Combined Notice of Filings #1, 50058-50059 [E6-14008]
Download as PDF
50058
Federal Register / Vol. 71, No. 164 / Thursday, August 24, 2006 / Notices
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–14018 Filed 8–23–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
rmajette on PROD1PC67 with NOTICES1
August 17, 2006.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG06–71–000.
Applicants: Evergreen Wind Power,
LLC.
Description: Evergreen Wind Power
LLC’s Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 8/11/2006.
Accession Number: 20060815–0029.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
VerDate Aug<31>2005
15:15 Aug 23, 2006
Jkt 208001
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER03–719–003;
ER03–720–003; ER03–721–003; ER98–
830–012.
Applicants: New Athens Generating
Company, LLC.
Description: New Athens Generating
Co LLC et al submits a Notice of NonMaterial Change in Status relating to
their upstream indirect ownership.
Filed Date: 8/11/2006.
Accession Number: 20060816–0057.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
Docket Numbers: ER05–718–000.
Applicants: California Independent
System Operator.
Description: California Independent
System Operator Corp. submits its SixtyThird Report on Market Impacts of
Amendment 66, as prepared by the
ISO’s Department of Market Monitoring.
Filed Date: 8/11/2006.
Accession Number: 20060815–0196.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
Docket Numbers: ER05–976–001.
Applicants: FirstEnergy Solutions
Corp.
Description: FirstEnergy Solutions
Corp. submits a substitute FERC Electric
Tariff, First Revised Volume No. 1.
Filed Date: 8/11/2006.
Accession Number: 20060816–0067.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
Docket Numbers: ER06–1228–001.
Applicants: Phibro LLC.
Description: Phibro LLC submits its
triennial updated market analysis.
Filed Date: 8/11/2006.
Accession Number: 20060815–0030.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
Docket Numbers: ER06–1352–000.
Applicants: American Electric Power
Services Corp.
Description: Indiana & Michigan
Power Co. submits an interconnection
and local delivery service agreement
with the City of Niles, Michigan.
Filed Date: 8/11/2006.
Accession Number: 20060814–0208.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
Docket Numbers: ER06–1354–000.
Applicants: AB Energy, Inc.
Description: AB Energy, Inc. submits
its Petition for Acceptance of Initial
Tariff, Waivers, and Blanket Authority.
Filed Date: 8/11/2006.
Accession Number: 20060815–0027.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
Docket Numbers: ER06–1355–000.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Applicants: Evergreen Wind Power,
LLC.
Description: Application of Evergreen
Wind Power LLC for order accepting
initial tariff, waiving regulations &
granting blanket approvals, & request
for expedited consideraton & waiver of
60 day prior notice requirement.
Filed Date: 8/11/2006.
Accession Number: 20060815–0026.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
Docket Numbers: ER06–1356–000.
Applicants: Midwest Independent
Transmission System.
Description: Midwest Independent
Transmission System Operator, Inc.
submits proposed revisions to
Attachment L (Credit Policy) of its Open
Access Transmission and Energy
Markets Tariff.
Filed Date: 8/11/2006.
Accession Number: 20060815–0025.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
Docket Numbers: ER06–1357–000.
Applicants: Big Sandy Peaker Plant,
LLC.
Description: Big Sandy Peaker Plant
LLC submits its FERC Electric Tariff,
Original Volume No 3 pursuant to
which Big Sandy will provide Black
Start Service to PJM Interconnection
LLC.
Filed Date: 8/11/2006.
Accession Number: 20060815–0024.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
Docket Numbers: ER06–1358–000.
Applicants: Midwest Independent
Transmission System.
Description: Midwest Independent
Transmission System Operator, Inc. et
al. submits proposed revisions to
Attachment N–I of its ISO Open Access
Transmission & Energy Markets Tariff,
FERC Electric Tariff, Third Revised
Volume 1.
Filed Date: 8/11/2006.
Accession Number: 20060816–0056.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
Docket Numbers: ER06–1359–000.
Applicants: PJM Interconnection,
LLC.
Description: PJM Interconnection LLC
submits revisions to the chart in
Schedule 2 of the PJM Open Access
Transmission Tariff to incorporate
revised or new revenue requirements of
FPL Energy Marcus Hook lP et al.
Filed Date: 8/11/2006.
Accession Number: 20060816–0058.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
Docket Numbers: ER06–1360–000.
Applicants: California Independent
System Operator.
