Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NSPS for Coal Preparation Plants (Renewal), ICR Number 1062.09, OMB Control Number 2060-0122, 39108-39109 [E6-10861]
Download as PDF
39108
Federal Register / Vol. 71, No. 132 / Tuesday, July 11, 2006 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HW–OECA–2005–0065; FRL–8194–7]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; NSPS for Coal Preparation
Plants (Renewal), ICR Number 1062.09,
OMB Control Number 2060–0122
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: In compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.), this document announces
that an Information Collection Request
(ICR) has been forwarded to the Office
of Management and Budget (OMB) for
review and approval. This is a request
to renew an existing approved
collection. The ICR which is abstracted
below describes the nature of the
collection and the estimated burden and
cost.
DATES: Additional comments may be
submitted on or before August 10, 2006.
ADDRESSES: Submit your comments,
referencing docket ID number EPA–HQ–
OECA–2005–0065 to (1) EPA online
using https://www.regulations.gov (our
preferred method), or by e-mail to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center (EPA/DC), Environmental
Protection Agency, Enforcement and
Compliance Docket and Information
Center, mail code 2201T, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460, and (2) OMB at:
Office of Information and Regulatory
Affairs, Office of Management and
Budget (OMB), Attention: Desk Officer
for EPA, 725 17th Street, NW.,
Washington, DC 20503.
FOR FURTHER INFORMATION CONTACT:
Gregory Fried, Compliance Assessment
and Media Programs Division, Office of
Compliance, (Mail code 2223A),
Environmental Protection Agency, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460; telephone
number: (202) 564–7016; fax number:
(202) 564–0050; e-mail address:
fried.gregory@epa.gov.
EPA has
submitted the following ICR to OMB for
review and approval according to the
procedures prescribed in 5 CFR 1320.12.
On September 21, 2005, (70 FR 55368),
EPA sought comments on this ICR
pursuant to 5 CFR 1320.8(d). EPA
received no comments. Any additional
comments on this ICR should be
submitted to EPA and OMB within 30
days of this notice.
sroberts on PROD1PC70 with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Aug<31>2005
16:49 Jul 10, 2006
Jkt 208001
EPA has established a public docket
for this ICR under docket ID number
EPA–HQ–OECA–2005–0065, which is
available for public viewing online at
https://www.regulations.gov, or in person
viewing at the Enforcement and
Compliance Docket in the EPA Docket
Center (EPA/DC), EPA West, Room
B102, 1301 Constitution Avenue, NW.,
Washington, DC. The EPA Docket
Center Public Reading Room is open
from 8:30 a.m. to 4:30 p.m., Monday
through Friday, excluding legal
holidays. The telephone number for the
Reading Room is (202) 566–1744, and
the telephone number for the
Enforcement and Compliance Docket is
(202) 566–1752.
Use EPA’s electronic docket and
comment system at https://
www.regulations.gov, to submit or view
public comments, access the index
listing of the contents of the docket, and
to access those documents in the docket
that are available electronically. Once in
the system, select ‘‘docket search,’’ then
key in the docket ID number identified
above. Please note that EPA’s policy is
that public comments, whether
submitted electronically or in paper,
will be made available for public
viewing at https://www.regulations.gov,
as EPA receives them and without
change, unless the comment contains
copyrighted material, Confidential
Business Information (CBI), or other
information whose public disclosure is
restricted by statute. For further
information about the electronic docket,
go to www.regulations.gov.
Title: NSPS for Coal Preparation
Plants (Renewal).
ICR Numbers: EPA ICR Number
1062.09, OMB Control Number 2060–
0122.
ICR Status: This ICR is scheduled to
expire on June 30, 2006. Under OMB
regulations, the Agency may continue to
conduct or sponsor the collection of
information while this submission is
pending at OMB. An Agency may not
conduct or sponsor, and a person is not
required to respond to, a collection of
information unless it displays a
currently valid OMB control number.
The OMB control numbers for EPA’s
regulations in title 40 of the CFR, after
appearing in the Federal Register when
approved, are listed in 40 CFR part 9,
and displayed either by publication in
the Federal Register or by other
appropriate means, such as on the
related collection instrument or form, if
applicable. The display of OMB control
numbers in certain EPA regulations is
consolidated in 40 CFR part 9.
Abstract: These regulations apply to
owners or operators of coal preparation
plants that process more than 200 tons
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
of coal per day. Owners or operators are
required to submit initial notifications,
conduct initial performance tests, and
maintain records of operating
parameters. Owners or operators that
install continuous emission monitors
are required to report excess emissions
semiannually. Owners or operators are
also required to maintain records of the
occurrence and duration of any startup,
shutdown, or malfunction in the
operation of an affected facility, or any
period during which the monitoring
system is inoperative. Owners or
operators are required to maintain
records for at least two years.
