Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 37067 [E6-10162]
Download as PDF
Federal Register / Vol. 71, No. 125 / Thursday, June 29, 2006 / Notices
representative of the Applicant
specified in the particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10126 Filed 6–27–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Amendment
of License and Soliciting Comments,
Motions To Intervene, and Protests
jlentini on PROD1PC65 with NOTICES
June 22, 2006.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Capacity
Amendment of License.
b. Project No: 400–044.
c. Date Filed: May 9, 2006.
d. Applicant: Public Service Company
of Colorado.
e. Name of Project: Tacoma-Ames
Hydroelectric Project.
f. Location: The Tacoma Hydroelectric
Project is located on Cascade Creek,
Little Cascade Creek, Elbert Creek, and
the Animas River in La Plata and San
Juan Counties, Colorado. The Tacoma
Project occupies lands of the San Juan
National Forest.
The Ames Hydroelectric Project is
located on the Lake Fork, Howard Fork,
and the South Fork of the San Miguel
River, in San Miguel County, Colorado.
The Ames Project occupies lands of the
Uncompahgre National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Alfred Hughes,
Xcel Energy, 240 Electra Lake Road East,
Durango, Colorado 81301 (970) 247–
8363.
i. FERC Contact: Any questions on
this notice should be addressed to Ms.
VerDate Aug<31>2005
17:03 Jun 28, 2006
Jkt 208001
Linda Stewart at (202) 502–6680, or email address: linda.stewart@ferc.gov.
j. Deadline for filing comments and or
motions: July 21, 2006.
k. Description of Request: The Public
Service Company of Colorado proposes
to replace and realign approximately
900 feet of existing penstock route at the
Ames Project development. The
penstock section to be replaced is
elevated above ground level on a steep
slope below State Highway 145 and is
difficult to maintain in its current
location. The new alignment would
increase overall penstock stability and
limit the potential for future damage.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. Information about this
filing may also be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
37067
filing refers. All documents (original
and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10162 Filed 6–28–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Comments,
Protests, and Motions to Intervene
June 22, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No: 12614–000.
c. Date filed: September 29, 2005.
d. Applicant: Alaska Power &
Telephone Company.
e. Name and Location of Project: The
proposed Ninemile Hydroelectric
Project would be located on the Salmon
River in the Prince of Wales-Outer
Ketchikan Census Area in Ketchikan,
Alaska. The project would occupy lands
of the United States within the Tongass
National Forest.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant Contact: Robert S.
Grimm, President, Alaska Power &
Telephone Co., P.O. Box 3222, Port
Townsend, WA 98368, (360) 385–1733
x120.
E:\FR\FM\29JNN1.SGM
29JNN1
Agencies
[Federal Register Volume 71, Number 125 (Thursday, June 29, 2006)]
[Notices]
[Page 37067]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-10162]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Amendment of License and Soliciting
Comments, Motions To Intervene, and Protests
June 22, 2006.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Non-Capacity Amendment of License.
b. Project No: 400-044.
c. Date Filed: May 9, 2006.
d. Applicant: Public Service Company of Colorado.
e. Name of Project: Tacoma-Ames Hydroelectric Project.
f. Location: The Tacoma Hydroelectric Project is located on Cascade
Creek, Little Cascade Creek, Elbert Creek, and the Animas River in La
Plata and San Juan Counties, Colorado. The Tacoma Project occupies
lands of the San Juan National Forest.
The Ames Hydroelectric Project is located on the Lake Fork, Howard
Fork, and the South Fork of the San Miguel River, in San Miguel County,
Colorado. The Ames Project occupies lands of the Uncompahgre National
Forest.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Alfred Hughes, Xcel Energy, 240 Electra Lake
Road East, Durango, Colorado 81301 (970) 247-8363.
i. FERC Contact: Any questions on this notice should be addressed
to Ms. Linda Stewart at (202) 502-6680, or e-mail address:
linda.stewart@ferc.gov.
j. Deadline for filing comments and or motions: July 21, 2006.
k. Description of Request: The Public Service Company of Colorado
proposes to replace and realign approximately 900 feet of existing
penstock route at the Ames Project development. The penstock section to
be replaced is elevated above ground level on a steep slope below State
Highway 145 and is difficult to maintain in its current location. The
new alignment would increase overall penstock stability and limit the
potential for future damage.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. Information about this filing
may also be viewed on the Commission's Web site at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. You may
also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. All documents (original and eight copies)
should be filed with: Magalie R. Salas, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington DC 20426. A
copy of any motion to intervene must also be served upon each
representative of the Applicant specified in the particular
application.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Magalie R. Salas,
Secretary.
[FR Doc. E6-10162 Filed 6-28-06; 8:45 am]
BILLING CODE 6717-01-P