Agency Information Collection Activities: Request for Comments for New Information Collection, 36384-36386 [06-5663]

Download as PDF 36384 Federal Register / Vol. 71, No. 122 / Monday, June 26, 2006 / Notices processing, and disposition of petitions for exemption part 11 of Title 14, Code of Federal Regulations (14 CFR), this notice contains a summary of certain petitions seeking relief from specified requirements of 14 CFR. The purpose of this notice is to improve the public’s awareness of, and participation in, this aspect of FAA’s regulatory activities. Neither publication of this notice nor the inclusion or omission of information in the summary is intended to affect the legal status of any petition or its final disposition. DATES: Comments on petitions received must identify the petition docket number involved and must be received on or before July 3, 2006. ADDRESSES: You may submit comments [identified by DOT DMS Docket Number FAA–2006–25068] by any of the following methods: • Web Site: https://dms.dot.gov. Follow the instructions for submitting comments on the DOT electronic docket site. • Fax: 1–202–493–2251. • Mail: Docket Management Facility; U.S. Department of Transportation, 400 Seventh Street, SW., Nassif Building, Room PL–401, Washington, DC 20590– 001. • Hand Delivery: Room PL–401 on the plaza level of the Nassif Building, 400 Seventh Street, SW., Washington, DC, between 9 a.m. and 5 p.m., Monday through Friday, except Federal Holidays. Docket: For access to the docket to read background documents or comments received, go to https:// dms.dot.gov at any time or to Room PL– 401 on the plaza level of the Nassif Building, 400 Seventh Street, SW., Washington, DC, between 9 a.m. and 5 p.m., Monday through Friday, except Federal Holidays. FOR FURTHER INFORMATION CONTACT: Tim Adams (202) 267–8033, Sandy Buchanan-Sumter (202) 267–7271, Shanna Harvey (202) 493–4657, or John Linsenmeyer (202) 267–5174, Office of Rulemaking (ARM–1), Federal Aviation Administration, 800 Independence Avenue, SW., Washington, DC 20591. This notice is published pursuant to 14 CFR 11.85 and 11.91. rwilkins on PROD1PC63 with NOTICES Issued in Washington, DC, on June 21, 2006. Anthony F. Fazio, Director, Office of Rulemaking. Petitions for Exemption [Docket No.: FAA–2006–25068] Petitioner: Experimental Aircraft Association. Section of 14 CFR Affected: 14 CFR 61.325. VerDate Aug<31>2005 17:00 Jun 23, 2006 Jkt 208001 Description of Relief Sought: To permit Experimental Aircraft Association, to allow sport pilots’ who have not received the required ground and flight training, and endorsements to operate within the Wittman Regional Airport (Oshkosh, Wisconsin) Class D airspace during the period July 22, 2006, through July 31, 2006, for the purpose of attending AirVenture 2006. [FR Doc. E6–10036 Filed 6–23–06; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF TRANSPORTATION Federal Highway Administration [Docket No. FHWA–2006–25066] Agency Information Collection Activities: Request for Comments for New Information Collection Federal Highway Administration (FHWA), DOT. ACTION: Notice and request for comments. AGENCY: SUMMARY: The FHWA invites public comments about our intention to request the Office of Management and Budget’s (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We are required to public this notice in the Federal Register by the Paperwork Reduction Act of 1995. DATES: Please submit comments by August 25, 2006. ADDRESSES: You may submit comments identified by DOT DMS Docket Number FHWA–2006–25066 by any of the following methods: • Web Site: https://dms.dot.gov. Follow the instructions for submitting comments on the DOT electronic docket site. • Fax: 1–202–493–2251. • Mail: Docket Management Facility; U.S. Department of Transportation, 400 Seventh Street, SW., Nassif Building, Room PL–401, Washington, DC 20590– 0001. • Hand Delivery: Room PL–401 on the plaza level of the Nassif Building, 400 Seventh Street, SW., Washington, DC, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. Docket: For access to the docket to read background documents or comments received, go to https:// dms.dot.gov at any time or to Room 401 on the plaza level of the Nassif Building, 400 Seventh Street, SW., Washington, DC, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: For questions concerning the Truck Parking PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 Initiatives Grant Program, please contact William F. Mahorney, Office of Freight Management and Operation, HOFM–1, at (202) 366–6817, Department of Transportation, 400 Seventh Street, SW., Washington, DC 20590. Office hours are from 7:45 a.m. to 4:15 p.m., Monday through Friday, except Federal holidays. SUPPLEMENTARY INFORMATION: Title: Truck Parking Initiative. Background The shortage of long-term truck parking on the National Highway System (NHS) is a problem that needs to be addressed. It is nationally recognized that truck drivers frequently cannot find adequate, safe parking in order to obtain rest needed to comply with the Federal Motor Carrier Safety Regulations and ensure safety. Further, parking areas are often designed or maintained for short-term parking only, and as a result, allow