Environmental Impacts Statements; Notice of Availability, 40096-40097 [E6-11125]
Download as PDF
40096
Federal Register / Vol. 71, No. 135 / Friday, July 14, 2006 / Notices
Summary: EPA’s concerns about
potential impacts to soil and water
quality and from invasive species have
been addressed, therefore, we do not
object to the proposed action.
EIS No. 20060261, ERP No. F–NPS–
J61106–UT, Burr Trail Modification
Project, Proposed Road Modification
within Capitol Reef National Park,
Garfield County, UT
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20060104, ERP No. FR–BLM–
A65174–00, PROGRAMMATIC—
Proposed Revision to Grazing
Regulations for the Public Lands, 42
CFR Part 4100, in the Western Portion
of the United States
Summary: No formal comment letter
was sent to the preparing agency.
Dated: July 11, 2006.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E6–11129 Filed 7–13–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6677–2]
jlentini on PROD1PC65 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed 07/03/2006 Through
07/07/2006.
Pursuant to 40 CFR 1506.9.
THIS NOTICE SUPERSEDES
‘‘SPECIAL NOTICE DATED: 07/07/
2006’’ EIS’S FILED JUNE 19 THRU
JUNE 23, 2006 SCHEDULED TO
APPEAR IN THE Federal Register ON
JUN 30, 2006, BUT WERE PUBLISHED
ON MONDAY JULY 3, 2006.
CALCULATED FROM JULY 3, 2006
Federal Register THE DRAFT EIS’S
COMMENT PERIODS WILL END ON
AUGUST 17, 2006 AND FINAL EIS’S
WAIT PERIODS WILL END ON
AUGUST 2, 2006.
EIS No. 20060281, Final EIS, NPS, CA,
Furnace Creek Water Collection
System, Reconstruction, Death Valley
National Park, Implementation, Inyo
County, CA, Wait Period Ends: 08/14/
2006, Contact: Linda Greene 760–
786–3253.
EIS No. 20060282, Final EIS, BLM, CA,
Southern Diablo Mountain Range and
Central Coast of California Resource
Management Plan, Several Counties,
VerDate Aug<31>2005
17:44 Jul 13, 2006
Jkt 208001
CA, Wait Period Ends: 08/14/2006,
Contact: Sky Murphy 831–630–5039.
EIS No. 20060283, Draft EIS, FHW, UT,
Riverdale Road Project (UT–26),
Improvement Mobility and Safety
between 1900 West in Roy, UT and
U.S. Highway 89 (Washington
Boulevard) in Odgen, UT, Cities of
Roy, Riverdale, South Ogden and
Ogden, Weber County, UT, Comment
Period Ends: 08/28/2006, Contact:
Greg Punske 801–963–0182.
EIS No. 20060284, Draft EIS, FHW, KY,
I–66 Somerset to London Project,
Construction from the Vicinity of the
Northern Bypass (I–66) in Somerset,
KY to I–75 between London and
Corbin Cities, Pulaski, U.S. Army COE
Section 404 Permit, Rockcastle and
Laurel Counties, KY, Comment Period
Ends: 08/28/2006, Contact: Jose
Sepulveda 502–223–6740.
EIS No. 20060285, Draft Supplement,
FHW, ME, Aroostook County
Transport Study, New and Updated
Information, To Identify
Transportation Corridors that will
Improve Mobility and Efficiency
within Northeastern Aroostook
County and other portions of the U.S.
and Canada, U.S. Army COE Section
404 Permit, Endangered Species Act,
NPDES and Section 10 River and
Harbors Act, Aroostook, ME,
Comment Period Ends: 08/31/2006,
Contact: Mark Hasselman 207–622–
8350.
EIS No. 20060286, Draft EIS, BLM, ID,
Eastside Township Fuels and
Vegetation Project, Address the Forest
Health, Fuels, Safety, and Watershed
Issues, Elk City, Idaho County, ID,
Comment Period Ends: , 09/11/2006,
Contact: Robbin B. Boyce 208–962–
3594.
