Downeast LNG, Inc.; Supplemental Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Downeast LNG Project and Request for Comments on Environmental Issues, 55779-55780 [E6-15666]
Download as PDF
Federal Register / Vol. 71, No. 185 / Monday, September 25, 2006 / Notices
compilation of system of record notices
apply to this system.
POLICIES AND PRACTICES FOR STORING,
RETRIEVING, ACCESSING, RETAINING, AND
DISPOSING OF RECORDS IN THE SYSTEM:
Instruction 5211.5; 32 CFR part 701; or
may be obtained from the system
manager.
RECORD SOURCE CATEGORIES:
STORAGE:
Automated records may be stored on
magnetic tapes, disc, and drums.
Manual records may be stored in paper
file folders, or removable electronic
storage media.
Personnel service jackets,
correspondence, official records of
professional qualifications, and
educational institutions.
EXEMPTIONS CLAIMED FOR THE SYSTEM:
None.
[FR Doc. 06–8158 Filed 9–22–06; 8:45 am]
RETRIEVABILITY:
BILLING CODE 5001–06–U
Name, Social Security Number, rate/
pay grade, activity, and/or record status
within command.
DEPARTMENT OF ENERGY
SAFEGUARDS:
Computer processing facilities and
terminals are located in restricted areas
accessible only to authorized persons
that are properly screened, cleared, and
trained. Manual records and computer
printouts are available only to
authorized personnel having a need-toknow.
RETENTION AND DISPOSAL:
Records are generally maintained
until superseded or for a period of two
years and then disposed of by burning
or shredding.
SYSTEM MANAGER(S) AND ADDRESS:
Commander, Navy Personnel
Command (Pers—455), 5720 Integrity
Drive, Millington, TN 38055–0600.
NOTIFICATION PROCEDURE:
Individuals seeking to determine
whether this system of records contains
information about themselves should
address written inquiries to the
Commander, Navy Personnel Command
(Pers—455), 5720 Integrity Drive,
Millington, TN 38055–0600.
The letter should contain full name,
Social Security Number (and/or enlisted
service number), rate, military status,
and signature of the requester.
RECORD ACCESS PROCEDURES:
rwilkins on PROD1PC63 with NOTICES
Individuals seeking access to records
about themselves contained in this
system of records should address
written inquiries to the Commander,
Navy Personnel Command (Pers—455),
5720 Integrity Drive, Millington, TN
38055–0600.
The letter should contain full name,
Social Security Number (and/or enlisted
service number), rate, military status,
and signature of the requester.
CONTESTING RECORD PROCEDURES:
The Navy’s rules for accessing
records, and for contesting contents and
appealing initial agency determinations
are published in Secretary of the Navy
VerDate Aug<31>2005
17:46 Sep 22, 2006
Jkt 208001
Federal Energy Regulatory
Commission
[Docket No. PF06–13–000]
Downeast LNG, Inc.; Supplemental
Notice of Intent To Prepare an
Environmental Impact Statement for
the Proposed Downeast LNG Project
and Request for Comments on
Environmental Issues
September 18, 2006.
The Federal Energy Regulatory
Commission (FERC or Commission) and
the U.S. Department of Homeland
Security, U.S. Coast Guard (Coast
Guard) are preparing an environmental
impact statement (EIS) that will discuss
the environmental impacts of the
Downeast Liquefied Natural Gas (LNG)
Project proposed by Downeast LNG, Inc.
(Downeast). The FERC and the U.S.
Coast Guard will be the lead federal
agencies in the preparation of the EIS,
but will prepare the EIS in coordination
with their cooperating agencies: the
Environmental Protection Agency, U.S.
Army Corps of Engineers, and the
National Oceanic and Atmospheric
Administration National Marine
Fisheries Service. The document will
satisfy the requirements of the National
Environmental Policy Act.
This notice supplements the Notice of
Intent (NOI) to prepare an EIS issued on
March 13, 2006. The NOI provided
information about the proposed project
and the environmental review process
and requested comments on the scope of
issues to address in the EIS. The
comment period for the NOI closed on
April 17, 2006.