parking for limited time periods. Section 1305 of the Safe, Accountable, Flexible, Efficient, and Transportation Equity Act: A Legacy for Users (SAFETEA–LU) directed the Secretary of Transportation to establish a Pilot program to address the long-term parking shortages along the NHS. eligible projects under section 1305 include: 1. Promoting the real-time dissemination of publicly or privately provided commercial motor vehicle parking availability on the NHS using ITS and other means; 2. Opening non-traditional facilities to commercial motor vehicle parking, including inspection and weigh stations, and park and ride facilities; 3. Making capital improvements to public commercial motor vehicle parking facilities currently closed on a seasonal basis to allow the facilities to remain open year round; 4. Constructing turnouts along the NHS to facilitate commercial motor vehicle access to parking facilities, and/ or improving the geometric design of interchanges to improve access to commercial motor vehicle parking facilities; 5. Constructing commercial motor vehicle parking facilities adjacent to commercial truck stops and travel plazas; 6. Constructing safety rest areas that include parking for commercial motor Vehicles. It is the belief of FHWA that given the limited resources available, the broad dissemination of the availability of public or private long-term parking spaces provides the greatest opportunity to maximize the effectiveness of this pilot program. E:\FR\FM\26JNN1.SGM 26JNN1 Federal Register / Vol. 71, No. 122 / Monday, June 26, 2006 / Notices Guidelines and Administration To administer this program for fiscal years 2006 through 2009, the GHWA will collection information necessary to evaluate and rank projects. The information collection is intended to only address the project funding allotted through the program. 1. The Administrator has determined that $5.385 million is available for grants in FY 2006 under section 1305, after obligation limitations. 2. Projects funded under this section shall be treated as projects on a FederalAid System under Chapter 1 of Title 23, United States Code. 3. Grants may be funded at an 80 to 100 percent funding level based on the criteria specified in section 120 of Title 23, U.S. Code. As soon as practicable, a Federal Register Notice will be published with information and guidance relating to the application process. Also, a solicitation letter will be sent to all FHWA Division Offices containing the same information. This information will also be posted on the FHWA Web site, https://www.fhwa.dot.gov/. All applications must be submitted thru a State Department of Transportation to FHWA’s Office of Freight Management and Operations, via the FHWA Division Office in the State in which the application was submitted. Awarded projects will be administered by the applicable State Department of Transportation as a Federal aid grant. rwilkins on PROD1PC63 with NOTICES Information Proposed for Collection Information recommended under SAFETEA–LU and proposed for the current program includes the following: 1. Project Description. The proposal should include a detailed project description, which would include the extent of the long-term truck parking shortage in the corridor/area to be addressed, along with contact information for the project’s primary point of contact, and whether funds are being requested under 120 U.S.C. (b) or (c) or Title 23. Data helping to define the shortage may include truck volume (Average Daily Truck Traffic—ADTT) in the corridor to be addressed, current number of long-term commerical motor vehicle parking spaces, utilization of current long-term parking spaces, driver surveys, observational field studies, proximity to freight loading/unloading facilities, proximity to the NHS, etc. 2. Project Rationale. The proposal should set forth the rationale for the project and should include an analysis and demonstration of how the proposed project will positively affect truck parking, safety, traffic, congestion, or air VerDate Aug<31>2005 17:00 Jun 23, 2006 Jkt 208001 quality in the identified corridor. Examples may include: Advance information on availability of parking that may help to reduce the number of trucks parked on roadsides and increase the utilization of available truck parking spaces, etc. 3. Scope of work. The scope of work should include a complete listing of activities to be funded through the grant; including technology development, information processing, information integration activities, developmental phase activities (planning, feasibility analysis, environmental review, engineering or design work, and other activities), construction, reconstruction, acquisition of real property (including land related to the project and improvements to land), environmental mitigation, construction contingencies, acquisition of equipment, and operational improvements. Also to be included should be a 3-year performance measurement plan that continues beyond the demonstration period of the project. 