Pacific Gas and Electric Company California; Notice of Availability of Draft Environmental Assessment, 45816 [E6-13048]
Download as PDF
rwilkins on PROD1PC61 with NOTICES
45816
Federal Register / Vol. 71, No. 154 / Thursday, August 10, 2006 / Notices
Filed Date: 07/31/2006.
Accession Number: 20060801–0104.
Comment Date: 5 pm Eastern Time on
Monday, August 21, 2006.
Docket Numbers: ER06–1316–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
LLC submits an agreement for Network
Integration Transmission Service under
its OATT.
Filed Date: 07/31/2006.
Accession Number: 20060801–0103.
Comment Date: 5 pm Eastern Time on
Monday, August 21, 2006.
Docket Numbers: ER06–1317–000.
Applicants: PJM Interconnection,
LLC.
Description: PJM Interconnection LLC
submits a Network Integration
Transmission Service Agreement with
Wabash Valley Power Association, Inc.
Filed Date: 07/31/2006.
Accession Number: 20060801–0100.
Comment Date: 5 pm Eastern Time on
Monday, August 21, 2006.
Docket Numbers: ER06–1318–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool
Inc submits an executed Agreement for
the Provision of Transmission Service to
Missouri Bundled Retailed Load with
Kansas City Power & Light Co et al.
Filed Date: 07/31/2006.
Accession Number: 20060801–0109.
Comment Date: 5 pm Eastern Time on
Monday, August 21, 2006.
Take notice that the Commission
received the following electric securities
filings
Docket Numbers: ES06–58–000.
Applicants: MDU Resources Group,
Inc.
Description: MDU Resources, Group
Inc submits an application for authority
to issue an additional 400,000 shares of
Company Common Stock in connection
with its Non-Employee Director Stock
Compensation Plan under ES06–58.
Filed Date: 07/28/2006.
Accession Number: 20060801–0098.
Comment Date: 5 pm Eastern Time on
Friday, August 18, 2006.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and § 385.214) on or before 5 p.m.
Eastern time on the specified comment
date. It is not necessary to separately
intervene again in a subdocket related to
a compliance filing if you have
previously intervened in the same
VerDate Aug<31>2005
21:27 Aug 09, 2006
Jkt 208001
docket. Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. In
reference to filings initiating a new
proceeding, interventions or protests
submitted on or before the comment
deadline need not be served on persons
other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–13041 Filed 8–9–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 2107–016]
Pacific Gas and Electric Company
California; Notice of Availability of
Draft Environmental Assessment
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for license for the Poe Hydroelectric
Project, located on the North Fork
Feather River in Butte County,
California, and has prepared a Draft
Environmental Assessment (DEA) for
the project. The Project occupies 144
acres of lands of the United States,
which are administered by the Forest
Supervisor of the Plumas National
Forest.
The DEA contains the staff’s analysis
of the potential environmental impacts
of the project and concludes that
licensing the project, with appropriate
environmental protective measures,
would not constitute a major Federal
action that would significantly affect the
quality of the human environment.
A copy of the DEA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
45 days from the date of this notice and
should be addressed to Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Please affix
Project No. 2107–016 to all comments.
Comments may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
For further information, contact John
Mudre at (202) 502–8902.
August 2, 2006.
Magalie R. Salas,
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Secretary.
[FR Doc. E6–13048 Filed 8–9–06; 8:45 am]
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
E:\FR\FM\10AUN1.SGM
10AUN1
Agencies
[Federal Register Volume 71, Number 154 (Thursday, August 10, 2006)]
[Notices]
[Page 45816]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-13048]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ Project No. 2107-016]
Pacific Gas and Electric Company California; Notice of
Availability of Draft Environmental Assessment
August 2, 2006.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects has reviewed the application for license for the Poe
Hydroelectric Project, located on the North Fork Feather River in Butte
County, California, and has prepared a Draft Environmental Assessment
(DEA) for the project. The Project occupies 144 acres of lands of the
United States, which are administered by the Forest Supervisor of the
Plumas National Forest.
The DEA contains the staff's analysis of the potential
environmental impacts of the project and concludes that licensing the
project, with appropriate environmental protective measures, would not
constitute a major Federal action that would significantly affect the
quality of the human environment.
A copy of the DEA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY,
(202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Any comments should be filed within 45 days from the date of this
notice and should be addressed to Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426. Please affix Project No. 2107-016 to all comments. Comments may
be filed electronically via the Internet in lieu of paper. The
Commission strongly encourages electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(https://www.ferc.gov) under the ``e-Filing'' link.
For further information, contact John Mudre at (202) 502-8902.
Magalie R. Salas,
Secretary.
[FR Doc. E6-13048 Filed 8-9-06; 8:45 am]