Preparation of the Brigade Combat Team Transformation Programmatic Environmental Impact Statement (PEIS), Fort Irwin, CA, 48542 [06-7054]
Download as PDF
48542
Federal Register / Vol. 71, No. 161 / Monday, August 21, 2006 / Notices
DEPARTMENT OF DEFENSE
Office of the Secretary
Strategic Environmental Research and
Development Program, Scientific
Advisory Board
Department of Defense.
Notice of meeting.
AGENCY:
ACTION:
SUMMARY: This Notice is published in
accordance with Section 10(a)(2) of the
Federal Advisory Committee Act (Pub.
L. 92–463). The topic of the meeting on
September 12–14, 2006 are to review
new start and continuing research and
development projects requesting
Strategic Environmental Research and
Development Program funds in excess
of $1M. This meeting is open to the
public. Any interested person may
attend, appear before, or file statements
with the Scientific Advisory Board at
the time and in the manner permitted by
the Board.
DATES: September 12, 2006 from 10:30
a.m. to 5 p.m.; September 13 from 8:30
a.m. to 5 p.m.; and September 14, 2006
from 8:30 a.m. to 2 p.m.
ADDRESSES: SERDP Program Office
Conference Center, 901 North Stuart
Street, Suite 804, Arlington, VA 22203.
FOR FURTHER INFORMATION CONTACT: Ms.
Misa Jensen, SERDP Program Office, 901
North Stuart Street, Suite 303,
Arlington, VA or by telephone at (703)
696–2126.
Dated: August 15, 2006.
C.R. Choate,
Alternate OSD Federal Register Liaison
Officer, Department of Defense.
[FR Doc. 06–7038 Filed 8–18–06; 8:45 am]
BILLING CODE 5001–06–M
DEPARTMENT OF DEFENSE
Department of the Army
Preparation of the Brigade Combat
Team Transformation Programmatic
Environmental Impact Statement
(PEIS), Fort Irwin, CA
Department of the Army, DoD.
Notice of intent.
AGENCY:
hsrobinson on PROD1PC72 with NOTICES
ACTION:
SUMMARY: The Army Installation
Management Agency and the Fort Irwin
National Training Center will prepare a
PEIS to analyze the impacts of mission
realignment in support of the Army
Transformation, the Army Campaign
Plan, and other Army initiatives. Under
the proposed action, the 11th Armored
Cavalry Regiment will expand to
become a full-size, multi-component
Heavy Brigade Combat Team (BCT),
VerDate Aug<31>2005
17:53 Aug 18, 2006
Jkt 208001
deployable throughout the world. Other,
smaller units will also be stationed at
Fort Irwin. Training rotations will
increase from 10 per year to 12. The
PEIS will evaluate the new construction,
new land use, and changes in training,
area use necessary to implement the
proposed action at Fort Irwin.
FOR FURTHER INFORMATION CONTACT:
Public Affairs Office: Major John
Clearwater, Attention: IMSW–IRW–PA
Fort Irwin, CA 92310; telephone: (760)
380–3078; or Directorate of Public
Works: Mr. Mickey Quillman, Attention:
PEIS; IMSW–IRW–PWE, Building 602,
Fort Irwin, CA 92310; fax: (760) 380–
2677, or e-mail
mickey.quillman@irwin.army.mil.
SUPPLEMENTARY INFORMATION: The PEIS
will assess the environmental impacts
associated with the stationing and
training of new soldiers at Fort Irwin.
Under the proposed action,
approximately 690 additional soldiers
would be stationed at Fort Irwin, with
approximately 760 family members
accompanying them. The proposed
action will increase training by about
20% on all Fort Irwin training areas and
may involve some new range
construction. This increased usage will
ultimately involve the maneuver
training areas into which Fort Irwin
expanded, as decided in 2006. The
proposed action will result in additional
construction in the Fort Irwin
cantonment area for such projects as
soldier and family housing, schools,
infrastructure, utilities, and related
facilities. These changes would provide
the capability to train additional units
and represent a realignment of existing
missions for the installation. The action
may have environmental impacts to air
quality, water usage, waste water and
other utilities, and biological resources.
Fort Irwin will continue to train
rotational units and would now support
the 11th Armored Cavalry Regiment
(ACR), a multi-component Heavy BCT.
A range of reasonable alternatives,
including an alternative of considering
no action as required by the National
Environmental Policy Act, will be
developed and analyzed in the PEIS.
The range of alternatives will include
varying amounts of new construction
and training area changes. During the
scoping process, other alternatives may
be developed and added for
consideration. The PEIS will also
analyze each alternative’s impact upon
the natural, cultural, and man-made
environments at Fort Irwin and in the
surrounding region.
Tribal, Federal, state and local
agencies, as well as the public are
invited to participate in the scoping
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
process for the preparation of this PEIS.
Scoping meetings will be held in
convenient locations near the
installation. Notification of the times
and locations for the scoping meetings
will be published in local newspapers.
The scoping process will help identify
additional possible alternatives,
potential environmental impacts, and
key issues of concern to be analyzed in
the PEIS. To ensure scoping comments
are fully considered in the Draft PEIS,
comments and suggestions should be
received within the 30-day scoping
period or no later than 15 days
following the last scoping meeting,
whichever is later.
