East Kentucky Power Cooperative; Notice of Intent To Hold Public Scoping Meetings and Prepare an Environmental Assessment, 37038-37039 [06-5803]
Download as PDF
jlentini on PROD1PC65 with NOTICES
37038
Federal Register / Vol. 71, No. 125 / Thursday, June 29, 2006 / Notices
by its members. As such, it provides
wholesale electricity and related
services to five electric distribution
cooperatives and one municipal utility.
SME’s 58,000-square mile (150,220square kilometer) service area
encompasses 22 counties in two states—
Montana and a very small area of
Wyoming. Under its charter, SME is
required to meet the electric power
needs of the cooperative member
systems it serves. Presently, SME meets
all of its power requirements for its
member systems by purchasing power
from two Federal power suppliers—the
Bonneville Power Administration (BPA)
and the Western Area Power
Administration. However, its major
supplier (BPA) will begin to phase out
its sales of power to SME in 2008, and
terminate them entirely by 2011. Thus,
SME does not have the capacity to meet
all of its members’ power needs beyond
roughly 2010.
After considering various ways to
meet those future needs, SME identified
the construction of a new coal-fired
power plant near Great Falls—the
proposed HGS—supplemented with
four wind turbines on the same site, as
its best course of action to meet its
electric energy and related service
needs. An Alternative Evaluation Study
and the DEIS examined a total of 26
alternative means of responding to the
identified purpose and need for the
project. These alternatives were
evaluated in terms of cost-effectiveness,
technical feasibility, and environmental
soundness. Twenty-three alternatives
were considered but dismissed from
more detailed analysis on one or more
of these grounds. The three alternatives
analyzed fully in the Draft EIS are the
No Action Alternative, Proposed Action
(HGS at the Salem Site eight miles east
of Great Falls), and Alternative Site
(building the power plant at a
designated industrial park closer to
Great Falls).
Under the No Action Alternative, the
HGS would not be constructed or
operated to meet the projected 250–MW
base load needs of SME. There would be
no facilities constructed at either the
Salem or Industrial Park sites to meet
the purpose and need.
Under the Proposed Action, a 250–
MW (net) generating station utilizing
CFB technology to burn coal—the
HGS—would be built and operated
approximately eight miles east of Great
Falls. In addition, four 1.5–MW wind
turbines would be constructed and
operated on the same site. Ash from coal
combustion would be disposed of using
approved means on-site. The Proposed
Action would entail potentially
significant adverse impacts on cultural
VerDate Aug<31>2005
17:03 Jun 28, 2006
Jkt 208001
and visual resources, because it is
located on and adjacent to the Great
Falls Portage National Historic
Landmark. Other adverse but nonsignificant impacts of the Proposed
Action include those on soils, water, air,
biological resources, noise,
transportation, farmland and land use,
human health and safety, and
environmental justice. The Proposed
Action would result in moderately
beneficial socioeconomic impacts,
including increased employment
opportunities, total purchases of goods
and services, and an increase in the tax
base.
Utilizing the alternative Industrial
Park Site would result in broadly
similar impacts to those of the Proposed
Action, but with some important
distinctions. No wind turbines are
proposed for the Industrial Park site.
Due to space limitations at the
Industrial Park site, ash from coal
combustion would be hauled off-site to
a licensed landfill for disposal. Adverse
but non-significant impacts of the
Alternative Site include those on soils,
water, air, biological resources, noise,
cultural resources, visual resources,
transportation, farmland and land use,
human health and safety, and
environmental justice. Building and
operating the proposed SME power
plant at the Alternative Site would
produce moderately beneficial
socioeconomic impacts, including
increased employment opportunities,
total purchases of goods and services,
and an increase in the tax base.
Dated: June 22, 2006.
James R. Newby,
Assistant Administrator, Electric Program,
Rural Development.
