Dominion Transmission, Inc.; Notice of Request Under Blanket Authorization, 36766 [E6-10155]
Download as PDF
36766
Federal Register / Vol. 71, No. 124 / Wednesday, June 28, 2006 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–738–000; ER06–738–
001; ER06–739–000; ER06–739–001]
Cogen Technologies Liden Venture,
L.P.; East Coast Power Liden Holding,
L.L.C.; Notice of Issuance of Order
jlentini on PROD1PC65 with NOTICES
June 22, 2006.
Cogen Technologies Liden Venture,
L.P. and East Coast Power Liden
Holding, L.L.C. (collectively, the Liden
Group) filed applications for marketbased rate authority, with
accompanying rate schedules. The
proposed market-based rate schedules
provide for the sale of energy, capacity
and ancillary services at market-based
rates. The Liden Group also requested
waivers of various Commission
regulations. In particular, the Liden
Group requested that the Commission
grant blanket approval under 18 CFR
part 34 of all future issuances of
securities and assumptions of liability
by the Liden Group.
On June 21, 2006, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approvals of issuances of
securities or assumptions of liability by
the Liden Group should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is July 21, 2006.
Absent a request to be heard in
opposition by the deadline above, the
Liden Group is authorized to issue
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of the Liden Group,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
VerDate Aug<31>2005
18:33 Jun 27, 2006
Jkt 208001
adversely affected by continued
approvals of the Liden Group’s
issuances of securities or assumptions of
liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10163 Filed 6–27–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–386–000]
Dominion Transmission, Inc.; Notice of
Request Under Blanket Authorization
June 20, 2006.
Take notice that on June 13, 2006,
Dominion Transmission, Inc. (DTI), 120
Tredegar Street, Riverside Building,
Richmond, Virginia 23219, filed in
Docket No. CP06–386–000 a request
pursuant to sections 157.205(b) and
157.208(f)(2) of the Commission’s
Regulations under the Natural Gas Act
(18 CFR 157.205 and 157.208) for
authorization to increase the maximum
allowable operating pressure (MAOP) of
LN 257–S at the Sharon Storage
Complex located in Potter County,
Pennsylvania, under the authorization
issued in Docket No. CP82–537–000
pursuant to section 7 of the Natural Gas
Act, all as more fully described in the
request.
This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Any questions concerning this request
may be directed to Matthew R. Bley,
Manager, Gas Transmission Certificates,
Dominion Transmission, Inc., 120
Tredegar Street, Richmond, Virginia
23219, at (804) 819–2877 or Fax (804)
819–2064 or
Matthew_R_Bley@dom.com.
DTI states that because no
compression facilities are available at
the Sharon Storage Complex (Sharon),
Sharon’s pool pressure and inventory
levels rely on pipeline pressures
available from DTI’s State Line and
Quinlan Compressor Stations (Quinlan).
DTI asserts that since TL527, which
connects Quinlan and Sharon has an
MAOP of 1,250 psig, it is necessary to
uprate the MAOP of LN 257–S from
1,100 psig to 1,250 psig in order to
achieve an equilibrium in pressure
between Quinlan and Sharon. DTI
maintains that the proposed MAOP
increase is needed in order to provide
greater operating flexibility and to allow
for the continued and effective
operation of Sharon. DTI contends that
LN 257–S was tested to 2,200 psig when
it was replaced in 1994.
Any person or the Commission’s Staff
may, within 45 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10155 Filed 6–27–06; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\28JNN1.SGM
28JNN1
Agencies
[Federal Register Volume 71, Number 124 (Wednesday, June 28, 2006)]
[Notices]
[Page 36766]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-10155]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP06-386-000]
Dominion Transmission, Inc.; Notice of Request Under Blanket
Authorization
June 20, 2006.
Take notice that on June 13, 2006, Dominion Transmission, Inc.
(DTI), 120 Tredegar Street, Riverside Building, Richmond, Virginia
23219, filed in Docket No. CP06-386-000 a request pursuant to sections
157.205(b) and 157.208(f)(2) of the Commission's Regulations under the
Natural Gas Act (18 CFR 157.205 and 157.208) for authorization to
increase the maximum allowable operating pressure (MAOP) of LN 257-S at
the Sharon Storage Complex located in Potter County, Pennsylvania,
under the authorization issued in Docket No. CP82-537-000 pursuant to
section 7 of the Natural Gas Act, all as more fully described in the
request.
This filing is available for review at the Commission in the Public
Reference Room or may be viewed on the Commission's Web site at https://
www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY,
contact (202) 502-8659.
Any questions concerning this request may be directed to Matthew R.
Bley, Manager, Gas Transmission Certificates, Dominion Transmission,
Inc., 120 Tredegar Street, Richmond, Virginia 23219, at (804) 819-2877
or Fax (804) 819-2064 or Matthew--R--Bley@dom.com.
DTI states that because no compression facilities are available at
the Sharon Storage Complex (Sharon), Sharon's pool pressure and
inventory levels rely on pipeline pressures available from DTI's State
Line and Quinlan Compressor Stations (Quinlan). DTI asserts that since
TL527, which connects Quinlan and Sharon has an MAOP of 1,250 psig, it
is necessary to uprate the MAOP of LN 257-S from 1,100 psig to 1,250
psig in order to achieve an equilibrium in pressure between Quinlan and
Sharon. DTI maintains that the proposed MAOP increase is needed in
order to provide greater operating flexibility and to allow for the
continued and effective operation of Sharon. DTI contends that LN 257-S
was tested to 2,200 psig when it was replaced in 1994.
Any person or the Commission's Staff may, within 45 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and, pursuant to section 157.205 of
the Commission's Regulations under the Natural Gas Act (NGA) (18 CFR
157.205) a protest to the request. If no protest is filed within the
time allowed therefore, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to section 7 of the NGA.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under the ``e-filing''
link. The Commission strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6-10155 Filed 6-27-06; 8:45 am]