Drawbridge Operation Regulations; Gulf Intracoastal Waterway, Galveston, TX, 47737 [E6-13665]
Download as PDF
Federal Register / Vol. 71, No. 160 / Friday, August 18, 2006 / Rules and Regulations
compromised, or debts on which
collection activity cannot be suspended
or terminated, to the Department of
Justice for litigation. Debts shall be
referred as early as possible, consistent
with the standards contained if 31 CFR
Chapter IX parts 900–904 and, in any
event, well within the period for
initiating timely lawsuits against the
debtors. The NLRB will make every
effort to refer delinquent debts to the
Department of Justice within one year of
the date such debts became delinquent.
Dated: Washington, DC, August 15, 2006.
By Direction of the Board.
Lester A. Heltzer,
Executive Secretary.
[FR Doc. E6–13688 Filed 8–17–06; 8:45 am]
BILLING CODE 7545–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD08–06–027]
Drawbridge Operation Regulations;
Gulf Intracoastal Waterway, Galveston,
TX
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
rwilkins on PROD1PC63 with RULES
ACTION:
SUMMARY: The Commander, Eighth
Coast Guard District, has issued a
temporary deviation from the regulation
governing the operation of the Galveston
Causeway Railroad Bascule Bridge
across the Gulf Intracoastal Waterway,
mile 357.2 west of Harvey Locks, at
Galveston, Galveston County, Texas.
This deviation provides for two (2)
three-hour closures to conduct
scheduled maintenance to the
drawbridge.
DATES: This deviation is effective from
7 a.m. until 4 p.m. on Tuesday, August
29, 2006.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at the office of the Eighth Coast
Guard District, Bridge Administration
Branch, Hale Boggs Federal Building,
Room 1313, 500 Poydras Street, New
Orleans, Louisiana 70130–3310 between
7 a.m. and 3 p.m., Monday through
Friday, except Federal holidays. The
telephone number is (504) 671–2128.
The Bridge Administration Branch of
the Eighth Coast Guard District
maintains the public docket for this
temporary deviation.
VerDate Aug<31>2005
18:30 Aug 17, 2006
Jkt 208001
FOR FURTHER INFORMATION CONTACT:
David Frank, Bridge Administration
Branch, telephone (504) 671–2129.
The
Burlington Northern Railway Company
has requested a temporary deviation in
order to perform necessary maintenance
on the rail joints of the Galveston
Causeway Railroad Bascule Bridge
across the Gulf Intracoastal Waterway,
mile 357.2 west of Harvey Locks, at
Galveston, Galveston County, Texas.
The maintenance is essential for the
continued safe operation of the railroad
bridge. The bridge currently opens on
signal in accordance with 33 CFR 117.5.
This temporary deviation will allow the
bridge to remain in the closed-tonavigation position from 7 a.m. until 10
a.m. and from 1 p.m. until 4 p.m. on
Tuesday, August 29, 2006. This
temporary deviation was originally
published to occur on Wednesday,
August 16, 2006; however, Burlington
Northern Railway Company has
requested to reschedule to Tuesday,
August 29, 2006.
The bridge has a vertical clearance of
10 feet above mean high water in the
closed-to-navigation position.
Navigation at the site of the bridge
consists mainly of tows with barges and
some recreational pleasure craft. Due to
prior experience, as well as
coordination with waterway users, it
has been determined that this closure
will not have a significant effect on
these vessels. No alternate routes are
available.
In accordance with 33 CFR 117.35(c),
this work will be performed with all due
speed in order to return the bridge to
normal operation as soon as possible.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
SUPPLEMENTARY INFORMATION:
Dated: August 8, 2006.
Marcus Redford,
Bridge Administrator.
[FR Doc. E6–13665 Filed 8–17–06; 8:45 am]
BILLING CODE 4910–15–P
PO 00000
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 138
[USCG–2005–21780]
RIN 1625–AA98
New Oil Pollution Limits of Liability for
Vessels—Delaware River Protection
Act of 2006 Amendment to the Oil
Pollution Act of 1990
Coast Guard, DHS.
Notice of policy.