[FR Doc. 06–5801 Filed 6–28–06; 8:45 am]
BILLING CODE 3410–15–P
DEPARTMENT OF AGRICULTURE
Rural Utilities Service
East Kentucky Power Cooperative;
Notice of Intent To Hold Public
Scoping Meetings and Prepare an
Environmental Assessment
Rural Utilities Service, USDA.
Notice of intent to hold public
scoping meetings and prepare an
environmental assessment (EA).
AGENCY:
ACTION:
SUMMARY: The Rural Utilities Service, an
agency which administers the U.S.
Department of Agriculture’s Rural
Development Programs (USDA Rural
Development) intends to hold public
scoping meetings and prepare an
environmental assessment (EA) related
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
to possible financial assistance to East
Kentucky Power Cooperative, Inc.
(EKPC) of Kentucky for the proposed
construction of approximately 35 miles
of 345 kilovolt (kV) transmission line in
Clark, Madison, and Garrard counties,
KY. The proposed 345 kV transmission
line project would be constructed
within one of several corridors under
consideration. The transmission line
corridors originate at the J.K. Smith
Power Station near the community of
Trapp in Clark County, KY and
terminate at the proposed location of a
new 345 kV switching station. EKPC is
requesting USDA Rural Development to
provide financial assistance for the
proposed project.
DATES: USDA Rural Development will
conduct a scoping meeting in an open
house format from 3 p.m. until 7 p.m.
on Tuesday, July 11, 2006. The purpose
of the meeting is to provide information
and solicit comments for the
preparation of an EA.
ADDRESSES: The public meeting will be
held at the Best Western-Holiday Plaza
located at 100 Eastern Bypass,
Richmond, KY 40475; Phone: 859–623–
9220.
A Macro Corridor Study will be
available for public review at USDA
Rural Development, Utilities Programs,
1400 Independence Avenue, SW.,
Washington, DC 20250–1571; at the
USDA Rural Development’s Web site
https://www.usda.gov/rus/water/ees/
ea.htm; at EKPC’s headquarters office
4775 Lexington Road, Winchester,
Kentucky 40391; and at the following
Public Library locations:
Clark County Library, 370 South Burns
Avenue, Winchester, KY 40391. (859)
744–5661. Julie Maruskin, Director.
Madison County Public Library, 507
West Main St., Richmond, KY 40475.
(859) 623–6704. Sue Hays, Director.
Garrard County Public Library, 101
Lexington St, Lancaster, KY 40444.
(859) 792–3424. Joan Tussey.
Written comments should be sent to:
Stephanie Strength, Environmental
Protection Specialist, USDA, Rural
Development, Utilities Programs,
Engineering and Environmental Staff,
1400 Independence Avenue, SW., Stop
1571, Washington, DC 20250–1571, or email: stephanie.strength@wdc.usda.gov.
FOR FURTHER INFORMATION CONTACT:
Stephanie Strength, Environmental
Protection Specialist, USDA, Rural
Development, Utilities Programs,
Engineering and Environmental Staff,
Stop 1571, 1400 Independence Avenue,
SW., Washington, DC 20250–1571,
telephone (202) 720–0468. Mrs.
Strength’s e-mail address is
stephanie.strength@wdc.usda.gov.
E:\FR\FM\29JNN1.SGM
29JNN1
Federal Register / Vol. 71, No. 125 / Thursday, June 29, 2006 / Notices
EKPC
proposes to construct a 345 kV
transmission line between a source
substation at the J.K. Smith Power
Station in Clark County and a proposed
switching station located near
Lancaster, Kentucky. The proposed line
would be constructed within one of
several corridors under consideration.
The proposed corridors are located in
Clark, Madison, and Garrard counties.
The proposed corridors extend
southwesterly from the J.K. Smith
Power Station near Trapp, KY. From
Trapp, the corridors will extend towards
the communities of Union City,
Redhouse, and White Hall to the north
side of Richmond. From Richmond the
corridors head in the southwesterly
direction near communities such as
Roundhill, Kirksville, Ruthton,
Teatersville, Mcreary, Nina, and Three
Forks towards the proposed location of
a 345kV switching station. The
proposed switching station would be
located west of the community of
Lancaster. The transmission line would
require a right-of-way of 150 feet.
