Southwest Gas Transmission Company, A Limited Partnership; Notice of Proposed Changes In FERC Gas Tariff, 46217 [E6-13142]
Download as PDF
Federal Register / Vol. 71, No. 155 / Friday, August 11, 2006 / Notices
Comment Date: 5 p.m. Eastern Time on
August 31, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–13140 Filed 8–10–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Public Service Company of Oklahoma,
(Docket No. EL06–95–000); Lawton
Cogeneration, L.L.C., (Docket No.
QF02–16–004); Notice of Filing
hsrobinson on PROD1PC67 with NOTICES1
August 4, 2006.
Take notice on August 1, 2006,
pursuant to Rule 215(a)(3)(i), Public
Service Company of Oklahoma (PSO)
filed an amended motion for revocation
of the qualifying facility (QF) status of
the cogeneration facility proposed by
Lawton Cogeneration, L.L.C. (Lawton)
which was obtained by self
recertification and a petition for
declaratory order asking the
Commission to find: Any further
amendments to the QF would render the
Lawton Facility a new cogeneration
facility pursuant to CFR 292.205(d); if
the Lawton Facility does not meet the
standards pursuant to § 292.205(a) when
it commences operations, PSO will not
have to purchase power from the
Lawton Facility and cannot be
compelled to enter into a contract that
requires otherwise; if the Oklahoma
Corporation Commission (OCC) compels
PSO to pay Lawton an avoided energy
cost based on heat rate of a peaking
plant it would be in contravention of the
Public Utility Regulatory Policies Act of
1978; and that the OCC has no authority
to compel PSO to name Lawton as a
designated Network Resource of PSO, as
such as is preempted by the Federal
Power Act, an in any event Order 888
does not compel utilities to purchase
transmission service for any third party.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
VerDate Aug<31>2005
15:03 Aug 10, 2006
Jkt 208001
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on August 31, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–13143 Filed 8–10–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
46217
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–13142 Filed 8–10–06; 8:45 am]
[Docket No. RP06–464–000]
BILLING CODE 6717–01–P
Southwest Gas Transmission
Company, A Limited Partnership;
Notice of Proposed Changes In FERC
Gas Tariff
August 4, 2006.
Take notice that on August 1, 2006,
Southwest Gas Transmission Company,
A Limited Partnership (SGTC) tendered
for filing as part of its FERC Gas Tariff,
First Revised Volume No. 2, First
Revised Sheet No. 16, to become
effective August 31, 2006.
SGTC states that it has served copies
of its filing on its affected customer and
interested state regulatory commission.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Docket No. RP06–465–000]
Texas Eastern Transmission, LP;
Algonquin Gas Transmission, LLC;
Maritimes & Northeast Pipeline, L.L.C.;
East Tennessee Natural Gas, LLC;
Egan Hub Storage, LLC; Notice
Requesting Temporary Waiver of
Certain Tariff Provisions and NAESB
Standards and Notice of Expedited
Comment Period
August 4, 2006.
Take notice that on August 3, 2006,
Texas Eastern Transmission, LP (Texas
Eastern), Algonquin Gas Transmission,
LLC (Algonquin), Maritimes & Northeast
Pipeline, L.L.C. (Maritimes), East
Tennessee Natural Gas, LLC (East
Tennessee) and Egan Hub Storage, LLC
(Egan Hub) (together referred to as the
‘‘Pipelines’’) requested temporary
E:\FR\FM\11AUN1.SGM
11AUN1
Agencies
[Federal Register Volume 71, Number 155 (Friday, August 11, 2006)]
[Notices]
[Page 46217]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-13142]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP06-464-000]
Southwest Gas Transmission Company, A Limited Partnership; Notice
of Proposed Changes In FERC Gas Tariff
August 4, 2006.
Take notice that on August 1, 2006, Southwest Gas Transmission
Company, A Limited Partnership (SGTC) tendered for filing as part of
its FERC Gas Tariff, First Revised Volume No. 2, First Revised Sheet
No. 16, to become effective August 31, 2006.
SGTC states that it has served copies of its filing on its affected
customer and interested state regulatory commission.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-13142 Filed 8-10-06; 8:45 am]
BILLING CODE 6717-01-P