Environmental Impact Statements; Notice of Availability, 55463-55464 [06-8103]

Download as PDF sroberts on PROD1PC70 with NOTICES Federal Register / Vol. 71, No. 184 / Friday, September 22, 2006 / Notices Grand Mesa, Uncompahgre and Gunnison National Forests, Gunnison County, CO. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20060267, ERP No. F–BLM– K65290–CA, Ukiah Resource Management Plan, Implementation, Several Counties, CA. Summary: EPA does not object to the selected actions, and believes that the management actions presented in the Resource Management Plan will minimize human exposure to naturally occurring asbestos (NOA) within the jurisdiction of the Ukiah Field Office. EIS No. 20060320, ERP No. F–NRC– F06026–IL, Early Site Permit (ESP) at the Exelon ESP Site, Application for ESP on One Additional Nuclear Unit, within the Clinton Power Station (CPS), NUREG–1815, DeWitt County, IL. Summary: EPA continues to express concerns about the adequacy and clarity of radiological risk information, the level of wetland information provided, and project impacts on Clinton Lake. EIS No. 20060329, ERP No. F–NRS– H34030–MO, East Locust Creek Watershed Revised Plan, Installation of Multiple-Purpose Reservoir, Flood Prevention and Watershed Protection, Sullivan and Putnam Counties, MO. Summary: EPA’s previous concerns have been resolved; therefore, EPA does not object to the proposed action. EIS No. 20060331, ERP No. F–FRC– L05232–WA, Rocky Reach Hydroelectric Project, (FERC/DEIS– 0184F), Application for a New License for the Existing 865.76 Megawatt Facility, Public Utility District No. 1 (PUD), Columbia River, Chelan County, WA. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20060336, ERP No. F–NPS– K61160–CA, Non-Native Deer Management Plan of Axis Deer (Axis axis) and Fallow Deer (Dama dama), Implementation, Point Reyes National Seashore (PRNS) and Golden Gate National Recreation Area, Marin County, CA. Summary: EPA does not object to the proposed project. EIS No. 20060339, ERP No. F–FRA– J53007–00, ADOPTION—Powder River Basin Expansion Project, Construction of New Rail Facilities, Finance Docket No. 33407 Dakota, Minnesota and Eastern Railroad, SD, WY and MN. Summary: No formal comment letter was sent on this adopted EIS. VerDate Aug<31>2005 21:44 Sep 21, 2006 Jkt 208001 EIS No. 20060353, ERP No. F–NRS– J36054–UT, Coal Creek Flood Control and Parkway Project, Proposed Channel Improvements, Two Irrigation Division Structures on Coal Creek (the Main Street Diversion and the Woodbury Diversion), Cedar City, Iron County, UT. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20060334, ERP No. FS–UAF– G11038–00, Realistic Bomber Training Initiative, Addresses Impacts of Wake Vortices on Surface Structures, Dyess Air Force Base, TX and Barksdale Air Force Base, LA. Summary: No formal comment letter was sent to the preparing agency. Dated: September 19, 2006. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 06–8051 Filed 9–21–06; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6679–4] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 9/11/2006 Through 9/15/2006 Pursuant to 40 CFR 1506.9. EIS No. 20060378, Draft EIS, NPS, 00, Programmatic—Servicewide Benefits Sharing Project, To Clarify the Rights and Responsibilities of Researchers and National Park Service (NPS) Management in Connection with the Use of Valuable Discoveries, Inventions, and Other Developments, across the United States, Comment Period Ends: 12/15/2006, Contact: Susan M. Mills 307–344–2203. EIS No. 20060379, Final EIS, BPA, OR, Klondike III Wind Project (300 megawatts {MW}) and Biglow Canyon Wind Farm (400 megawatts {MW}) Integration Project, Construction and Operation of a Double-Circuit 230Kilovolt (kV) Transmission, Sherman County, OR, Wait Period Ends: 10/23/ 2006, Contact: Gene Lynard 503–230– 3790. EIS No. 20060380, Draft EIS, AFS, CO, Robin Redbreast Unpatented Lode Claim Mining Plan of Operations, Implementation, U.S. Army COE Section 404 Permit, Located above the PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 