Preparation of the Brigade Combat Team Transformation Programmatic Environmental Impact Statement (PEIS), Fort Irwin, CA, 48542 [06-7054]

Download as PDF 48542 Federal Register / Vol. 71, No. 161 / Monday, August 21, 2006 / Notices DEPARTMENT OF DEFENSE Office of the Secretary Strategic Environmental Research and Development Program, Scientific Advisory Board Department of Defense. Notice of meeting. AGENCY: ACTION: SUMMARY: This Notice is published in accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92–463). The topic of the meeting on September 12–14, 2006 are to review new start and continuing research and development projects requesting Strategic Environmental Research and Development Program funds in excess of $1M. This meeting is open to the public. Any interested person may attend, appear before, or file statements with the Scientific Advisory Board at the time and in the manner permitted by the Board. DATES: September 12, 2006 from 10:30 a.m. to 5 p.m.; September 13 from 8:30 a.m. to 5 p.m.; and September 14, 2006 from 8:30 a.m. to 2 p.m. ADDRESSES: SERDP Program Office Conference Center, 901 North Stuart Street, Suite 804, Arlington, VA 22203. FOR FURTHER INFORMATION CONTACT: Ms. Misa Jensen, SERDP Program Office, 901 North Stuart Street, Suite 303, Arlington, VA or by telephone at (703) 696–2126. Dated: August 15, 2006. C.R. Choate, Alternate OSD Federal Register Liaison Officer, Department of Defense. [FR Doc. 06–7038 Filed 8–18–06; 8:45 am] BILLING CODE 5001–06–M DEPARTMENT OF DEFENSE Department of the Army Preparation of the Brigade Combat Team Transformation Programmatic Environmental Impact Statement (PEIS), Fort Irwin, CA Department of the Army, DoD. Notice of intent. AGENCY: hsrobinson on PROD1PC72 with NOTICES ACTION: SUMMARY: The Army Installation Management Agency and the Fort Irwin National Training Center will prepare a PEIS to analyze the impacts of mission realignment in support of the Army Transformation, the Army Campaign Plan, and other Army initiatives. Under the proposed action, the 11th Armored Cavalry Regiment will expand to become a full-size, multi-component Heavy Brigade Combat Team (BCT), VerDate Aug<31>2005 17:53 Aug 18, 2006 Jkt 208001 deployable throughout the world. Other, smaller units will also be stationed at Fort Irwin. Training rotations will increase from 10 per year to 12. The PEIS will evaluate the new construction, new land use, and changes in training, area use necessary to implement the proposed action at Fort Irwin. FOR FURTHER INFORMATION CONTACT: Public Affairs Office: Major John Clearwater, Attention: IMSW–IRW–PA Fort Irwin, CA 92310; telephone: (760) 380–3078; or Directorate of Public Works: Mr. Mickey Quillman, Attention: PEIS; IMSW–IRW–PWE, Building 602, Fort Irwin, CA 92310; fax: (760) 380– 2677, or e-mail mickey.quillman@irwin.army.mil. SUPPLEMENTARY INFORMATION: The PEIS will assess the environmental impacts associated with the stationing and training of new soldiers at Fort Irwin. Under the proposed action, approximately 690 additional soldiers would be stationed at Fort Irwin, with approximately 760 family members accompanying them. The proposed action will increase training by about 20% on all Fort Irwin training areas and may involve some new range construction. This increased usage will ultimately involve the maneuver training areas into which Fort Irwin expanded, as decided in 2006. The proposed action will result in additional construction in the Fort Irwin cantonment area for such projects as soldier and family housing, schools, infrastructure, utilities, and related facilities. These changes would provide the capability to train additional units and represent a realignment of existing missions for the installation. The action may have environmental impacts to air quality, water usage, waste water and other utilities, and biological resources. Fort Irwin will continue to train rotational units and would now support the 11th Armored Cavalry Regiment (ACR), a multi-component Heavy BCT. A range of reasonable alternatives, including an alternative of considering no action as required by the National Environmental Policy Act, will be developed and analyzed in the PEIS. The range of alternatives will include varying amounts of new construction and training area changes. During the scoping process, other alternatives may be developed and added for consideration. The PEIS will also analyze each alternative’s impact upon the natural, cultural, and man-made environments at Fort Irwin and in the surrounding region. Tribal, Federal, state and local agencies, as well as the public are invited to participate in the scoping PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 process for the preparation of this PEIS. Scoping meetings will be held in convenient locations near the installation. Notification of the times and locations for the scoping meetings will be published in local newspapers. The scoping process will help identify additional possible alternatives, potential environmental impacts, and key issues of concern to be analyzed in the PEIS. To ensure scoping comments are fully considered in the Draft PEIS, comments and suggestions should be received within the 30-day scoping period or no later than 15 days following the last scoping meeting, whichever is later. Dated: August 8, 2006. Addison D. Davis, IV, Deputy Assistant Secretary of the Army, (Environment, Safety and Occupational Health), OASA(I&E). [FR Doc. 06–7054 Filed 8–18–06; 8:45 am] BILLING CODE 3710–08–M DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Notice of Availability for the Draft Environmental Impact Statement/ Environmental Impact Report for the Berth 97–109 Container Terminal Project, Los Angeles County, CA Department of the Army—U.S. Army Corps of Engineers, DoD. ACTION: Notice of availability. AGENCY: SUMMARY: The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Branch), in coordination with the Port of Los Angeles, has completed a Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Berth 97–109 Container Terminal Project. The Port of Los Angeles requires authorization pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act for wharf and terminal development (142 acres) in three phases, dredging up to 41,000 cubic yards of sediment, construction of two new concrete pile-supported wharves (for a total of 2,500 feet), new terminal buildings and two new terminal bridges. FOR FURTHER INFORMATION CONTACT: Questions or comments concerning the Draft EIS/EIR should be directed to Dr. Aaron O. Allen, Senior Project Manager, Regulatory Branch, U.S. Army Corps of Engineers, P.O. Box 532711, Los Angeles, CA 90053–2325, (805) 585– 2148. E:\FR\FM\21AUN1.SGM 21AUN1

