Portland General Electric Company; Notice of Proposed Changes in FERC Gas Tariff, 40715 [E6-11358]
Download as PDF
Federal Register / Vol. 71, No. 137 / Tuesday, July 18, 2006 / Notices
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–11353 Filed 7–17–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP06–395–001]
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–11356 Filed 7–17–06; 8:45 am]
Iroquois Gas Transmission System,
L.P.; Notice of Change to FERC Gas
Tariff
BILLING CODE 6717–01–P
July 12, 2006.
DEPARTMENT OF ENERGY
Second Revised Sheet No. 49A
Fourth Revised Sheet No. 59A
Third Revised Sheet No. 80
wwhite on PROD1PC61 with NOTICES
Take notice that on July 10, 2006,
Iroquois Gas Transmission System, L.P.
(Iroquois) tendered for filing the
following revised sheets to its FERC Gas
Tariff, First Revised Volume No. 1, to be
effective on July 20, 2006:
16:25 Jul 17, 2006
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Jkt 208001
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E6–11358 Filed 7–17–06; 8:45 am]
[Docket No. RP06–429–000]
BILLING CODE 6717–01–P
Portland General Electric Company;
Notice of Proposed Changes in FERC
Gas Tariff
Iroquois states that copies of its filing
were served on all jurisdictional
customers and interested state
regulatory agencies and all parties to the
proceeding.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
VerDate Aug<31>2005
40715
DEPARTMENT OF ENERGY
July 12, 2006.
Take notice that on July 10, 2006,
Portland General Electric Company
(PGE) tendered for filing as part of its
FERC Gas Tariff, Volume No. 1, the
following tariff sheets, to become
effective August 7, 2006.
First Revised Sheet No. 24
Second Revised Sheet No. 30
Second Revised Sheet No. 62
First Revised Sheet No. 86
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. RP01–229–003]
Trunkline LNG Company, LLC; Notice
of Proposed Changes in FERC Gas
Tariff
July 12, 2006.
Take notice that on July 7, 2006,
Trunkline LNG Company, LLC
(Trunkline LNG) tendered for filing, as
part of its FERC Gas Tariff, Second
Revised Volume No. 1–A, the following
tariff sheets to become effective April 5,
2006 and July 8, 2006, respectively:
Second Revised Sheet No. 6
Third Revised Sheet No. 6
Trunkline LNG states that the purpose
of this filing is to reflect the
implementation of negotiated rate
transactions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
E:\FR\FM\18JYN1.SGM
18JYN1
Agencies
[Federal Register Volume 71, Number 137 (Tuesday, July 18, 2006)]
[Notices]
[Page 40715]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-11358]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP06-429-000]
Portland General Electric Company; Notice of Proposed Changes in
FERC Gas Tariff
July 12, 2006.
Take notice that on July 10, 2006, Portland General Electric
Company (PGE) tendered for filing as part of its FERC Gas Tariff,
Volume No. 1, the following tariff sheets, to become effective August
7, 2006.
First Revised Sheet No. 24
Second Revised Sheet No. 30
Second Revised Sheet No. 62
First Revised Sheet No. 86
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-11358 Filed 7-17-06; 8:45 am]
BILLING CODE 6717-01-P