55463 Middle Fork of the Cimarron River within the Uncompahgre Wilderness, Ouray Ranger District, Grand Mesa, Uncompahgre and Gunnison National Forests, Hinsdale County, CO, Comment Period Ends: 11/06/2006, Contact: Jeff Burch 970–874–6649. EIS No. 20060381, Final EIS, AFS, WV, Programmatic—Monongahela National Forest Plan Revision, Proposes to Revise Land and Resource Management Plan, Barbour, Grant, Greebrier, Nicholas, Pendleton, Pocahontab, Preston, Randolph, Tucker and Webster Counties, WV, Wait Period Ends: 10/23/2006, Contact: Anita Kelley 304–636–1800 Ext. 324. EIS No. 20060382, Final EIS, BLM, 00, Lake Havasu Field Office Resource Management Plan, Implementation, Colorado River, Davis Dam in the north and south to Park Dam, CA and AZ, Wait Period Ends: 10/23/2006, Contact: Gine Trafton 1–888–213– 2582 Ext 273. EIS No. 20060383, Draft EIS, NPS, 00, South Florida and Caribbean Parks Exotic Plant Management Plan, Manage and Control Exotic Plants in Nine Parks, Five in South Florida Parks: Big Cypress National Preserve, Biscayne National Park, Canaveral National Seashore, Dry Tortugas National Park, Everglades National Park and Four in Caribbean Parks: Buck Island Reef National Monument, Christiansted National Historic Site, Salt River Bay National Historic Park and Ecological Preserve and Virgin Islands National Park, Florida and Caribbean, Comment Period Ends: 11/ 20/2006, Contact: Sandra Hamilton 303–969–2068. EIS No. 20060384, Final EIS, NRS, KY Rockhouse Creek Watershed Plan, To Protect Regimental and Nonresidential Structures from Recurrent Flood Problem, Leslie County, KY, Wait Period Ends: 10/23/2006, Contact: Anita Arends 859–224–7354. EIS No. 20060385, Final EIS, COE, WV, Spruce No. 1 Mine, Construction and Operation, Mining for 2.73 Million Ton of Bituminous Coal, NPDES Permit and U.S. Army COE Section 404 Permit, Logan County, WV, Wait Period Ends: 10/23/2006, Contact: Teresa Spagna 304–399– 5710. EIS No. 20060386, Final Supplement, AFS, WI, Northwest Howell Vegetation Management Project, New Information to Address Inadequate Disclosure of the Cumulative Effects Analysis for Six Animal and Two Plant Species, Eagle River-Florence Ranger District, Chequamegon-Nicole National Forest, Florence and Forest E:\FR\FM\22SEN1.SGM 22SEN1 55464 Federal Register / Vol. 71, No. 184 / Friday, September 22, 2006 / Notices Counties, WI, Wait Period Ends: 10/ 23/2006, Contact: Brian Quinn 715– 762–5176. ENVIRONMENTAL PROTECTION AGENCY B. How Can I Get Copies of this Document and Other Related Information? Amended Notices [EPA–HQ–OPP–2006–0703; FRL–8093–1] EIS No. 20060295, Draft EIS, BLM, WY, Casper Field Office Planning Area Resource Management Plan, Implementation, Natrona, Converse, Goshen, and Platte Counties, WY, Comment Period Ends: 10/19/2006, Contact: Linda Stone 307–261–7600. Revision to FR Notice Published 07/ 21/2006: Extended Comment Period from 09/18/2006 to 10/19/2006. EIS No. 20060315, Draft EIS, AFS, CA, Antelope-Pardee 500kV Transmission Project, Construct, Operate and Maintain a New 25.6 mile 500kV Transmission Line, Right-of-Way Permit and Special Use Authorization, Angeles National Forest, Los Angeles County, CA, Comment Period Ends: 10/03/2006, Contact: Marian Kadota 805–961– 5732. Revision of FR Notice Published 08/04/2006: Extended Comment Period from 09/18/2006 to 10/03/ 2006. EIS No. 20060357, Draft EIS, COE, CA, Hemet/San Jacinto Integrated Recharge and Recovery Program, Construction and Operation, U.S. Army COE Section 404 Permit, Riverside County, CA, Comment Period Ends: 10/20/2006, Contact: Dr. Daniel P. Swenson 213–452–3414. Revision of FR Notice Published 09/ 01/2006: Correction to Comment Period from 10/16/2006 to 10/20/2006. EIS No. 20060361, Draft Supplement, NRS, WV, Lost River Subwatershed of the Potomac River Watershed Project, Construction of Site 16 on Lower Cove Run and Deletion of Site 23 on Upper Cove Run, U.S. Army COE Section 404 Permit, Hardy County, WV, Comment Period Ends: 10/25/ 2006, Contact: Ronald L. Hilliard 304– 284–7560. Exposure Modeling Work