Federal Register / Vol. 71, No. 154 / Thursday, August 10, 2006 / Notices
Trailblazer states that copies of the
filing are being mailed to its customers
and interested state commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–13080 Filed 8–9–06; 8:45 am]
rwilkins on PROD1PC61 with NOTICES
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[ Docket No. RP97–255–070]
[Docket No. RP06–450–000]
TransColorado Gas Transmission
Company; Notice of Compliance Filing
Transcontinental Gas Pipe Line
Corporation; Notice of Proposed
Changes in FERC Gas Tariff
August 2, 2006.
Take notice that on July 31, 2006,
TransColorado Gas Transmission
Company (TransColorado) tendered for
filing of its FERC Gas Tariff, First
Revised Volume No. 1, Eighth Revised
Sheet No. 22B, to be effective August 1,
2006.
TransColorado stated that a copy of
this filing has been served upon all
parties to this proceeding,
TransColorado’s customers, the
Colorado Public Utilities Commission
and the New Mexico Public Utilities
Commission.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–13054 Filed 8–9–06; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
21:27 Aug 09, 2006
Jkt 208001
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
August 2, 2006.
Take notice that on July 31, 2006,
Transcontinental Gas Pipe Line
Corporation (Transco) tendered for
filing as part of its FERC Gas Tariff,
Third Revised Volume No. 1, ThirtyFourth Revised Sheet No. 28, to become
effective August 1, 2006.
Transco states that copies of the filing
are being mailed to affected customers
and interested state commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of § 154.210 of the
Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive E-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
E:\FR\FM\10AUN1.SGM
10AUN1
Federal Register / Vol. 71, No. 154 / Thursday, August 10, 2006 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–13052 Filed 8–9–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E6–13077 Filed 8–9–06; 8:45 am]
[Docket No. RP06–457–000]
BILLING CODE 6717–01–P
Transcontinental Gas Pipe Line
Corporation; Notice of Tariff Filing
DEPARTMENT OF ENERGY
rwilkins on PROD1PC61 with NOTICES
August 3, 2006.
Take notice that on August 1, 2006,
Transcontinental Gas Pipe Line
Corporation (Transco) tendered for
filing as part of its FERC Gas Tariff,
Third Revised Volume No. 1, the tariff
sheets listed on Appendix A to its filing,
to become effective July 1, 2006. The
revised tariff sheets reflect the
cancellation of Rate Schedule FT–NT
and make additional conforming
changes.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
VerDate Aug<31>2005
21:27 Aug 09, 2006
Jkt 208001
Federal Energy Regulatory
Commission
45811
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 pm Eastern Time
August 10, 2006.
[Docket No. RP06–462–000]
Magalie R. Salas,
Secretary.
[FR Doc. E6–13084 Filed 8–9–06; 8:45 am]
Transcontinental Gas Pipe Line
Corporation; Notice of Refund Report
BILLING CODE 6717–01–P
August 3, 2006.
DEPARTMENT OF ENERGY
Take notice that on July 31, 2006
Transcontinental Gas Pipe Line
Corporation (Transco) filed a report
reflecting the flow through of refunds
received from Dominion Transmission,
Inc. (Dominion) in Docket No. RP06–
424–000. On July 31, 2006 Transco, in
accordance with section 4 of its Rate
Schedules LSS and FT–NT and section
3 of its Rate Schedule GSS, flowed
through the amount of $27,960.34
refunded by Dominion to its LSS, FT–
NT and GSS customers.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. EF06–5011–000]
Western Area Power Administration;
Notice of Filing
August 3, 2006.
Take notice that on July 28, 2006, the
Deputy Secretary, U.S. Department of
Energy, pursuant to the authority vested
on the Deputy Secretary by Delegation
Order No. 00–37.00, effective December
6, 2001, submitted for confirmation and
approval on a final basis, the following
rate schedules effective September 1,
2006 and ending September 30, 2009:
Rate Schedules CV–F12, for base
resource and first preference power
from the Central Valley Project; CV–T2
for firm and non-firm point-to-point
transmission service on the CVP
transmission system, CV–NWT4 for
network integration transmission
service on the CVP transmission system,
COTP–T2 for firm and non firm pointto-point transmission service on the
California-Oregon Transmission Project,
and PACI–T2 for firm and non-firm
point-to-point transmission service on
the Pacific Alternating Current Intertie.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
E:\FR\FM\10AUN1.SGM
10AUN1
Agencies
[Federal Register Volume 71, Number 154 (Thursday, August 10, 2006)]
[Notices]
[Pages 45810-45811]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-13052]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP06-450-000]
Transcontinental Gas Pipe Line Corporation; Notice of Proposed
Changes in FERC Gas Tariff
August 2, 2006.
Take notice that on July 31, 2006, Transcontinental Gas Pipe Line
Corporation (Transco) tendered for filing as part of its FERC Gas
Tariff, Third Revised Volume No. 1, Thirty-Fourth Revised Sheet No. 28,
to become effective August 1, 2006.
Transco states that copies of the filing are being mailed to
affected customers and interested state commissions.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Sec. 154.210 of the Commission's regulations (18 CFR 154.210). Anyone
filing an intervention or protest must serve a copy of that document on
the Applicant. Anyone filing an intervention or protest on or before
the intervention or protest date need not serve motions to intervene or
protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible online at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive E-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
[[Page 45811]]
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-13052 Filed 8-9-06; 8:45 am]
BILLING CODE 6717-01-P