Drawbridge Operation Regulations; Jamaica Bay and Connecting Waterways, Queens, NY, 45386 [E6-12983]
Download as PDF
45386
Federal Register / Vol. 71, No. 153 / Wednesday, August 9, 2006 / Rules and Regulations
provided in paragraph (a)(3) of this
section apply to plan amendments
adopted after August 9, 2006.
(4) Effective date for change to
redundancy rule regarding bifurcation
of benefits. The rules provided in
paragraph (c)(6) of this section are
applicable for amendments adopted
after August 9, 2006.
(5) Effective date for rules relating to
utilization test. The rules provided in
paragraph (f) of this section are
applicable for amendments adopted
after December 31, 2006.
*
*
*
*
*
Mark E. Matthews,
Deputy Commissioner for Services and
Enforcement.
Approved: July 31, 2006.
Eric Solomon,
Acting Deputy Assistant Secretary of the
Treasury (Tax Policy).
[FR Doc. E6–12885 Filed 8–8–06; 8:45 am]
BILLING CODE 4830–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–06–105]
Drawbridge Operation Regulations;
Jamaica Bay and Connecting
Waterways, Queens, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
jlentini on PROD1PC65 with RULES
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Marine Parkway
Bridge across Jamaica Bay at mile 3.0, at
Queens, New York. Under this
temporary deviation, the Marine
Parkway Bridge need not open for the
passage of vessel traffic between 7 a.m.
and 3 p.m. on August 28, 2006 and
August 29, 2006. This deviation is
necessary to facilitate scheduled bridge
maintenance.
DATES: This deviation is effective from
August 28, 2006 through August 29,
2006.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at the First Coast Guard
District, Bridge Branch Office, One
South Street, New York, New York,
10004, between 7 a.m. and 4 p.m.,
Monday through Friday, except Federal
holidays. The telephone number is (212)
668–7165. The First Coast Guard
VerDate Aug<31>2005
16:38 Aug 08, 2006
Jkt 208001
District Bridge Branch Office maintains
the public docket for this temporary
deviation.
FOR FURTHER INFORMATION CONTACT: Judy
Leung-Yee, Project Officer, First Coast
Guard District, at (212) 668–7195.
SUPPLEMENTARY INFORMATION: The
Marine Parkway Bridge, across Jamaica
Bay at mile 3.0, at Queens, New York,
has a vertical clearance in the closed
position of 55 feet at mean high water
and 59 feet at mean low water. The
existing drawbridge operation
regulations are listed at 33 CFR
117.795(a).
The owner of the bridge, MTA Bridges
and Tunnels, requested a temporary
deviation to facilitate bridge inspection
operations. The bridge will not be able
to open while the bridge inspection
operation is underway.
Under this temporary deviation, the
Marine Parkway Bridge across Jamaica
Bay at mile 3.0 need not open for the
passage of vessel traffic between 7 a.m.
and 3 p.m. on August 28, 2006 and
August 29, 2006.
In accordance with 33 CFR 117.35(c),
this work will be performed with all due
speed in order to return the bridge to
normal operation as soon as possible.
Should the bridge maintenance
authorized by this temporary deviation
be completed before the end of the
effective period published in this notice,
the Coast Guard will rescind the
remainder of this temporary deviation,
and the bridge shall be returned to its
normal operating schedule. Notice of
the above action shall be provided to the
public in the Local Notice to Mariners
and the Federal Register, where
practicable.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: August 1, 2006.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E6–12983 Filed 8–8–06; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–06–099]
Drawbridge Operation Regulations;
Long Island, New York Inland
Waterway From East Rockaway Inlet to
Shinnecock Canal, Jones Beach, NY
AGENCY:
PO 00000
Coast Guard, DHS.
Frm 00024
Fmt 4700
Sfmt 4700
Notice of temporary deviation
from regulations.
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Loop Parkway
Bridge across Long Creek at mile 0.7, at
Jones Beach, New York. Under this
temporary deviation, the Loop Parkway
Bridge need not open for the passage of
vessel traffic from 8:30 a.m. through
11:30 a.m. and 1:30 p.m. through 4:30
p.m., daily, from September 6, 2006
through October 26, 2006. A single
bridge opening for all inbound
commercial fishing vessels shall be
provided, if a request to open the bridge
is given, during the 1:30 p.m. to 4:30
p.m. bridge closure period. This
deviation is necessary to facilitate
scheduled bridge maintenance.