Burden Statement: The annual public
reporting and recordkeeping burden for
this collection of information is
estimated to average 20 hours per
response. Burden means the total time,
effort, or financial resources expended
by persons to generate, maintain, retain,
or disclose or provide information to or
for a Federal agency. This includes the
time needed to review instructions;
develop, acquire, install, and utilize
technology and systems for the purposes
of collecting, validating, and verifying
information, processing and
maintaining information, and disclosing
and providing information; adjust the
existing ways to comply with any
previously applicable instructions and
requirements which have subsequently
changed; train personnel to be able to
respond to a collection of information;
search data sources; complete and
review the collection of information;
and transmit or otherwise disclose the
information.
Respondents/Affected Entities: Coal
Preparation Plants.
Estimated Number of Respondents:
1,013.
Frequency of Response: Initially and
semiannually.
Estimated Total Annual Hour Burden:
29,590.
Estimated Total Annual Cost:
$2,546,188, which includes $0
annualized capital startup costs,
$40,000 annualized Operations and
Maintenance costs, $2,506,188
annualized labor costs.
Changes in the Estimates: There is an
increase of 12,428 hours in the total
estimated burden currently identified in
the OMB Inventory of Approved ICR
Burdens. The increase in burden from
the most recently approved ICR is due
to an increase in the number of plants
affected by the subpart as well as an
increase in the estimated number of
plants with sources that need to be
replaced, reconstructed, or expanded
such that additional testing is required.
The O&M costs associated with this
subpart also increased as a result of the
E:\FR\FM\11JYN1.SGM
11JYN1
Federal Register / Vol. 71, No. 132 / Tuesday, July 11, 2006 / Notices
increase in the estimated number of
affected sources.
Dated: June 29, 2006.
Richard T. Westlund,
Acting Director, Collection Strategies
Division.
[FR Doc. E6–10861 Filed 7–10–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2005–0076, FRL–8194–8]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; NESHAP for Shipbuilding
and Ship Repair Facilities (Surface
Coating) (Renewal); EPA ICR Number
1712.05; OMB Control Number 2060–
0330
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: In compliance with the
Paperwork Reduction Act (PRA) (44
U.S.C. 3501 et seq.), this document
announces that an Information
Collection Request (ICR) has been
forwarded to the Office of Management
and Budget (OMB) for review and
approval. This is a request to renew an
existing approved collection. The ICR,
which is abstracted below, describes the
nature of the information collection and
its estimated burden and cost.
DATES: Additional comments may be
submitted on or before August 10, 2006.
ADDRESSES: Submit your comments,
referencing docket ID Number EPA–
HQ–OECA–2005–0076, to (1) EPA
online using https://www.regulations.gov
(our preferred method), by e-mail to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center (EPA/DC), Environmental
Protection Agency, Enforcement and
Compliance Docket and Information
Center, mail code 2201T, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460, and (2) OMB by
mail to: Office of Information and
Regulatory Affairs, Office of
Management and Budget (OMB),
Attention: Desk Officer for EPA, 725
17th Street, NW., Washington, DC
20503.
sroberts on PROD1PC70 with NOTICES
FOR FURTHER INFORMATION CONTACT:
Leonard Lazarus, Compliance
Assessment and Media Programs
Division (CAMPD), Office of
Compliance, (2223A), Environmental
Protection Agency, 1200 Pennsylvania
Avenue, NW., Washington, DC 20460;
telephone number: (202) 564–6369; fax
VerDate Aug<31>2005
16:49 Jul 10, 2006
Jkt 208001
number: (202) 564–0050; e-mail address:
lazarus.leonard@epa.gov.
SUPPLEMENTARY INFORMATION: EPA has
submitted the following ICR to OMB for
review and approval according to the
procedures prescribed in 5 CFR 1320.12.
On September 21, 2005 (70 FR 55368),
EPA sought comments on this ICR
pursuant to 5 CFR 1320.8(d). EPA
received no comments. Any additional
comments on this ICR should be
submitted to EPA and OMB within 30
days of this notice.
EPA has established a public docket
for this ICR under Docket ID Number
EPA–HQ–OECA–2005–0076, which is
available for online viewing at https://
www.regulations.gov, or in person
viewing at the Enforcement and
Compliance Docket and Information
Center in the EPA Docket Center (EPA/
DC), EPA West, Room B102, 1301
Constitution Avenue, NW., Washington,
DC. The EPA/DC Public Reading Room
is open from 8 a.m. to 4:30 p.m.,
Monday through Friday, excluding legal
holidays. The telephone number for the
Reading Room is (202) 566–1744, and
the telephone number for the
Enforcement and Compliance Docket
and Information Center Docket is (202)
564–1927.
