Download as PDF 47494 Federal Register / Vol. 71, No. 159 / Thursday, August 17, 2006 / Notices protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on August 24, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–13536 Filed 8–16–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 rwilkins on PROD1PC63 with NOTICES August 10, 2006. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG06–70–000. Applicants: White Creek Wind I, LLC. Description: White Creek Wind I, LLC submits a Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 08/04/2006. Accession Number: 20060810–0056. Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER02–2119–005; ER06–1189–001. Applicants: Southern California Edison Company. Description: Southern California Edison Company submits a Motion for Leave to Answer and Answer to the Protests of Coral Power. Filed Date: 08/04/2006. VerDate Aug<31>2005 16:36 Aug 16, 2006 Jkt 208001 Accession Number: 20060804–5082. Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006. Docket Numbers: ER04–776–007. Applicants: PJM Interconnection, LLC. Description: Public Utilities Commission of Ohio submits a State Certification in which they make certain representations and warranties regarding its legal obligations and those of its authorized representatives. Filed Date: 08/04/2006. Accession Number: 20060807–0108. Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006. Docket Numbers: ER05–1050–003. Applicants: AmerGen Energy Company LLC. Description: Refund Report of AmerGen Energy Company in Compliance with Commission’s June 28, 2006 Order under ER05–1050. Filed Date: 08/04/2006. Accession Number: 20060804–5063. Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006. Docket Numbers: ER06–95–001. Applicants: Pacific Gas & Electric Company. Description: Pacific Gas and Electric Company submits a compliance electric refund report pursuant to the Commission’s 6/9/06 Order. Filed Date: 08/09/2006. Accession Number: 20060809–5040. Comment Date: 5 p.m. Eastern Time on Wednesday, August 30, 2006. Docket Numbers: ER05–1050–001. Applicants: MinnDakota Wind LLC. Description: MinnDakota Wind LLC submits its response in Compliance with Commission’s July 5, 2006 Order. Filed Date: 08/04/2006. Accession Number: 20060810–0079. Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006. Docket Numbers: ER06–1051–003. Applicants: Midwest Independent Transmission System. Description: Midwest Independent Transmission System Operator Inc. submits the supplemental information requested in FERC’s 7/5/06 deficiency letter. Filed Date: 08/04/2006. Accession Number: 20060808–0147. Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006. Docket Numbers: ER06–1308–001. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc. submits its errata to their 7/31/06 filing. Filed Date: 08/08/2006. Accession Number: 20060810–0057. PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 Comment Date: 5 p.m. Eastern Time on Tuesday, August 29, 2006. Docket Numbers: ER06–1320–000. Applicants: Wisconsin Electric Power Company. Description: Wisconsin Electric Power Co. submits its proposed increase in the rates charges to certain of its wholesale customers. Filed Date: 08/01/2006. Accession Number: 20060803–0074. Comment Date: 5 p.m. Eastern Time on Friday, September 01, 2006. Docket Numbers: ER06–1325–000. Applicants: Pacific Gas & Electric Company. Description: Pacific Gas and Electric Company submits a request of approval for proposed rate changes for wholesale and retail electric transmission rates etc, effective 10/1/06. Filed Date: 08/01/2006. Accession Number: 20060810–0105. Comment Date: 5 p.m. Eastern Time on Tuesday, August 22, 2006. Docket Numbers: ER06–1346–000. Applicants: White Creek Wind I, LLC. Description: White Creek Wind I, LLC submits its application for order accepting Market-Based Rate Tariff, granting authorizations and blanket authority and waiving certain requirements, FERC Electric Tariff, Original Volume 1. Filed Date: 08/04/2006. Accession Number: 20060810–0054. Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH06–48–000. Applicants: Legg Mason, Inc. Description: Legg Mason Inc. submits additional information to its 5/5/2006 pursuant to the Commission’s Order issued 6/30/06. Filed Date: 08/01/2006. Accession Number: 20060802–0117. Comment Date: 5 p.m. Eastern Time on Tuesday, August 22, 2006. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that E:\FR\FM\17AUN1.SGM 17AUN1 Federal Register / Vol. 71, No. 159 / Thursday, August 17, 2006 / Notices document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive E-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERCOnline service, please E-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–13541 Filed 8–16–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12658–000] E.ON U.S. Hydro 1 LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process rwilkins on PROD1PC63 with NOTICES August 10, 2006. a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 12658–000. c. Dated Filed: June 12, 2006. d. Submitted By: E.ON U.S. Hydro 1 LLC. e. Name of Project: Meldahl Hydroelectric Project. VerDate Aug<31>2005 16:36 Aug 16, 2006 Jkt 208001 f. Location: The project would be located on the Ohio River in Bracken County, Kentucky. The existing dam is owned and operated by the U.S. Army Corps of Engineers (Corps). The project would occupy United States lands administered by the Corps. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Mr. Michael S. Beer, E.ON U.S. Hydro 1 LLC, 220 West Main Street, Louisville, KY 40202, (502) 627–3547; e-mail— mike.beer@eon-us.com. i. FERC Contact: Peter Leitzke at (202) 502–6059; or e-mail at peter.leitzke@ferc.gov. j. E.ON U.S. Hydro 1 LLC filed its request to use the Traditional Licensing Process on June 12, 2006. With this notice, the Director of the Office of Energy Projects approves E.ON U.S. Hydro 1 LLC’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; (b) NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920; and (c) the Kentucky State Historic Preservation Officer, as required by Section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating E.ON U.S. Hydro 1 LLC as the Commission’s non-Federal representative for carrying out informal consultation, pursuant to section 7 of the Endangered Species Act, section 305 of the Magnuson-Stevens Fishery Conservation and Management Act, and Section 106 of the National Historic Preservation Act. m. E.ON U.S. Hydro 1 LLC filed a PreApplication Document (PAD) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov or toll free at 1–866–208–3676, of for TTY, (202) 502–8659. A copy is also available PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 47495 for inspection and reproduction at the address in paragraph h. Register online at https://ferc.gov/ esubscribenow.htm to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Magalie R. Salas, Secretary. [FR Doc. E6–13537 Filed 8–16–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12667–001] City of Hamilton, OH; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process August 10, 2006. a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 12667–001. c. Dated Filed: June 12, 2006. d. Submitted By: City of Hamilton, Ohio. e. Name of Project: Meldahl Hydroelectric Project. f. Location: The project would be located on the Ohio River in Bracken County, Kentucky. The existing dam is owned and operated by the U.S. Army Corps of Engineers (Corps). The project would occupy United States lands administered by the Corps. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Mr. Michael Perry, Director of Electric, City of Hamilton, Ohio, 345 High Street, Hamilton, OH 45011, (513) 785–7229. i. FERC Contact: Peter Leitzke at (202) 502–6059; or e-mail at peter.leitzke@ferc.gov. j. The City of Hamilton, Ohio, filed its Notice of Intent to File License Application using the Traditional Licensing Process on June 12, 2006. With this notice, the Director of the Office of Energy Projects approves City of Hamilton, Ohio’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; (b) NOAA Fisheries under section 305(b) of the Magnuson- E:\FR\FM\17AUN1.SGM 17AUN1