Group; Notice of Public Meeting 1. Docket. EPA has established a docket for this action under docket identification (ID) number EPA–HQ– OPP–2006–0703. Publicly available docket materials are available either in the electronic docket at https:// www.regulations.gov, or, if only available in hard copy, at the Office of Pesticide Programs (OPP) Regulatory Public Docket in Rm. S-4400, One Potomac Yard (South Building), 2777 S. Crystal Drive Arlington, VA. The hours of operation of this Docket Facility are from 8:30 a.m. to 4 p.m., Monday through Friday, excluding legal holidays. The Docket telephone number is (703) 305-5805. 2. Electronic access. You may access this Federal Register document electronically through the EPA Internet under the ‘‘Federal Register’’ listings at https://www.epa.gov/fedrgstr. sroberts on PROD1PC70 with NOTICES Revision of FR Notice Published 9/8/ 2006: Correction to Document Status from Draft Supplement to Draft. Dated: September 19, 2006. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 06–8103 Filed 9–21–06; 8:45 am] BILLING CODE 6560–50–P VerDate Aug<31>2005 20:37 Sep 21, 2006 Jkt 208001 Environmental Protection Agency (EPA). AGENCY: ACTION: Notice. SUMMARY: The Exposure Modeling Work Group (EMWG) will hold a 1–day meeting on October 3, 2006. This notice announces the location and time for the meeting and provides the tentative agenda topics. The meeting will be held on October 3, 2006 from 9 am to 3 pm. To request accommodation of a disability, please contact the person listed under FOR FURTHER INFORMATON CONTACT, preferably at least 10 days prior to the meeting, to give EPA as much time as possible to process your request. DATES: The meeting will be held at the Environmental Protection Agency, Office of Pesticide Programs (OPP), One Potomac Yard (South Building), Room S–4380, 2777 S. Crystal Drive, Arlington, VA. ADDRESSES: FOR FURTHER INFORMATION CONTACT: Keara Moore, Environmental Fate and Effects Division, Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460-0001; telephone number: (703) 305-0878; fax number: (703) 305-6309; e-mail address: moore.keara@epa.gov. SUPPLEMENTARY INFORMATION: I. General Information A. Does this Action Apply to Me? This action is directed to the public in general, and may be of particular interest to those persons who are or may be required to conduct testing of chemical substances under the Toxic Substances Control Act (TSCA), the Federal Food, Drug and Cosmetic Act (FFDCA), or the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA). Since other entities may also be interested, the Agency has not attempted to describe all the specific entities that may be affected by this action. If you have any questions regarding the applicability of this action to a particular entity, consult the person listed under FOR FURTHER INFORMATION CONTACT. PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 II. Background On a quarterly interval, the Exposure Modeling Work Group meets to discuss current issues in modeling pesticide fate, transport, and exposure to pesticides in support of risk assessment in a regulatory context. III. How Can I Request to Participate in this Meeting? You may submit a request to participate in this meeting to the person listed under FOR FURTHER INFORMATION CONTACT. Do not submit any information in your request that is considered CBI. Requests to participate in the meeting, identified by docket ID number EPA– HQ–OPP–2006–0703, must be received on or before October 23, 2006. IV. Tentative Agenda 1. Welcome and Introductions 2. Old Action Items 3. Brief Updates 4. Major Topics • Use of Visual PLUMES and EXAMS in the Development and Field Evaluation of Aquatic Herbicides (Scott Jackson, BASF) • Field and Modeling Investigations of Setback Distances for Aquatic Pest Management Products (TCB, Dow) • 2–D Canal and Lake Modeling using Finite Element Model RMA–11 (TBD, Syngenta) • Exposure Assessment of Aquatic Pesticides (R David Jones, EPA/EFED) • TBD, (Kurt Getsinger, USACE) • TBD, (Lars Anderson, USDA-ARS) E:\FR\FM\22SEN1.SGM 22SEN1