EIS No. 20060287, Draft EIS, AFS, MT,
Little Belt-Castle-North Half Crazy
Mountains Travel Management Plan,
To Change the Management of
Motorized and Non-motorized Travel
on the Road, Trails, and Areas within,
Belt Creek, Judith, Musselshell, and
White Sulphur Springs Ranger
Districts, Lewis and Clark National
Forest, Cascade, Judith Basin,
Meagher, Wheatland, Sweetgrass and
Park Counties, MT, Comment Period
Ends: 09/15/2006, Contact: Dick
Schwecke 406–791–7700.
EIS No. 20060288, Final EIS, FTA, CA,
Warm Springs Extension, Proposing
5.4 mile Extension of the BART
System in the City of Fremont,
Funding, San Francisco Bay Area
Rapid Transit District, Alameda
County, CA, Wait Period Ends: 08/14/
2006, Contact: Lorraine Lerman 415–
744–2735.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
EIS No. 20060289, Final EIS, AFS, WA,
School Fire Salvage Recovery Project,
Salvage Harvest Fire-Killed (dead)
and Fire-Damaged (dying) Trees,
Implementation, Pomeroy Ranger
District, Umatilla National Forest,
Columbia and Garfield Counties, WA,
Wait Period Ends: 08/14/2006,
Contact: Dean Millett 509–843–1891.
EIS No. 20060290, Draft Supplement,
NRC, VA, Early Site Permit (ESP) at
the North Anna Power Station ESP
Site (TAC No. MC1128), New and
Updated Information, Construction
and Operation, NUREG–1811, Louisa
County, VA, Comment Period Ends:
08/28/2006, Contact: Jacking Cushing
301–415–1424.
EIS No. 20060291, Final EIS, NOA, 00,
Consolidated Atlantic Highly
Migratory Species Fishery
Management Plan for Atlantic Tunas,
Swordfish, and Shark and the Atlantic
Billfish Fishery Management Plan,
Implementation, Atlantic Coast,
Caribbean and Gulf of Mexico, Wait
Period Ends: 08/14/2006, Contact:
Karyle Brewster-Geisz 301–713–2347.
Amended Notices
EIS No. 20060260, Final EIS, BLM, AK,
East Alaska Draft Resource
Management Plan (RMP), Provide a
Single Comprehensive Land Use Plan,
Implementation, Glennallen Field
Office District, AK, Wait Period Ends:
08/02/2006, Contact: Bruce Rogers
907–822–3217.
Revision to Federal Register Notice
Published 07/03/2006: Correction to
Wait Period from 07/31/2006 to 08/02/
2006.
EIS No. 20060261, Final EIS, NPS, UT,
Burr Trail Modification Project,
Proposed Road Modification within
Capitol Reef National Park, Garfield
County, UT, Wait Period Ends: 08/02/
2006, Contact: Chris Turk 303–969–
2832.
Revision to Federal Register Notice
Published 07/03/2006: Correction to
Wait Period from 07/31/2006 to 08/02/
2006.
EIS No. 20060263, Final EIS, BIA, MI,
Nottawaseppi Huron Band of
Potawatomi Indians (the Tribe),
Proposes Fee-to-Trust Transfer and
Casino Project, Calhoun County, MI,
Wait Period Ends: 08/02/2006,
Contact: Terrance Virden 612–725–
4510.
Revision to Federal Register Notice
Published 07/03/2006: Correction to
Wait Period from 07/31/2006 to 08/02/
2006.
EIS No. 20060264, Draft EIS, AFS, WY,
Lower Valley Energy (LVE) Natural
Gas Pipeline Project, Construction
E:\FR\FM\14JYN1.SGM
14JYN1
jlentini on PROD1PC65 with NOTICES
Federal Register / Vol. 71, No. 135 / Friday, July 14, 2006 / Notices
and Operation of a Pressurized
Natural Gas Pipeline, Special-UseAuthorization, Big Piney and Jackson
Ranger Districts, Bridger-Teton
National Forest, Sublette and Teton
Counties, WY, Comment Period Ends:
08/25/2006, Contact: Teresa Trulock
307–276–3375.
Revision to Federal Register Notice
Published 07/03/2006: Extend Comment
Period from 08/17/2006 to 08/25/2006.
EIS No. 20060266, Draft EIS, DOT, TX,
North Corridor Fixed Guideway
Project, Propose Transit
Improvements from University of
Houston (UH)-Downtown Station to
Northline Mall, Harris County, TX,
Comment Period Ends: 08/17/2006,
Contact: John Sweek 817–978–0550.
