Federal Register / Vol. 71, No. 131 / Monday, July 10, 2006 / Notices
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link at https://www.ferc.gov.
The Commission strongly encourages
intervenors to file electronically.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Comment Date: July 21, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10689 Filed 7–7–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–764–000, ER06–764–
001]
The Premcor Refining Group, Inc.;
Notice of Issuance of Order
sroberts on PROD1PC70 with NOTICES
June 30, 2006.
The Premier Refining Group, Inc.
(Premcor Refining) filed an application
for market-based rate authority, with an
accompanying rate schedule. The
proposed market-based rate schedule
provides for the sale of energy, capacity
and ancillary services at market-based
rates. Premcor Refining also requested
waivers of various Commission
regulations. In particular, Premcor
Refining requested that the Commission
grant blanket approval under 18 CFR
part 34 of all future issuances of
securities and assumptions of liability
by Premcor Refining.
On June 27, 2006, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
VerDate Aug<31>2005
17:10 Jul 07, 2006
Jkt 208001
Development—West, granted the
requests for blanket approval under part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
Premcor Refining should file a motion
to intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is July 27, 2006.
Absent a request to be heard in
opposition by the deadline above,
Premcor Refining is authorized to issue
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of Premcor Refining,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Premcor Refining’s
issuances of securities or assumptions of
liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10693 Filed 7–7–06; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
38873
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
July 3, 2006.
Take notice that the Commission
received the following electric rate
filings.
Docket Numbers: ER03–693–003.
Applicants: ISG Sparrows Point LLC.
Description: ISG Sparrows Point LLC
submits an amendment to its May 9,
2006 updated market power analysis in
compliance with the Commission’s
orders dated May 7, 2003 and May 13,
2004.
Filed Date: June 28, 2006.
Accession Number: 20060629–0096.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 19, 2006.
Docket Numbers: ER03–908–002.
Applicants: Fulcrum Power Marketing
LLC.
Description: Fulcrum Power
Marketing, LLC submits its triennial
market power update pursuant to the
Commission’s order issued June 30,
2003.
Filed Date: June 28, 2006.
Accession Number: 20060630–0143.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 19, 2006.
Docket Numbers: ER04–708–001.
Applicants: Horsehead Corp.
Description: Horsehead Corp. submits
its amended petition for acceptance of
their triennial market power analysis
and market-based rate compliance
filings.
Filed Date: June 29, 2006.
Accession Number: 20060703–0202.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 20, 2006.
Docket Numbers: ER06–819–001.
Applicants: Consolidated Edison
Energy Massachusetts.
Description: Consolidated Edison
Energy Massachusetts, Inc.’s request
that page 6 be added to the June 26,
2006 response to Question 8.d of the
May 26, 2006 deficiency letter.
Filed Date: June 28, 2006.
Accession Number: 20060630–0117.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 19, 2006.
Docket Numbers: ER06–1118–001.
Applicants: ECP Energy, LLC.
Description: ECP Energy, LLC submits
the Amended Application for order
accepting initial tariff, waiving
regulations, and granting blanket
approvals.
Filed Date: June 29, 2006.
Accession Number: 20060703–0204.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 20, 2006.
E:\FR\FM\10JYN1.SGM
10JYN1
sroberts on PROD1PC70 with NOTICES
38874
Federal Register / Vol. 71, No. 131 / Monday, July 10, 2006 / Notices
Docket Numbers: ER06–1175–000.
Applicants: Delmarva Power & Light
Company.
Description: Delmarva Power & Light
Co. submits the Amended and Restated
Mutual Operating Agreements with
Town of Smyrna.
Filed Date: June 27, 2006.
Accession Number: 20060629–0094.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 18, 2006.
Docket Numbers: ER06–1176–000.
Applicants: Carolina Power & Light
Company.
Description: Carolina Power & Light
Co. dba Progress Energy Carolinas, Inc.
submits the Standard Large Generator
Interconnection Agreement with North
Carolina Electric Membership Corp.
Filed Date: June 28, 2006.
Accession Number: 20060629–0095.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 19, 2006.
Docket Numbers: ER06–1182–000.
Applicants: Calumet Energy Team,
LLC.
