Environmental Impact Statements; Notice of Availability, 46220 [E6-13207]

Download as PDF 46220 Federal Register / Vol. 71, No. 155 / Friday, August 11, 2006 / Notices Swordfish, and Shark and the Atlantic Billfish Fishery Management Plan, Implementation, Atlantic Coast, Caribbean and Gulf of Mexico. Summary: EPA does not object to the proposed action. Dated: August 8, 2006. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E6–13160 Filed 8–10–06; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6678–1] hsrobinson on PROD1PC67 with NOTICES1 Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 07/31/2006 Through 08/04/2006 Pursuant to 40 CFR 1506.9. EIS No. 20060326, Final EIS, BOP, NH, Berlin, Coos County, Proposed Federal Correctional Institution, Construction and Operation, City of Berlin, Coos County, NH, Wait Period Ends: 09/11/2006, Contact: Pamela J. Chandler 202–514–6470. EIS No. 20060327, Final Supplement, AFS, CA, Empire Vegetation Management Project, Additional Information to Clarify Previous Analysis, Vegetation, Fire/Fuels/Air Quality, Wildlife, Watershed, and Botanical Resource/Noxious Weeds, Mount Hough Ranger District, Plumas National Forest, Plumas County, CA, Wait Period Ends: 09/11/2006, Contact: Gary Rotta 530–283–0555. EIS No. 20060328, Draft EIS, NRS, MA, Cape Cod Water Resources Restoration Project, Restore Degraded Salt Marshes, Restore Anadromous Fish Passages, and Improve Water Quality for Shellfishing Area, Cape Cod, Barnstable County, MA, Comment Period Ends: 09/25/2006, Contact: Carl Gustafson 413–253– 4302. EIS No. 20060329, Final EIS, NRS, MO, East Locust Creek Watershed Revised Plan, Installation of Multiple-Purpose Reservoir, Flood Prevention and Watershed Protection, Sullivan and Putnam Counties, MO, Wait Period Ends: 09/11/2006, Contact: Roger A. Hansen 573–876–0901. EIS No. 20060330, Draft EIS, NOA, CA, Channel Islands National Marine Sanctuary (CINES) Project, VerDate Aug<31>2005 15:03 Aug 10, 2006 Jkt 208001 Establishment of No-Take and Limited-Take Marine Zones, Protection of Sanctuary Biodiversity, CA, Comment Period Ends: 10/10/ 2006, Contact: Chris Mobley 805– 966–7107. EIS No. 20060331, Final EIS, FRC, WA, Rocky Reach Hydroelectric Project, (FERC/DEIS–0184D), Application for a New License for the Existing 865.76 Megawatt Facility, Public Utility District No. 1 (PUD), Columbia River, Chelan County, WA, Wait Period Ends: 09/11/2006, Contact: Todd Sedmak 1–866–208–FERC. EIS No. 20060332, Final Supplement, NOA, 00, Amendment 26 to the Gulf of Mexico Reef Fish Fishery Management Plan, Proposed Individual Fishing Quota (IFQ) Program to Reduce Overcapacity in the Commercial Red Snapper Fishery, Wait Period Ends: 09/11/2006, Contact: Roy E. Crabtree 727–824– 5308. EIS No. 20060333, Draft EIS, USA, MD, U.S. Army Medical Research Institute of Infectious Diseases (USAMRIID), Construction and Operation of New USAMRIID Facilities and Decommissioning and Demolition and/or Re-use of Existing USAMRIID Facilities, Fort Detrick, MD, Comment Period Ends: 09/25/2006, Contact: Dave Hand 410–962–8154. EIS No. 20060334, Final Supplement, UAF, 00, Realistic Bomber Training Initiative, Addresses Impacts of Wake Vortices on Surface Structures, Dyess Air Force Base, TX and Barksdale Air Force Base, LA, Wait Period Ends: 09/ 11/2006, Contact: Sheryl Parker 757– 764–9334. Amended Notices EIS No. 20060318, Draft EIS, FHW, NC, Greenville Southwest Bypass Study, Transportation Improvements to NC 11 and U.S. 264 Business, U.S. Army COE Section 404 Permit, Pitt County, NC, Comment Period Ends: 09/18/ 2006, Contact: John F. Sullivan, III 919–856–4346. Revision of FR Notice Published in 08/04/2006: Correction to State from NY to NC. Dated: August 8, 2006. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E6–13207 Filed 8–10–06; 8:45 am] BILLING CODE 6560–50–P PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 ENVIRONMENTAL PROTECTION AGENCY [FRL–8208–6; Docket ID No. EPA–HQ–ORD– 2004–0002] Draft Toxicological Review of Dichlorobenzenes: In Support of Summary Information on the Integrated Risk Information System (IRIS) Environmental Protection Agency (EPA). ACTION: Notice of Extension of Public Comment Period and Rescheduled External Peer Review Panel Meeting. AGENCY: SUMMARY: The EPA is extending the public comment period and rescheduling an external peer review panel meeting to review selected sections of the final draft document titled, ‘‘Toxicological Review of Dichlorobenzenes: In Support of Summary Information on the Integrated Risk Information System (IRIS)’’ (EPA/ 635/R–03/015), related to the inhalation reference concentration (RfC) and inhalation cancer assessment for 1,4dichlorobenzene. The document was prepared by the National Center for Environmental Assessment (NCEA) within EPA’s Office of Research and Development. On July 11, 2006, EPA published a Federal Register notice (71 FR 39113) announcing a comment period that ended August 9 and an external peer review panel meeting that was scheduled for August 16. EPA is extending the public comment period to October 10, 2006, in response to requests. The external peer review panel meeting will be held on October 30, 2006. As previously stated in 71 FR 39113, EPA is releasing this draft document solely for the purpose of predissemination peer review under applicable information quality guidelines. This document has not been formally disseminated by EPA. It does not represent and should not be construed to represent any Agency policy or determination. EPA will consider any public comments submitted in accordance with this notice when revising the document. DATES: The period for submission of comments on the final draft document will end on October 10, 2006. Technical comments should be in writing and must be received by EPA by October 10, 2006. Comments submitted to the EPA by October 10, 2006, will be provided to the external peer review panel prior to the teleconference meeting. The peer review panel meeting will be conducted on October 30, 2006, by teleconference E:\FR\FM\11AUN1.SGM 11AUN1