4. Stakeholder identification. Stakeholder identification should include evidence of prior consultation and/or partnership with affected MPOs, local governments, community groups, private providers of commercial motor vehicle parking, and motorist and trucking organizations. It should include a listing of all public and private partners, and the role each will play in the execution of the project. Consultation examples may include: Memorandums of Agreement, Memorandums of Understanding, contracts, meeting minutes, letters of support/commitment, documentation in a State’s TIPS/STIPS plans, etc. 5. Cost estimate: Applicants should provide a detailed quantification of eligible project costs by activity, and identification of all funding sources that will supplement the grant and be necessary to fully fund the project, and the anticipated dates on which the additional funds are to be made available. Public and private sources of funds (non-Federal commitment) will be considered by FHWA as an in-kind match contributing to the project. State matching funds will be required for projects eligible under 120 U.S.C. (b). 6. Timeline. Applicants should also submit a timeline that includes work to be completed and anticipated funding cycles. Gantt charts are preferred. 7. Environmental process. Applicants should show the timeline for complying with the national Environmental Policy Act (NEPA), if applicable. 8. Project map. Applicants should include a project map consisting of PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 36385 schematic illustrations depicting the project and connecting transportation infrastructure. 9. Proposals should not exceed 20 pages in length. Burden Hours for Information Collection Frequency: Annual. Respondents: The 50 State DOTs and Puerto Rico and the District of Columbia. Estimated Average Burden per Response: Burden hours estimates and discussions are provided for each item presented and required within the application submittal process. • Project Description: 16 hours. • The project description will be submitted through the submitting State agency, in conjunction with local governments, MPO’s and other potential partners. • Project Rationale: 8 hours. Æ Project rationale should include an analysis and demonstration of how the proposed project will positively effect truck parking, safety, traffic congestion, or air quality in the identified corridor. • Scope of Work: 16 hours. Æ A complete listing of activities to be funded through the grant; including technology development, information processing, information integration activities, developmental phase activities (planning, feasibility analysis, environmental review, engineering or design work, and other activities), construction, reconstruction, acquisition of real property (including land related to the project and improvements to land), environmental mitigation, construction contingencies, acquisition of equipment, operational improvements, and a 3-year performance measurement plan that continues beyond the demonstration period of the project. • Stakeholder Identification: 1 hour. Æ Evidence of prior consultation and/ or partnership with affected MPOs, local governments, community groups, private providers of commercial motor vehicle parking, and motorist and trucking organizations. A listing of all public and private partners, and the role each will play in the execution of the project should also be included. • Cost estimate: 4 hours. Æ A detailed quantification of eligible project costs by activity, and an identification of all funding sources that will supplement the grant and be necessary to fully fund the project, and the anticipated dates on which the additional funds are to be made available. Public and private sources of funds (non-federal commitment) will be considered. State matching funds will E:\FR\FM\26JNN1.SGM 26JNN1 36386 Federal Register / Vol. 71, No. 122 / Monday, June 26, 2006 / Notices be required for projects eligible under 120 U.S.C. (b). • Project Timeline: 1 hour 30 minutes. Æ That includes work to be completed and anticipated funding cycles. Gantt charts preferred. • Environmental process: 2 hours. Æ Applicant should show the timeline for complying with the National Environmental Policy Act (NEPA), if applicable. • Project Map: 1 hour. Æ Consisting of schematic illustrations depicting the project and connecting transportation infrastructure. • Contact information of the State DOT, Local Agency or MPO (if applicable), FHWA Division Office. 5 minutes. Æ This requires providing a list of contracts and involves a nominal amount of time. The total amount of time estimated to complete the application is 49 hours and 35 minutes. Estimated Total Annual Burden Hours: 1487 total burden hours. It is estimated 30 applications will be processed annually. Public Comments Invited: You are asked to comment on any aspect of this information collection, including: (1) Whether the proposed collection is necessary for the FHWA’s performance; (2) the accuracy of the estimated burdens; (3) ways for the FHWA to enhance the quality, usefulness, and clarity of the collected information; and (4) ways that the burden could be minimized, including the use of electronic technology, without reducing the quality of the collected information. The agency will summarize and/or include your comments in the request for OMB’s