Description: Calumet Energy Team,
LLC submits a rate schedule under
which it specifies revenue requirement
for providing Reactive Supply and
Voltage Control from Generation
Sourced Services.
Filed Date: June 29, 2006.
Accession Number: 20060703–0203.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 20, 2006.
Docket Numbers: ER06–1183–000.
Applicants: LG&E Energy LLC.
Description: LG&E Energy, LLC et al.
submit compliance filing in accordance
with FERC’s March 17, 2006 Order.
Filed Date: June 28, 2006.
Accession Number: 20060703–0057.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 19, 2006.
Docket Numbers: ER06–1184–000.
Applicants: Vermont Electric Power
Company.
Description: Vermont Electric Power
Co. submits a notice of cancellation for
Rate Schedule 205, which is its
certificate of concurrence in the
‘‘REMVEC II Agreement.’’
Filed Date: June 29, 2006.
Accession Number: 20060703–0056.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 20, 2006.
Docket Numbers: ER06–1185–000.
Applicants: Pace Global Asset
Management, LLC.
Description: Pace Global Asset
Management, LLC submits Energy
Management Agreement, request for
confidential treatment and request for
blanket authority and waivers.
Filed Date: June 29, 2006.
Accession Number: 20060703–0048.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 20, 2006.
VerDate Aug<31>2005
17:10 Jul 07, 2006
Jkt 208001
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10702 Filed 7–7–06; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP05–91–000; Docket No.
CP05–380–000]
Calhoun LNG, L.P.; Point Comfort
Pipeline Company, L.P.; Notice of
Availability of the Draft Environmental
Impact Statement for the Calhoun LNG
Terminal and Pipeline Project
June 30, 2006.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared this draft
Environmental Impact Statement (EIS)
for the construction and operation of the
liquefied natural gas (LNG) import
terminal and natural gas pipeline
facilities (referred to as the Calhoun
LNG Project or Project) as proposed by
Calhoun LNG, L.P. and Point Comfort
Pipeline Company, L.P. (collectively
referred to as Calhoun Point Comfort) in
the above-referenced dockets.
The draft EIS was prepared to satisfy
the requirements of the National
Environmental Policy Act (NEPA). The
staff concludes that approval of the
Calhoun LNG Project, with appropriate
mitigating measures as recommended,
would have limited adverse
environmental impact. The draft EIS
evaluates alternatives to the proposal,
including system alternatives,
alternative sites for the LNG import
terminal, and pipeline alternatives.
The purpose of the Calhoun LNG
Project is to provide facilities necessary
to import, store, and vaporize on
average about 1.0 billion cubic feet per
day of LNG to provide a competitive
supply of natural gas to local industrial
customers, such as Formosa
Hydrocarbons Company and Formosa
Plastics Corporation, and other energyconsuming customers in Texas and
deliver natural gas into existing
interstate and intrastate natural gas
pipelines near Edna, Texas. In order to
accomplish this purpose, Calhoun Point
Comfort proposes to construct and
operate a new LNG import terminal
including an LNG ship berth and
unloading facilities on the southeastern
shoreline of Lavaca Bay, south of Point
Comfort, in Calhoun County, Texas. In
addition, Calhoun Point Comfort would
construct and operate a new natural gas
pipeline and ancillary facilities
extending northward from the LNG
terminal to natural gas pipeline
interconnects southwest of Edna, in
Jackson County, Texas.
The draft EIS addresses the potential
environmental effects of the
construction and operation of the
E:\FR\FM\10JYN1.SGM
10JYN1
Agencies
[Federal Register Volume 71, Number 131 (Monday, July 10, 2006)]
[Notices]
[Pages 38873-38874]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-10702]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
July 3, 2006.
Take notice that the Commission received the following electric
rate filings.
Docket Numbers: ER03-693-003.
Applicants: ISG Sparrows Point LLC.
Description: ISG Sparrows Point LLC submits an amendment to its May
9, 2006 updated market power analysis in compliance with the
Commission's orders dated May 7, 2003 and May 13, 2004.
Filed Date: June 28, 2006.
Accession Number: 20060629-0096.