Use EPA’s electronic docket and
comment system at https://
www.regulations.gov, to submit or view
public comments, access the index
listing of the contents of the docket, and
to access those documents in the docket
that are available electronically. Once in
the system, select ‘‘docket search,’’ then
key in the docket ID number identified
above. Please note that EPA’s policy is
that public comments, whether
submitted electronically or in paper,
will be made available for public
viewing at https://www.regulations.gov
as EPA receives them and without
change, unless the comment contains
copyrighted material, CBI, or other
information whose public disclosure is
restricted by statute. For further
information about the electronic docket,
go to https://www.regulations.gov.
Title: NESHAP for Shipbuilding and
Ship Repair Facilities (Surface Coating)
(Renewal)
ICR numbers: EPA ICR Number
1712.05, OMB Control Number 2060–
0330.
ICR Status: This ICR is scheduled to
expire on September 30, 2006. Under
OMB regulations, the Agency may
continue to conduct or sponsor the
collection of information while this
submission is pending at OMB. An
Agency may not conduct or sponsor,
and a person is not required to respond
to, a collection of information, unless it
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
39109
displays a currently valid OMB control
number. The OMB control numbers for
EPA’s regulations in title 40 of the CFR,
after appearing in the Federal Register
when approved, are listed in 40 CFR
part 9, are displayed either by
publication in the Federal Register or
by other appropriate means, such as on
the related collection instrument or
form, if applicable. The display of OMB
control numbers in certain EPA
regulations is consolidated in 40 CFR
part 9.
Abstract: The respondents are owners
or operators of Shipbuilding and Ship
Repair Facilities. Operations covered
include: primer and top coat application
in manufacturing processes and in ship
repair processes. The NESHAP
regulation 40 CFR part 63, subpart II,
was promulgated on December 15, 1995.
Owners or operators of the affected
facilities described must make initial
reports when a source becomes subject,
conduct and report on a performance
test, demonstrate and report on
continuous monitor performance, and
maintain records of the occurrence and
duration of any startup, shutdown, or
malfunction in the operation of an
affected facility. Semiannual reports of
excess emissions are required. These
notifications, reports, and records are
essential in determining compliance;
and are required, in general, of all
sources subject to National Emission
Standards for Hazardous Air Pollutants
(NESHAP).
Any owner or operator subject to the
provisions of this part shall maintain a
file of these measurements, and retain
the file for at least five years following
the date of such measurements,
maintenance reports, and records. All
reports are sent to the delegated state or
local authority. In the event that there
is no such delegated authority, the
reports are sent directly to the EPA
regional office.
An agency may not conduct or
sponsor, and a person is not required to
respond to, a collection of information
unless it displays a currently valid OMB
control number. The OMB control
numbers for EPA’s regulations in 40
CFR are listed in 40 CFR part 9 and are
identified on the form and/or
instrument, if applicable.
Burden Statement: The annual public
reporting and recordkeeping burden for
this collection of information is
estimated to average 255 hours per
response. Burden means the total time,
effort, or financial resources expended
by persons to generate, maintain, retain,
or disclose or provide information to or
for a Federal agency. This includes the
time needed to review instructions;
develop, acquire, install, and utilize
E:\FR\FM\11JYN1.SGM
11JYN1
Agencies
[Federal Register Volume 71, Number 132 (Tuesday, July 11, 2006)]
[Notices]
[Pages 39108-39109]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-10861]
[[Page 39108]]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[EPA-HW-OECA-2005-0065; FRL-8194-7]
Agency Information Collection Activities; Submission to OMB for
Review and Approval; Comment Request; NSPS for Coal Preparation Plants
(Renewal), ICR Number 1062.09, OMB Control Number 2060-0122
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501
et seq.), this document announces that an Information Collection
Request (ICR) has been forwarded to the Office of Management and Budget
(OMB) for review and approval. This is a request to renew an existing
approved collection. The ICR which is abstracted below describes the
nature of the collection and the estimated burden and cost.
DATES: Additional comments may be submitted on or before August 10,
2006.
ADDRESSES: Submit your comments, referencing docket ID number EPA-HQ-
OECA-2005-0065 to (1) EPA online using https://www.regulations.gov (our
preferred method), or by e-mail to docket.oeca@epa.gov, or by mail to:
EPA Docket Center (EPA/DC), Environmental Protection Agency,
Enforcement and Compliance Docket and Information Center, mail code
2201T, 1200 Pennsylvania Avenue, NW., Washington, DC 20460, and (2) OMB
at: Office of Information and Regulatory Affairs, Office of Management
and Budget (OMB), Attention: Desk Officer for EPA, 725 17th Street,
NW., Washington, DC 20503.
FOR FURTHER INFORMATION CONTACT: Gregory Fried, Compliance Assessment
and Media Programs Division, Office of Compliance, (Mail code 2223A),
Environmental Protection Agency, 1200 Pennsylvania Avenue, NW.,
Washington, DC 20460; telephone number: (202) 564-7016; fax number:
(202) 564-0050; e-mail address: fried.gregory@epa.gov.