clearance of this information collection. Authority: The Paperwork Reduction Act of 1995; 44 U.S.C. Chapter 35, as amended; and 49 CFR 1.48. James R. Kabel, Chief, Management Programs and Analysis Division. [FR Doc. 06–5663 Filed 6–23–06; 8:45 am] BILLING CODE 4910–22–M DEPARTMENT OF TRANSPORTATION rwilkins on PROD1PC63 with NOTICES Federal Highway Administration [Docket No. FHWA–2006–25067] Emergency OMB Approval for the Truck Parking Facilities Grant Program Federal Highway Administration (FHWA), DOT. AGENCY: VerDate Aug<31>2005 17:00 Jun 23, 2006 Jkt 208001 Emergency OMB Approval Federal Register Notice. ACTION: SUMMARY: The Federal Highway Administration has submitted the following request for emergency processing of a public information collection to the Office of Management and Budget (OMB) for review and clearance under the Paperwork Reduction Act of 1995 (Pub. L. 104–13, 44 U.S.C. Chapters 35). This notice announces that the Information Collection Request (ICR) abstracted below has been forwarded to OMB for review and comment. The ICR describes the nature of the information collection and the expected burden. Comments: Comments should be directed to the Office of Information and Regulatory Affairs, Office of Management and Budget, 725 Seventeenth Street, NW., Washington, DC 20503, Attention: Desk Officer for the Federal Highway Administration. Type of Request: New. DATES: OMB Approval has been requested by July 14th, 2006. FOR FURTHER INFORMATION CONTACT: For questions concerning the Truck Parking Initiatives grant program, please contact William F. Mahorney, Office of Freight Management and Operations, HOFM–1, at (202) 366–6817, Department of Transportation, 400 Seventh Street, SW., Washington, DC 20590. Office hours are from 7:45 a.m. to 4:15 p.m., Monday through Friday, except Federal holidays. SUPPLEMENTARY INFORMATION: Title: Truck Parking Initiative. Background The shortage of long-term truck parking on the National Highway System (NHS) is a problem that needs to be addressed. It is nationally recognized that truck drivers frequently cannot find adequate, safe parking in order to obtain rest needed to comply with the Federal Motor Carrier Safety Regulations and ensure safety. Further, parking areas are often designed or maintained for short-term parking only, and as a result, allow parking for limited time periods. Section 1305 of the Safe, Accountable, Flexible, Efficient, and Transportation Equity Act: A Legacy for Users (SAFETEA–LU) directed the Secretary of Transportation to establish a Pilot program to address the long-term parking shortages along the NHS. Eligible projects under section 1305 include: 1. Promoting the real-time dissemination of publicly or privately provided commercial motor vehicle parking availability on the NHS using ITS and other means; PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 2. Opening non-traditional facilities to commercial motor vehicle parking, including inspection and weigh stations, and park and ride facilities; 3. Making capital improvements to public commercial motor vehicle parking facilities currently closed on a seasonal basis to allow the facilities to remain open year round; 4. Constructing turnouts along the NHS to facilitate commercial motor vehicle access to parking facilities, and/ or improving the geometric design of interchanges to improve access to commercial motor vehicle parking facilities; 5. Constructing commercial motor vehicle parking facilities adjacent to commercial truck stops and travel plazas; and 6. Constructing safety rest areas that include parking for commercial motor vehicles. It is the belief of FHWA that given the limited resources available, the broad dissemination of the availability of public or private long-term parking spaces provides the greatest opportunity to maximize the effectiveness of this pilot program. Guidelines and Administration To administer this program for fiscal years 2006 through 2009, the FHWA will collect information necessary to evaluate and rank projects. The information collection is intended to only address the project funding allotted through the program. 1. The Administrator has determined that $5.384 million is available for grants in FY 2006 under section 1305, after obligation limitations. 2. Projects funded under this section shall be treated as projects on a FederalAid System under Chapter 1 of Title 23, United States Code. 3. Grants may be funded at an 80 to 100 percent funding level based on the criteria specified in section 120 of Title 23, U.S. Code. As soon as practicable after the granting of this Emergency Clearance, a Federal Register Notice will be published with information and guidance relating to the application process. Also, a solicitation letter will be sent to all FHWA Division Offices containing the same information. This information will also be posted on the FHWA Web site. https:// www.fhwa.dot.gov/. All applications must be submitted thru a State Department of Transportation to FHWA’s Office of Freight Management and Operations, via the FHWA’s Division Office in the State in which the application was submitted. Awarded projects will be administered by the E:\FR\FM\26JNN1.SGM 26JNN1

