Central Maine Power Company; Notice of Amendment To Filing, 38391 [E6-10486]
Download as PDF
Federal Register / Vol. 71, No. 129 / Thursday, July 6, 2006 / Notices
disposal of government personal
property.
(5) Respondents: 176.
(6) Estimated Number of Burden
Hours: 3,960.
Statutory Authority: Department of Energy
Organization Act, Public Law 95–91.
Issued in Washington, DC on June 28,
2006.
Sharon A. Evelin,
Director, Records Management Division,
Office of the Chief Information Officer.
[FR Doc. E6–10561 Filed 7–5–06; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Notice of Availability of the Draft
Environmental Assessment for the
Proposed Infrastructure Improvements
for the Yucca Mountain Project,
Nevada
U.S. Department of Energy.
Notice of Availability.
AGENCY:
jlentini on PROD1PC65 with NOTICES
ACTION:
SUMMARY: This notice announces the
availability, and the opportunity for
public review and comment, of a draft
environmental assessment (EA) (DOE/
EA–1566) that examines the impacts of
a proposal by the Department of Energy
(DOE) to repair, replace, or improve
certain facilities, structures, roads, and
utilities (collectively referred to as
infrastructure) for the Yucca Mountain
Project. The proposed action would
enhance safety at the project and enable
DOE to safely continue ongoing
operations, scientific testing, and
maintenance until such time as the
Nuclear Regulatory Commission decides
whether to authorize construction of a
repository.
DATES: Comments should be submitted
to DOE no later than August 7, 2006.
DOE will consider comments submitted
after this date to the extent practicable.
ADDRESSES: Comments, or requests for
copies of the draft EA, should be sent to
Dr. Jane Summerson, EA Document
Manager, United States Department of
Energy, 1551 Hillshire Drive, Las Vegas,
NV 89134. Requests for copies of the
draft EA may also be made by calling 1–
800–225–6972. The draft EA and
electronic comment forms are available
at https://www.ocrwm.doe.gov.
Comments may also be faxed to 1–800–
967–0739.
FOR FURTHER INFORMATION CONTACT: Dr.
Jane Summerson, EA Document
Manager, at the above address or at 1–
800–225–6972.
SUPPLEMENTARY INFORMATION: The
proposed action is to repair, replace, or
improve certain infrastructure at Yucca
VerDate Aug<31>2005
17:01 Jul 05, 2006
Jkt 208001
Mountain over a two-year period to
enhance safety at the project and to
enable DOE to continue safely
conducting operations, scientific testing,
and routine maintenance until such
time as the Nuclear Regulatory
Commission (NRC) decides whether to
authorize construction of a repository.
For purposes of analysis in this EA,
DOE assumes this period could be up to
10 years in duration. This EA does not,
however, consider or include any
actions beyond an NRC decision on
construction authorization. The main
elements of the proposed action are as
follows:
• Construct up to 33 miles of new and
replacement roads (with two options for
an access road)
• Construct up to 20.6 miles of new
138 kV power lines (with two options
for a main power line)
• Develop a Central Operations Area
consisting of six support buildings to
replace existing infrastructure that is
nearing or, in some instances, has
exceeded its expected design and
operational life
• Site, repair, and construct other
facilities and structures for the Yucca
Mountain Project
Under both the proposed action and
the no-action alternative, ongoing
operations, scientific testing, and
routine maintenance would continue to
be considered.
Some portions of the roads evaluated
in this EA cross or run parallel to
floodplains. Therefore, this EA includes
a floodplain and wetlands assessment in
compliance with DOE Floodplain and
Wetland Environmental Review
Requirements (10 CFR Part 1022).
DOE will consider comments received
(see DATES and ADDRESSES, above) in
finalizing the EA. Based on the final EA,
DOE will determine whether to prepare
an environmental impact statement or
issue a finding of no significant impact
if appropriate for the proposed action.
Issued in Washington, DC, on June 29,
2006.
Edward F. Sproat, III,
Director, Office of Civilian Radioactive Waste
Management.
[FR Doc. E6–10563 Filed 7–5–06; 8:45 am]
BILLING CODE 6450–01–P
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
38391
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER06–963–001]
Central Maine Power Company; Notice
of Amendment To Filing
June 21, 2006.
On June 8, 2006, Central Maine Power
filed an answer to a protest providing
additional information in support of its
request recover Regional Transmission
Organization formation costs in its
transmission rates. This additional
information constitutes an amendment
to Central Maine Power’s pending filing
in Docket No. ER06–963–000.
Comment Due Date: 5 p.m. Eastern
Time, June 30, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10486 Filed 7–5–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Surrender of
License and Soliciting Comments,
Motions To Intervene, and Protests
June 21, 2006.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Surrender of
License.
b. Project No.: 2642–013.
c. Date Filed: April 3, 2006.
d. Applicant: Garkane Energy
Cooperative, Inc.
e. Name of Project: Glen Canyon-Paria
Transmission Line Project.
f. Location: The project is located in
Kane County, Utah, and Coconino
County, Arizona. The project occupies
lands of the United States managed by
the Bureau of Reclamation and the
National Park Service.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a—825r.
h. Applicant Contact: Mr. Mike
Avant, Engineering Manager, Garkane
Energy Cooperative, Inc., 1802 South
175 East, Kanab, Utah 84741, (435)644–
5026, Fax (435)644–8120.
i. FERC Contact: Any questions on
this notice should be addressed to Ms.
Patricia W. Gillis at (202) 502–8735.
j. Deadline for filing comments,
motions to intervene, and protests: 30
days from the issuance date of this
notice.
E:\FR\FM\06JYN1.SGM
06JYN1
Agencies
[Federal Register Volume 71, Number 129 (Thursday, July 6, 2006)]
[Notices]
[Page 38391]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-10486]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER06-963-001]
Central Maine Power Company; Notice of Amendment To Filing
June 21, 2006.
On June 8, 2006, Central Maine Power filed an answer to a protest
providing additional information in support of its request recover
Regional Transmission Organization formation costs in its transmission
rates. This additional information constitutes an amendment to Central
Maine Power's pending filing in Docket No. ER06-963-000.
Comment Due Date: 5 p.m. Eastern Time, June 30, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6-10486 Filed 7-5-06; 8:45 am]
BILLING CODE 6717-01-P