Dated: August 8, 2006.
Addison D. Davis, IV,
Deputy Assistant Secretary of the Army,
(Environment, Safety and Occupational
Health), OASA(I&E).
[FR Doc. 06–7054 Filed 8–18–06; 8:45 am]
BILLING CODE 3710–08–M
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
Notice of Availability for the Draft
Environmental Impact Statement/
Environmental Impact Report for the
Berth 97–109 Container Terminal
Project, Los Angeles County, CA
Department of the Army—U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of availability.
AGENCY:
SUMMARY: The U.S. Army Corps of
Engineers, Los Angeles District
(Regulatory Branch), in coordination
with the Port of Los Angeles, has
completed a Draft Environmental
Impact Statement/Environmental
Impact Report (EIS/EIR) for the Berth
97–109 Container Terminal Project. The
Port of Los Angeles requires
authorization pursuant to Section 404 of
the Clean Water Act and Section 10 of
the Rivers and Harbors Act for wharf
and terminal development (142 acres) in
three phases, dredging up to 41,000
cubic yards of sediment, construction of
two new concrete pile-supported
wharves (for a total of 2,500 feet), new
terminal buildings and two new
terminal bridges.
FOR FURTHER INFORMATION CONTACT:
Questions or comments concerning the
Draft EIS/EIR should be directed to Dr.
Aaron O. Allen, Senior Project Manager,
Regulatory Branch, U.S. Army Corps of
Engineers, P.O. Box 532711, Los
Angeles, CA 90053–2325, (805) 585–
2148.
E:\FR\FM\21AUN1.SGM
21AUN1
Agencies
[Federal Register Volume 71, Number 161 (Monday, August 21, 2006)]
[Notices]
[Page 48542]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-7054]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army
Preparation of the Brigade Combat Team Transformation
Programmatic Environmental Impact Statement (PEIS), Fort Irwin, CA
AGENCY: Department of the Army, DoD.
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: The Army Installation Management Agency and the Fort Irwin
National Training Center will prepare a PEIS to analyze the impacts of
mission realignment in support of the Army Transformation, the Army
Campaign Plan, and other Army initiatives. Under the proposed action,
the 11th Armored Cavalry Regiment will expand to become a full-size,
multi-component Heavy Brigade Combat Team (BCT), deployable throughout
the world. Other, smaller units will also be stationed at Fort Irwin.
Training rotations will increase from 10 per year to 12. The PEIS will
evaluate the new construction, new land use, and changes in training,
area use necessary to implement the proposed action at Fort Irwin.
FOR FURTHER INFORMATION CONTACT: Public Affairs Office: Major John
Clearwater, Attention: IMSW-IRW-PA Fort Irwin, CA 92310; telephone:
(760) 380-3078; or Directorate of Public Works: Mr. Mickey Quillman,
Attention: PEIS; IMSW-IRW-PWE, Building 602, Fort Irwin, CA 92310; fax:
(760) 380-2677, or e-mail mickey.quillman@irwin.army.mil.
SUPPLEMENTARY INFORMATION: The PEIS will assess the environmental
impacts associated with the stationing and training of new soldiers at
Fort Irwin. Under the proposed action, approximately 690 additional
soldiers would be stationed at Fort Irwin, with approximately 760
family members accompanying them. The proposed action will increase
training by about 20% on all Fort Irwin training areas and may involve
some new range construction. This increased usage will ultimately
involve the maneuver training areas into which Fort Irwin expanded, as
decided in 2006. The proposed action will result in additional
construction in the Fort Irwin cantonment area for such projects as
soldier and family housing, schools, infrastructure, utilities, and
related facilities. These changes would provide the capability to train
additional units and represent a realignment of existing missions for
the installation. The action may have environmental impacts to air
quality, water usage, waste water and other utilities, and biological
resources. Fort Irwin will continue to train rotational units and would
now support the 11th Armored Cavalry Regiment (ACR), a multi-component
Heavy BCT.
A range of reasonable alternatives, including an alternative of
considering no action as required by the National Environmental Policy
Act, will be developed and analyzed in the PEIS. The range of
alternatives will include varying amounts of new construction and
training area changes. During the scoping process, other alternatives
may be developed and added for consideration. The PEIS will also
analyze each alternative's impact upon the natural, cultural, and man-
made environments at Fort Irwin and in the surrounding region.
Tribal, Federal, state and local agencies, as well as the public
are invited to participate in the scoping process for the preparation
of this PEIS. Scoping meetings will be held in convenient locations
near the installation. Notification of the times and locations for the
scoping meetings will be published in local newspapers. The scoping
process will help identify additional possible alternatives, potential
environmental impacts, and key issues of concern to be analyzed in the
PEIS. To ensure scoping comments are fully considered in the Draft
PEIS, comments and suggestions should be received within the 30-day
scoping period or no later than 15 days following the last scoping
meeting, whichever is later.
Dated: August 8, 2006.
Addison D. Davis, IV,
Deputy Assistant Secretary of the Army, (Environment, Safety and
Occupational Health), OASA(I&E).
[FR Doc. 06-7054 Filed 8-18-06; 8:45 am]
BILLING CODE 3710-08-M