Environmental Impact Statements; Notice of Availability, 46220 [E6-13207]
Download as PDF
46220
Federal Register / Vol. 71, No. 155 / Friday, August 11, 2006 / Notices
Swordfish, and Shark and the Atlantic
Billfish Fishery Management Plan,
Implementation, Atlantic Coast,
Caribbean and Gulf of Mexico.
Summary: EPA does not object to the
proposed action.
Dated: August 8, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E6–13160 Filed 8–10–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6678–1]
hsrobinson on PROD1PC67 with NOTICES1
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 07/31/2006 Through 08/04/2006
Pursuant to 40 CFR 1506.9.
EIS No. 20060326, Final EIS, BOP, NH,
Berlin, Coos County, Proposed
Federal Correctional Institution,
Construction and Operation, City of
Berlin, Coos County, NH, Wait Period
Ends: 09/11/2006, Contact: Pamela J.
Chandler 202–514–6470.
EIS No. 20060327, Final Supplement,
AFS, CA, Empire Vegetation
Management Project, Additional
Information to Clarify Previous
Analysis, Vegetation, Fire/Fuels/Air
Quality, Wildlife, Watershed, and
Botanical Resource/Noxious Weeds,
Mount Hough Ranger District, Plumas
National Forest, Plumas County, CA,
Wait Period Ends: 09/11/2006,
Contact: Gary Rotta 530–283–0555.
EIS No. 20060328, Draft EIS, NRS, MA,
Cape Cod Water Resources
Restoration Project, Restore Degraded
Salt Marshes, Restore Anadromous
Fish Passages, and Improve Water
Quality for Shellfishing Area, Cape
Cod, Barnstable County, MA,
Comment Period Ends: 09/25/2006,
Contact: Carl Gustafson 413–253–
4302.
EIS No. 20060329, Final EIS, NRS, MO,
East Locust Creek Watershed Revised
Plan, Installation of Multiple-Purpose
Reservoir, Flood Prevention and
Watershed Protection, Sullivan and
Putnam Counties, MO, Wait Period
Ends: 09/11/2006, Contact: Roger A.
Hansen 573–876–0901.
EIS No. 20060330, Draft EIS, NOA, CA,
Channel Islands National Marine
Sanctuary (CINES) Project,
VerDate Aug<31>2005
15:03 Aug 10, 2006
Jkt 208001
Establishment of No-Take and
Limited-Take Marine Zones,
Protection of Sanctuary Biodiversity,
CA, Comment Period Ends: 10/10/
2006, Contact: Chris Mobley 805–
966–7107.
EIS No. 20060331, Final EIS, FRC, WA,
Rocky Reach Hydroelectric Project,
(FERC/DEIS–0184D), Application for
a New License for the Existing 865.76
Megawatt Facility, Public Utility
District No. 1 (PUD), Columbia River,
Chelan County, WA, Wait Period
Ends: 09/11/2006, Contact: Todd
Sedmak 1–866–208–FERC.
EIS No. 20060332, Final Supplement,
NOA, 00, Amendment 26 to the Gulf
of Mexico Reef Fish Fishery
Management Plan, Proposed
Individual Fishing Quota (IFQ)
Program to Reduce Overcapacity in
the Commercial Red Snapper Fishery,
Wait Period Ends: 09/11/2006,
Contact: Roy E. Crabtree 727–824–
5308.
EIS No. 20060333, Draft EIS, USA, MD,
U.S. Army Medical Research Institute
of Infectious Diseases (USAMRIID),
Construction and Operation of New
USAMRIID Facilities and
Decommissioning and Demolition
and/or Re-use of Existing USAMRIID
Facilities, Fort Detrick, MD, Comment
Period Ends: 09/25/2006, Contact:
Dave Hand 410–962–8154.
EIS No. 20060334, Final Supplement,
UAF, 00, Realistic Bomber Training
Initiative, Addresses Impacts of Wake
Vortices on Surface Structures, Dyess
Air Force Base, TX and Barksdale Air
Force Base, LA, Wait Period Ends: 09/
11/2006, Contact: Sheryl Parker 757–
764–9334.
Amended Notices
EIS No. 20060318, Draft EIS, FHW, NC,
Greenville Southwest Bypass Study,
Transportation Improvements to NC
11 and U.S. 264 Business, U.S. Army
COE Section 404 Permit, Pitt County,
NC, Comment Period Ends: 09/18/
2006, Contact: John F. Sullivan, III
919–856–4346. Revision of FR Notice
Published in 08/04/2006: Correction
to State from NY to NC.
Dated: August 8, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E6–13207 Filed 8–10–06; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8208–6; Docket ID No. EPA–HQ–ORD–
2004–0002]
Draft Toxicological Review of
Dichlorobenzenes: In Support of
Summary Information on the
Integrated Risk Information System
(IRIS)
Environmental Protection
Agency (EPA).
ACTION: Notice of Extension of Public
Comment Period and Rescheduled
External Peer Review Panel Meeting.
AGENCY:
SUMMARY: The EPA is extending the
public comment period and
rescheduling an external peer review
panel meeting to review selected
sections of the final draft document
titled, ‘‘Toxicological Review of
Dichlorobenzenes: In Support of
Summary Information on the Integrated
Risk Information System (IRIS)’’ (EPA/
635/R–03/015), related to the inhalation
reference concentration (RfC) and
inhalation cancer assessment for 1,4dichlorobenzene. The document was
prepared by the National Center for
Environmental Assessment (NCEA)
within EPA’s Office of Research and
Development.