Depending on which route is chosen the
approximate length of the transmission
line would be from 35–37 miles. It is
anticipated that this transmission line
would be in service in late spring to
early summer of 2009.
Alternatives considered by USDA
Rural Development and EKPC include:
(a) No action, (b) alternative
transmission improvements, and (c)
alternative transmission line corridors.
An Electric Alternative Evaluation
and Macro Corridor Study Report,
prepared by EKPC will be presented at
the public scoping meeting. The Report
is available for public review at the
addresses provided in this notice.
Government agencies, private
organizations, and the public are invited
to participate in the planning and
analysis of the proposed project.
Representatives from USDA Rural
Development and EKPC will be
available at the scoping meeting to
discuss USDA Rural Development’s
environmental review process, describe
the project, the need for the project, the
macro corridors under consideration,
and discuss the scope of environmental
issues to be considered, answer
questions, and accept oral and written
comments.
Questions and comments should be
received by USDA Rural Development
in writing by August 10, 2006 to ensure
that they are considered in this
environmental impact determination.
The comments received will be
incorporated into the environmental
analysis EKPC will submit to USDA
Rural Development for review. USDA
jlentini on PROD1PC65 with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Aug<31>2005
17:03 Jun 28, 2006
Jkt 208001
Rural Development will use the
environmental analysis to determine the
significance of the impacts of the project
and may adopt it as its environmental
assessment of the project. USDA Rural
Development’s environmental
assessment of the project would be
available for review and comment for 30
days. Should USDA Rural Development
determine, based on the EA of the
project, that the project would not have
a significant environmental impact, it
will prepare a finding of no significant
impact. Public notification of a finding
of no significant impact would be
published in the Federal Register and in
newspapers with a circulation in the
project area. Any final action by USDA
Rural Development related to the
proposed project will be subject to, and
contingent upon, compliance with
environmental review requirements as
prescribed by the Council on
Environmental Quality and USDA Rural
Development environmental policies
and procedures.
Dated: June 22, 2006.
Mark S. Plank,
Director, Engineering and Environmental
Staff, USDA/Rural Development/Utilities
Programs.
[FR Doc. 06–5803 Filed 6–28–06; 8:45 am]
BILLING CODE 3410–15–P
COMMISSION ON CIVIL RIGHTS
Agenda and Notice of Public Meeting
of the Rhode Island State Advisory
Committee
Notice is hereby given, pursuant to
the provisions of the rules and
regulations of the U.S. Commission on
Civil Rights, that a planning meeting of
the Rhode Island State Advisory
Committee will convene at 12:30 p.m.
and adjourn at 3 p.m. on Thursday, July
20, 2006 at the law offices of Tillinghast
Licht at 10 Weybosset Street in
Providence, Rhode Island. The purpose
of the meeting is for the committee to
review the transcript and summaries of
its May briefing on the disparate
treatment of minority youth in the
education and justice systems in Rhode
Island and to plan future work products
and potential briefings.
Persons desiring additional
information should contact Barbara de
La Viez of the Eastern Regional Office,
202–376–7533 (TTY 202–376–8116).
Hearing impaired persons who will
attend the meeting and require the
services of a sign language interpreter
should contact the Eastern Regional
Office at least 5 (five) working days
before the scheduled date of the
planning meeting. It was not possible to
PO 00000
Frm 00008
Fmt 4703
Sfmt 4703
37039
publish this notice 15 days in advance
of the meeting date because of internal
processing delays.
The meeting will be conducted
pursuant to the provisions of the rules
and regulations of the Commission.
Dated at Washington, DC, June 23, 2006.
Ivy L. Davis,
Acting Chief, Regional Programs
Coordination Unit.