AGENCY:
ACTION:
SUMMARY: The Coast Guard announces
the enactment of statutory changes that
will affect the financial responsibility of
vessel owners and operators for oil
pollution from their vessels. The
Delaware River Protection Act of 2006
amends limits of liability under the Oil
Pollution Act of 1990 (OPA 90) for
discharges and substantial threats of
discharge of oil from vessels. This
statutory change will also result in
future changes to Coast Guard
regulations related to proof of financial
responsibility by vessel owners and
operators for discharges of oil from
vessels.
FOR FURTHER INFORMATION CONTACT:
Fmt 4700
Sfmt 4700
Mr.
Benjamin White at 202–493–6863.
SUPPLEMENTARY INFORMATION:
Background and Purpose
The limits of liability for oil removal
costs and damages that result from
discharges or substantial threats of
discharge of oil from vessels, under
OPA 90 (33 U.S.C. 2704), were amended
by the enactment of the Delaware River
Protection Act of 2006 (the Act), title VI
of the Coast Guard and Maritime
Transportation Act of 2006 (Pub. L.
109–241). The purpose of this notice
is—
1. To alert the public of the amended
limits of liability for vessels;
2. To notify the public that existing
Coast Guard regulations in 33 CFR part
138 entitled ‘‘Financial Responsibility
for Water Pollution (Vessels)’’ remain in
effect until amended; and
3. To notify the public that a
rulemaking project will be initiated to
amend the regulations in 33 CFR part
138 to reflect the amended liability
limits.
The following table shows the original
and amended limits of liability by vessel
type:
Limits of Liability
Frm 00041
47737
E:\FR\FM\18AUR1.SGM
18AUR1
Agencies
[Federal Register Volume 71, Number 160 (Friday, August 18, 2006)]
[Rules and Regulations]
[Page 47737]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-13665]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD08-06-027]
Drawbridge Operation Regulations; Gulf Intracoastal Waterway,
Galveston, TX
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eighth Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Galveston Causeway Railroad Bascule Bridge across the Gulf Intracoastal
Waterway, mile 357.2 west of Harvey Locks, at Galveston, Galveston
County, Texas. This deviation provides for two (2) three-hour closures
to conduct scheduled maintenance to the drawbridge.
DATES: This deviation is effective from 7 a.m. until 4 p.m. on Tuesday,
August 29, 2006.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at the office of the Eighth Coast Guard District,
Bridge Administration Branch, Hale Boggs Federal Building, Room 1313,
500 Poydras Street, New Orleans, Louisiana 70130-3310 between 7 a.m.
and 3 p.m., Monday through Friday, except Federal holidays. The
telephone number is (504) 671-2128. The Bridge Administration Branch of
the Eighth Coast Guard District maintains the public docket for this
temporary deviation.
FOR FURTHER INFORMATION CONTACT: David Frank, Bridge Administration
Branch, telephone (504) 671-2129.
SUPPLEMENTARY INFORMATION: The Burlington Northern Railway Company has
requested a temporary deviation in order to perform necessary
maintenance on the rail joints of the Galveston Causeway Railroad
Bascule Bridge across the Gulf Intracoastal Waterway, mile 357.2 west
of Harvey Locks, at Galveston, Galveston County, Texas. The maintenance
is essential for the continued safe operation of the railroad bridge.
The bridge currently opens on signal in accordance with 33 CFR 117.5.
This temporary deviation will allow the bridge to remain in the closed-
to-navigation position from 7 a.m. until 10 a.m. and from 1 p.m. until
4 p.m. on Tuesday, August 29, 2006. This temporary deviation was
originally published to occur on Wednesday, August 16, 2006; however,
Burlington Northern Railway Company has requested to reschedule to
Tuesday, August 29, 2006.
The bridge has a vertical clearance of 10 feet above mean high
water in the closed-to-navigation position.
Navigation at the site of the bridge consists mainly of tows with
barges and some recreational pleasure craft. Due to prior experience,
as well as coordination with waterway users, it has been determined
that this closure will not have a significant effect on these vessels.
No alternate routes are available.
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to normal operation as
soon as possible. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: August 8, 2006.
Marcus Redford,
Bridge Administrator.
[FR Doc. E6-13665 Filed 8-17-06; 8:45 am]
BILLING CODE 4910-15-P