On July 11, 2006, EPA published a
Federal Register notice (71 FR 39113)
announcing a comment period that
ended August 9 and an external peer
review panel meeting that was
scheduled for August 16. EPA is
extending the public comment period to
October 10, 2006, in response to
requests. The external peer review panel
meeting will be held on October 30,
2006.
As previously stated in 71 FR 39113,
EPA is releasing this draft document
solely for the purpose of predissemination peer review under
applicable information quality
guidelines. This document has not been
formally disseminated by EPA. It does
not represent and should not be
construed to represent any Agency
policy or determination. EPA will
consider any public comments
submitted in accordance with this
notice when revising the document.
DATES: The period for submission of
comments on the final draft document
will end on October 10, 2006. Technical
comments should be in writing and
must be received by EPA by October 10,
2006. Comments submitted to the EPA
by October 10, 2006, will be provided to
the external peer review panel prior to
the teleconference meeting. The peer
review panel meeting will be conducted
on October 30, 2006, by teleconference
E:\FR\FM\11AUN1.SGM
11AUN1
Agencies
[Federal Register Volume 71, Number 155 (Friday, August 11, 2006)]
[Notices]
[Page 46220]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-13207]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6678-1]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 07/31/2006 Through 08/04/2006
Pursuant to 40 CFR 1506.9.
EIS No. 20060326, Final EIS, BOP, NH, Berlin, Coos County, Proposed
Federal Correctional Institution, Construction and Operation, City of
Berlin, Coos County, NH, Wait Period Ends: 09/11/2006, Contact: Pamela
J. Chandler 202-514-6470.
EIS No. 20060327, Final Supplement, AFS, CA, Empire Vegetation
Management Project, Additional Information to Clarify Previous
Analysis, Vegetation, Fire/Fuels/Air Quality, Wildlife, Watershed, and
Botanical Resource/Noxious Weeds, Mount Hough Ranger District, Plumas
National Forest, Plumas County, CA, Wait Period Ends: 09/11/2006,
Contact: Gary Rotta 530-283-0555.
EIS No. 20060328, Draft EIS, NRS, MA, Cape Cod Water Resources
Restoration Project, Restore Degraded Salt Marshes, Restore Anadromous
Fish Passages, and Improve Water Quality for Shellfishing Area, Cape
Cod, Barnstable County, MA, Comment Period Ends: 09/25/2006, Contact:
Carl Gustafson 413-253-4302.
EIS No. 20060329, Final EIS, NRS, MO, East Locust Creek Watershed
Revised Plan, Installation of Multiple-Purpose Reservoir, Flood
Prevention and Watershed Protection, Sullivan and Putnam Counties, MO,
Wait Period Ends: 09/11/2006, Contact: Roger A. Hansen 573-876-0901.
EIS No. 20060330, Draft EIS, NOA, CA, Channel Islands National Marine
Sanctuary (CINES) Project, Establishment of No-Take and Limited-Take
Marine Zones, Protection of Sanctuary Biodiversity, CA, Comment Period
Ends: 10/10/2006, Contact: Chris Mobley 805-966-7107.
EIS No. 20060331, Final EIS, FRC, WA, Rocky Reach Hydroelectric
Project, (FERC/DEIS-0184D), Application for a New License for the
Existing 865.76 Megawatt Facility, Public Utility District No. 1 (PUD),
Columbia River, Chelan County, WA, Wait Period Ends: 09/11/2006,
Contact: Todd Sedmak 1-866-208-FERC.
EIS No. 20060332, Final Supplement, NOA, 00, Amendment 26 to the Gulf
of Mexico Reef Fish Fishery Management Plan, Proposed Individual
Fishing Quota (IFQ) Program to Reduce Overcapacity in the Commercial
Red Snapper Fishery, Wait Period Ends: 09/11/2006, Contact: Roy E.
Crabtree 727-824-5308.
EIS No. 20060333, Draft EIS, USA, MD, U.S. Army Medical Research
Institute of Infectious Diseases (USAMRIID), Construction and Operation
of New USAMRIID Facilities and Decommissioning and Demolition and/or
Re-use of Existing USAMRIID Facilities, Fort Detrick, MD, Comment
Period Ends: 09/25/2006, Contact: Dave Hand 410-962-8154.
EIS No. 20060334, Final Supplement, UAF, 00, Realistic Bomber Training
Initiative, Addresses Impacts of Wake Vortices on Surface Structures,
Dyess Air Force Base, TX and Barksdale Air Force Base, LA, Wait Period
Ends: 09/11/2006, Contact: Sheryl Parker 757-764-9334.
Amended Notices
EIS No. 20060318, Draft EIS, FHW, NC, Greenville Southwest Bypass
Study, Transportation Improvements to NC 11 and U.S. 264 Business, U.S.
Army COE Section 404 Permit, Pitt County, NC, Comment Period Ends: 09/
18/2006, Contact: John F. Sullivan, III 919-856-4346. Revision of FR
Notice Published in 08/04/2006: Correction to State from NY to NC.
Dated: August 8, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-13207 Filed 8-10-06; 8:45 am]
BILLING CODE 6560-50-P