[FR Doc. E6–10240 Filed 6–28–06; 8:45 am]
BILLING CODE 6335–01–P
DEPARTMENT OF COMMERCE
Census Bureau
[Docket No. 060606154–6154–01]
Privacy Act of 1974: System of
Records
U.S. Census Bureau,
Commerce.
ACTION: Notice of New Privacy System
of Records: COMMERCE/CENSUS–10,
American Community Survey.
AGENCY:
SUMMARY: In accordance with the
Privacy Act of 1974, as amended, 5
U.S.C. 552a(e)(4) and (11), the
Department of Commerce is issuing
notice of intent to establish a new
system of records under COMMERCE/
CENSUS–10, American Community
Survey.
DATES: To be considered, written
comments must be submitted on or
before July 31, 2006. Unless comments
are received, the amendments to the
system of records will become effective
as proposed on the date of publication
of a subsequent notice in the Federal
Register.
ADDRESSES: Written comments may be
sent to Gerald W. Gates, Chief Privacy
Officer, U.S. Census Bureau,
Washington, DC 20233. Comments may
be submitted electronically to the
following electronic mail address:
Dir.Privacy.Office@Census.Gov.
FOR FURTHER INFORMATION CONTACT:
Gerald W. Gates, Chief Privacy Officer,
U.S. Census Bureau, Washington, DC
20233, 301–763–2515.
SUPPLEMENTARY INFORMATION: This
notice announces the Department’s
proposal for a new system of records
under the Privacy Act. The system is
entitled ‘‘American Community
Survey.’’ The American Community
Survey (ACS) testing (demonstration
period) occurred between 1996–2004.
During that time period, the survey was
conducted under the authority of Title
13, Section 182 (Periodic Censuses and
Surveys), and therefore is considered to
E:\FR\FM\29JNN1.SGM
29JNN1
Agencies
[Federal Register Volume 71, Number 125 (Thursday, June 29, 2006)]
[Notices]
[Pages 37038-37039]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-5803]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Rural Utilities Service
East Kentucky Power Cooperative; Notice of Intent To Hold Public
Scoping Meetings and Prepare an Environmental Assessment
AGENCY: Rural Utilities Service, USDA.
ACTION: Notice of intent to hold public scoping meetings and prepare an
environmental assessment (EA).
-----------------------------------------------------------------------
SUMMARY: The Rural Utilities Service, an agency which administers the
U.S. Department of Agriculture's Rural Development Programs (USDA Rural
Development) intends to hold public scoping meetings and prepare an
environmental assessment (EA) related to possible financial assistance
to East Kentucky Power Cooperative, Inc. (EKPC) of Kentucky for the
proposed construction of approximately 35 miles of 345 kilovolt (kV)
transmission line in Clark, Madison, and Garrard counties, KY. The
proposed 345 kV transmission line project would be constructed within
one of several corridors under consideration. The transmission line
corridors originate at the J.K. Smith Power Station near the community
of Trapp in Clark County, KY and terminate at the proposed location of
a new 345 kV switching station. EKPC is requesting USDA Rural
Development to provide financial assistance for the proposed project.
DATES: USDA Rural Development will conduct a scoping meeting in an open
house format from 3 p.m. until 7 p.m. on Tuesday, July 11, 2006. The
purpose of the meeting is to provide information and solicit comments
for the preparation of an EA.
ADDRESSES: The public meeting will be held at the Best Western-Holiday
Plaza located at 100 Eastern Bypass, Richmond, KY 40475; Phone: 859-
623-9220.
A Macro Corridor Study will be available for public review at USDA
Rural Development, Utilities Programs, 1400 Independence Avenue, SW.,
Washington, DC 20250-1571; at the USDA Rural Development's Web site
https://www.usda.gov/rus/water/ees/ea.htm; at EKPC's headquarters office
4775 Lexington Road, Winchester, Kentucky 40391; and at the following
Public Library locations:
Clark County Library, 370 South Burns Avenue, Winchester, KY 40391.