Revision to Federal Register Notice
Published 07/03/2006: Correction to
Comment Period from 08/14/2006 to 08/
17/2006.
EIS No. 20060267, Final EIS, BLM, CA,
Ukiah Resource Management Plan,
Implementation, Several Counties,
CA, Wait Period Ends: 08/02/2006,
Contact: Eli Ilano 916–978–4427.
Revision to Federal Register Notice
Published 07/03/2006: Correction to
Wait Period from 08/14/2006 to 08/02/
2006.
EIS No. 20060269, Draft Supplement,
COE, MD, Masonville Dredged
Material Containment Facility, New
Information, New Source of Dike
Building Material from the Seagirt
Dredging Project within the Patapsco
River, Funding, Baltimore, MD,
Comment Period Ends: 08/17/2006,
Contact: Jon Romeo 410–962–6079.
Revision to Federal Register Notice
Published 07/03/2006: Correction to
Comment Period from 08/14/2006 to 08/
17/2006.
EIS No. 20060270, Second Draft
Supplement, COE, FL, Cape Sable
Seaside Sparrow Protection, Interim
Operation Plan (IOP), Additional
Information Alternative 7, Providing
Additional Flood Control Capacity,
Implementation, Everglades National
Park, Miami-Dade County, FL,
Comment Period Ends: 08/17/2006,
Contact: Dr. Jon Moulding 904–232–
2286
Revision to Federal Register Notice
Published 07/03/2006: Correction to
Comment Period from 08/14/2006 to 08/
17/2006.
EIS No. 20060271, Draft EIS, CGD, 00,
PROGRAMMATIC—Implementation
of the U.S. Coast Guard Nationwide
Automatic Identification System
Project, Providing Vessel
Identification, Tracking and
Information Exchange Capabilities to
VerDate Aug<31>2005
17:44 Jul 13, 2006
Jkt 208001
Support National Maritime Interests,
Comment Period Ends: 08/17/2006,
Contact: Anita Allen 202–475–3292
Revision to Federal Register Notice
Published 07/03/2006: Correction to
Comment Period from 08/14/2006 to 08/
17/2006.
EIS No. 20060272, Draft EIS, COE, NC,
West Onslow Beach and New River
Inlet (Topsail Beach) Shore Protection
Project, Storm Damages and Beach
Erosion Reduction, Funding, Pender
County, NC, Comment Period Ends:
08/17/2006, Contact: Jenny Owens
910–251–4757.
Revision to Federal Register Notice
Published 07/03/2006: Correction to
Comment Period from 08/14/2006 to 08/
17/2006.
EIS No. 20060273, Draft EIS, RUS, MT,
Highwood Generating Station, 250megawatt Coal Fired Power Plant and
6MW of Wind Generation at a Site
near Great Falls, Construction and
Operation, Licenses Permit, U.S.
Army COE Section 10 Permit, Cascade
County, MT, Comment Period Ends:
08/17/2006, Contact: Richard Fristik
202–720–5093.
This document is available on the
Internet at: https://www.usda.gov/rus/
water/ees/eis.htm.
Revision to Federal Register Notice
Published 07/03/2006: Correction to
Comment Period from 08/15/2006 to 08/
17/2006.
EIS No. 20060278, Draft EIS, NOA, 00,
North Atlantic Right Whale Ship
Strike Reduction Strategy, To
Implement the Operational Measures
to Reduce the Occurrence and
Severity of Vessel Collisions with the
Right Whale, Serious Injury and
Deaths Resulting from Collisions with
Vessels, Comment Period Ends: 09/
05/2006, Contact: Stewart Harris 301–
713–2322.
Revision of Federal Register Notice
Published 07/07/2006. Correction to
Contact Person Name and Telephone
Number.
Dated: July 11, 2006.
Robert W. Hargrove.
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E6–11125 Filed 7–13–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2005–0479; FRL–8078–6]
Dicamba Reregistration Eligibility
Decision; Notice of Availability
Environmental Protection
Agency (EPA).
AGENCY:
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
ACTION:
40097
Notice.
