Northwest Pipeline Corporation; Notice of Proposed Changes in FERC Gas Tariff, 39084 [E6-10821]

Download as PDF 39084 Federal Register / Vol. 71, No. 132 / Tuesday, July 11, 2006 / Notices document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP06–416–000] Northwest Pipeline Corporation; Notice of Proposed Changes in FERC Gas Tariff Magalie R. Salas, Secretary. [FR Doc. E6–10821 Filed 7–10–06; 8:45 am] July 3, 2006. BILLING CODE 6717–01–P Take notice that on June 30, 2006, Northwest Pipeline Corporation (Northwest) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, the following tariff sheets to become effective August 1, 2006: sroberts on PROD1PC70 with NOTICES July 3, 2006. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a 16:49 Jul 10, 2006 Jkt 208001 Federal Energy Regulatory Commission Notice of Issuance of Order Thirty-First Revised Sheet No. 5. Third Revised Sheet No. 5–B. Sixth Revised Sheet No. 5–C. First Revised Sheet No. 5–D. Fourteenth Revised Sheet No. 6. Fifteenth Revised Sheet No. 7. Seventeenth Revised Sheet No. 8. Fifteenth Revised Sheet No. 8.1. Fifth Revised Sheet No. 91. Third Revised Sheet No. 91–A. VerDate Aug<31>2005 DEPARTMENT OF ENERGY RockGen OL–1, LLC (Docket No. ER06– 1036–000); RockGen OL–2, LLC (ER06– 1050–000); RockGen OL–3, LLC (ER06– 1037–000); and RockGen OL–4, LLC (ER06–1095–000) RockGen OL–1, LLC, RockGen OL–2, LLC, RockGen OL–3, LLC and RockGen OL–4, LLC (RockGen OLs) filed applications for market-based rate authority, with accompanying tariffs. The proposed market-based rate tariffs provide for the sale of energy, capacity and ancillary services at market-based rates. RockGen OLs also requested waivers of various Commission regulations. In particular, RockGen OLs requested that the Commission grant blanket approval under 18 CFR part 34 of all future issuances of securities and assumptions of liability by RockGen OLs. On June 28, 2006, pursuant to delegated authority, the Director, Division of Tariffs and Market Development—West, granted the requests for blanket approval under part 34. The Director’s order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard or to protest the blanket approvals of issuances of securities or assumptions of liability by RockGen OLs should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing motions to intervene or protest is July 28, 2006. Absent a request to be heard in opposition by the deadline above, RockGen OLs are authorized to issue PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of RockGen OLs, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of RockGen OLs’ issuances of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Magalie R. Salas, Secretary. [FR Doc. E6–10799 Filed 7–10–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP06–406–000] Texas Eastern Transmission, LP; Notice of Proposed Changes in FERC Gas Tariff July 3, 2006. Take notice that on June 29, 2006, Texas Eastern Transmission, LP (Texas Eastern) tendered for filing as part of its FERC Gas Tariff, Seventh Revised Volume No. 1 and First Revised Volume No. 2, the revised tariff sheets listed on Appendix B to the filing, to become effective August 1, 2006. Texas Eastern states that copies of its filing have been served upon all affected customers of Texas Eastern and interested state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by E:\FR\FM\11JYN1.SGM 11JYN1

Agencies

[Federal Register Volume 71, Number 132 (Tuesday, July 11, 2006)]
[Notices]
[Page 39084]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-10821]



[[Page 39084]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP06-416-000]


Northwest Pipeline Corporation; Notice of Proposed Changes in 
FERC Gas Tariff

July 3, 2006.
    Take notice that on June 30, 2006, Northwest Pipeline Corporation 
(Northwest) tendered for filing as part of its FERC Gas Tariff, Third 
Revised Volume No. 1, the following tariff sheets to become effective 
August 1, 2006:

Thirty-First Revised Sheet No. 5.
Third Revised Sheet No. 5-B.
Sixth Revised Sheet No. 5-C.
First Revised Sheet No. 5-D.
Fourteenth Revised Sheet No. 6.
Fifteenth Revised Sheet No. 7.
Seventeenth Revised Sheet No. 8.
Fifteenth Revised Sheet No. 8.1.
Fifth Revised Sheet No. 91.
Third Revised Sheet No. 91-A.

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible online at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E6-10821 Filed 7-10-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.