DATES: This deviation is effective from
September 6, 2006 through October 26,
2006.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at the First Coast Guard
District, Bridge Branch Office, One
South Street, New York, New York
10004, between 7 a.m. and 4 p.m.,
Monday through Friday, except Federal
holidays. The telephone number is (212)
668–7165. The First Coast Guard
District Bridge Branch Office maintains
the public docket for this temporary
deviation.
FOR FURTHER INFORMATION CONTACT: Judy
Leung-Yee, Project Officer, First Coast
Guard District, at (212) 668–7195.
SUPPLEMENTARY INFORMATION: The Loop
Parkway Bridge, across Long Creek at
mile 0.7, at Jones Beach, New York, has
a vertical clearance in the closed
position of 21 feet at mean high water
and 25 feet at mean low water. The
existing drawbridge operation
regulations are listed at 33 CFR
117.799(f).
The owner of the bridge, New York
State Department of Transportation,
requested a temporary deviation to
facilitate bridge painting operations.
The bridge will not be able to open
while the bridge painting operation is
underway.
Under this temporary deviation, the
Loop Parkway Bridge across Long Creek
at mile 0.7, need not open for the
passage of vessel traffic from 8:30 a.m.
through 11:30 a.m. and from 1:30 p.m.
through 4:30 p.m., daily, from
September 6, 2006 through October 26,
2006. All inbound commercial fishing
vessels shall be provided a single bridge
opening during the 1:30 p.m. through
4:30 p.m. bridge closure period each day
provided a bridge opening request is
E:\FR\FM\09AUR1.SGM
09AUR1
Agencies
[Federal Register Volume 71, Number 153 (Wednesday, August 9, 2006)]
[Rules and Regulations]
[Page 45386]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-12983]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-06-105]
Drawbridge Operation Regulations; Jamaica Bay and Connecting
Waterways, Queens, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Marine Parkway Bridge across Jamaica Bay at mile 3.0, at Queens, New
York. Under this temporary deviation, the Marine Parkway Bridge need
not open for the passage of vessel traffic between 7 a.m. and 3 p.m. on
August 28, 2006 and August 29, 2006. This deviation is necessary to
facilitate scheduled bridge maintenance.
DATES: This deviation is effective from August 28, 2006 through August
29, 2006.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at the First Coast Guard District, Bridge Branch
Office, One South Street, New York, New York, 10004, between 7 a.m. and
4 p.m., Monday through Friday, except Federal holidays. The telephone
number is (212) 668-7165. The First Coast Guard District Bridge Branch
Office maintains the public docket for this temporary deviation.
FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First
Coast Guard District, at (212) 668-7195.
SUPPLEMENTARY INFORMATION: The Marine Parkway Bridge, across Jamaica
Bay at mile 3.0, at Queens, New York, has a vertical clearance in the
closed position of 55 feet at mean high water and 59 feet at mean low
water. The existing drawbridge operation regulations are listed at 33
CFR 117.795(a).
The owner of the bridge, MTA Bridges and Tunnels, requested a
temporary deviation to facilitate bridge inspection operations. The
bridge will not be able to open while the bridge inspection operation
is underway.
Under this temporary deviation, the Marine Parkway Bridge across
Jamaica Bay at mile 3.0 need not open for the passage of vessel traffic
between 7 a.m. and 3 p.m. on August 28, 2006 and August 29, 2006.
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to normal operation as
soon as possible.
Should the bridge maintenance authorized by this temporary
deviation be completed before the end of the effective period published
in this notice, the Coast Guard will rescind the remainder of this
temporary deviation, and the bridge shall be returned to its normal
operating schedule. Notice of the above action shall be provided to the
public in the Local Notice to Mariners and the Federal Register, where
practicable.
This deviation from the operating regulations is authorized under
33 CFR 117.35.
Dated: August 1, 2006.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.