Agencies

[Federal Register Volume 71, Number 122 (Monday, June 26, 2006)]
[Notices]
[Pages 36384-36386]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-5663]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Highway Administration

[Docket No. FHWA-2006-25066]


Agency Information Collection Activities: Request for Comments 
for New Information Collection

AGENCY: Federal Highway Administration (FHWA), DOT.

ACTION: Notice and request for comments.

-----------------------------------------------------------------------

SUMMARY: The FHWA invites public comments about our intention to 
request the Office of Management and Budget's (OMB) approval for a new 
information collection, which is summarized below under SUPPLEMENTARY 
INFORMATION. We are required to public this notice in the Federal 
Register by the Paperwork Reduction Act of 1995.

DATES: Please submit comments by August 25, 2006.

ADDRESSES: You may submit comments identified by DOT DMS Docket Number 
FHWA-2006-25066 by any of the following methods:
     Web Site: https://dms.dot.gov. Follow the instructions for 
submitting comments on the DOT electronic docket site.
     Fax: 1-202-493-2251.
     Mail: Docket Management Facility; U.S. Department of 
Transportation, 400 Seventh Street, SW., Nassif Building, Room PL-401, 
Washington, DC 20590-0001.
     Hand Delivery: Room PL-401 on the plaza level of the 
Nassif Building, 400 Seventh Street, SW., Washington, DC, between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
    Docket: For access to the docket to read background documents or 
comments received, go to https://dms.dot.gov at any time or to Room 401 
on the plaza level of the Nassif Building, 400 Seventh Street, SW., 
Washington, DC, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays.

FOR FURTHER INFORMATION CONTACT: For questions concerning the Truck 
Parking Initiatives Grant Program, please contact William F. Mahorney, 
Office of Freight Management and Operation, HOFM-1, at (202) 366-6817, 
Department of Transportation, 400 Seventh Street, SW., Washington, DC 
20590. Office hours are from 7:45 a.m. to 4:15 p.m., Monday through 
Friday, except Federal holidays.

SUPPLEMENTARY INFORMATION:
    Title: Truck Parking Initiative.

Background

    The shortage of long-term truck parking on the National Highway 
System (NHS) is a problem that needs to be addressed. It is nationally 
recognized that truck drivers frequently cannot find adequate, safe 
parking in order to obtain rest needed to comply with the Federal Motor 
Carrier Safety Regulations and ensure safety. Further, parking areas 
are often designed or maintained for short-term parking only, and as a 
result, allow parking for limited time periods. Section 1305 of the 
Safe, Accountable, Flexible, Efficient, and Transportation Equity Act: 
A Legacy for Users (SAFETEA-LU) directed the Secretary of 
Transportation to establish a Pilot program to address the long-term 
parking shortages along the NHS. eligible projects under section 1305 
include:
    1. Promoting the real-time dissemination of publicly or privately 
provided commercial motor vehicle parking availability on the NHS using 
ITS and other means;
    2. Opening non-traditional facilities to commercial motor vehicle 
parking, including inspection and weigh stations, and park and ride 
facilities;
    3. Making capital improvements to public commercial motor vehicle 
parking facilities currently closed on a seasonal basis to allow the 
facilities to remain open year round;
    4. Constructing turnouts along the NHS to facilitate commercial 
motor vehicle access to parking facilities, and/or improving the 
geometric design of interchanges to improve access to commercial motor 
vehicle parking facilities;
    5. Constructing commercial motor vehicle parking facilities 
adjacent to commercial truck stops and travel plazas;
    6. Constructing safety rest areas that include parking for 
commercial motor Vehicles.
    It is the belief of FHWA that given the limited resources 
available, the broad dissemination of the availability of public or 
private long-term parking spaces provides the greatest opportunity to 
maximize the effectiveness of this pilot program.

