Williston Basin Interstate Pipeline Company; Notice of Proposed Changes in FERC Gas Tariff, 53435 [E6-14977]

Download as PDF Federal Register / Vol. 71, No. 175 / Monday, September 11, 2006 / Notices Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Magalie R. Salas, Secretary. [FR Doc. E6–14964 Filed 9–8–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP06–542–000] Williston Basin Interstate Pipeline Company; Notice of Proposed Changes in FERC Gas Tariff September 5, 2006. Take notice that on August 31, 2006, Williston Basin Interstate Pipeline Company (Williston Basin), tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1 the following tariff sheets to become effective October 1, 2006. rwilkins on PROD1PC61 with NOTICES Sixty-Fourth Revised Sheet No. 15 Thirty-Seventh Revised Sheet No. 15A Sixty-Second Revised Sheet No. 18 Thirty-Seventh Revised Sheet No. 18A Thirty-Seventh Revised Sheet No. 19 Thirty-Seventh Revised Sheet No. 20 Sixth Revised Sheet No. 724 Magalie R. Salas, Secretary. [FR Doc. E6–14977 Filed 9–8–06; 8:45 am] Williston Basin states that the tariff sheets reflect revisions to the fuel reimbursement current percentage component of the Company’s total fuel reimbursement percentages for gathering, storage and transportation services, and to the electric power reimbursement current rate component of the Company’s total electric power reimbursement rates for gathering, storage and transportation services, pursuant to Williston Basin’s Fuel and Electric Power Reimbursement Adjustment Provision contained in Section 38 of the General Terms and Conditions of its FERC Gas Tariff, Second Revised Volume No. 1. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and VerDate Aug<31>2005 18:03 Sep 08, 2006 Jkt 208001 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings August 30, 2006. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG06–76–000. Applicants: Noble Clinton Windpark I, LLC. Description: Noble Clinton Windpark I, LLC submits a Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 08/25/2006. Accession Number: 20060829–0175. PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 53435 Comment Date: 5 p.m. Eastern Time on Friday, September 15, 2006. Docket Numbers: EG06–77–000. Applicants: Noble Ellenberg Windpark, LLC. Description: Noble Ellenberg Windpark, LLC submits a Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 08/25/2006. Accession Number: 20060829–0176. Comment Date: 5 p.m. Eastern Time on Friday, September 15, 2006. Docket Numbers: EG06–78–000. Applicants: Noble Altona Windpark, LLC. Description: Noble Altona Windpark, LLC submits a Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 08/25/2006. Accession Number: 20060829–0177. Comment Date: 5 p.m. Eastern Time on Friday, September 15, 2006. Docket Numbers: EG06–79–000. Applicants: Noble Bliss Windpark, LLC. Description: Noblie Bliss Windpark, LLC submits a notice of self-certification of exempt wholesale generator status. Filed Date: 08/25/2006. Accession Number: 20060829–0178. Comment Date: 5 p.m. Eastern Time on Friday, September 15, 2006. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER97–4345–020; ER98–511–008. Applicants: Oklahoma Gas and Electric Company; OGE Energy Resources Inc. Description: Oklahoma Gas and Electric Co et al. resubmits its 7/25/06 filing of proposed revisions to their respective market-based rate tariffs to allow the OGE Companies to sell power at market-based rates. Filed Date: 08/25/2006. Accession Number: 20060829–0181. Comment Date: 5 p.m. Eastern Time on Friday, September 15, 2006. Docket Numbers: ER05–911–001. Applicants: Pacific Gas & Electric Company. Description: Pacific Gas & Electric Company submits a compliance Electric Refund Report. Filed Date: 08/28/2006. Accession Number: 20060828–5048. Comment Date: 5 p.m. Eastern Time on Monday, September 18, 2006. Docket Numbers: ER06–451–001; ER06–641–002. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc submits a compliance filing E:\FR\FM\11SEN1.SGM 11SEN1

Agencies

[Federal Register Volume 71, Number 175 (Monday, September 11, 2006)]
[Notices]
[Page 53435]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-14977]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP06-542-000]


Williston Basin Interstate Pipeline Company; Notice of Proposed 
Changes in FERC Gas Tariff

September 5, 2006.
    Take notice that on August 31, 2006, Williston Basin Interstate 
Pipeline Company (Williston Basin), tendered for filing as part of its 
FERC Gas Tariff, Second Revised Volume No. 1 the following tariff 
sheets to become effective October 1, 2006.

Sixty-Fourth Revised Sheet No. 15
Thirty-Seventh Revised Sheet No. 15A
Sixty-Second Revised Sheet No. 18
Thirty-Seventh Revised Sheet No. 18A
Thirty-Seventh Revised Sheet No. 19
Thirty-Seventh Revised Sheet No. 20
Sixth Revised Sheet No. 724

    Williston Basin states that the tariff sheets reflect revisions to 
the fuel reimbursement current percentage component of the Company's 
total fuel reimbursement percentages for gathering, storage and 
transportation services, and to the electric power reimbursement 
current rate component of the Company's total electric power 
reimbursement rates for gathering, storage and transportation services, 
pursuant to Williston Basin's Fuel and Electric Power Reimbursement 
Adjustment Provision contained in Section 38 of the General Terms and 
Conditions of its FERC Gas Tariff, Second Revised Volume No. 1.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E6-14977 Filed 9-8-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.