SUMMARY: This notice announces the
availability of EPA’s Reregistration
Eligibility Decision (RED) for the
pesticide dicamba acid and its
associated salts and opens a public
comment period on this document. The
Agency’s risk assessments and other
related documents also are available in
the dicamba Docket. Dicamba (2methoxy-3,6-dichlorobenzoic acid) is a
selective benzoic acid herbicide
registered for pre-emergent control of
broadleaf weeds and woody plants. EPA
has reviewed dicamba through the
public participation process that the
Agency uses to involve the public in
developing pesticide reregistration and
tolerance reassessment decisions.
Through these programs, EPA is
ensuring that all pesticides meet current
health and safety standards.
DATES: Comments must be received on
or before September 12, 2006.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPP–2005–0479, by
one of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the on-line
instructions for submitting comments.
• Mail: Office of Pesticide Programs
(OPP) Regulatory Public Docket (7502P),
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460-0001.
• Delivery: OPP Regulatory Public
Docket (7502P), Environmental
Protection Agency, Rm. S-4400, One
Potomac Yard (South Bldg.), 2777 S.
Crystal Drive, Arlington, VA. Deliveries
are only accepted during the Docket’s
normal hours of operation (8:30 a.m. to
4 p.m., Monday through Friday,
excluding legal holidays). Special
arrangements should be made for
deliveries of boxed information. The
Docket telephone number is (703) 3055805.
Instructions: Direct your comments to
docket ID number EPA–HQ–OPP–2005–
0479. EPA’s policy is that all comments
received will be included in the docket
without change and may be made
available on-line at https://
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
consider to be CBI or otherwise
protected through regulations.gov or email. The Federal regulations.gov
website is an ‘‘anonymous access’’
system, which means EPA will not
know your identity or contact
E:\FR\FM\14JYN1.SGM
14JYN1
Agencies
[Federal Register Volume 71, Number 135 (Friday, July 14, 2006)]
[Notices]
[Pages 40096-40097]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-11125]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6677-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 07/03/2006
Through 07/07/2006.
Pursuant to 40 CFR 1506.9.
THIS NOTICE SUPERSEDES ``SPECIAL NOTICE DATED: 07/07/2006'' EIS'S
FILED JUNE 19 THRU JUNE 23, 2006 SCHEDULED TO APPEAR IN THE Federal
Register ON JUN 30, 2006, BUT WERE PUBLISHED ON MONDAY JULY 3, 2006.
CALCULATED FROM JULY 3, 2006 Federal Register THE DRAFT EIS'S COMMENT
PERIODS WILL END ON AUGUST 17, 2006 AND FINAL EIS'S WAIT PERIODS WILL
END ON AUGUST 2, 2006.
EIS No. 20060281, Final EIS, NPS, CA, Furnace Creek Water Collection
System, Reconstruction, Death Valley National Park, Implementation,
Inyo County, CA, Wait Period Ends: 08/14/2006, Contact: Linda Greene
760-786-3253.
EIS No. 20060282, Final EIS, BLM, CA, Southern Diablo Mountain Range
and Central Coast of California Resource Management Plan, Several
Counties, CA, Wait Period Ends: 08/14/2006, Contact: Sky Murphy 831-
630-5039.
EIS No. 20060283, Draft EIS, FHW, UT, Riverdale Road Project (UT-26),
Improvement Mobility and Safety between 1900 West in Roy, UT and U.S.
Highway 89 (Washington Boulevard) in Odgen, UT, Cities of Roy,
Riverdale, South Ogden and Ogden, Weber County, UT, Comment Period
Ends: 08/28/2006, Contact: Greg Punske 801-963-0182.
EIS No. 20060284, Draft EIS, FHW, KY, I-66 Somerset to London Project,
Construction from the Vicinity of the Northern Bypass (I-66) in
Somerset, KY to I-75 between London and Corbin Cities, Pulaski, U.S.
Army COE Section 404 Permit, Rockcastle and Laurel Counties, KY,
Comment Period Ends: 08/28/2006, Contact: Jose Sepulveda 502-223-6740.
EIS No. 20060285, Draft Supplement, FHW, ME, Aroostook County Transport
Study, New and Updated Information, To Identify Transportation
Corridors that will Improve Mobility and Efficiency within Northeastern
Aroostook County and other portions of the U.S. and Canada, U.S. Army
COE Section 404 Permit, Endangered Species Act, NPDES and Section 10
River and Harbors Act, Aroostook, ME, Comment Period Ends: 08/31/2006,
Contact: Mark Hasselman 207-622-8350.
