Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments, 44687-44688 [E6-12713]
Download as PDF
Federal Register / Vol. 71, No. 151 / Monday, August 7, 2006 / Notices
comments in response to this Notice of
Intent. For information on electronically
filing comments, please see the
instructions on the Commission’s Web
site at www.ferc.gov.
The public scoping meetings are
designed to provide another opportunity
to offer comments on the proposed
project. Interested groups and
individuals are encouraged to attend the
meetings and to present comments on
the environmental issues they believe
should be addressed in the EIS. A
transcript of each meeting will be
generated so that your comments will be
accurately recorded.
Once SESH formally files its
application with the Commission, you
may want to become an official party to
the proceeding known as an
‘‘intervenor.’’ Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in a
Commission proceeding by filing a
request to intervene. Instructions for
becoming an intervenor are included in
the User’s Guide under the ‘‘e-filing’’
link on the Commission’s Web site.
Please note that you may not request
intervenor status at this time. You must
wait until a formal application is filed
with the Commission.
sroberts on PROD1PC70 with NOTICES
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within distances
defined in the Commission’s regulations
of certain aboveground facilities.
If you received this notice, you are on
the environmental mailing list for this
project. If you do not want to send
comments at this time, but still want to
remain on our mailing list, please return
the Information Request (Appendix 3). If
you do not return the Information
Request, you will be removed from the
Commission’s environmental mailing
list.
Availability of Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC (3372). Additional
information can also be found on the
Internet at www.ferc.gov. The ‘‘eLibrary
link’’ on the FERC Web site provides
access to documents submitted to and
issued by the Commission, such as
VerDate Aug<31>2005
17:19 Aug 04, 2006
Jkt 208001
comments, orders, notices and
rulemakings. Once on the FERC Web
site, click on the ‘‘eLibrary link,’’ select
‘‘General Search’’ and in the ‘‘Docket
Number’’ field enter the project docket
number excluding the last three digits
(PF06–28). When researching
information be sure to select an
appropriate date range. In addition, the
FERC now offers a free e-mail service
called eSubscription that allows you to
keep track of all formal issuances and
submittals in specific dockets. This can
reduce the amount of time you spend
researching proceedings by
automatically providing you with
notification of these filings, document
summaries and direct links to the
documents. To register for this service,
go to www.ferc.gov/esubscribenow.htm.
Public meetings or site visits will be
posted on the Commission’s calendar
located at www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
For assistance with the FERC Web site
or with eSubscription, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or TTY, contact
(202) 502–8659.
Finally, SESH has established an
Internet Web site for this project at
www.duke-energy.com/companies/degt/
projects/sesh/. The Web site includes a
description of the project, a map of the
proposed pipeline route, and answers to
frequently asked questions. You can
also request additional information or
provide comments directly to SESH at
1–888–312–7374.
Magalie R. Salas,
Secretary.
[FR Doc. E6–12720 Filed 8–4–06; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
July 28, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12713–000.
c. Date filed: July 14, 2006.
d. Applicant: Reedsport OPT Wave
Park, LLC.
e. Name of Project: Reedsport OPT
Wave Park Project.
PO 00000
Frm 00083
Fmt 4703
Sfmt 4703
44687
f. Location: The project would be
located in the Pacific Ocean about 3
miles off shore in Douglas County,
Oregon.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contacts: Charles F.
Dunleavy, Reedsport OPT Wave Park,
LLC, 1590 Reed Road, Pennington, NJ
08534, phone: (609)–730–0400.
i. FERC Contact: Robert Bell, (202)
502–6062.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would consist of: (1)
200 Power Buoys having a total
installed capacity of 50 megawatts, (2) a
proposed 13.8 kilovolt transmission
line; and (3) appurtenant facilities. The
project is estimated to have an annual
generation of 153.3 gigawatt-hours perunit per-year, which would be sold to a
local utility.
l. Locations of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit:
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
E:\FR\FM\07AUN1.SGM
07AUN1
sroberts on PROD1PC70 with NOTICES
44688
Federal Register / Vol. 71, No. 151 / Monday, August 7, 2006 / Notices
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
o. Competing Development
Application: Any qualified development
applicant desiring to file a competing
development application must submit to
the Commission, on or before a
specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
§ 4.30(b) and 4.36.
p. Notice of Intent: A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
VerDate Aug<31>2005
17:19 Aug 04, 2006
Jkt 208001
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR.