Agencies

[Federal Register Volume 71, Number 161 (Monday, August 21, 2006)]
[Notices]
[Page 48542]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-7054]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army


Preparation of the Brigade Combat Team Transformation 
Programmatic Environmental Impact Statement (PEIS), Fort Irwin, CA

AGENCY: Department of the Army, DoD.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: The Army Installation Management Agency and the Fort Irwin 
National Training Center will prepare a PEIS to analyze the impacts of 
mission realignment in support of the Army Transformation, the Army 
Campaign Plan, and other Army initiatives. Under the proposed action, 
the 11th Armored Cavalry Regiment will expand to become a full-size, 
multi-component Heavy Brigade Combat Team (BCT), deployable throughout 
the world. Other, smaller units will also be stationed at Fort Irwin. 
Training rotations will increase from 10 per year to 12. The PEIS will 
evaluate the new construction, new land use, and changes in training, 
area use necessary to implement the proposed action at Fort Irwin.

FOR FURTHER INFORMATION CONTACT: Public Affairs Office: Major John 
Clearwater, Attention: IMSW-IRW-PA Fort Irwin, CA 92310; telephone: 
(760) 380-3078; or Directorate of Public Works: Mr. Mickey Quillman, 
Attention: PEIS; IMSW-IRW-PWE, Building 602, Fort Irwin, CA 92310; fax: 
(760) 380-2677, or e-mail mickey.quillman@irwin.army.mil.

SUPPLEMENTARY INFORMATION: The PEIS will assess the environmental 
impacts associated with the stationing and training of new soldiers at 
Fort Irwin. Under the proposed action, approximately 690 additional 
soldiers would be stationed at Fort Irwin, with approximately 760 
family members accompanying them. The proposed action will increase 
training by about 20% on all Fort Irwin training areas and may involve 
some new range construction. This increased usage will ultimately 
involve the maneuver training areas into which Fort Irwin expanded, as 
decided in 2006. The proposed action will result in additional 
construction in the Fort Irwin cantonment area for such projects as 
soldier and family housing, schools, infrastructure, utilities, and 
related facilities. These changes would provide the capability to train 
additional units and represent a realignment of existing missions for 
the installation. The action may have environmental impacts to air 
quality, water usage, waste water and other utilities, and biological 
resources. Fort Irwin will continue to train rotational units and would 
now support the 11th Armored Cavalry Regiment (ACR), a multi-component 
Heavy BCT.
    A range of reasonable alternatives, including an alternative of 
considering no action as required by the National Environmental Policy 
Act, will be developed and analyzed in the PEIS. The range of 
alternatives will include varying amounts of new construction and 
training area changes. During the scoping process, other alternatives 
may be developed and added for consideration. The PEIS will also 
analyze each alternative's impact upon the natural, cultural, and man-
made environments at Fort Irwin and in the surrounding region.
    Tribal, Federal, state and local agencies, as well as the public 
are invited to participate in the scoping process for the preparation 
of this PEIS. Scoping meetings will be held in convenient locations 
near the installation. Notification of the times and locations for the 
scoping meetings will be published in local newspapers. The scoping 
process will help identify additional possible alternatives, potential 
environmental impacts, and key issues of concern to be analyzed in the 
PEIS. To ensure scoping comments are fully considered in the Draft 
PEIS, comments and suggestions should be received within the 30-day 
scoping period or no later than 15 days following the last scoping 
meeting, whichever is later.

    Dated: August 8, 2006.
Addison D. Davis, IV,
Deputy Assistant Secretary of the Army, (Environment, Safety and 
Occupational Health), OASA(I&E).
[FR Doc. 06-7054 Filed 8-18-06; 8:45 am]