EIS No. 20060286, Draft EIS, BLM, ID, Eastside Township Fuels and
Vegetation Project, Address the Forest Health, Fuels, Safety, and
Watershed Issues, Elk City, Idaho County, ID, Comment Period Ends: ,
09/11/2006, Contact: Robbin B. Boyce 208-962-3594.
EIS No. 20060287, Draft EIS, AFS, MT, Little Belt-Castle-North Half
Crazy Mountains Travel Management Plan, To Change the Management of
Motorized and Non-motorized Travel on the Road, Trails, and Areas
within, Belt Creek, Judith, Musselshell, and White Sulphur Springs
Ranger Districts, Lewis and Clark National Forest, Cascade, Judith
Basin, Meagher, Wheatland, Sweetgrass and Park Counties, MT, Comment
Period Ends: 09/15/2006, Contact: Dick Schwecke 406-791-7700.
EIS No. 20060288, Final EIS, FTA, CA, Warm Springs Extension, Proposing
5.4 mile Extension of the BART System in the City of Fremont, Funding,
San Francisco Bay Area Rapid Transit District, Alameda County, CA, Wait
Period Ends: 08/14/2006, Contact: Lorraine Lerman 415-744-2735.
EIS No. 20060289, Final EIS, AFS, WA, School Fire Salvage Recovery
Project, Salvage Harvest Fire-Killed (dead) and Fire-Damaged (dying)
Trees, Implementation, Pomeroy Ranger District, Umatilla National
Forest, Columbia and Garfield Counties, WA, Wait Period Ends: 08/14/
2006, Contact: Dean Millett 509-843-1891.
EIS No. 20060290, Draft Supplement, NRC, VA, Early Site Permit (ESP) at
the North Anna Power Station ESP Site (TAC No. MC1128), New and Updated
Information, Construction and Operation, NUREG-1811, Louisa County, VA,
Comment Period Ends: 08/28/2006, Contact: Jacking Cushing 301-415-1424.
EIS No. 20060291, Final EIS, NOA, 00, Consolidated Atlantic Highly
Migratory Species Fishery Management Plan for Atlantic Tunas,
Swordfish, and Shark and the Atlantic Billfish Fishery Management Plan,
Implementation, Atlantic Coast, Caribbean and Gulf of Mexico, Wait
Period Ends: 08/14/2006, Contact: Karyle Brewster-Geisz 301-713-2347.
Amended Notices
EIS No. 20060260, Final EIS, BLM, AK, East Alaska Draft Resource
Management Plan (RMP), Provide a Single Comprehensive Land Use Plan,
Implementation, Glennallen Field Office District, AK, Wait Period Ends:
08/02/2006, Contact: Bruce Rogers 907-822-3217.
Revision to Federal Register Notice Published 07/03/2006:
Correction to Wait Period from 07/31/2006 to 08/02/2006.
EIS No. 20060261, Final EIS, NPS, UT, Burr Trail Modification Project,
Proposed Road Modification within Capitol Reef National Park, Garfield
County, UT, Wait Period Ends: 08/02/2006, Contact: Chris Turk 303-969-
2832.
Revision to Federal Register Notice Published 07/03/2006:
Correction to Wait Period from 07/31/2006 to 08/02/2006.
EIS No. 20060263, Final EIS, BIA, MI, Nottawaseppi Huron Band of
Potawatomi Indians (the Tribe), Proposes Fee-to-Trust Transfer and
Casino Project, Calhoun County, MI, Wait Period Ends: 08/02/2006,
Contact: Terrance Virden 612-725-4510.
Revision to Federal Register Notice Published 07/03/2006:
Correction to Wait Period from 07/31/2006 to 08/02/2006.
EIS No. 20060264, Draft EIS, AFS, WY, Lower Valley Energy (LVE) Natural
Gas Pipeline Project, Construction
[[Page 40097]]
and Operation of a Pressurized Natural Gas Pipeline, Special-Use-
Authorization, Big Piney and Jackson Ranger Districts, Bridger-Teton
National Forest, Sublette and Teton Counties, WY, Comment Period Ends:
08/25/2006, Contact: Teresa Trulock 307-276-3375.