Comment Date: 5 p.m. Eastern Time on Wednesday, July 19, 2006.
Docket Numbers: ER03-908-002.
Applicants: Fulcrum Power Marketing LLC.
Description: Fulcrum Power Marketing, LLC submits its triennial
market power update pursuant to the Commission's order issued June 30,
2003.
Filed Date: June 28, 2006.
Accession Number: 20060630-0143.
Comment Date: 5 p.m. Eastern Time on Wednesday, July 19, 2006.
Docket Numbers: ER04-708-001.
Applicants: Horsehead Corp.
Description: Horsehead Corp. submits its amended petition for
acceptance of their triennial market power analysis and market-based
rate compliance filings.
Filed Date: June 29, 2006.
Accession Number: 20060703-0202.
Comment Date: 5 p.m. Eastern Time on Thursday, July 20, 2006.
Docket Numbers: ER06-819-001.
Applicants: Consolidated Edison Energy Massachusetts.
Description: Consolidated Edison Energy Massachusetts, Inc.'s
request that page 6 be added to the June 26, 2006 response to Question
8.d of the May 26, 2006 deficiency letter.
Filed Date: June 28, 2006.
Accession Number: 20060630-0117.
Comment Date: 5 p.m. Eastern Time on Wednesday, July 19, 2006.
Docket Numbers: ER06-1118-001.
Applicants: ECP Energy, LLC.
Description: ECP Energy, LLC submits the Amended Application for
order accepting initial tariff, waiving regulations, and granting
blanket approvals.
Filed Date: June 29, 2006.
Accession Number: 20060703-0204.
Comment Date: 5 p.m. Eastern Time on Thursday, July 20, 2006.
[[Page 38874]]
Docket Numbers: ER06-1175-000.
Applicants: Delmarva Power & Light Company.
Description: Delmarva Power & Light Co. submits the Amended and
Restated Mutual Operating Agreements with Town of Smyrna.
Filed Date: June 27, 2006.
Accession Number: 20060629-0094.
Comment Date: 5 p.m. Eastern Time on Tuesday, July 18, 2006.
Docket Numbers: ER06-1176-000.
Applicants: Carolina Power & Light Company.
Description: Carolina Power & Light Co. dba Progress Energy
Carolinas, Inc. submits the Standard Large Generator Interconnection
Agreement with North Carolina Electric Membership Corp.
Filed Date: June 28, 2006.
Accession Number: 20060629-0095.
Comment Date: 5 p.m. Eastern Time on Wednesday, July 19, 2006.
Docket Numbers: ER06-1182-000.
Applicants: Calumet Energy Team, LLC.
Description: Calumet Energy Team, LLC submits a rate schedule under
which it specifies revenue requirement for providing Reactive Supply
and Voltage Control from Generation Sourced Services.
Filed Date: June 29, 2006.
Accession Number: 20060703-0203.
Comment Date: 5 p.m. Eastern Time on Thursday, July 20, 2006.
Docket Numbers: ER06-1183-000.
Applicants: LG&E Energy LLC.
Description: LG&E Energy, LLC et al. submit compliance filing in
accordance with FERC's March 17, 2006 Order.
Filed Date: June 28, 2006.
Accession Number: 20060703-0057.
Comment Date: 5 p.m. Eastern Time on Wednesday, July 19, 2006.
Docket Numbers: ER06-1184-000.
Applicants: Vermont Electric Power Company.
Description: Vermont Electric Power Co. submits a notice of
cancellation for Rate Schedule 205, which is its certificate of
concurrence in the ``REMVEC II Agreement.''
Filed Date: June 29, 2006.
Accession Number: 20060703-0056.
Comment Date: 5 p.m. Eastern Time on Thursday, July 20, 2006.
Docket Numbers: ER06-1185-000.
Applicants: Pace Global Asset Management, LLC.
Description: Pace Global Asset Management, LLC submits Energy
Management Agreement, request for confidential treatment and request
for blanket authority and waivers.
Filed Date: June 29, 2006.
Accession Number: 20060703-0048.
Comment Date: 5 p.m. Eastern Time on Thursday, July 20, 2006.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-10702 Filed 7-7-06; 8:45 am]