Portland General Electric Company and the Confederated Tribes of the Warm Springs Reservation of Oregon; Notice Extending Comment Period, 47804 [E6-13767]
Download as PDF
jlentini on PROD1PC65 with NOTICES
47804
Federal Register / Vol. 71, No. 160 / Friday, August 18, 2006 / Notices
l. This application has not been
accepted for filing. We are not soliciting
motions to intervene, protests, or final
terms and conditions at this time.
m. The existing Lake Blackshear
Project consists of: (1) A 402-foot-long,
46-foot-high gated spillway; (2) a 630foot-long auxiliary spillway; (3) a 3,410foot-long north embankment; (4) a 650foot-long south embankment; (5) an
8,700-acre impoundment at a full pool
elevation of 237 feet mean sea level; (6)
a powerhouse containing four turbines
with a total installed capacity of 15.2
MW; (7) a 1,400-foot-long, 46 kilovolt
transmission line; and (8) appurtenant
facilities.
n. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. With this notice, we are initiating
consultation with the Georgia State
Historic Preservation Officer (SHPO), as
required by section 106, National
Historic Preservation Act, and the
regulations of the Advisory Council on
Historic Preservation, 36 CFR, at
§ 800.4.
p. Procedural schedule and final
amendments: At this time we do not
anticipate the need for preparing a draft
environmental assessment (EA).
Recipients will have 45 days to provide
the Commission with any written
comments on the EA. All comments
filed with the Commission will be
considered in the Order taking final
action on the license applications.
However, should substantive comments
requiring re-analysis be received on the
EA document, we would consider
preparing a subsequent EA document.
The application will be processed
according to the following Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Acceptance letter or Deficiency
Letter and request Additional
Information, if needed—November
2006
VerDate Aug<31>2005
18:35 Aug 17, 2006
Jkt 208001
Notice soliciting final terms and
conditions—March 2007
Notice of the Availability of the EA—
October 2007
Ready for Commission’s decision on the
application February 2008
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice soliciting final terms
and conditions.
Magalie R. Salas,
Secretary.
[FR Doc. E6–13627 Filed 8–17–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2030–073]
Portland General Electric Company
and the Confederated Tribes of the
Warm Springs Reservation of Oregon;
Notice Extending Comment Period
August 1, 2006.
This notice applies to the Pelton
Round Butte Hydroelectric Project,
FERC No. P–2030. The project is
licensed to Portland General Electric
Company and the Confederated Tribes
of the Warm Springs Reservation of
Oregon (licensees).
On July 3, 2006, the Commission
issued a Notice of Application and
Soliciting Comments, Motions to
Intervene, and Protests for an
application by the licensees for a
shoreline management plan as required
by article 428 of the project license. The
notice established July 31, 2006, as the
deadline for filing comments or
motions. This notice extends the
deadline to August 31, 2006.
If you have any questions regarding
this notice, please call Lesley Kordella
at (202) 502–6406.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1971–079]
Idaho Power Company, Idaho/Oregon;
Notice of Intent To Hold Public
Meetings
August 11, 2006.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR Part 380 (Order No.
486, 52 Fed. Reg. 47897), the Office of
Energy Projects reviewed the
application for license for the Hells
Canyon Project (FERC No. 1971),
located on the Snake River in
Washington and Adams Counties,
Idaho, and Wallowa and Baker
Counties, Oregon, and issued a Draft
Environmental Impact Statement (draft
EIS) for the project on July 28, 2006.
Copies of the draft EIS are available
for review at the Commission’s Public
Reference Branch, Room 2A, located at
888 First Street, N.E., Washington, DC
20426 or may be viewed on the
Commission’s Web site at https://
www.ferc.gov under the e-Library link
by entering the docket number, P–1971,
in the e-Library docket number field.
For assistance, e-mail FERC Online
Support at
FERCOnlineSupport@ferc.gov or call
toll-free at 1–866–208–3676, or for TTY,
(202) 502–8659.
You are invited to attend any or all of
four public meetings that will be held to
receive comments on the draft EIS. The
time and location of the meetings are as
follows:
Boise, ID
Magalie R. Salas,
Secretary.
[FR Doc. E6–13767 Filed 8–17–06; 8:45 am]
Date: September 7, 2006.
Time: 7 to 11 p.m. (MST).
Place: Doubletree Hotel Boise
Riverside.
Address: 2900 Chinden Blvd., Boise,
ID.
Date: September 8, 2006.
Time: 10 a.m. to 2 p.m. (MST).
Place: Doubletree Hotel Boise
Riverside.
Address: 2900 Chinden Blvd., Boise,
ID.
BILLING CODE 6717–01–P
Halfway, OR
PO 00000
Date: September 11, 2006.
Time: 7 to 9 p.m. (MST).
Place: Lions Hall.
Address: Center Street, Halfway, OR.
Weiser, ID
Date: September 12, 2006.
Time: 7 to 9 p.m. (MST).
Frm 00033
Fmt 4703
Sfmt 4703
E:\FR\FM\18AUN1.SGM
18AUN1
Agencies
[Federal Register Volume 71, Number 160 (Friday, August 18, 2006)]
[Notices]
[Page 47804]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-13767]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2030-073]
Portland General Electric Company and the Confederated Tribes of
the Warm Springs Reservation of Oregon; Notice Extending Comment Period
August 1, 2006.
This notice applies to the Pelton Round Butte Hydroelectric
Project, FERC No. P-2030. The project is licensed to Portland General
Electric Company and the Confederated Tribes of the Warm Springs
Reservation of Oregon (licensees).
On July 3, 2006, the Commission issued a Notice of Application and
Soliciting Comments, Motions to Intervene, and Protests for an
application by the licensees for a shoreline management plan as
required by article 428 of the project license. The notice established
July 31, 2006, as the deadline for filing comments or motions. This
notice extends the deadline to August 31, 2006.
If you have any questions regarding this notice, please call Lesley
Kordella at (202) 502-6406.
Magalie R. Salas,
Secretary.
[FR Doc. E6-13767 Filed 8-17-06; 8:45 am]