E:\FR\FM\24AUN1.SGM
24AUN1
rmajette on PROD1PC67 with NOTICES1
Federal Register / Vol. 71, No. 164 / Thursday, August 24, 2006 / Notices
Description: California Independent
System Operator Corp. on behalf of
itself and Pacific Gas & Electric et al
submits an amendment to the
Transmission Control Agreement, Rate
Schedule 7 among the ISO and the
Participating Transmission Owners.
Filed Date: 8/11/2006.
Accession Number: 20060816–0250.
Comment Date: 5 p.m. Eastern Time
on Friday, September 1, 2006.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
VerDate Aug<31>2005
15:15 Aug 23, 2006
Jkt 208001
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–14008 Filed 8–23–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–85–000]
CenterPoint Energy Gas Transmission
Company; Notice of Availability of the
Final Environmental Impact Statement
for the Proposed Carthage to Perryville
Project
August 18, 2006.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared this Final
Environmental Impact Statement (EIS)
for the natural gas pipeline facilities
proposed by CenterPoint Energy Gas
Transmission (CEGT) under the abovereferenced docket. CEGT’s Carthage to
Perryville Project (Project) would be
located in various counties and parishes
in eastern Texas and northern
Louisiana.
The Final EIS was prepared to satisfy
the requirements of the National
Environmental Policy Act. The FERC
staff concludes that the proposed
Project, with the appropriate mitigation
measures as recommended, would have
limited adverse environmental impact.
The U.S. Fish and Wildlife Service
(FWS) and the U.S. Army Corps of
Engineers (COE) are Federal cooperating
agencies for the development of this
EIS. A Federal cooperating agency has
jurisdiction by law or special expertise
with respect to any environmental
impact involved with the proposal and
is involved in the NEPA analysis.
The general purpose of the proposed
Project is to facilitate the transport of up
to 1.2 billion cubic feet per day of
natural gas received from production
areas in eastern Texas, as well as
northern Louisiana, to markets in the
Midwest and Northeastern regions of
the United States that can be accessed
through interconnects with existing
pipeline infrastructure.
The Final EIS addresses the potential
environmental effects of construction
and operation of the following facilities:
• About 172.1 miles of 42-inchdiameter natural gas pipeline in Panola
County, Texas, and Caddo, DeSoto, Red
River, Bienville, Jackson, Ouachita, and
Richland Parishes, Louisiana;
• Two new, 20,620 horsepower (hp)
gas-turbine-driven compressor stations,
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
50059
the Panola and Vernon Compressor
Stations, located in Panola County,
Texas, and Jackson Parish, Louisiana,
respectively;
• Two meter and regulator stations at
receipt points with three intrastate
pipelines, including:
—Houston Pipe Line (HPL) Meter/
Regulator (M/R) Station in Panola
County, Texas;
—Duke Energy Field Services-Enbridge
M/R Station in Panola County, Texas;
• Four new meter and regulator
stations at interconnects with existing
interstate pipelines, including:
—Texas Gas M/R Station in Ouachita
Parish, Louisiana;
—ANR M/R Station in Richland Parish,
Louisiana;
—Trunkline M/R Station in Richland
Parish, Louisiana;
—Columbia Gulf M/R Station in
Richland Parish, Louisiana;
• 11 mainline valves; and
• Four pig launcher/receiver facilities
associated with the Panola and Vernon
Compressor Stations and the HPL and
Columbia Gulf M/R Stations.
CEGT proposes to construct its
pipeline facilities in two phases.
Construction of Phase I would be
initiated in October 2006 and completed
by February 2007, at which point CEGT
would place the proposed Project inservice. Under Phase I, a single, 10,310hp turbine compressor would be
installed at each compressor station.
Under Phase II, a second compressor
would be installed to bring the total
installed compression at each facility to
20,620 hp. CEGT indicates that Phase II
facilities would be installed and
operational by October 2008.
The Final EIS has been placed in the
public files of the FERC and is available
for public inspection at: Federal Energy
Regulatory Commission, Public
Reference Room, 888 First Street, NE.,
Room 2A, Washington, DC 20426, (202)
502–8371.
A limited number of copies of the
Final EIS are available from the Public
Reference Room identified above. In
addition, CD copies of the Final EIS
have been mailed to affected
landowners; various Federal, state, and
local government agencies; elected
officials; environmental and public
interest groups; Native American tribes;
local libraries and newspapers;
intervenors; and other individuals that
expressed an interest in the proposed
Project. Hard-copies of the Final EIS
have also been mailed to those who
requested that format during the scoping
and comment periods for the proposed
Project.
