Midwestern Gas Transmission Company; Notice of Proposed Changes in FERC Gas Tariff, 54040 [E6-15166]
Download as PDF
54040
Federal Register / Vol. 71, No. 177 / Wednesday, September 13, 2006 / Notices
Take notice that during the month of
August 2006, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a).
Magalie R. Salas,
Secretary.
[FR Doc. E6–15172 Filed 9–12–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E6–15145 Filed 9–12–06; 8:45 am]
[Docket No. RP06–511–000]
Maritimes & Northeast Pipeline, LLC;
Notice of Proposed Changes in FERC
Gas Tariff
hsrobinson on PROD1PC61 with NOTICES
August 29, 2006.
Take notice that on August 24, 2006,
Maritimes & Northeast Pipeline, LLC
(Maritimes) tendered for filing as part of
its FERC Gas Tariff, First Revised
Volume No. 1, Second Revised Sheet
No. 306 to be effective September 24,
2006.
Maritimes states that copies of its
filing have been mailed to all affected
customers and interested state
commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
VerDate Aug<31>2005
16:19 Sep 12, 2006
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Jkt 208001
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E6–15166 Filed 9–12–06; 8:45 am]
[Docket No. RP06–583–000]
BILLING CODE 6717–01–P
Midwestern Gas Transmission
Company; Notice of Proposed
Changes in FERC Gas Tariff
September 6, 2006.
Take notice that on September 1,
2006, Midwestern Gas Transmission
Company (Midwestern) tendered for
filing to become part of its FERC Gas
Tariff, Third Revised Volume No. 1, the
following tariff sheets to become
effective October 1, 2006:
Second Revised Sheet No. 78
Third Revised Sheet No. 80
Third Revised Sheet No. 81
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–445–000]
MIGC, Inc.; Colorado Interstate Gas
Company; Notice of Application
September 7, 2006.
Take notice that on September 1,
2006, MIGC, Inc. (MIGC), 1099 18th
Street, Suite 1200, Denver, CO 80202,
and Colorado Interstate Gas Company
(CIG), P.O. Box 1087, Colorado Springs,
Colorado, 80944, filed a joint
application in Docket No. CP06–445–
000, pursuant to sections 7(b) and 7(c)
of the Natural Gas Act for approval for
MIGC to abandon its lease of capacity
on CIG’s Powder River Lateral located in
Converse County, Wyoming.
Concurrently, CIG is seeking
authorization to reacquire the capacity
associated with the terminating lease
with MIGC, all as more fully set forth in
the application which is on file with the
Commission and open for public
inspection. These filings are available
for review at the Commission in the
Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
E:\FR\FM\13SEN1.SGM
13SEN1
Agencies
[Federal Register Volume 71, Number 177 (Wednesday, September 13, 2006)]
[Notices]
[Page 54040]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-15166]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP06-583-000]
Midwestern Gas Transmission Company; Notice of Proposed Changes
in FERC Gas Tariff
September 6, 2006.
Take notice that on September 1, 2006, Midwestern Gas Transmission
Company (Midwestern) tendered for filing to become part of its FERC Gas
Tariff, Third Revised Volume No. 1, the following tariff sheets to
become effective October 1, 2006:
Second Revised Sheet No. 78
Third Revised Sheet No. 80
Third Revised Sheet No. 81
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible online at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-15166 Filed 9-12-06; 8:45 am]
BILLING CODE 6717-01-P