Notice of Application for Non-Project Use of Project Lands and Waters and Soliciting Comments, Motions To Intervene, and Protests, 54653 [E6-15428]
Download as PDF
Federal Register / Vol. 71, No. 180 / Monday, September 18, 2006 / Notices
n. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘PROTESTS’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
o. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filling comments, it will be assumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–15427 Filed 9–15–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Waters and
Soliciting Comments, Motions To
Intervene, and Protests
cprice-sewell on PROD1PC66 with NOTICES
September 12, 2006.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No.: 349–115.
c. Date Filed: August 18, 2006.
d. Applicant: Alabama Power
Company.
e. Name of Project: Martin Dam
Hydroelectric Project.
f. Location: The project is located on
Lake Martin in Tallapoosa County,
Alabama.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r) and 799
and 801.
h. Applicant Contact: Mr. Keith E.
Bryant, Senior Engineer; 600 18th Street
North, Birmingham, AL 35203, (205)
257–1403.
VerDate Aug<31>2005
14:48 Sep 15, 2006
Jkt 208001
i. FERC Contact: Any questions on
this notice should be addressed to Isis
Johnson at (202) 502–6346, or by e-mail:
Isis.Johnson@ferc.gov.
j. Deadline for filing comments and or
motions: October 13, 2006.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Please include the project number (P–
349–115) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages efilings.
k. Description of Request: Alabama
Power Company, licensee for the Martin
Dam Hydroelectric Project, has
requested Commission approval to
permit The Pointe at Sunset Point LLC
to install 30 stationary boat slips, as
well as a separate stationary wooden
pier and platform. These facilities are
intended for use by the residents of
condominiums that are located outside
the project boundary on adjoining lands.
These facilities would be located on the
north side of Blue Creek, approximately
eight stream miles above Martin Dam.
Existing structures within the project
boundary at the proposed development
site include ten stationary wooden boat
slips and a seawall that protects 974 feet
of shoreline. These structures were
previously permitted by the licensee. A
commercial marina, Harbor Pointe, is
also located within one mile of The
Pointe at Sunset Point.
l. Location of the Application: This
filing is available for review at the
Commission or may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
54653
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title ‘‘Comments’’,
‘‘Recommendations for Terms and
Conditions’’, ‘‘Protest’’, or ‘‘Motion to
Intervene’’, as applicable, and the
Project Number of the particular
application to which the filing refers. A
copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described
applications. A copy of the applications
may be obtained by agencies directly
from the Applicant. If an agency does
not file comments within the time
specified for filing comments, it will be
presumed to have no comments. One
copy of an agency’s comments must also
be sent to the Applicant’s
representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–15428 Filed 9–15–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP06–365–000; Docket No.
RP06–231–002]
Columbia Gas Transmission
Corporation; Norstar Operating, LLC v.
Columbia Gas Transmission
Corporation; Notice of Meeting
September 12, 2006.
Take notice that a meeting will be
held in the above-captioned proceeding
on Tuesday, September 26, 2006, at 1
p.m. (EDT), at 200 Civic Center Drive,
Columbus, Ohio 43215.
The purpose of the meeting is to
discuss the basics of pipeline corrosion
including measurement, assessment,
and control methods, as well as history
and experience.
Attendance is limited to Commission
Staff and parties to the proceeding.
Those parties who want to attend
E:\FR\FM\18SEN1.SGM
18SEN1
Agencies
[Federal Register Volume 71, Number 180 (Monday, September 18, 2006)]
[Notices]
[Page 54653]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-15428]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Non-Project Use of Project Lands and
Waters and Soliciting Comments, Motions To Intervene, and Protests
September 12, 2006.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Non-Project Use of Project Lands and Waters.
b. Project No.: 349-115.
c. Date Filed: August 18, 2006.
d. Applicant: Alabama Power Company.
e. Name of Project: Martin Dam Hydroelectric Project.
f. Location: The project is located on Lake Martin in Tallapoosa
County, Alabama.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r)
and 799 and 801.
h. Applicant Contact: Mr. Keith E. Bryant, Senior Engineer; 600
18th Street North, Birmingham, AL 35203, (205) 257-1403.
i. FERC Contact: Any questions on this notice should be addressed
to Isis Johnson at (202) 502-6346, or by e-mail: Isis.Johnson@ferc.gov.
j. Deadline for filing comments and or motions: October 13, 2006.
All documents (original and eight copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Please include the project
number (P-349-115) on any comments or motions filed. Comments,
protests, and interventions may be filed electronically via the
internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site under the ``e-Filing'' link.
The Commission strongly encourages e-filings.
k. Description of Request: Alabama Power Company, licensee for the
Martin Dam Hydroelectric Project, has requested Commission approval to
permit The Pointe at Sunset Point LLC to install 30 stationary boat
slips, as well as a separate stationary wooden pier and platform. These
facilities are intended for use by the residents of condominiums that
are located outside the project boundary on adjoining lands. These
facilities would be located on the north side of Blue Creek,
approximately eight stream miles above Martin Dam. Existing structures
within the project boundary at the proposed development site include
ten stationary wooden boat slips and a seawall that protects 974 feet
of shoreline. These structures were previously permitted by the
licensee. A commercial marina, Harbor Pointe, is also located within
one mile of The Pointe at Sunset Point.
l. Location of the Application: This filing is available for review
at the Commission or may be viewed on the Commission's Web site at
https://www.ferc.gov, using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY,
contact (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``Comments'', ``Recommendations
for Terms and Conditions'', ``Protest'', or ``Motion to Intervene'', as
applicable, and the Project Number of the particular application to
which the filing refers. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described applications. A copy of the
applications may be obtained by agencies directly from the Applicant.
If an agency does not file comments within the time specified for
filing comments, it will be presumed to have no comments. One copy of
an agency's comments must also be sent to the Applicant's
representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6-15428 Filed 9-15-06; 8:45 am]
BILLING CODE 6717-01-P