Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests and Comments, 55780-55781 [E6-15664]
Download as PDF
55780
Federal Register / Vol. 71, No. 185 / Monday, September 25, 2006 / Notices
rwilkins on PROD1PC63 with NOTICES
or lessen environmental impacts. The
more specific your comments, the more
useful they will be. To ensure that your
comments are timely and properly
recorded, please follow these
instructions:
• Send an original and two copies of
your letter to: Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426.
• Label one copy of your comments
for the attention of OEP/DG2E/Gas
Branch 3.
• Reference Docket No. PF06–13–000
on the original and both copies.
• Mail your comments so that they
will be received in Washington, DC on
or before October 18, 2006. Appropriate
copies will be provided to the Coast
Guard.
The Commission strongly encourages
electronic filing of any comments in
response to this NOI. For information on
electronically filing comments, please
see the instructions on the
Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing’’ link
and the link to the User’s Guide as well
as information in 18 CFR
385.2001(a)(1)(iii). Before you can file
comments you will need to create a free
account, which can be accomplished
on-line.
identified on the Commission’s service
list for this proceeding. Persons on the
service list with e-mail addresses may
be served electronically; others must be
served a hard copy of the filing.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Becoming an Intervenor
Because the NEPA Pre-Filing Process
occurs before an application to begin a
proceeding is officially filed, petitions
to intervene during this process are
premature and will not be accepted by
the Commission. When Downeast files
its application for authorization to
construct the proposed facilities, the
Commission will publish notice of the
application in the Federal Register and
establish a deadline for interested
persons to intervene in the proceeding.
To become an intervenor you must
file a motion to intervene according to
Rule 214 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.214). Intervenors have the right to
seek rehearing of the Commission’s
decision. Motions to Intervene should
be electronically submitted using the
Commission’s eFiling system at https://
www.ferc.gov. Persons without Internet
access should send an original and 14
copies of their motion to the Secretary
of the Commission at the address
indicated previously. Persons filing
Motions to Intervene on or before the
comment deadline indicated above must
send a copy of the motion to the
Applicant. All filings, including late
interventions, submitted after the
comment deadline must be served on
the Applicant and all other intervenors
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208-FERC (3372) or on the
FERC Internet Web site (https://
www.ferc.gov) using the ‘‘eLibrary link.’’
Click on the eLibrary link, select
‘‘General Search’’ and enter the project
docket number excluding the last three
digits (i.e., PF06–13) in the ‘‘Docket
Number’’ field. Be sure you have
selected an appropriate date range. For
assistance with eLibrary, the eLibrary
helpline can be reached at 1–866–208–
3676, TTY (202) 502–8659, or by e-mail
at FercOnlineSupport@ferc.gov. The
eLibrary link on the FERC Internet Web
site also provides access to the texts of
formal documents issued by the
Commission, such as orders, notices,
and rule makings.
In addition, the FERC now offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to https://www.ferc.gov/
esubscribenow.htm.
VerDate Aug<31>2005
17:46 Sep 22, 2006
Jkt 208001
Environmental Mailing List
All commentors will be retained on
our mailing list. If you do not want to
send comments at this time but still
want to keep informed and receive
copies of the Draft and Final EISs, you
must return the Information Request
(Appendix 2). Also, indicate on the form
your preference for receiving a paper
version in lieu of an electronic version
of the EIS on CD–ROM. If you do not
return this form, we will remove your
name from our mailing list.
Please note, if you have previously
submitted comments or returned an
Information Request, you are already on
our mailing list and do not need to resubmit comments or an Information
Request.
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
Public meetings or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Finally, Downeast has established an
Internet Web site for this project at
https://www.downeastlng.com/
index.htm. The Web site includes a
project overview, status, potential
impacts and mitigation, and answers to
frequently asked questions. You can
also request additional information by
calling Downeast directly at 207–214–
5926.
Magalie R. Salas,
Secretary.
[FR Doc. E6–15666 Filed 9–22–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests and Comments
September 18, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: P–12723–000.
c. Date filed: August 18, 2006.
d. Applicant: City of Quincy, Illinois.
e. Name of Project: Mississippi Lock
& Dam No. 20 Hydroelectric Project.
f. Location: At the existing U.S. Army
Corps of Engineers’ Mississippi Lock
and Dam No. 20 on the Mississippi
River, in Lewis County, Missouri, and
Adams County, Illinois.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Kenneth
Cantrell, Director of Administrative
Services, City of Quincy, 730 Maine
Street, Quincy, IL 62301, (217) 228–
4500.
i. FERC Contact: Patricia W. Gillis at
(202) 502–8735.
