Missouri Ameren Union Electric Company; Notice of Application for Amendment of License and Soliciting Comments, Motions to Intervene, and Protests, 39681 [E6-10989]

Download as PDF Federal Register / Vol. 71, No. 134 / Thursday, July 13, 2006 / Notices agency management objectives; (3) review and discuss existing information and identify preliminary information and potential study needs; (4) review and discuss the process plan and schedule for pre-filing activity that incorporates the time frames provided for in Part 5 of the Commission’s regulations and, to the extent possible, maximizes coordination of federal, state, and tribal permitting and certification processes; and (5) discuss requests by any federal or state agency or Indian tribe acting as a cooperating agency for development of an environmental document. Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PreApplication Document in preparation for the scoping meeting. Directions on how to obtain a copy of the PAD and SD1 are included in item m of this document. Scoping Meeting Procedures The scoping meeting will be recorded by a stenographer and will become part of the formal Commission record on the project. Magalie R. Salas, Secretary. [FR Doc. E6–10988 Filed 7–12–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 459–158] Missouri Ameren Union Electric Company; Notice of Application for Amendment of License and Soliciting Comments, Motions to Intervene, and Protests sroberts on PROD1PC70 with NOTICES June 27, 2006. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of License. b. Project No.: 459–158. c. Date Filed: May 15, 2006. d. Applicant: Missouri Ameren Union Electric Company. e. Name of Project: Osage Project. f. Location: The project is located on the Osage River, Benton, and Camden Counties, Missouri. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a—825r. h. Applicant Contact: Mr. Mark C. Jordan, General Supervisor Real Estate, Missouri Ameren Union Electric VerDate Aug<31>2005 17:46 Jul 12, 2006 Jkt 208001 Company, 101 Madison Street, P.O. Box 780 MC–CP850, Jefferson City, MO 65102, telephone: (573) 681–7246. i. FERC Contact: Any questions on this notice should be addressed to Mr. Robert Bell at (202) 502–6062. j. Deadline for filing comments and or motions: July 27, 2006. k. Description of Request: In the filing, Missouri Ameren Union Electric Company, (Ameren) requests Commission approval to remove 180.22 acres of land from the project boundary, and to revise the Exhibit G to show the revised project boundary. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. Information about this filing may also be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 39681 filing refers. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. Magalie R. Salas, Secretary. [FR Doc. E6–10989 Filed 7–12–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP01–245–016] Transcontinental Gas Pipe Line Corporation; Notice of Technical Conference June 27, 2006. Take notice that the Commission will convene a technical conference on Monday, July 24, 2006, at 9 a.m. (EDT), in a room to be designated at the offices of the Federal Energy Regulatory Commission, 888 First Street, NE., Washington DC 20426. The Commission’s May 30, 2006 order in this proceeding established a technical conference to address the issue of the appropriate method of conducting pooling in Transco’s Zone 4.1 The order found that there are certain aspects of the operation of the current Zone 4 pool at Station 85 that were unclear from the present record. The Commission found that a technical conference will provide an opportunity to clarify the present operation of the Station 85 pooling point and consider whether improvements could be made 1 Transcontinental Gas Pipe Line Corporation, 115 FERC ¶ 61, 268 (2006). E:\FR\FM\13JYN1.SGM 13JYN1

Agencies

[Federal Register Volume 71, Number 134 (Thursday, July 13, 2006)]
[Notices]
[Page 39681]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-10989]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 459-158]


Missouri Ameren Union Electric Company; Notice of Application for 
Amendment of License and Soliciting Comments, Motions to Intervene, and 
Protests

June 27, 2006.
    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Amendment of License.
    b. Project No.: 459-158.
    c. Date Filed: May 15, 2006.
    d. Applicant: Missouri Ameren Union Electric Company.
    e. Name of Project: Osage Project.
    f. Location: The project is located on the Osage River, Benton, and 
Camden Counties, Missouri.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a--825r.
    h. Applicant Contact: Mr. Mark C. Jordan, General Supervisor Real 
Estate, Missouri Ameren Union Electric Company, 101 Madison Street, 
P.O. Box 780 MC-CP850, Jefferson City, MO 65102, telephone: (573) 681-
7246.
    i. FERC Contact: Any questions on this notice should be addressed 
to Mr. Robert Bell at (202) 502-6062.
    j. Deadline for filing comments and or motions: July 27, 2006.
    k. Description of Request: In the filing, Missouri Ameren Union 
Electric Company, (Ameren) requests Commission approval to remove 
180.22 acres of land from the project boundary, and to revise the 
Exhibit G to show the revised project boundary.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. Information about this filing 
may also be viewed on the Commission's Web site at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. You may 
also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. All documents (original and eight copies) 
should be filed with: Magalie R. Salas, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington DC 20426. A 
copy of any motion to intervene must also be served upon each 
representative of the Applicant specified in the particular 
application.
    p. Agency Comments--Federal, State, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.
    q. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site at https://www.ferc.gov 
under the ``e-Filing'' link.

Magalie R. Salas,
Secretary.
[FR Doc. E6-10989 Filed 7-12-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.