Notice of Effectiveness of Exempt Wholesale Generator or Foreign Utility Company Status, 54039-54040 [E6-15172]

Download as PDF 54039 Federal Register / Vol. 71, No. 177 / Wednesday, September 13, 2006 / Notices South’s customers, state commissions and other interested parties. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, on or before the date as indicated below. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time September 13, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–15159 Filed 9–12–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator or Foreign Utility Company Status September 7, 2006. Docket No. hsrobinson on PROD1PC61 with NOTICES LSP Morro Bay, LLC (f/k/a Duke Energy Morro Bay LLC) ................................................................................................. LSP South Bay, LLC (f/k/a Duke Energy South Bay LLC) ................................................................................................ Bridgeport Energy LLC (f/k/a Duke Energy Morro Bay LLC) ............................................................................................. LSP Moss Landing, LLC (f/k/a Duke Energy Moss Landing LLC) ..................................................................................... Griffith Energy, LLC ............................................................................................................................................................ LSP Arlington Valley, LLC (f/k/a Duke Energy Arlington Valley LLC) ................................................................................ Casco Bay Energy Company, LLC ..................................................................................................................................... LSP Oakland, LLC (f/k/a Duke Energy Oakland LLC) ....................................................................................................... Flat Rock Windpower II LLC ............................................................................................................................................... EPCOR Transmission Inc.; EPCOR Energy Inc.; EPCOR Distribution Inc.; EPCOR Energy Alberta Inc.; EPCOR Utilities Inc. Babcock & Brown Infrastructure Limited; BBI Energy Partnership Pty Limited; BBI Networks (Australia) Pty Limited; BBI IEG Australia Holdings Pty Limited. SUEZ S.A.; Electrabel S.A.; SUEZ Energy Services S.A.; Rivolam S.A.; PTT Natural Gas Distribution Co. Ltd.; SUEZ ¨ Energy Asia Co. Ltd.; Suez-Tractebel Energy Holding Cooperatieve U.A.; Zhenjiang Hongshun Thermal Power Co. Ltd.; SUEZ Energy International Luxembourg S.A.; United Power Company S.A.O.G.; Belgelectric Finance B.V.; Sohar Power Company SAOC; Sohar Operation and Maintenance Company LLC; Al Ezzel Power Company B.S.C; Al Ezzel Operation and Maintenance Company W.L.L; Al Hidd Power Company B.S.C.; Tractebel Bahrain W.L.L.; Tractebel Parts & Repairs FZE; SUEZ Energy Andino S.A.; Tibsa Inversora S.A.; SUEZ Energy South America ´ Participacoes Ltda.; Energıa del Sur S.A.; Gas Natural de Lima y Callao S.R.L.; SUEZ Energia de Mexico, S.A. de C.V.; Mexico Gas Tampico 1 Ltd.; Tractebel Energia de Monterrey Holdings B.V.; Trigen Energia, Inc.; Trigen Mexico, Inc.; 6425496 Canada Inc. FortisOntario, Inc.; Newfoundland Power Inc.; Maritime Electric Company, Limited; FortisAlberta Inc.; FortisBC Inc.; Belize Electricity Limited; Carribean Utilities Company, Ltd; Princeton Light and Power Company, Limited. Prisma Energy Nicaragua Holdings Ltd.; Prisma Energy International Inc.; Empresa Energetica Corinto Ltd. ................ Brookfield Asset Management Inc.; Valerie Falls Limited Partnership; Lake Superior Power Limited Partnership; Mississippi Property Inc.; Superior Wind Blue Highlands Power Inc.; Superior Wind Prince Power Inc.; Brookfield Power Wind Prince LP; Beaver Power Corporation; Carmichael Limited Partnership; Algonquin Power (Nagagami) ` L.P.; FPS Canada, Inc.; Waltham Power and Company, Limited Partnership; Lievre Power L.P.; Coulonge Power ` and Company, Limited Partnership; Powell River Energy Limited Partnership; Pingston Power Inc.; Energetica Rio ` ` ` Pedrinho S.A.; Centrais Hidreletricas Grapon S.A.; Energetica Salto Natal S.A.; Energetica Ponte Alta S.A.; ` Brascan Energetica Minas Gerais S.A.. Centrica Barry Limited; Barrow Offshore Wind Limited; Braes of Doune Wind Farm (Scotland) Limited; Centrica (DSW) Limited; Centrica (IDW) Limited; Centrica (Lincs) Limited; Centrica (RBW) Limited; Centrica Brigg Limited; Centrica KL Limited; Centrica Langage Limited; Centrica KPS Limited; Centrica PB Limited; Centrica RPS Limited; Centrica SHB Limited; Glens of Foudland Windfarm Limited; Segebel SA. VerDate Aug<31>2005 16:19 Sep 12, 2006 Jkt 208001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\13SEN1.SGM 13SEN1 EG06–54–000 EG06–55–000 EG06–56–000 EG06–57–000 EG06–58–000 EG06–59–000 EG06–60–000 EG06–61–000 EG06–62–000 FC06–7–000 FC06–8–000 FC06–9–000 FC06–10–000 FC06–11–000 FC06–12–000 FC06–14–000 54040 Federal Register / Vol. 71, No. 177 / Wednesday, September 13, 2006 / Notices Take notice that during the month of August 2006, the status of the abovecaptioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Magalie R. Salas, Secretary. [FR Doc. E6–15172 Filed 9–12–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E6–15145 Filed 9–12–06; 8:45 am] [Docket No. RP06–511–000] Maritimes & Northeast Pipeline, LLC; Notice of Proposed Changes in FERC Gas Tariff hsrobinson on PROD1PC61 with NOTICES August 29, 2006. Take notice that on August 24, 2006, Maritimes & Northeast Pipeline, LLC (Maritimes) tendered for filing as part of its FERC Gas Tariff, First Revised Volume No. 1, Second Revised Sheet No. 306 to be effective September 24, 2006. Maritimes states that copies of its filing have been mailed to all affected customers and interested state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, VerDate Aug<31>2005 16:19 Sep 12, 2006 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Jkt 208001 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E6–15166 Filed 9–12–06; 8:45 am] [Docket No. RP06–583–000] BILLING CODE 6717–01–P Midwestern Gas Transmission Company; Notice of Proposed Changes in FERC Gas Tariff September 6, 2006. Take notice that on September 1, 2006, Midwestern Gas Transmission Company (Midwestern) tendered for filing to become part of its FERC Gas Tariff, Third Revised Volume No. 1, the following tariff sheets to become effective October 1, 2006: Second Revised Sheet No. 78 Third Revised Sheet No. 80 Third Revised Sheet No. 81 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP06–445–000] MIGC, Inc.; Colorado Interstate Gas Company; Notice of Application September 7, 2006. Take notice that on September 1, 2006, MIGC, Inc. (MIGC), 1099 18th Street, Suite 1200, Denver, CO 80202, and Colorado Interstate Gas Company (CIG), P.O. Box 1087, Colorado Springs, Colorado, 80944, filed a joint application in Docket No. CP06–445– 000, pursuant to sections 7(b) and 7(c) of the Natural Gas Act for approval for MIGC to abandon its lease of capacity on CIG’s Powder River Lateral located in Converse County, Wyoming. Concurrently, CIG is seeking authorization to reacquire the capacity associated with the terminating lease with MIGC, all as more fully set forth in the application which is on file with the Commission and open for public inspection. These filings are available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at E:\FR\FM\13SEN1.SGM 13SEN1