Since the NOI dated March 13, 2006,
the natural gas sendout pipeline routes
have been analyzed in greater technical
detail by Downeast. Originally,
Downeast evaluated three options for
the sendout pipeline route. Option 3 has
been eliminated from further
consideration because of significant
residential impacts and the lack of
PO 00000
Frm 00006
Fmt 4703
Sfmt 4703
55779
available land area adjacent to
roadways. Downeast has identified two
additional route options (Route Options
4 and 5). The previous transmittal
identified Route Option 1 as the
preferred alternative for the pipeline
route. Among the route option
alternatives now available and
evaluated, Option 4 is now the preferred
route for the following reasons:
• Shorter pipeline length by 3 miles
(28 miles long);
• Follows existing transmission
corridors for 57 percent of its length;
• Reduced potential for wetlands
impact;
• Reduced number of residences
within 50 feet of the construction ROW;
• Reduced acreage of Significant
Wildlife Habitat within 250 feet of the
construction ROW;
• An inability to receive irrevocable
license agreements from the Maine
Department of Transportation for use of
the existing but inactive railroad and
other roadways;
• The potential for re-activation of the
railway would require reconstruction of
the rail bed and straightening of rail line
segments which could require
relocation of the proposed gas pipeline;
and
• On-going discussions with the staff
at the Moosehorn National Wildlife
Refuge regarding minimization of
pipeline routing through the refuge.
A map depicting the current preferred
route and alternative route locations is
included in Appendix 1 1. We 2 are
specifically requesting comments on the
new preferred Route Option 4. Your
input will help identify the issues that
need to be evaluated in the EIS. The
scoping period for this Notice ends on
October 18, 2006.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the
planned project. By becoming a
commentor, your concerns will be
addressed in the EIS and considered by
the Commission. Your comments
should focus on the potential
environmental effects, reasonable
alternatives (including alternative
pipeline routes), and measures to avoid
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies are
available on the Commission’s Web site (excluding
maps) at the ‘‘eLibrary’’ link or from the
Commission’s Public Reference Room or call (202)
502–8371. For instructions on connecting to eLibrary refer to the end of this notice. Copies of the
appendices were sent to all those receiving this
notice in the mail.
2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the FERC’s Office of Energy
Projects.
E:\FR\FM\25SEN1.SGM
25SEN1
55780
Federal Register / Vol. 71, No. 185 / Monday, September 25, 2006 / Notices
rwilkins on PROD1PC63 with NOTICES
or lessen environmental impacts. The
more specific your comments, the more
useful they will be. To ensure that your
comments are timely and properly
recorded, please follow these
instructions:
• Send an original and two copies of
your letter to: Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426.
• Label one copy of your comments
for the attention of OEP/DG2E/Gas
Branch 3.
• Reference Docket No. PF06–13–000
on the original and both copies.
• Mail your comments so that they
will be received in Washington, DC on
or before October 18, 2006. Appropriate
copies will be provided to the Coast
Guard.
The Commission strongly encourages
electronic filing of any comments in
response to this NOI. For information on
electronically filing comments, please
see the instructions on the
Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing’’ link
and the link to the User’s Guide as well
as information in 18 CFR
385.2001(a)(1)(iii). Before you can file
comments you will need to create a free
account, which can be accomplished
on-line.
identified on the Commission’s service
list for this proceeding. Persons on the
service list with e-mail addresses may
be served electronically; others must be
served a hard copy of the filing.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Becoming an Intervenor
Because the NEPA Pre-Filing Process
occurs before an application to begin a
proceeding is officially filed, petitions
to intervene during this process are
premature and will not be accepted by
the Commission. When Downeast files
its application for authorization to
construct the proposed facilities, the
Commission will publish notice of the
application in the Federal Register and
establish a deadline for interested
persons to intervene in the proceeding.
To become an intervenor you must
file a motion to intervene according to
Rule 214 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.214). Intervenors have the right to
seek rehearing of the Commission’s
decision. Motions to Intervene should
be electronically submitted using the
Commission’s eFiling system at https://
www.ferc.gov. Persons without Internet
access should send an original and 14
copies of their motion to the Secretary
of the Commission at the address
indicated previously. Persons filing
Motions to Intervene on or before the
comment deadline indicated above must
send a copy of the motion to the
Applicant. All filings, including late
interventions, submitted after the
comment deadline must be served on
the Applicant and all other intervenors
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208-FERC (3372) or on the
FERC Internet Web site (https://
www.ferc.gov) using the ‘‘eLibrary link.’’
Click on the eLibrary link, select
‘‘General Search’’ and enter the project
docket number excluding the last three
digits (i.e., PF06–13) in the ‘‘Docket
Number’’ field. Be sure you have
selected an appropriate date range. For
assistance with eLibrary, the eLibrary
helpline can be reached at 1–866–208–
3676, TTY (202) 502–8659, or by e-mail
at FercOnlineSupport@ferc.gov. The
eLibrary link on the FERC Internet Web
site also provides access to the texts of
formal documents issued by the
Commission, such as orders, notices,
and rule makings.
In addition, the FERC now offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to https://www.ferc.gov/
esubscribenow.htm.