Revision to Federal Register Notice Published 07/03/2006: Extend
Comment Period from 08/17/2006 to 08/25/2006.
EIS No. 20060266, Draft EIS, DOT, TX, North Corridor Fixed Guideway
Project, Propose Transit Improvements from University of Houston (UH)-
Downtown Station to Northline Mall, Harris County, TX, Comment Period
Ends: 08/17/2006, Contact: John Sweek 817-978-0550.
Revision to Federal Register Notice Published 07/03/2006:
Correction to Comment Period from 08/14/2006 to 08/17/2006.
EIS No. 20060267, Final EIS, BLM, CA, Ukiah Resource Management Plan,
Implementation, Several Counties, CA, Wait Period Ends: 08/02/2006,
Contact: Eli Ilano 916-978-4427.
Revision to Federal Register Notice Published 07/03/2006:
Correction to Wait Period from 08/14/2006 to 08/02/2006.
EIS No. 20060269, Draft Supplement, COE, MD, Masonville Dredged
Material Containment Facility, New Information, New Source of Dike
Building Material from the Seagirt Dredging Project within the Patapsco
River, Funding, Baltimore, MD, Comment Period Ends: 08/17/2006,
Contact: Jon Romeo 410-962-6079.
Revision to Federal Register Notice Published 07/03/2006:
Correction to Comment Period from 08/14/2006 to 08/17/2006.
EIS No. 20060270, Second Draft Supplement, COE, FL, Cape Sable Seaside
Sparrow Protection, Interim Operation Plan (IOP), Additional
Information Alternative 7, Providing Additional Flood Control Capacity,
Implementation, Everglades National Park, Miami-Dade County, FL,
Comment Period Ends: 08/17/2006, Contact: Dr. Jon Moulding 904-232-2286
Revision to Federal Register Notice Published 07/03/2006:
Correction to Comment Period from 08/14/2006 to 08/17/2006.
EIS No. 20060271, Draft EIS, CGD, 00, PROGRAMMATIC--Implementation of
the U.S. Coast Guard Nationwide Automatic Identification System
Project, Providing Vessel Identification, Tracking and Information
Exchange Capabilities to Support National Maritime Interests, Comment
Period Ends: 08/17/2006, Contact: Anita Allen 202-475-3292
Revision to Federal Register Notice Published 07/03/2006:
Correction to Comment Period from 08/14/2006 to 08/17/2006.
EIS No. 20060272, Draft EIS, COE, NC, West Onslow Beach and New River
Inlet (Topsail Beach) Shore Protection Project, Storm Damages and Beach
Erosion Reduction, Funding, Pender County, NC, Comment Period Ends: 08/
17/2006, Contact: Jenny Owens 910-251-4757.
Revision to Federal Register Notice Published 07/03/2006:
Correction to Comment Period from 08/14/2006 to 08/17/2006.
EIS No. 20060273, Draft EIS, RUS, MT, Highwood Generating Station, 250-
megawatt Coal Fired Power Plant and 6MW of Wind Generation at a Site
near Great Falls, Construction and Operation, Licenses Permit, U.S.
Army COE Section 10 Permit, Cascade County, MT, Comment Period Ends:
08/17/2006, Contact: Richard Fristik 202-720-5093.
This document is available on the Internet at: https://www.usda.gov/
rus/water/ees/eis.htm.
Revision to Federal Register Notice Published 07/03/2006:
Correction to Comment Period from 08/15/2006 to 08/17/2006.
EIS No. 20060278, Draft EIS, NOA, 00, North Atlantic Right Whale Ship
Strike Reduction Strategy, To Implement the Operational Measures to
Reduce the Occurrence and Severity of Vessel Collisions with the Right
Whale, Serious Injury and Deaths Resulting from Collisions with
Vessels, Comment Period Ends: 09/05/2006, Contact: Stewart Harris 301-
713-2322.
Revision of Federal Register Notice Published 07/07/2006.
Correction to Contact Person Name and Telephone Number.
Dated: July 11, 2006.
Robert W. Hargrove.
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-11125 Filed 7-13-06; 8:45 am]
BILLING CODE 6560-50-P