02, 2006
Jkt 211001
PO 00000
Frm 00044
Fmt 4700
Sfmt 4700
DEPARTMENT OF HEALTH AND
HUMAN SERVICES
Centers for Medicare & Medicaid
Services
42 CFR Parts 409, 410, 412, 413, 414,
424, 485, 489, and 505
[CMS–1488–CN]
RIN 0938–AO12
Medicare Program; Changes to the
Hospital Inpatient Prospective
Payment Systems and Fiscal Year 2007
Rates; Correction
Centers for Medicare &
Medicaid Services (CMS), HHS.
ACTION: Correction of final rule.
AGENCY:
SUMMARY: This document corrects
technical errors that appeared in the
final rule published in the Federal
Register on August 18, 2006 entitled
‘‘Medicare Program; Hospital Inpatient
Prospective Payment Systems and Fiscal
Year 2007 Rates.’’
DATES: Effective Date: These corrections
are effective on October 1, 2006.
FOR FURTHER INFORMATION CONTACT:
Marc Hartstein, (410) 786–4548.
SUPPLEMENTARY INFORMATION:
I. Background
In FR Doc. 06–6692 of August 18,
2006 (71 FR 47870), the final rule
entitled ‘‘Changes to the Hospital
Inpatient Prospective Payment Systems
and Fiscal Year 2007 Rates’’ (hereinafter
referred to as the FY 2007 IPPS final
rule) there were several minor
typographical and technical errors that
we are identifying and correcting in
section III. of this notice. The provisions
in this correction notice are effective as
if they had been included in the
published FY 2007 IPPS final rule.
Accordingly, the corrections are
effective October 1, 2006.
II. Summary of the Corrections to the
FY 2007 IPPS Final Rule
On page 47944, in our preamble
discussion regarding Carotid Artery
Stents, we erroneously stated that we
were creating a new DRG 583, when, in
fact, we were creating a new DRG 577.
Therefore, in section III. A. of this
notice, we are correcting that error. This
technical correction merely corrects the
description of the new DRG in the
preamble text and does not affect the
GROUPER or the relative weight for the
new DRG.
On page 48137, we made several
errors in the first amendatory statement
for § 412.25. First, we misstated that we
were amending the introductory text of
E:\FR\FM\03OCR1.SGM
03OCR1
Agencies
[Federal Register Volume 71, Number 191 (Tuesday, October 3, 2006)]
[Rules and Regulations]
[Page 58286]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-16318]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-06-120]
Drawbridge Operation Regulations; Kennebec River, Bath and
Woolwich, ME
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Carlton Bridge across the Kennebec River at mile 14.0, between Bath and
Woolwich, Maine. Under this temporary deviation, the bridge may remain
in the closed position from 7 a.m. on October 16, 2006 through 8 p.m.,
on October 17, 2006. This deviation is necessary to facilitate
scheduled bridge maintenance.
DATES: This deviation is effective from October 16, 2006 through
October 17, 2006.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at the First Coast Guard District, Bridge Branch
Office, 408 Atlantic Avenue, Boston, Massachusetts 02110, between 7
a.m. and 3 p.m., Monday through Friday, except Federal holidays. The
telephone number is (617) 223-8364. The First Coast Guard District
Bridge Branch Office maintains the public docket for this temporary
deviation.
FOR FURTHER INFORMATION CONTACT: John McDonald, Project Officer, First
Coast Guard District, at (617) 223-8364.
SUPPLEMENTARY INFORMATION: The Carlton Bridge, across the Kennebec
River at mile 14.0, between Bath and Woolwich, Maine, has a vertical
clearance in the closed position of 10 feet at mean high water and 16
feet at mean low water. The existing drawbridge operation regulations
are listed at 33 CFR 117.525.
The owner of the bridge, Maine Department of Transportation,
requested a temporary deviation to facilitate scheduled bridge
maintenance, replacement of the bridge lift cables. The bridge will not
be able to open while the bridge maintenance is underway.
Under this temporary deviation, the Carlton Bridge need not open
for the passage of vessel traffic from 7 a.m. on October 16, 2006
through 8 p.m. on October 17, 2006.
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to normal operation as
soon as possible.
Should the bridge maintenance authorized by this temporary
deviation be completed before the end of the effective period published
in this notice, the Coast Guard will rescind the remainder of this
temporary deviation, and the bridge shall be returned to its normal
operating schedule. Notice of the above action shall be provided to the
public in the Local Notice to Mariners and the Federal Register, where
practicable.
This deviation from the operating regulations is authorized under
33 CFR 117.35.
Dated: September 25, 2006.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E6-16318 Filed 10-2-06; 8:45 am]
BILLING CODE 4910-15-P