VerDate Aug<31>2005
17:46 Sep 22, 2006
Jkt 208001
Environmental Mailing List
All commentors will be retained on
our mailing list. If you do not want to
send comments at this time but still
want to keep informed and receive
copies of the Draft and Final EISs, you
must return the Information Request
(Appendix 2). Also, indicate on the form
your preference for receiving a paper
version in lieu of an electronic version
of the EIS on CD–ROM. If you do not
return this form, we will remove your
name from our mailing list.
Please note, if you have previously
submitted comments or returned an
Information Request, you are already on
our mailing list and do not need to resubmit comments or an Information
Request.
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
Public meetings or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Finally, Downeast has established an
Internet Web site for this project at
https://www.downeastlng.com/
index.htm. The Web site includes a
project overview, status, potential
impacts and mitigation, and answers to
frequently asked questions. You can
also request additional information by
calling Downeast directly at 207–214–
5926.
Magalie R. Salas,
Secretary.
[FR Doc. E6–15666 Filed 9–22–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests and Comments
September 18, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: P–12723–000.
c. Date filed: August 18, 2006.
d. Applicant: City of Quincy, Illinois.
e. Name of Project: Mississippi Lock
& Dam No. 20 Hydroelectric Project.
f. Location: At the existing U.S. Army
Corps of Engineers’ Mississippi Lock
and Dam No. 20 on the Mississippi
River, in Lewis County, Missouri, and
Adams County, Illinois.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Kenneth
Cantrell, Director of Administrative
Services, City of Quincy, 730 Maine
Street, Quincy, IL 62301, (217) 228–
4500.
i. FERC Contact: Patricia W. Gillis at
(202) 502–8735.
j. Deadline for filing comments,
protests, and motions to intervene:
November 24, 2006.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
E:\FR\FM\25SEN1.SGM
25SEN1
Agencies
[Federal Register Volume 71, Number 185 (Monday, September 25, 2006)]
[Notices]
[Pages 55779-55780]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-15666]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF06-13-000]
Downeast LNG, Inc.; Supplemental Notice of Intent To Prepare an
Environmental Impact Statement for the Proposed Downeast LNG Project
and Request for Comments on Environmental Issues
September 18, 2006.
The Federal Energy Regulatory Commission (FERC or Commission) and
the U.S. Department of Homeland Security, U.S. Coast Guard (Coast
Guard) are preparing an environmental impact statement (EIS) that will
discuss the environmental impacts of the Downeast Liquefied Natural Gas
(LNG) Project proposed by Downeast LNG, Inc. (Downeast). The FERC and
the U.S. Coast Guard will be the lead federal agencies in the
preparation of the EIS, but will prepare the EIS in coordination with
their cooperating agencies: the Environmental Protection Agency, U.S.
Army Corps of Engineers, and the National Oceanic and Atmospheric
Administration National Marine Fisheries Service. The document will
satisfy the requirements of the National Environmental Policy Act.
This notice supplements the Notice of Intent (NOI) to prepare an
EIS issued on March 13, 2006. The NOI provided information about the
proposed project and the environmental review process and requested
comments on the scope of issues to address in the EIS. The comment
period for the NOI closed on April 17, 2006.
Since the NOI dated March 13, 2006, the natural gas sendout
pipeline routes have been analyzed in greater technical detail by
Downeast. Originally, Downeast evaluated three options for the sendout
pipeline route. Option 3 has been eliminated from further consideration
because of significant residential impacts and the lack of available
land area adjacent to roadways. Downeast has identified two additional
route options (Route Options 4 and 5). The previous transmittal
identified Route Option 1 as the preferred alternative for the pipeline
route. Among the route option alternatives now available and evaluated,
Option 4 is now the preferred route for the following reasons:
Shorter pipeline length by 3 miles (28 miles long);
Follows existing transmission corridors for 57 percent of
its length;
Reduced potential for wetlands impact;
Reduced number of residences within 50 feet of the
construction ROW;
Reduced acreage of Significant Wildlife Habitat within 250
feet of the construction ROW;
An inability to receive irrevocable license agreements
from the Maine Department of Transportation for use of the existing but
inactive railroad and other roadways;
The potential for re-activation of the railway would
require reconstruction of the rail bed and straightening of rail line
segments which could require relocation of the proposed gas pipeline;
and
On-going discussions with the staff at the Moosehorn
National Wildlife Refuge regarding minimization of pipeline routing
through the refuge.
A map depicting the current preferred route and alternative route
locations is included in Appendix 1 \1\. We \2\ are specifically
requesting comments on the new preferred Route Option 4. Your input
will help identify the issues that need to be evaluated in the EIS. The
scoping period for this Notice ends on October 18, 2006.
