SG Resources Mississippi, L.L.C.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Southern Pines Energy Center Expansion Project and Request for Comments on Environmental Issues, 51603-51604 [E6-14378]
Download as PDF
Federal Register / Vol. 71, No. 168 / Wednesday, August 30, 2006 / Notices
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–14396 Filed 8–29–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP02–229–002]
SG Resources Mississippi, L.L.C.;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Southern Pines Energy
Center Expansion Project and Request
for Comments on Environmental
Issues
jlentini on PROD1PC65 with NOTICES
August 21, 2006.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Southern Pines Energy Center
Expansion Project involving
construction and operation of facilities
by SG Resources Mississippi, L.L.C.
(SGRM) in Greene County, Mississippi
and Mobile County, Alabama. These
facilities would consist of about 26.1
miles of bi-directional 24-inch-diameter
pipeline, expansion of working gas
capacity of two previously certificated
solution-mined salt caverns, and
construction of an additional solution
mined salt cavern and two new brine
disposal wells. The EA will be used by
the Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
If you are a landowner receiving this
notice, you may be contacted by an
SGRM representative about the
acquisition of an easement to construct,
VerDate Aug<31>2005
16:39 Aug 29, 2006
Jkt 208001
operate, and maintain the proposed
facilities. SGRM would seek to negotiate
a mutually acceptable agreement.
However, if the project is approved by
the Commission, that approval conveys
with it the right of eminent domain.
Therefore, if easement negotiations fail
to produce an agreement, SGRM could
initiate condemnation proceedings in
accordance with state law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
notice that SGRM provided to
landowners. This fact sheet addresses a
number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is
available for viewing on the FERC
Internet Web site (https://www.ferc.gov).
Summary of the Proposed Project
SGRM wants to provide up to 24
billion cubic feet (Bcf) of working gas
storage capacity and receive/deliver up
to 1.0 Bcf/day from/to Florida Gas
Transmission Company (FGT) and 0.6
Bcf/day from/to Transcontinental Gas
Pipe Line Corporation (Transco). SGRM
seeks authority to construct and operate
the following facilities:
• Expand two certificated solution
mined storage caverns to a total working
gas volume of 12.0 Bcf;
• A solution-mined storage cavern
that would have a working gas volume
of 8.0 Bcf;
• Two brine disposal wells;
• FGT/Transco Lateral consisting of
26.1 miles of dual 24-inch-diameter
pipelines;
• Two mainline valves;
• A meter station; and
• A 115 Kilovolt substation.
The location of the project facilities is
shown in Appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would require about 423.0 acres of land.
Following construction, about 162.7
acres would be maintained as new
aboveground facility sites and
permanent rights-of-way. The remaining
260.3 acres of land would be restored
and allowed to revert to its former use.
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices, other than Appendix 1 (maps), are
available on the Commission’s website at the
‘‘eLibrary’’ link or from the Commission’s Public
Reference Room, 888 First Street, NE., Washington,
DC 20426, or call (202) 502–8371. For instructions
on connecting to eLibrary refer to the last page of
this notice. Copies of the appendices were sent to
all those receiving this notice in the mail.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
51603
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping’’. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, the Commission staff
requests public comments on the scope
of the issues to address in the EA. All
comments received are considered
during the preparation of the EA. State
and local government representatives
are encouraged to notify their
constituents of this proposed action and
encourage them to comment on their
areas of concern.
In the EA we 2 will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils.
• Land use.
• Water resources, fisheries, and
wetlands.
• Cultural resources.
• Vegetation and wildlife.
• Air quality and noise.
• Endangered and threatened species.
• Public safety.
We will also evaluate possible
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Our independent analysis of the
issues will be in the EA. Depending on
the comments received during the
scoping process, the EA may be
published and mailed to federal, state,
and local agencies, public interest
groups, interested individuals, affected
landowners, newspapers, libraries, and
the Commission(s official service list for
this proceeding. A comment period will
be allotted for review if the EA is
published. We will consider all
comments on the EA before we make
our recommendations to the
Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the public participation
section below.
2 ‘‘We’’ ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the Office of Energy Projects
(OEP).
E:\FR\FM\30AUN1.SGM
30AUN1
51604
Federal Register / Vol. 71, No. 168 / Wednesday, August 30, 2006 / Notices
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the EA
and considered by the Commission. You
should focus on the potential
environmental effects of the proposal,
alternatives to the proposal (including
alternative routes), and measures to
avoid or lessen environmental impact.