[[Page 36385]]

Guidelines and Administration

    To administer this program for fiscal years 2006 through 2009, the 
GHWA will collection information necessary to evaluate and rank 
projects. The information collection is intended to only address the 
project funding allotted through the program.
    1. The Administrator has determined that $5.385 million is 
available for grants in FY 2006 under section 1305, after obligation 
limitations.
    2. Projects funded under this section shall be treated as projects 
on a Federal-Aid System under Chapter 1 of Title 23, United States 
Code.
    3. Grants may be funded at an 80 to 100 percent funding level based 
on the criteria specified in section 120 of Title 23, U.S. Code.
    As soon as practicable, a Federal Register Notice will be published 
with information and guidance relating to the application process. 
Also, a solicitation letter will be sent to all FHWA Division Offices 
containing the same information. This information will also be posted 
on the FHWA Web site, https://www.fhwa.dot.gov/. All applications must 
be submitted thru a State Department of Transportation to FHWA's Office 
of Freight Management and Operations, via the FHWA Division Office in 
the State in which the application was submitted. Awarded projects will 
be administered by the applicable State Department of Transportation as 
a Federal aid grant.

Information Proposed for Collection

    Information recommended under SAFETEA-LU and proposed for the 
current program includes the following:
    1. Project Description. The proposal should include a detailed 
project description, which would include the extent of the long-term 
truck parking shortage in the corridor/area to be addressed, along with 
contact information for the project's primary point of contact, and 
whether funds are being requested under 120 U.S.C. (b) or (c) or Title 
23. Data helping to define the shortage may include truck volume 
(Average Daily Truck Traffic--ADTT) in the corridor to be addressed, 
current number of long-term commerical motor vehicle parking spaces, 
utilization of current long-term parking spaces, driver surveys, 
observational field studies, proximity to freight loading/unloading 
facilities, proximity to the NHS, etc.
    2. Project Rationale. The proposal should set forth the rationale 
for the project and should include an analysis and demonstration of how 
the proposed project will positively affect truck parking, safety, 
traffic, congestion, or air quality in the identified corridor. 
Examples may include: Advance information on availability of parking 
that may help to reduce the number of trucks parked on roadsides and 
increase the utilization of available truck parking spaces, etc.
    3. Scope of work. The scope of work should include a complete 
listing of activities to be funded through the grant; including 
technology development, information processing, information integration 
activities, developmental phase activities (planning, feasibility 
analysis, environmental review, engineering or design work, and other 
activities), construction, reconstruction, acquisition of real property 
(including land related to the project and improvements to land), 
environmental mitigation, construction contingencies, acquisition of 
equipment, and operational improvements. Also to be included should be 
a 3-year performance measurement plan that continues beyond the 
demonstration period of the project.
    4. Stakeholder identification. Stakeholder identification should 
include evidence of prior consultation and/or partnership with affected 
MPOs, local governments, community groups, private providers of 
commercial motor vehicle parking, and motorist and trucking 
organizations. It should include a listing of all public and private 
partners, and the role each will play in the execution of the project. 
Consultation examples may include: Memorandums of Agreement, 
Memorandums of Understanding, contracts, meeting minutes, letters of 
support/commitment, documentation in a State's TIPS/STIPS plans, etc.
    5. Cost estimate: Applicants should provide a detailed 
quantification of eligible project costs by activity, and 
identification of all funding sources that will supplement the grant 
and be necessary to fully fund the project, and the anticipated dates 
on which the additional funds are to be made available. Public and 
private sources of funds (non-Federal commitment) will be considered by 
FHWA as an in-kind match contributing to the project. State matching 
funds will be required for projects eligible under 120 U.S.C. (b).
    6. Timeline. Applicants should also submit a timeline that includes 
work to be completed and anticipated funding cycles. Gantt charts are 
preferred.
    7. Environmental process. Applicants should show the timeline for 
complying with the national Environmental Policy Act (NEPA), if 
applicable.
    8. Project map. Applicants should include a project map consisting 
of schematic illustrations depicting the project and connecting 
transportation infrastructure.
    9. Proposals should not exceed 20 pages in length.