Agencies

[Federal Register Volume 71, Number 177 (Wednesday, September 13, 2006)]
[Notices]
[Pages 54039-54040]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-15172]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Effectiveness of Exempt Wholesale Generator or Foreign 
Utility Company Status

September 7, 2006.

------------------------------------------------------------------------
                                                    Docket No.
------------------------------------------------------------------------
LSP Morro Bay, LLC (f/k/a Duke Energy     EG06-54-000
 Morro Bay LLC).
LSP South Bay, LLC (f/k/a Duke Energy     EG06-55-000
 South Bay LLC).
Bridgeport Energy LLC (f/k/a Duke Energy  EG06-56-000
 Morro Bay LLC).
LSP Moss Landing, LLC (f/k/a Duke Energy  EG06-57-000
 Moss Landing LLC).
Griffith Energy, LLC....................  EG06-58-000
LSP Arlington Valley, LLC (f/k/a Duke     EG06-59-000
 Energy Arlington Valley LLC).
Casco Bay Energy Company, LLC...........  EG06-60-000
LSP Oakland, LLC (f/k/a Duke Energy       EG06-61-000
 Oakland LLC).
Flat Rock Windpower II LLC..............  EG06-62-000
EPCOR Transmission Inc.; EPCOR Energy     FC06-7-000
 Inc.; EPCOR Distribution Inc.; EPCOR
 Energy Alberta Inc.; EPCOR Utilities
 Inc.
Babcock & Brown Infrastructure Limited;   FC06-8-000
 BBI Energy Partnership Pty Limited; BBI
 Networks (Australia) Pty Limited; BBI
 IEG Australia Holdings Pty Limited.
SUEZ S.A.; Electrabel S.A.; SUEZ Energy   FC06-9-000
 Services S.A.; Rivolam S.A.; PTT
 Natural Gas Distribution Co. Ltd.; SUEZ
 Energy Asia Co. Ltd.; Suez-Tractebel
 Energy Holding Co[ouml]peratieve U.A.;
 Zhenjiang Hongshun Thermal Power Co.
 Ltd.; SUEZ Energy International
 Luxembourg S.A.; United Power Company
 S.A.O.G.; Belgelectric Finance B.V.;
 Sohar Power Company SAOC; Sohar
 Operation and Maintenance Company LLC;
 Al Ezzel Power Company B.S.C; Al Ezzel
 Operation and Maintenance Company
 W.L.L; Al Hidd Power Company B.S.C.;
 Tractebel Bahrain W.L.L.; Tractebel
 Parts & Repairs FZE; SUEZ Energy Andino
 S.A.; Tibsa Inversora S.A.; SUEZ Energy
 South America Participacoes Ltda.;
 Energ[iacute]a del Sur S.A.; Gas
 Natural de Lima y Callao S.R.L.; SUEZ
 Energia de Mexico, S.A. de C.V.; Mexico
 Gas Tampico 1 Ltd.; Tractebel Energia
 de Monterrey Holdings B.V.; Trigen
 Energia, Inc.; Trigen Mexico, Inc.;
 6425496 Canada Inc.
FortisOntario, Inc.; Newfoundland Power   FC06-10-000
 Inc.; Maritime Electric Company,
 Limited; FortisAlberta Inc.; FortisBC
 Inc.; Belize Electricity Limited;
 Carribean Utilities Company, Ltd;
 Princeton Light and Power Company,
 Limited.
Prisma Energy Nicaragua Holdings Ltd.;     FC06-11-000
 Prisma Energy International Inc.;
 Empresa Energetica Corinto Ltd..
Brookfield Asset Management Inc.;         FC06-12-000
 Valerie Falls Limited Partnership; Lake
 Superior Power Limited Partnership;
 Mississippi Property Inc.; Superior
 Wind Blue Highlands Power Inc.;
 Superior Wind Prince Power Inc.;
 Brookfield Power Wind Prince LP; Beaver
 Power Corporation; Carmichael Limited
 Partnership; Algonquin Power (Nagagami)
 L.P.; FPS Canada, Inc.; Waltham Power
 and Company, Limited Partnership;
 Li[egrave]vre Power L.P.; Coulonge
 Power and Company, Limited Partnership;
 Powell River Energy Limited
 Partnership; Pingston Power Inc.;
 Energ[egrave]tica Rio Pedrinho S.A.;
 Centrais Hidrel[egrave]tricas Grapon
 S.A.; Energ[egrave]tica Salto Natal
 S.A.; Energ[egrave]tica Ponte Alta
 S.A.; Brascan Energ[egrave]tica Minas
 Gerais S.A..
Centrica Barry Limited; Barrow Offshore   FC06-14-000
 Wind Limited; Braes of Doune Wind Farm
 (Scotland) Limited; Centrica (DSW)
 Limited; Centrica (IDW) Limited;
 Centrica (Lincs) Limited; Centrica
 (RBW) Limited; Centrica Brigg Limited;
 Centrica KL Limited; Centrica Langage
 Limited; Centrica KPS Limited; Centrica
 PB Limited; Centrica RPS Limited;
 Centrica SHB Limited; Glens of Foudland
 Windfarm Limited; Segebel SA.
------------------------------------------------------------------------


[[Page 54040]]

    Take notice that during the month of August 2006, the status of the 
above-captioned entities as Exempt Wholesale Generators or Foreign 
Utility Companies became effective by operation of the Commission's 
regulations. 18 CFR 366.7(a).

Magalie R. Salas,
Secretary.
[FR Doc. E6-15172 Filed 9-12-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.