In accordance with the Council on
Environmental Quality’s (CEQ)
E:\FR\FM\24AUN1.SGM
24AUN1
Agencies
[Federal Register Volume 71, Number 164 (Thursday, August 24, 2006)]
[Notices]
[Pages 50058-50059]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-14008]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
August 17, 2006.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG06-71-000.
Applicants: Evergreen Wind Power, LLC.
Description: Evergreen Wind Power LLC's Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 8/11/2006.
Accession Number: 20060815-0029.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER03-719-003; ER03-720-003; ER03-721-003; ER98-830-
012.
Applicants: New Athens Generating Company, LLC.
Description: New Athens Generating Co LLC et al submits a Notice of
Non-Material Change in Status relating to their upstream indirect
ownership.
Filed Date: 8/11/2006.
Accession Number: 20060816-0057.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Docket Numbers: ER05-718-000.
Applicants: California Independent System Operator.
Description: California Independent System Operator Corp. submits
its Sixty-Third Report on Market Impacts of Amendment 66, as prepared
by the ISO's Department of Market Monitoring.
Filed Date: 8/11/2006.
Accession Number: 20060815-0196.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Docket Numbers: ER05-976-001.
Applicants: FirstEnergy Solutions Corp.
Description: FirstEnergy Solutions Corp. submits a substitute FERC
Electric Tariff, First Revised Volume No. 1.
Filed Date: 8/11/2006.
Accession Number: 20060816-0067.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Docket Numbers: ER06-1228-001.
Applicants: Phibro LLC.
Description: Phibro LLC submits its triennial updated market
analysis.
Filed Date: 8/11/2006.
Accession Number: 20060815-0030.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Docket Numbers: ER06-1352-000.
Applicants: American Electric Power Services Corp.
Description: Indiana & Michigan Power Co. submits an
interconnection and local delivery service agreement with the City of
Niles, Michigan.
Filed Date: 8/11/2006.
Accession Number: 20060814-0208.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Docket Numbers: ER06-1354-000.
Applicants: AB Energy, Inc.
Description: AB Energy, Inc. submits its Petition for Acceptance of
Initial Tariff, Waivers, and Blanket Authority.
Filed Date: 8/11/2006.
Accession Number: 20060815-0027.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Docket Numbers: ER06-1355-000.
Applicants: Evergreen Wind Power, LLC.
Description: Application of Evergreen Wind Power LLC for order
accepting initial tariff, waiving regulations & granting blanket
approvals, & request for expedited consideraton & waiver of 60 day
prior notice requirement.
Filed Date: 8/11/2006.
Accession Number: 20060815-0026.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Docket Numbers: ER06-1356-000.
Applicants: Midwest Independent Transmission System.
Description: Midwest Independent Transmission System Operator, Inc.
submits proposed revisions to Attachment L (Credit Policy) of its Open
Access Transmission and Energy Markets Tariff.
Filed Date: 8/11/2006.
Accession Number: 20060815-0025.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Docket Numbers: ER06-1357-000.
Applicants: Big Sandy Peaker Plant, LLC.
Description: Big Sandy Peaker Plant LLC submits its FERC Electric
Tariff, Original Volume No 3 pursuant to which Big Sandy will provide
Black Start Service to PJM Interconnection LLC.
Filed Date: 8/11/2006.
Accession Number: 20060815-0024.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Docket Numbers: ER06-1358-000.
Applicants: Midwest Independent Transmission System.
Description: Midwest Independent Transmission System Operator, Inc.
et al. submits proposed revisions to Attachment N-I of its ISO Open
Access Transmission & Energy Markets Tariff, FERC Electric Tariff,
Third Revised Volume 1.
Filed Date: 8/11/2006.
Accession Number: 20060816-0056.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Docket Numbers: ER06-1359-000.
Applicants: PJM Interconnection, LLC.
Description: PJM Interconnection LLC submits revisions to the chart
in Schedule 2 of the PJM Open Access Transmission Tariff to incorporate
revised or new revenue requirements of FPL Energy Marcus Hook lP et al.
Filed Date: 8/11/2006.
Accession Number: 20060816-0058.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Docket Numbers: ER06-1360-000.
Applicants: California Independent System Operator.
[[Page 50059]]
Description: California Independent System Operator Corp. on behalf
of itself and Pacific Gas & Electric et al submits an amendment to the
Transmission Control Agreement, Rate Schedule 7 among the ISO and the
Participating Transmission Owners.
Filed Date: 8/11/2006.
Accession Number: 20060816-0250.
Comment Date: 5 p.m. Eastern Time on Friday, September 1, 2006.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St. NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-14008 Filed 8-23-06; 8:45 am]