Agencies

[Federal Register Volume 71, Number 155 (Friday, August 11, 2006)]
[Notices]
[Page 46220]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-13207]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6678-1]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 07/31/2006 Through 08/04/2006
Pursuant to 40 CFR 1506.9.

EIS No. 20060326, Final EIS, BOP, NH, Berlin, Coos County, Proposed 
Federal Correctional Institution, Construction and Operation, City of 
Berlin, Coos County, NH, Wait Period Ends: 09/11/2006, Contact: Pamela 
J. Chandler 202-514-6470.
EIS No. 20060327, Final Supplement, AFS, CA, Empire Vegetation 
Management Project, Additional Information to Clarify Previous 
Analysis, Vegetation, Fire/Fuels/Air Quality, Wildlife, Watershed, and 
Botanical Resource/Noxious Weeds, Mount Hough Ranger District, Plumas 
National Forest, Plumas County, CA, Wait Period Ends: 09/11/2006, 
Contact: Gary Rotta 530-283-0555.
EIS No. 20060328, Draft EIS, NRS, MA, Cape Cod Water Resources 
Restoration Project, Restore Degraded Salt Marshes, Restore Anadromous 
Fish Passages, and Improve Water Quality for Shellfishing Area, Cape 
Cod, Barnstable County, MA, Comment Period Ends: 09/25/2006, Contact: 
Carl Gustafson 413-253-4302.
EIS No. 20060329, Final EIS, NRS, MO, East Locust Creek Watershed 
Revised Plan, Installation of Multiple-Purpose Reservoir, Flood 
Prevention and Watershed Protection, Sullivan and Putnam Counties, MO, 
Wait Period Ends: 09/11/2006, Contact: Roger A. Hansen 573-876-0901.
EIS No. 20060330, Draft EIS, NOA, CA, Channel Islands National Marine 
Sanctuary (CINES) Project, Establishment of No-Take and Limited-Take 
Marine Zones, Protection of Sanctuary Biodiversity, CA, Comment Period 
Ends: 10/10/2006, Contact: Chris Mobley 805-966-7107.
EIS No. 20060331, Final EIS, FRC, WA, Rocky Reach Hydroelectric 
Project, (FERC/DEIS-0184D), Application for a New License for the 
Existing 865.76 Megawatt Facility, Public Utility District No. 1 (PUD), 
Columbia River, Chelan County, WA, Wait Period Ends: 09/11/2006, 
Contact: Todd Sedmak 1-866-208-FERC.
EIS No. 20060332, Final Supplement, NOA, 00, Amendment 26 to the Gulf 
of Mexico Reef Fish Fishery Management Plan, Proposed Individual 
Fishing Quota (IFQ) Program to Reduce Overcapacity in the Commercial 
Red Snapper Fishery, Wait Period Ends: 09/11/2006, Contact: Roy E. 
Crabtree 727-824-5308.
EIS No. 20060333, Draft EIS, USA, MD, U.S. Army Medical Research 
Institute of Infectious Diseases (USAMRIID), Construction and Operation 
of New USAMRIID Facilities and Decommissioning and Demolition and/or 
Re-use of Existing USAMRIID Facilities, Fort Detrick, MD, Comment 
Period Ends: 09/25/2006, Contact: Dave Hand 410-962-8154.
EIS No. 20060334, Final Supplement, UAF, 00, Realistic Bomber Training 
Initiative, Addresses Impacts of Wake Vortices on Surface Structures, 
Dyess Air Force Base, TX and Barksdale Air Force Base, LA, Wait Period 
Ends: 09/11/2006, Contact: Sheryl Parker 757-764-9334.

Amended Notices

EIS No. 20060318, Draft EIS, FHW, NC, Greenville Southwest Bypass 
Study, Transportation Improvements to NC 11 and U.S. 264 Business, U.S. 
Army COE Section 404 Permit, Pitt County, NC, Comment Period Ends: 09/
18/2006, Contact: John F. Sullivan, III 919-856-4346. Revision of FR 
Notice Published in 08/04/2006: Correction to State from NY to NC.

    Dated: August 8, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-13207 Filed 8-10-06; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.