Agencies

[Federal Register Volume 71, Number 184 (Friday, September 22, 2006)]
[Notices]
[Pages 55463-55464]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-8103]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6679-4]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of FederalActivities, General 
Information (202) 564-7167 orhttps://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 9/11/2006 Through 9/15/2006
Pursuant to 40 CFR 1506.9.

EIS No. 20060378, Draft EIS, NPS, 00, Programmatic--Servicewide 
Benefits Sharing Project, To Clarify the Rights and Responsibilities of 
Researchers and National ParkService (NPS) Management in Connection 
with the Use of ValuableDiscoveries, Inventions, and Other 
Developments, across the United States, Comment Period Ends: 12/15/
2006,Contact: Susan M. Mills 307-344-2203.
EIS No. 20060379, Final EIS, BPA, OR, Klondike III Wind Project (300 
megawatts {MW{time} ) and Biglow CanyonWind Farm (400 megawatts 
{MW{time} ) Integration Project, Construction and Operation of a 
Double-Circuit 230-Kilovolt (kV) Transmission,Sherman County, OR, Wait 
Period Ends: 10/23/2006,Contact: Gene Lynard 503-230-3790.
EIS No. 20060380, Draft EIS, AFS, CO, Robin Redbreast Unpatented Lode 
Claim Mining Plan of Operations,Implementation, U.S. Army COE Section 
404 Permit, Located above the Middle Fork of the Cimarron River within 
the UncompahgreWilderness, Ouray Ranger District, Grand Mesa, 
Uncompahgre andGunnison National Forests, Hinsdale County, CO, Comment 
PeriodEnds: 11/06/2006, Contact: Jeff Burch 970-874-6649.
EIS No. 20060381, Final EIS, AFS, WV, Programmatic--Monongahela 
National Forest Plan Revision,Proposes to Revise Land and Resource 
Management Plan, Barbour,Grant, Greebrier, Nicholas, Pendleton, 
Pocahontab, Preston,Randolph, Tucker and Webster Counties, WV, Wait 
Period Ends:10/23/2006, Contact: Anita Kelley 304-636-1800 Ext. 324.
EIS No. 20060382, Final EIS, BLM, 00, Lake Havasu Field Office Resource 
Management Plan,Implementation, Colorado River, Davis Dam in the north 
and south to Park Dam, CA and AZ, Wait Period Ends: 10/23/2006, 
Contact: Gine Trafton 1-888-213-2582 Ext 273.
EIS No. 20060383, Draft EIS, NPS, 00, South Florida and Caribbean Parks 
Exotic Plant Management Plan,Manage and Control Exotic Plants in Nine 
Parks, Five in SouthFlorida Parks: Big Cypress National Preserve, 
Biscayne NationalPark, Canaveral National Seashore, Dry Tortugas 
National Park,Everglades National Park and Four in Caribbean Parks: 
Buck IslandReef National Monument, Christiansted National Historic 
Site,Salt River Bay National Historic Park and Ecological Preserve and 
Virgin Islands National Park, Florida and Caribbean,Comment Period 
Ends: 11/20/2006, Contact: Sandra Hamilton 303-969-2068.
EIS No. 20060384, Final EIS, NRS, KY Rockhouse Creek Watershed Plan, To 
Protect Regimental andNon-residential Structures from Recurrent Flood 
Problem, LeslieCounty, KY, Wait Period Ends: 10/23/2006,Contact: Anita 
Arends 859-224-7354.
EIS No. 20060385, Final EIS, COE, WV, Spruce No. 1 Mine, Construction 
and Operation, Mining for 2.73Million Ton of Bituminous Coal, NPDES 
Permit and U.S. Army COE
Section 404 Permit, Logan County, WV, Wait Period Ends:10/23/2006, 
Contact: Teresa Spagna 304-399-5710.
EIS No. 20060386, Final Supplement, AFS, WI, Northwest Howell 
Vegetation Management Project, New Information to Address Inadequate 
Disclosure of the Cumulative EffectsAnalysis for Six Animal and Two 
Plant Species, EagleRiver-Florence Ranger District, Chequamegon-Nicole 
NationalForest, Florence and Forest

[[Page 55464]]

Counties, WI, Wait Period Ends:10/23/2006, Contact: Brian Quinn 715-
762-5176.

Amended Notices

EIS No. 20060295, Draft EIS, BLM, WY, Casper Field Office Planning Area 
Resource Management Plan,Implementation, Natrona, Converse, Goshen, and 
Platte Counties,WY, Comment Period Ends: 10/19/2006,Contact: Linda 
Stone 307-261-7600.Revision to FR Notice Published 07/21/2006: Extended 
CommentPeriod from 09/18/2006 to 10/19/2006.
EIS No. 20060315, Draft EIS, AFS, CA, Antelope-Pardee 500kV 
Transmission Project, Construct, Operate and Maintain a New 25.6 mile 
500kV Transmission Line,Right-of-Way Permit and Special Use 
Authorization, AngelesNational Forest, Los Angeles County, CA, Comment 
Period Ends:10/03/2006, Contact: Marian Kadota 805-961-5732.Revision of 
FR Notice Published 08/04/2006: Extended CommentPeriod from 09/18/2006 
to 10/03/2006.
EIS No. 20060357, Draft EIS, COE, CA, Hemet/San Jacinto Integrated 
Recharge and Recovery Program,Construction and Operation, U.S. Army COE 
Section 404 Permit,Riverside County, CA, Comment Period Ends: 10/20/
2006, Contact:
    Dr. Daniel P. Swenson 213-452-3414.
    Revision of FR Notice Published 09/01/2006: Correction to Comment 
Period from 10/16/2006 to 10/20/2006.
EIS No. 20060361, Draft Supplement, NRS, WV, Lost River Subwatershed of 
the Potomac River Watershed Project,Construction of Site 16 on Lower 
Cove Run and Deletion of Site 23 on Upper Cove Run, U.S. Army COE 
Section 404 Permit, HardyCounty, WV, Comment Period Ends: 10/25/2006, 
Contact:Ronald L. Hilliard 304-284-7560.

    Revision of FR Notice Published 9/8/2006: Correction to Document 
Status from Draft Supplement to Draft.

    Dated: September 19, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 06-8103 Filed 9-21-06; 8:45 am]
BILLING CODE 6560-50-P