Burden Hours for Information Collection

    Frequency: Annual.
    Respondents: The 50 State DOTs and Puerto Rico and the District of 
Columbia.
    Estimated Average Burden per Response: Burden hours estimates and 
discussions are provided for each item presented and required within 
the application submittal process.
     Project Description: 16 hours.
     The project description will be submitted through the 
submitting State agency, in conjunction with local governments, MPO's 
and other potential partners.
     Project Rationale: 8 hours.
    [cir] Project rationale should include an analysis and 
demonstration of how the proposed project will positively effect truck 
parking, safety, traffic congestion, or air quality in the identified 
corridor.
     Scope of Work: 16 hours.
    [cir] A complete listing of activities to be funded through the 
grant; including technology development, information processing, 
information integration activities, developmental phase activities 
(planning, feasibility analysis, environmental review, engineering or 
design work, and other activities), construction, reconstruction, 
acquisition of real property (including land related to the project and 
improvements to land), environmental mitigation, construction 
contingencies, acquisition of equipment, operational improvements, and 
a 3-year performance measurement plan that continues beyond the 
demonstration period of the project.
     Stakeholder Identification: 1 hour.
    [cir] Evidence of prior consultation and/or partnership with 
affected MPOs, local governments, community groups, private providers 
of commercial motor vehicle parking, and motorist and trucking 
organizations. A listing of all public and private partners, and the 
role each will play in the execution of the project should also be 
included.
     Cost estimate: 4 hours.
    [cir] A detailed quantification of eligible project costs by 
activity, and an identification of all funding sources that will 
supplement the grant and be necessary to fully fund the project, and 
the anticipated dates on which the additional funds are to be made 
available. Public and private sources of funds (non-federal commitment) 
will be considered. State matching funds will

[[Page 36386]]

be required for projects eligible under 120 U.S.C. (b).
     Project Timeline: 1 hour 30 minutes.
    [cir] That includes work to be completed and anticipated funding 
cycles. Gantt charts preferred.
     Environmental process: 2 hours.
    [cir] Applicant should show the timeline for complying with the 
National Environmental Policy Act (NEPA), if applicable.
     Project Map: 1 hour.
    [cir] Consisting of schematic illustrations depicting the project 
and connecting transportation infrastructure.
     Contact information of the State DOT, Local Agency or MPO 
(if applicable), FHWA Division Office. 5 minutes.
    [cir] This requires providing a list of contracts and involves a 
nominal amount of time.
    The total amount of time estimated to complete the application is 
49 hours and 35 minutes.
    Estimated Total Annual Burden Hours: 1487 total burden hours. It is 
estimated 30 applications will be processed annually.
    Public Comments Invited: You are asked to comment on any aspect of 
this information collection, including: (1) Whether the proposed 
collection is necessary for the FHWA's performance; (2) the accuracy of 
the estimated burdens; (3) ways for the FHWA to enhance the quality, 
usefulness, and clarity of the collected information; and (4) ways that 
the burden could be minimized, including the use of electronic 
technology, without reducing the quality of the collected information. 
The agency will summarize and/or include your comments in the request 
for OMB's clearance of this information collection.

    Authority: The Paperwork Reduction Act of 1995; 44 U.S.C. 
Chapter 35, as amended; and 49 CFR 1.48.

James R. Kabel,
Chief, Management Programs and Analysis Division.
[FR Doc. 06-5663 Filed 6-23-06; 8:45 am]