The more specific your comments, the
more useful they will be. Please
carefully follow these instructions to
ensure that your comments are received
in time and properly recorded:
• Send an original and two copies of
your letter to: Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426.
• Label one copy of the comments for
the attention of Gas Branch 3.
• Reference Docket No. CP02–229–
002.
• Mail your comments so that they
will be received in Washington, DC on
or before September 25, 2006.
The Commission strongly encourages
electronic filing of any comments or
interventions or protests to this
proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s
Guide. Before you can file comments
you will need to create a free account
which can be created on-line.
We may mail the EA for comment. If
you are interested in receiving it, please
return the Information Request
(Appendix 3). If you do not return the
Information Request, you will be taken
off the mailing list.
jlentini on PROD1PC65 with NOTICES
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding, or ‘‘intervenor’’. To become
an intervenor you must file a motion to
intervene according to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214). Intervenors
have the right to seek rehearing of the
Commission’s decision. Motions to
Intervene should be electronically
submitted using the Commission’s
eFiling system at https://www.ferc.gov.
Persons without Internet access should
send an original and 14 copies of their
motion to the Secretary of the
Commission at the address indicated
previously. Persons filing Motions to
Intervene on or before the comment
deadline indicated above must send a
VerDate Aug<31>2005
16:39 Aug 29, 2006
Jkt 208001
copy of the motion to the Applicant. All
filings, including late interventions,
submitted after the comment deadline
must be served on the Applicant and all
other intervenors identified on the
Commission’s service list for this
proceeding. Persons on the service list
with email addresses may be served
electronically; others must be served a
hard copy of the filing.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within distances
defined in the Commission’s regulations
of certain aboveground facilities. By this
notice we are also asking governmental
agencies, especially those in Appendix
2, to express their interest in becoming
cooperating agencies for the preparation
of the EA.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet website (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Magalie R. Salas,
Secretary.
[FR Doc. E6–14378 Filed 8–29–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Transfer of
License and Soliciting Comments,
Motions to Intervene, and Protests
August 21, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Transfer of
License.
b. Project No.: 6032–063.
c. Date Filed: August 4, 2006.
d. Applicants: Fourth Branch
Associates (Mechanicville) and Albany
Engineering Corporation.
e. Name and Location of Project: The
Mechanicville Project is located on the
Hudson River, in Saratoga and
Rensselaer Counties, New York.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant Contact: Mr. James A.
Besha, P.E., President, Albany
Engineering Corporation, 447 New
Karner Road, Albany, NY 12205, (518)
456–7712.
h. FERC Contact: Etta L. Foster (202)
502–8769.
i. Deadline for filing comments,
protests, and motions to intervene:
September 18, 2006.
All documents (original and eight
copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper, see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number
(P–6032–063) on any comments,
protests, or motions filed. The
Commission’s Rules of Practice and
Procedure require all intervenors filing
a document with the Commission to
serve a copy of that document on each
person in the official service list for the
project. Further, if an intervenor files
E:\FR\FM\30AUN1.SGM
30AUN1
Agencies
[Federal Register Volume 71, Number 168 (Wednesday, August 30, 2006)]
[Notices]
[Pages 51603-51604]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-14378]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP02-229-002]
SG Resources Mississippi, L.L.C.; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Southern Pines Energy Center
Expansion Project and Request for Comments on Environmental Issues
August 21, 2006.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Southern Pines Energy Center
Expansion Project involving construction and operation of facilities by
SG Resources Mississippi, L.L.C. (SGRM) in Greene County, Mississippi
and Mobile County, Alabama. These facilities would consist of about
26.1 miles of bi-directional 24-inch-diameter pipeline, expansion of
working gas capacity of two previously certificated solution-mined salt
caverns, and construction of an additional solution mined salt cavern
and two new brine disposal wells. The EA will be used by the Commission
in its decision-making process to determine whether the project is in
the public convenience and necessity.
If you are a landowner receiving this notice, you may be contacted
by an SGRM representative about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. SGRM would
seek to negotiate a mutually acceptable agreement. However, if the
project is approved by the Commission, that approval conveys with it
the right of eminent domain. Therefore, if easement negotiations fail
to produce an agreement, SGRM could initiate condemnation proceedings
in accordance with state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice that SGRM provided to landowners. This fact sheet
addresses a number of typically asked questions, including the use of
eminent domain and how to participate in the Commission's proceedings.