j. Deadline for filing comments,
protests, and motions to intervene:
November 24, 2006.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
E:\FR\FM\25SEN1.SGM
25SEN1
rwilkins on PROD1PC63 with NOTICES
Federal Register / Vol. 71, No. 185 / Monday, September 25, 2006 / Notices
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would utilize the
existing U.S. Army Corps of Engineers’
Mississippi Lock and Dam No. 20, and
would consist of the following facilities:
(1) A proposed powerhouse containing
16 generating units with an installed
capacity of 17.63 megawatts; (2) a
proposed 12-mile-long, 34.5-kilovolt or
a proposed 4-mile-long 69-kilovolt
transmission line; and (3) appurtenant
facilities. The average annual generation
is estimated to be 68,527 megawatt
hours.
l. Locations of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street NE.,
Room 2A, Washington DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit:
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
o. Competing Development
Application: Any qualified development
applicant desiring to file a competing
development application must submit to
the Commission, on or before a
specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
VerDate Aug<31>2005
17:46 Sep 22, 2006
Jkt 208001
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
p. Notice of Intent: A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies Under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
s. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and the number of copies
provided by the Commission’s
regulations to: The Secretary, Federal
Energy Regulatory Commission, 888
PO 00000
Frm 00008
Fmt 4703
Sfmt 4703
55781
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
t. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–15664 Filed 9–22–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Applications Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
September 18, 2006.
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection:
a. Type of Applications: Preliminary
Permit (Competing).
b. Applicants, Project Numbers, and
Dates Filed:
The City of Quincy, Illinois filed the
application for Project No. 12725–000
on August 18, 2006.
HydroUrban Development, LLC filed
the application for Project No.12728–
000 on August 28, 2006.
c. Name of the project is Mississippi
Lock & Dam No. 22 Project, located at
the existing U.S. Army Corps of
Engineers’ Mississippi Lock and Dam
No. 22 on the Mississippi River, in Ralls
County, Missouri, and Pike County,
Illinois.
d. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
e. Applicants Contacts: For City of
Quincy, Illinois: Mr. Kenneth Cantrell,
Director of Administrative Services, City
of Quincy, 730 Maine Street, Quincy, IL
62301, (217) 228–4500. For HydroUrban
Development, LLC: Mr. Victor Barrett,
HydroUrban Development, LLC, 3306
Shutten Way, St. Charles, MO, 63301
(314) 484–0400.
f. FERC Contact: Patricia W. Gillis at
(202) 502–8735.
g. Deadline for filing comments,
protests, and motions to intervene:
November 24, 2006.
E:\FR\FM\25SEN1.SGM
25SEN1
Agencies
[Federal Register Volume 71, Number 185 (Monday, September 25, 2006)]
[Notices]
[Pages 55780-55781]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-15664]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting Motions
To Intervene, Protests and Comments
September 18, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: P-12723-000.
c. Date filed: August 18, 2006.
d. Applicant: City of Quincy, Illinois.
e. Name of Project: Mississippi Lock & Dam No. 20 Hydroelectric
Project.
f. Location: At the existing U.S. Army Corps of Engineers'
Mississippi Lock and Dam No. 20 on the Mississippi River, in Lewis
County, Missouri, and Adams County, Illinois.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Kenneth Cantrell, Director of
Administrative Services, City of Quincy, 730 Maine Street, Quincy, IL
62301, (217) 228-4500.
i. FERC Contact: Patricia W. Gillis at (202) 502-8735.
j. Deadline for filing comments, protests, and motions to
intervene: November 24, 2006.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they
[[Page 55781]]
must also serve a copy of the document on that resource agency.
k. Description of Project: The proposed project would utilize the
existing U.S. Army Corps of Engineers' Mississippi Lock and Dam No. 20,
and would consist of the following facilities: (1) A proposed
powerhouse containing 16 generating units with an installed capacity of
17.63 megawatts; (2) a proposed 12-mile-long, 34.5-kilovolt or a
proposed 4-mile-long 69-kilovolt transmission line; and (3) appurtenant
facilities. The average annual generation is estimated to be 68,527
megawatt hours.
l. Locations of Applications: A copy of the application is
available for inspection and reproduction at the Commission in the
Public Reference Room, located at 888 First Street NE., Room 2A,
Washington DC 20426, or by calling (202) 502-8371. This filing may also
be viewed on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item h
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Competing Preliminary Permit: Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR
4.30(b) and 4.36.
o. Competing Development Application: Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
p. Notice of Intent: A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
q. Proposed Scope of Studies Under Permit: A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under ``e-filing'' link.
The Commission strongly encourages electronic filing.
s. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. Any of the above-named documents must be filed
by providing the original and the number of copies provided by the
Commission's regulations to: The Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426. A copy of any
motion to intervene must also be served upon each representative of the
Applicant specified in the particular application.
t. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6-15664 Filed 9-22-06; 8:45 am]