Transcontinental Gas Pipe Line Corporation; Notice of Proposed Changes in FERC Gas Tariff, 45810-45811 [E6-13052]

Download as PDF 45810 Federal Register / Vol. 71, No. 154 / Thursday, August 10, 2006 / Notices Trailblazer states that copies of the filing are being mailed to its customers and interested state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–13080 Filed 8–9–06; 8:45 am] rwilkins on PROD1PC61 with NOTICES BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [ Docket No. RP97–255–070] [Docket No. RP06–450–000] TransColorado Gas Transmission Company; Notice of Compliance Filing Transcontinental Gas Pipe Line Corporation; Notice of Proposed Changes in FERC Gas Tariff August 2, 2006. Take notice that on July 31, 2006, TransColorado Gas Transmission Company (TransColorado) tendered for filing of its FERC Gas Tariff, First Revised Volume No. 1, Eighth Revised Sheet No. 22B, to be effective August 1, 2006. TransColorado stated that a copy of this filing has been served upon all parties to this proceeding, TransColorado’s customers, the Colorado Public Utilities Commission and the New Mexico Public Utilities Commission. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–13054 Filed 8–9–06; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 21:27 Aug 09, 2006 Jkt 208001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 August 2, 2006. Take notice that on July 31, 2006, Transcontinental Gas Pipe Line Corporation (Transco) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, ThirtyFourth Revised Sheet No. 28, to become effective August 1, 2006. Transco states that copies of the filing are being mailed to affected customers and interested state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of § 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive E-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call E:\FR\FM\10AUN1.SGM 10AUN1 Federal Register / Vol. 71, No. 154 / Thursday, August 10, 2006 / Notices (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–13052 Filed 8–9–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E6–13077 Filed 8–9–06; 8:45 am] [Docket No. RP06–457–000] BILLING CODE 6717–01–P Transcontinental Gas Pipe Line Corporation; Notice of Tariff Filing DEPARTMENT OF ENERGY rwilkins on PROD1PC61 with NOTICES August 3, 2006. Take notice that on August 1, 2006, Transcontinental Gas Pipe Line Corporation (Transco) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, the tariff sheets listed on Appendix A to its filing, to become effective July 1, 2006. The revised tariff sheets reflect the cancellation of Rate Schedule FT–NT and make additional conforming changes. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. VerDate Aug<31>2005 21:27 Aug 09, 2006 Jkt 208001 Federal Energy Regulatory Commission 45811 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 pm Eastern Time August 10, 2006. [Docket No. RP06–462–000] Magalie R. Salas, Secretary. [FR Doc. E6–13084 Filed 8–9–06; 8:45 am] Transcontinental Gas Pipe Line Corporation; Notice of Refund Report BILLING CODE 6717–01–P August 3, 2006. DEPARTMENT OF ENERGY Take notice that on July 31, 2006 Transcontinental Gas Pipe Line Corporation (Transco) filed a report reflecting the flow through of refunds received from Dominion Transmission, Inc. (Dominion) in Docket No. RP06– 424–000. On July 31, 2006 Transco, in accordance with section 4 of its Rate Schedules LSS and FT–NT and section 3 of its Rate Schedule GSS, flowed through the amount of $27,960.34 refunded by Dominion to its LSS, FT– NT and GSS customers. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. EF06–5011–000] Western Area Power Administration; Notice of Filing August 3, 2006. Take notice that on July 28, 2006, the Deputy Secretary, U.S. Department of Energy, pursuant to the authority vested on the Deputy Secretary by Delegation Order No. 00–37.00, effective December 6, 2001, submitted for confirmation and approval on a final basis, the following rate schedules effective September 1, 2006 and ending September 30, 2009: Rate Schedules CV–F12, for base resource and first preference power from the Central Valley Project; CV–T2 for firm and non-firm point-to-point transmission service on the CVP transmission system, CV–NWT4 for network integration transmission service on the CVP transmission system, COTP–T2 for firm and non firm pointto-point transmission service on the California-Oregon Transmission Project, and PACI–T2 for firm and non-firm point-to-point transmission service on the Pacific Alternating Current Intertie. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of E:\FR\FM\10AUN1.SGM 10AUN1

Agencies

[Federal Register Volume 71, Number 154 (Thursday, August 10, 2006)]
[Notices]
[Pages 45810-45811]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-13052]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP06-450-000]


Transcontinental Gas Pipe Line Corporation; Notice of Proposed 
Changes in FERC Gas Tariff

August 2, 2006.
    Take notice that on July 31, 2006, Transcontinental Gas Pipe Line 
Corporation (Transco) tendered for filing as part of its FERC Gas 
Tariff, Third Revised Volume No. 1, Thirty-Fourth Revised Sheet No. 28, 
to become effective August 1, 2006.
    Transco states that copies of the filing are being mailed to 
affected customers and interested state commissions.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Sec.  154.210 of the Commission's regulations (18 CFR 154.210). Anyone 
filing an intervention or protest must serve a copy of that document on 
the Applicant. Anyone filing an intervention or protest on or before 
the intervention or protest date need not serve motions to intervene or 
protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible online at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive E-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call

[[Page 45811]]

(866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E6-13052 Filed 8-9-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.