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
s. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’,
‘‘COMPETING APPLICATION’’ or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and the number of copies
provided by the Commission’s
regulations to: The Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
t. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–12713 Filed 8–4–06; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Comments,
Protests, and Motions To Intervene
July 28, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12714–000.
c. Date filed: July 14, 2006.
d. Applicant: H2O Providers L.L.C.
e. Name and Location of Project: The
proposed Phantom Canon Hydroelectric
Pumped Back Storage/Hydroelectric
Generation Project would be located on
PO 00000
Frm 00084
Fmt 4703
Sfmt 4703
the Brush Hollow Creek of the Arkansas
River in Fremont County in Penrose,
Colorado.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant contact: Mark Morley, 15
North Nevada Ave., Colorado Springs,
CO 80903, (719) 499–4390.
h. FERC Contact: Tom Papsidero,
(202) 502–6002.
i. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
12714–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
j. Description of Existing Facilities
and Proposed Project: The proposed
project would consist of the following
new facilities: (1) An upper reservoir
with a maximum storage capacity of
58,000 acre-feet and a surface area of
1,114 acres at normal water surface
elevation of 5,600 feet above mean sea
level (msl), impounded by an earthen
dam, 70-foot-high and 1,400-foot-long;
(2) a 38,000-foot-long, 4-foot-diameter
reservoir river diversion concretereinforced pipeline; (3) a 21,750 or
17,825-foot-long, 4-foot-diameter steel
pipe and/or steel- or concrete-lined
penstock; (4) a powerhouse with two
180–220-megawatt pump/turbines; (5) a
lower reservoir with a maximum storage
capacity of 10,000 acre-feet and a
surface area of 200 acres at maximum
water surface elevation of 5,175 feet
msl, impounded by a 140-foot-high,
3,800-foot-long earthen dam; (8) a 9mile-long, 115-kilovolt transmission
line. The proposed project would have
an annual generation of 280,800–
457,600 MWh.
E:\FR\FM\07AUN1.SGM
07AUN1
Agencies
[Federal Register Volume 71, Number 151 (Monday, August 7, 2006)]
[Notices]
[Pages 44687-44688]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-12713]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting Motions
To Intervene, Protests, and Comments
July 28, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 12713-000.
c. Date filed: July 14, 2006.
d. Applicant: Reedsport OPT Wave Park, LLC.
e. Name of Project: Reedsport OPT Wave Park Project.
f. Location: The project would be located in the Pacific Ocean
about 3 miles off shore in Douglas County, Oregon.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contacts: Charles F. Dunleavy, Reedsport OPT Wave
Park, LLC, 1590 Reed Road, Pennington, NJ 08534, phone: (609)-730-0400.
i. FERC Contact: Robert Bell, (202) 502-6062.
j. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Project: The proposed project would consist of:
(1) 200 Power Buoys having a total installed capacity of 50 megawatts,
(2) a proposed 13.8 kilovolt transmission line; and (3) appurtenant
facilities. The project is estimated to have an annual generation of
153.3 gigawatt-hours per-unit per-year, which would be sold to a local
utility.
l. Locations of Applications: A copy of the application is
available for inspection and reproduction at the Commission in the
Public Reference Room, located at 888 First Street, NE., Room 2A,
Washington, DC 20426, or by calling (202) 502-8371. This filing may
also be viewed on the Commission's Web site at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item h
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Competing Preliminary Permit: Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the
[[Page 44688]]
particular application (see 18 CFR 4.36). Submission of a timely notice
of intent allows an interested person to file the competing preliminary
permit application no later than 30 days after the specified comment
date for the particular application. A competing preliminary permit
application must conform with 18 CFR 4.30(b) and 4.36.
o. Competing Development Application: Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR Sec. 4.30(b) and 4.36.
p. Notice of Intent: A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
q. Proposed Scope of Studies under Permit: A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
r. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; See 18 CFR. 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under ``e-filing'' link.
The Commission strongly encourages electronic filing.
s. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', ``COMPETING APPLICATION'' or
``MOTION TO INTERVENE'', as applicable, and the Project Number of the
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and the number
of copies provided by the Commission's regulations to: The Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
t. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6-12713 Filed 8-4-06; 8:45 am]
BILLING CODE 6450-01-P