Agencies

[Federal Register Volume 71, Number 159 (Thursday, August 17, 2006)]
[Notices]
[Pages 47494-47495]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-13541]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

August 10, 2006.
    Take notice that the Commission received the following exempt 
wholesale generator filings:
    Docket Numbers: EG06-70-000.
    Applicants: White Creek Wind I, LLC.
    Description: White Creek Wind I, LLC submits a Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 08/04/2006.
    Accession Number: 20060810-0056.
    Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006.

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER02-2119-005; ER06-1189-001.
    Applicants: Southern California Edison Company.
    Description: Southern California Edison Company submits a Motion 
for Leave to Answer and Answer to the Protests of Coral Power.
    Filed Date: 08/04/2006.
    Accession Number: 20060804-5082.
    Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006.

    Docket Numbers: ER04-776-007.
    Applicants: PJM Interconnection, LLC.
    Description: Public Utilities Commission of Ohio submits a State 
Certification in which they make certain representations and warranties 
regarding its legal obligations and those of its authorized 
representatives.
    Filed Date: 08/04/2006.
    Accession Number: 20060807-0108.
    Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006.

    Docket Numbers: ER05-1050-003.
    Applicants: AmerGen Energy Company LLC.
    Description: Refund Report of AmerGen Energy Company in Compliance 
with Commission's June 28, 2006 Order under ER05-1050.
    Filed Date: 08/04/2006.
    Accession Number: 20060804-5063.
    Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006.

    Docket Numbers: ER06-95-001.
    Applicants: Pacific Gas & Electric Company.
    Description: Pacific Gas and Electric Company submits a compliance 
electric refund report pursuant to the Commission's 6/9/06 Order.
    Filed Date: 08/09/2006.
    Accession Number: 20060809-5040.
    Comment Date: 5 p.m. Eastern Time on Wednesday, August 30, 2006.

    Docket Numbers: ER05-1050-001.
    Applicants: MinnDakota Wind LLC.
    Description: MinnDakota Wind LLC submits its response in Compliance 
with Commission's July 5, 2006 Order.
    Filed Date: 08/04/2006.
    Accession Number: 20060810-0079.
    Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006.

    Docket Numbers: ER06-1051-003.
    Applicants: Midwest Independent Transmission System.
    Description: Midwest Independent Transmission System Operator Inc. 
submits the supplemental information requested in FERC's 7/5/06 
deficiency letter.
    Filed Date: 08/04/2006.
    Accession Number: 20060808-0147.
    Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006.

    Docket Numbers: ER06-1308-001.
    Applicants: Midwest Independent Transmission System Operator, Inc.
    Description: Midwest Independent Transmission System Operator, Inc. 
submits its errata to their 7/31/06 filing.
    Filed Date: 08/08/2006.
    Accession Number: 20060810-0057.
    Comment Date: 5 p.m. Eastern Time on Tuesday, August 29, 2006.

    Docket Numbers: ER06-1320-000.
    Applicants: Wisconsin Electric Power Company.
    Description: Wisconsin Electric Power Co. submits its proposed 
increase in the rates charges to certain of its wholesale customers.
    Filed Date: 08/01/2006.
    Accession Number: 20060803-0074.
    Comment Date: 5 p.m. Eastern Time on Friday, September 01, 2006.

    Docket Numbers: ER06-1325-000.
    Applicants: Pacific Gas & Electric Company.
    Description: Pacific Gas and Electric Company submits a request of 
approval for proposed rate changes for wholesale and retail electric 
transmission rates etc, effective 10/1/06.
    Filed Date: 08/01/2006.
    Accession Number: 20060810-0105.
    Comment Date: 5 p.m. Eastern Time on Tuesday, August 22, 2006.

    Docket Numbers: ER06-1346-000.
    Applicants: White Creek Wind I, LLC.
    Description: White Creek Wind I, LLC submits its application for 
order accepting Market-Based Rate Tariff, granting authorizations and 
blanket authority and waiving certain requirements, FERC Electric 
Tariff, Original Volume 1.
    Filed Date: 08/04/2006.
    Accession Number: 20060810-0054.
    Comment Date: 5 p.m. Eastern Time on Friday, August 25, 2006.

    Take notice that the Commission received the following public 
utility holding company filings:
    Docket Numbers: PH06-48-000.
    Applicants: Legg Mason, Inc.
    Description: Legg Mason Inc. submits additional information to its 
5/5/2006 pursuant to the Commission's Order issued 6/30/06.
    Filed Date: 08/01/2006.
    Accession Number: 20060802-0117.
    Comment Date: 5 p.m. Eastern Time on Tuesday, August 22, 2006.
    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on

[[Page 47495]]

or before the comment deadline need not be served on persons other than 
the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive E-mail notification 
when a document is added to a subscribed dockets(s). For assistance 
with any FERCOnline service, please E-mail FERCOnlineSupport@ferc.gov. 
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E6-13541 Filed 8-16-06; 8:45 am]
BILLING CODE 6717-01-P