Union Electric Company, dba AmerenUE; Notice of Availability of Final Environmental Assessment, 47200 [E6-13363]
Download as PDF
47200
Federal Register / Vol. 71, No. 158 / Wednesday, August 16, 2006 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–13430 Filed 8–15–06; 8:45 am]
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E6–13370 Filed 8–15–06; 8:45 am]
[Project No. 405–068]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
Susquehanna Power Company and
PECO Energy Power Company; Notice
of Availability of Environmental
Assessment
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
August 9, 2006.
[Project No. 459–128]
Union Electric Company, dba
AmerenUE; Notice of Availability of
Final Environmental Assessment
August 8, 2006.
jlentini on PROD1PC65 with NOTICES
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects’ staff has reviewed the
application for new license for the
Osage Project, located on the Osage
River in south central Missouri, and has
prepared a final Environmental
Assessment (EA) for the project. In the
final EA, Commission staff analyzed the
potential environmental effects of
relicensing the project and concluded
that issuing a new license for the
project, with appropriate environmental
measures, would not constitute a major
Federal action that would significantly
affect the quality of the human
environment.
A copy of the final EA is available for
review in the Public Reference Room or
may be viewed on the Commission’s
Web site at https://www.ferc.gov, using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. You may register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or any other pending
projects. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–13363 Filed 8–15–06; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
20:24 Aug 15, 2006
Jkt 208001
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the
Office of Energy Projects has reviewed
an application for non-project use of
project lands and waters and has
prepared an environmental assessment
(EA) for public review. The licensees
seek Commission approval to permit use
of the Conowingo Hydroelectric Project,
FERC No. 405, reservoir and lands to
withdraw and discharge water. The EA
analyzes the environmental impacts of
the proposed water withdrawal and
discharge. The project is located on the
Susquehanna River in Hartford and
Cecil Counties in Maryland, and York
and Lancaster Counties in Pennsylvania.
The EA was written by staff in the
Office of Energy Projects, Federal
Energy Regulatory Commission
(Commission). A copy of the EA is
attached to a Commission order titled
‘‘Order Modifying and Approving NonProject Use of Project Lands and
Waters’’ issued August 8, 2006 and is
available for review at the Commission
or may be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access
documents. For assistance, contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
Any comments on the EA should be
filed within 30 days from the issuance
date of this notice, and should be
addressed to the Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Room 1–A,
Washington, DC 20426. Please affix
‘‘Conowingo Project No. 405–068’’ to all
comments. Comments may be filed
electronically via Internet in lieu of
paper filings. The Commission strongly
encourages electronic filings. See 18
CFR 385.20011(a)(1) (iii) and the
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
August 8, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major License.
b. Project No.: 12429–001.
c. Date filed: August 1, 2006.
d. Applicant: Clark Canyon Hydro,
LLC.
e. Name of Project: Clark Canyon Dam
Hydroelectric Project.
f. Location: On the Beaverhead River,
18 miles southwest of the Town of
Dillon, Beaverhead County, Montana.
The project would occupy 3.5 acres of
Federal land administered by the
Bureau of Reclamation.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Brent L. Smith,
Northwest Power Services, Inc., P.O.
Box 535, Rigby, ID 83442, (208) 745–
0834 or Dr. Vincent Lamarra,
Ecosystems Research Institute, Inc., 975
South State Highway, Logan, UT 84321.
i. FERC Contact: Dianne Rodman,
(202) 502–6077,
Dianne.rodman@ferc.gov.
j. Cooperating agencies: We are asking
Federal, state, local, and tribal agencies
with jurisdiction and/or special
expertise with respect to environmental
issues to cooperate with us in the
preparation of the environmental
document. Agencies who would like to
request cooperating status should follow
the instructions for filing comments
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
E:\FR\FM\16AUN1.SGM
16AUN1
Agencies
[Federal Register Volume 71, Number 158 (Wednesday, August 16, 2006)]
[Notices]
[Page 47200]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-13363]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 459-128]
Union Electric Company, dba AmerenUE; Notice of Availability of
Final Environmental Assessment
August 8, 2006.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects' staff has reviewed the application for new license
for the Osage Project, located on the Osage River in south central
Missouri, and has prepared a final Environmental Assessment (EA) for
the project. In the final EA, Commission staff analyzed the potential
environmental effects of relicensing the project and concluded that
issuing a new license for the project, with appropriate environmental
measures, would not constitute a major Federal action that would
significantly affect the quality of the human environment.
A copy of the final EA is available for review in the Public
Reference Room or may be viewed on the Commission's Web site at https://
www.ferc.gov, using the ``eLibrary'' link. Enter the docket number,
excluding the last three digits in the docket number field to access
the document. You may register online at https://www.ferc.gov/docs-
filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or any other pending projects. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-13363 Filed 8-15-06; 8:45 am]
BILLING CODE 6717-01-P