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available on the
Commission's Web site (excluding maps) at the ``eLibrary'' link or
from the Commission's Public Reference Room or call (202) 502-8371.
For instructions on connecting to e-Library refer to the end of this
notice. Copies of the appendices were sent to all those receiving
this notice in the mail.
\2\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the FERC's Office of Energy Projects.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the planned project. By becoming a
commentor, your concerns will be addressed in the EIS and considered by
the Commission. Your comments should focus on the potential
environmental effects, reasonable alternatives (including alternative
pipeline routes), and measures to avoid
[[Page 55780]]
or lessen environmental impacts. The more specific your comments, the
more useful they will be. To ensure that your comments are timely and
properly recorded, please follow these instructions:
Send an original and two copies of your letter to: Magalie
R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First
St., NE., Room 1A, Washington, DC 20426.
Label one copy of your comments for the attention of OEP/
DG2E/Gas Branch 3.
Reference Docket No. PF06-13-000 on the original and both
copies.
Mail your comments so that they will be received in
Washington, DC on or before October 18, 2006. Appropriate copies will
be provided to the Coast Guard.
The Commission strongly encourages electronic filing of any
comments in response to this NOI. For information on electronically
filing comments, please see the instructions on the Commission's Web
site at https://www.ferc.gov under the ``e-Filing'' link and the link to
the User's Guide as well as information in 18 CFR 385.2001(a)(1)(iii).
Before you can file comments you will need to create a free account,
which can be accomplished on-line.
Becoming an Intervenor
Because the NEPA Pre-Filing Process occurs before an application to
begin a proceeding is officially filed, petitions to intervene during
this process are premature and will not be accepted by the Commission.
When Downeast files its application for authorization to construct the
proposed facilities, the Commission will publish notice of the
application in the Federal Register and establish a deadline for
interested persons to intervene in the proceeding.
To become an intervenor you must file a motion to intervene
according to Rule 214 of the Commission's Rules of Practice and
Procedure (18 CFR 385.214). Intervenors have the right to seek
rehearing of the Commission's decision. Motions to Intervene should be
electronically submitted using the Commission's eFiling system at
https://www.ferc.gov. Persons without Internet access should send an
original and 14 copies of their motion to the Secretary of the
Commission at the address indicated previously. Persons filing Motions
to Intervene on or before the comment deadline indicated above must
send a copy of the motion to the Applicant. All filings, including late
interventions, submitted after the comment deadline must be served on
the Applicant and all other intervenors identified on the Commission's
service list for this proceeding. Persons on the service list with e-
mail addresses may be served electronically; others must be served a
hard copy of the filing.
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Environmental Mailing List
All commentors will be retained on our mailing list. If you do not
want to send comments at this time but still want to keep informed and
receive copies of the Draft and Final EISs, you must return the
Information Request (Appendix 2). Also, indicate on the form your
preference for receiving a paper version in lieu of an electronic
version of the EIS on CD-ROM. If you do not return this form, we will
remove your name from our mailing list.
Please note, if you have previously submitted comments or returned
an Information Request, you are already on our mailing list and do not
need to re-submit comments or an Information Request.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC (3372) or on
the FERC Internet Web site (https://www.ferc.gov) using the ``eLibrary
link.'' Click on the eLibrary link, select ``General Search'' and enter
the project docket number excluding the last three digits (i.e., PF06-
13) in the ``Docket Number'' field. Be sure you have selected an
appropriate date range. For assistance with eLibrary, the eLibrary
helpline can be reached at 1-866-208-3676, TTY (202) 502-8659, or by e-
mail at FercOnlineSupport@ferc.gov. The eLibrary link on the FERC
Internet Web site also provides access to the texts of formal documents
issued by the Commission, such as orders, notices, and rule makings.
In addition, the FERC now offers a free service called
eSubscription that allows you to keep track of all formal issuances and
submittals in specific dockets. This can reduce the amount of time you
spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. To register for this service, go to https://www.ferc.gov/
esubscribenow.htm.
Public meetings or site visits will be posted on the Commission's
calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx
along with other related information.
Finally, Downeast has established an Internet Web site for this
project at https://www.downeastlng.com/index.htm. The Web site includes
a project overview, status, potential impacts and mitigation, and
answers to frequently asked questions. You can also request additional
information by calling Downeast directly at 207-214-5926.
Magalie R. Salas,
Secretary.
[FR Doc. E6-15666 Filed 9-22-06; 8:45 am]
BILLING CODE 6717-01-P