SUPPLEMENTARY INFORMATION: EPA has submitted the following ICR to OMB
for review and approval according to the procedures prescribed in 5 CFR
1320.12. On September 21, 2005, (70 FR 55368), EPA sought comments on
this ICR pursuant to 5 CFR 1320.8(d). EPA received no comments. Any
additional comments on this ICR should be submitted to EPA and OMB
within 30 days of this notice.
EPA has established a public docket for this ICR under docket ID
number EPA-HQ-OECA-2005-0065, which is available for public viewing
online at https://www.regulations.gov, or in person viewing at the
Enforcement and Compliance Docket in the EPA Docket Center (EPA/DC),
EPA West, Room B102, 1301 Constitution Avenue, NW., Washington, DC. The
EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30
p.m., Monday through Friday, excluding legal holidays. The telephone
number for the Reading Room is (202) 566-1744, and the telephone number
for the Enforcement and Compliance Docket is (202) 566-1752.
Use EPA's electronic docket and comment system at https://
www.regulations.gov, to submit or view public comments, access the
index listing of the contents of the docket, and to access those
documents in the docket that are available electronically. Once in the
system, select ``docket search,'' then key in the docket ID number
identified above. Please note that EPA's policy is that public
comments, whether submitted electronically or in paper, will be made
available for public viewing at https://www.regulations.gov, as EPA
receives them and without change, unless the comment contains
copyrighted material, Confidential Business Information (CBI), or other
information whose public disclosure is restricted by statute. For
further information about the electronic docket, go to
www.regulations.gov.
Title: NSPS for Coal Preparation Plants (Renewal).
ICR Numbers: EPA ICR Number 1062.09, OMB Control Number 2060-0122.
ICR Status: This ICR is scheduled to expire on June 30, 2006. Under
OMB regulations, the Agency may continue to conduct or sponsor the
collection of information while this submission is pending at OMB. An
Agency may not conduct or sponsor, and a person is not required to
respond to, a collection of information unless it displays a currently
valid OMB control number. The OMB control numbers for EPA's regulations
in title 40 of the CFR, after appearing in the Federal Register when
approved, are listed in 40 CFR part 9, and displayed either by
publication in the Federal Register or by other appropriate means, such
as on the related collection instrument or form, if applicable. The
display of OMB control numbers in certain EPA regulations is
consolidated in 40 CFR part 9.
Abstract: These regulations apply to owners or operators of coal
preparation plants that process more than 200 tons of coal per day.
Owners or operators are required to submit initial notifications,
conduct initial performance tests, and maintain records of operating
parameters. Owners or operators that install continuous emission
monitors are required to report excess emissions semiannually. Owners
or operators are also required to maintain records of the occurrence
and duration of any startup, shutdown, or malfunction in the operation
of an affected facility, or any period during which the monitoring
system is inoperative. Owners or operators are required to maintain
records for at least two years.
Burden Statement: The annual public reporting and recordkeeping
burden for this collection of information is estimated to average 20
hours per response. Burden means the total time, effort, or financial
resources expended by persons to generate, maintain, retain, or
disclose or provide information to or for a Federal agency. This
includes the time needed to review instructions; develop, acquire,
install, and utilize technology and systems for the purposes of
collecting, validating, and verifying information, processing and
maintaining information, and disclosing and providing information;
adjust the existing ways to comply with any previously applicable
instructions and requirements which have subsequently changed; train
personnel to be able to respond to a collection of information; search
data sources; complete and review the collection of information; and
transmit or otherwise disclose the information.
Respondents/Affected Entities: Coal Preparation Plants.
Estimated Number of Respondents: 1,013.
Frequency of Response: Initially and semiannually.
Estimated Total Annual Hour Burden: 29,590.
Estimated Total Annual Cost: $2,546,188, which includes $0
annualized capital startup costs, $40,000 annualized Operations and
Maintenance costs, $2,506,188 annualized labor costs.
Changes in the Estimates: There is an increase of 12,428 hours in
the total estimated burden currently identified in the OMB Inventory of
Approved ICR Burdens. The increase in burden from the most recently
approved ICR is due to an increase in the number of plants affected by
the subpart as well as an increase in the estimated number of plants
with sources that need to be replaced, reconstructed, or expanded such
that additional testing is required. The O&M costs associated with this
subpart also increased as a result of the
[[Page 39109]]
increase in the estimated number of affected sources.
Dated: June 29, 2006.
Richard T. Westlund,
Acting Director, Collection Strategies Division.
[FR Doc. E6-10861 Filed 7-10-06; 8:45 am]
BILLING CODE 6560-50-P