It is available for viewing on the FERC Internet Web site (https://
www.ferc.gov).
Summary of the Proposed Project
SGRM wants to provide up to 24 billion cubic feet (Bcf) of working
gas storage capacity and receive/deliver up to 1.0 Bcf/day from/to
Florida Gas Transmission Company (FGT) and 0.6 Bcf/day from/to
Transcontinental Gas Pipe Line Corporation (Transco). SGRM seeks
authority to construct and operate the following facilities:
Expand two certificated solution mined storage caverns to
a total working gas volume of 12.0 Bcf;
A solution-mined storage cavern that would have a working
gas volume of 8.0 Bcf;
Two brine disposal wells;
FGT/Transco Lateral consisting of 26.1 miles of dual 24-
inch-diameter pipelines;
Two mainline valves;
A meter station; and
A 115 Kilovolt substation.
The location of the project facilities is shown in Appendix 1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices, other
than Appendix 1 (maps), are available on the Commission's website at
the ``eLibrary'' link or from the Commission's Public Reference
Room, 888 First Street, NE., Washington, DC 20426, or call (202)
502-8371. For instructions on connecting to eLibrary refer to the
last page of this notice. Copies of the appendices were sent to all
those receiving this notice in the mail.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would require about 423.0
acres of land. Following construction, about 162.7 acres would be
maintained as new aboveground facility sites and permanent rights-of-
way. The remaining 260.3 acres of land would be restored and allowed to
revert to its former use.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
This process is referred to as ``scoping''. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this Notice of Intent, the Commission staff
requests public comments on the scope of the issues to address in the
EA. All comments received are considered during the preparation of the
EA. State and local government representatives are encouraged to notify
their constituents of this proposed action and encourage them to
comment on their areas of concern.
In the EA we \2\ will discuss impacts that could occur as a result
of the construction and operation of the proposed project under these
general headings:
---------------------------------------------------------------------------
\2\ ``We'' ``us'', and ``our'' refer to the environmental staff
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------
Geology and soils.
Land use.
Water resources, fisheries, and wetlands.
Cultural resources.
Vegetation and wildlife.
Air quality and noise.
Endangered and threatened species.
Public safety.
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission(s official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the public participation section below.
[[Page 51604]]
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, alternatives to the proposal (including alternative routes),
and measures to avoid or lessen environmental impact. The more specific
your comments, the more useful they will be. Please carefully follow
these instructions to ensure that your comments are received in time
and properly recorded:
Send an original and two copies of your letter to: Magalie
R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First
St., NE., Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of Gas
Branch 3.
Reference Docket No. CP02-229-002.
Mail your comments so that they will be received in
Washington, DC on or before September 25, 2006.
The Commission strongly encourages electronic filing of any
comments or interventions or protests to this proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
at https://www.ferc.gov under the ``e-Filing'' link and the link to the
User's Guide. Before you can file comments you will need to create a
free account which can be created on-line.
We may mail the EA for comment. If you are interested in receiving
it, please return the Information Request (Appendix 3). If you do not
return the Information Request, you will be taken off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding, or ``intervenor''. To
become an intervenor you must file a motion to intervene according to
Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214). Intervenors have the right to seek rehearing of the
Commission's decision. Motions to Intervene should be electronically
submitted using the Commission's eFiling system at https://www.ferc.gov.
Persons without Internet access should send an original and 14 copies
of their motion to the Secretary of the Commission at the address
indicated previously. Persons filing Motions to Intervene on or before
the comment deadline indicated above must send a copy of the motion to
the Applicant. All filings, including late interventions, submitted
after the comment deadline must be served on the Applicant and all
other intervenors identified on the Commission's service list for this
proceeding. Persons on the service list with email addresses may be
served electronically; others must be served a hard copy of the filing.
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Environmental Mailing List
An effort is being made to send this notice to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project. This includes all landowners who are
potential right-of-way grantors, whose property may be used temporarily
for project purposes, or who own homes within distances defined in the
Commission's regulations of certain aboveground facilities. By this
notice we are also asking governmental agencies, especially those in
Appendix 2, to express their interest in becoming cooperating agencies
for the preparation of the EA.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet website (https://www.ferc.gov) using the eLibrary link.
Click on the eLibrary link, click on ``General Search'' and enter the
docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.
Magalie R. Salas,
Secretary.
[FR Doc. E6-14378 Filed 8-29-06; 8:45 am]
BILLING CODE 6717-01-P