(859) 744-5661. Julie Maruskin, Director.
Madison County Public Library, 507 West Main St., Richmond, KY 40475.
(859) 623-6704. Sue Hays, Director.
Garrard County Public Library, 101 Lexington St, Lancaster, KY 40444.
(859) 792-3424. Joan Tussey.
Written comments should be sent to: Stephanie Strength,
Environmental Protection Specialist, USDA, Rural Development, Utilities
Programs, Engineering and Environmental Staff, 1400 Independence
Avenue, SW., Stop 1571, Washington, DC 20250-1571, or e-mail:
stephanie.strength@wdc.usda.gov.
FOR FURTHER INFORMATION CONTACT: Stephanie Strength, Environmental
Protection Specialist, USDA, Rural Development, Utilities Programs,
Engineering and Environmental Staff, Stop 1571, 1400 Independence
Avenue, SW., Washington, DC 20250-1571, telephone (202) 720-0468. Mrs.
Strength's e-mail address is stephanie.strength@wdc.usda.gov.
[[Page 37039]]
SUPPLEMENTARY INFORMATION: EKPC proposes to construct a 345 kV
transmission line between a source substation at the J.K. Smith Power
Station in Clark County and a proposed switching station located near
Lancaster, Kentucky. The proposed line would be constructed within one
of several corridors under consideration. The proposed corridors are
located in Clark, Madison, and Garrard counties. The proposed corridors
extend southwesterly from the J.K. Smith Power Station near Trapp, KY.
From Trapp, the corridors will extend towards the communities of Union
City, Redhouse, and White Hall to the north side of Richmond. From
Richmond the corridors head in the southwesterly direction near
communities such as Roundhill, Kirksville, Ruthton, Teatersville,
Mcreary, Nina, and Three Forks towards the proposed location of a 345kV
switching station. The proposed switching station would be located west
of the community of Lancaster. The transmission line would require a
right-of-way of 150 feet. Depending on which route is chosen the
approximate length of the transmission line would be from 35-37 miles.
It is anticipated that this transmission line would be in service in
late spring to early summer of 2009.
Alternatives considered by USDA Rural Development and EKPC include:
(a) No action, (b) alternative transmission improvements, and (c)
alternative transmission line corridors.
An Electric Alternative Evaluation and Macro Corridor Study Report,
prepared by EKPC will be presented at the public scoping meeting. The
Report is available for public review at the addresses provided in this
notice.
Government agencies, private organizations, and the public are
invited to participate in the planning and analysis of the proposed
project. Representatives from USDA Rural Development and EKPC will be
available at the scoping meeting to discuss USDA Rural Development's
environmental review process, describe the project, the need for the
project, the macro corridors under consideration, and discuss the scope
of environmental issues to be considered, answer questions, and accept
oral and written comments.
Questions and comments should be received by USDA Rural Development
in writing by August 10, 2006 to ensure that they are considered in
this environmental impact determination.
The comments received will be incorporated into the environmental
analysis EKPC will submit to USDA Rural Development for review. USDA
Rural Development will use the environmental analysis to determine the
significance of the impacts of the project and may adopt it as its
environmental assessment of the project. USDA Rural Development's
environmental assessment of the project would be available for review
and comment for 30 days. Should USDA Rural Development determine, based
on the EA of the project, that the project would not have a significant
environmental impact, it will prepare a finding of no significant
impact. Public notification of a finding of no significant impact would
be published in the Federal Register and in newspapers with a
circulation in the project area. Any final action by USDA Rural
Development related to the proposed project will be subject to, and
contingent upon, compliance with environmental review requirements as
prescribed by the Council on Environmental Quality and USDA Rural
Development environmental policies and procedures.
Dated: June 22, 2006.
Mark S. Plank,
Director, Engineering and Environmental Staff, USDA/Rural Development/
Utilities Programs.
[FR Doc. 06-5803 Filed 6-28-06; 8:45 am]